CN106436578A - Constructing method and constructing device for cantilever sectional beam with specially-shaped cross section through short-line matching method - Google Patents

Constructing method and constructing device for cantilever sectional beam with specially-shaped cross section through short-line matching method Download PDF

Info

Publication number
CN106436578A
CN106436578A CN201610729412.8A CN201610729412A CN106436578A CN 106436578 A CN106436578 A CN 106436578A CN 201610729412 A CN201610729412 A CN 201610729412A CN 106436578 A CN106436578 A CN 106436578A
Authority
CN
China
Prior art keywords
section
beam section
mould
end mould
fixing end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610729412.8A
Other languages
Chinese (zh)
Inventor
徐闯
王俊
陈献忠
张长春
高炳荣
林晓波
汪永进
胡存坚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 23rd Bureau Group Co Ltd
Rail Transit Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Original Assignee
China Railway 23rd Bureau Group Co Ltd
Rail Transit Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 23rd Bureau Group Co Ltd, Rail Transit Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd filed Critical China Railway 23rd Bureau Group Co Ltd
Priority to CN201610729412.8A priority Critical patent/CN106436578A/en
Publication of CN106436578A publication Critical patent/CN106436578A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges

Abstract

The invention provides a constructing method and constructing device for a cantilever sectional beam with a specially-shaped cross section through a short-line matching method. The constructing method comprises the following steps of positioning a fixed end mould on one side of a beam section to be cast; performing matching surface positioning on an end mould on the other side of the beam section to be cast through a matching surface of a matching beam section; mounting a bottom mould of the beam section to be cast and a dolly, and adjusting the three-dimensional position of the bottom mould and the three-dimensional position of the matching beam section; mounting a side mould of the beam section to be cast; mounting an inner mould of the beam section to be cast; banding a reinforcing rib framework and hoisting the banded reinforcing rib framework to a mould of the beam section to be cast; performing concrete casting; performing concrete curing; and disassembling the moulds, and performing demoulding. The constructing method disclosed by the invention has the advantages that the splicing accuracy of a matching seam of every two adjacent beam sections is guaranteed; after a new casting beam section is preliminary cured and demoulded, the matching beam section is transported and stored, and the new casting beam section is transported to the position as a new matching beam section for completing the prefabricating the next beam section, so that through the circulation, the prefabricating of a whole-span beam section is completed.

Description

Odd-shaped cross section cantilever beam sections slug matching construction method and device
Technical field
The present invention relates to a kind of urban rail transit elevated circuit beam structure And of Varying Depth odd-shaped cross section " U-shaped+box " The prefabricated construction technology of compound section beam sections.
Background technology
The bridge of First Precast Concrete Segmental Bridges construction is to build up on the Seine of Paris, FRA in 1962 in the world Shoisy-Le-Roi bridge.The French Oleron strait Bridge built up for 1966 employs upstriker first and moves assembling support work Method is constructed.1978, the U.S.'s Long Key bridge being designed by Jean Muller, it is one and adopt external prestressing structure first Precast Concrete Segmental Bridges construction bridge, be also a new generation externally pre-stressed concrete bridge.2000, Bangkok, THA Man Na Highway overpass total length 55km, using prefabricated subsection method assembling construction, only 26 months duration.March calendar year 2001, the clear river in Shanghai Bridge adopts short-line prefabrication section assembling construction technology, is the first bridge block that China uses the construction of section assembling technology. The Su-Tong Brideg building up for 2008 adopts box girder segment assembling construction technology, across footpath 1088m, is the maximum sections of whole world across footpath Assembled cable-stayed bridge.
Assembly beam sections according to the present invention, are two-wire Prestressed Continuous compound cross-section beams, its topmost technological difficulties It is the coupling of each beam section, because beam sections adopt U beam and box beam compound cross-section, and beam bottom radian is that parabolical 1.8 powers become Change, prestressing tendon in entirety, because each segmental height, length dimension are different, therefore how to combine and precise control is this skill The key point of art.
Content of the invention
The purpose of the present invention aims to provide a kind of odd-shaped cross section cantilever beam sections slug matching construction method and device, with Overcome the existing defects of above-mentioned prior art.
The present invention provides a kind of odd-shaped cross section cantilever beam sections slug matching construction method, comprises the following steps,
Step A, the side fixing end mould positioning of beam section to be poured;
Step B, the end mould of the opposite side of beam section to be poured, using the coupling face of coupling beam section, mate face positioning;
Step C, the bed die installing beam section to be poured and chassis, and adjust bed die and the three-dimensional position mating beam section;
Step D, the side form of beam section to be poured is installed;
Step E, the internal model of beam section to be poured is installed;
Step F, tie with reinforcing bar simultaneously lift the mould into beam section to be poured;
Step G, casting concrete;
Step H, concrete curing;
Step I, form removal, the demoulding.
Further, the present invention provides a kind of odd-shaped cross section cantilever beam sections slug matching construction method, can also have Such feature:Wherein in step A, fixing end mould positioning has steps of,
Step A-1, middle line traffic control:Respectively set an axial line control point in the top surface of fixing end mould and bottom surface, during measurement it is desirable to Measurement baseline between this two control point and two measurement towers overlaps.
Step A-2, degree control:Measure upper and lower two center line control point to the horizontal range measuring basic point, and adjust Make it apart from equal it is ensured that vertical axis is vertical;Measurement is symmetricly set on absolute altitude and the plane of fixing end mould flange plate both sides Position control point is to measuring the distance of basic point and adjust and make it equal it is ensured that fixing end mould is in 90 ° with beam section axis to be poured;
Step A-3, levelness control:Measurement is symmetricly set on two absolute altitudes and the plane position of fixing end mould flange plate both sides Put the relative elevation at control point, control fixing end mould top surface levelness.
Further, the present invention provides a kind of odd-shaped cross section cantilever beam sections slug matching construction method, can also have Such feature:Wherein in step B, coupling face positioning has steps of,
Step B-1, the data according to beam section to be poured measurement and beam section to be poured with mate beam section mutual alignment relation, Calculate when pouring beam precast, the position that coupling beam section should be located;
Step B-2, determination coupling beam section mate the positional distance of face and fixing end mould;
Step B-3, according to positional distance, Primary Location is carried out to coupling beam section.
Step B-4, operate the hydraulic jack on the bottom die trolley of beam section to be poured carry out vertical, horizontal and horizontal absolute altitude essence Determine position.
Screw off four spiral spikes on bed die after step B-5, coupling beam section positioning, and make its stress, drop bed die platform Car jack, completes the conversion of fulcrum force.
Further, the present invention provides a kind of odd-shaped cross section cantilever beam sections slug matching construction method, can also have Such feature:Wherein step B also includes, step B-6, repetition measurement coupling beam section control point coordinate, and it is pre- whether detection positioning reaches Provisioning request;Detection is unqualified, re-starts positioning, return to step B-1.
Further, the present invention provides a kind of odd-shaped cross section cantilever beam sections slug matching construction method, can also have Such feature:Wherein step H includes, quiet stop, heat up, constant temperature, cooling four-stage carry out;At 6~10 hours between the quiet stopping time; Temperature rise period, heat up per hour and cannot be greater than 15 DEG C, until rising to 55 DEG C, terminating the temperature rise period, entering the thermostatic control stage; Constant temperature period curing temperature is maintained at 55 ± 5 DEG C;Temperature-fall period:When concrete strength reaches 70%, beam body maintenance can be entered Temperature-fall period, cooling rate cannot be greater than 15 DEG C/h.
Further, the present invention provides a kind of odd-shaped cross section cantilever beam sections slug matching construction method, can also have Such feature:Form removal and the demoulding are carried out when the difference of beam body surface temperature and ambient temperature is not more than 15 DEG C.
Further, the present invention provides a kind of odd-shaped cross section cantilever beam sections slug matching construction method, can also have Such feature:Prefabricated bridge belongs to the U-shaped beam bridge of two-wire prestressed concrete continuous beam, and beam bottom is pressed 1.8 power parabolas and become Change, prestressing tendon in entirety, the section of beam sections is special-shaped compound cross-section.
In addition, the present invention provides a kind of odd-shaped cross section cantilever beam sections slug matching constructing device:Including least one set Pour set of molds;Every group pours set of molds and has:Fixing end mould, the first bed die, the first chassis, the second bed die, the second chassis, side Mould and internal model;The support anchor support that fixing end mould is fixed on ground connects;Two bed dies are separately positioned on two chassis Coupling beam section is had on one bed die;Second bed die and the second chassis are arranged between fixing end mould and coupling beam section;Side form is installed Both sides in fixing end mould and coupling two ends;Internal model is inserted in the mould that fixing end mould, coupling face and side form are formed.
Further, the present invention provides a kind of odd-shaped cross section cantilever beam sections slug matching constructing device, can also have Such feature:Also include crampon, lifting bracket, carrier bar and driving;Lifting bracket moves on the track on ground;Hold Carrier beam is fixed on lifting bracket;Driving is moved on carrier bar, and crampon is fixed in driving;Crampon is by the second bottom Mould and the second chassis hang between the first bed die, fixing end mould.
Further, the present invention provides a kind of odd-shaped cross section cantilever beam sections slug matching constructing device, can also have Such feature:Chassis is provided with hydraulic jack, can be used for adjusting and mate the three-dimensional position of beam section;Pluggable slotting under bed die Enter formula vibrator vibrate based on when pouring as a plug vibrator vibrate.
A kind of odd-shaped cross section cantilever beam sections slug matching construction method and device that the present invention provides, are particularly well-suited to Across based on 50-55m, part of nodes main span reaches 70m to bridge main.For the node bridge for 50-70m for the main span, using sections Assembling technique is constructed.The continuous beam section of section assembling adopts U-shaped and welded box cross column, mainly by box beam top board (i.e. sections U beam Base plate), box beam base plate, box girder web, sections U back plate, sections U web and median ventral plate composition.Main spanning divide 70m, Tri- kinds of specifications of 55m, 50m, 11.44 meters of deck-siding, deck-molding 2.05-4.2 rice, 2.0~3.5 meters of sections partition length.
A kind of odd-shaped cross section cantilever beam sections slug matching construction method and device that the present invention provides, overall plan is Multiple pedestals, the operation simultaneously of each pedestal are set in precasting yard, all beam section are all poured on precast pedestal.When pouring, often Initiate beam section across beam precast and adopt one end fixing end mould, it is outer that one end movable end mould is poured, remaining beam section is then using one end For fixing end mould, the other end is that the previous beam section poured is done coupling beam section and poured into a mould it is ensured that adjacent beam section coupling seam Splicing precision, after newly pouring the preliminary health preserving of beam section, form removal, coupling beam section is transported and is deposited, and is newly poured beam section and transfer to this position Put conduct and newly mate beam section, complete the prefabricated of next beam section, and circulation completes the prefabricated of whole bridge section according to this.Sections beam model Using threedimensional model design, model decomposition is superstructure and substructure two parts, reaches superstructure and share, lower junction Structure list does;Model is adjusted using coordinate control mode it is ensured that precision.Complete the operation of a circulation.
Brief description
Fig. 1 is the structure chart of urban rail transit elevated circuit continuous beam.
Fig. 2 is the beam sections sectional drawing of urban rail transit elevated circuit continuous beam.
Fig. 3 is the structure chart of odd-shaped cross section cantilever beam sections slug matching constructing device.
Fig. 4 is the procedure chart that chassis adjusts bed die height.
Fig. 5 is step A to C construction drawing in odd-shaped cross section cantilever beam sections slug matching construction method.
Fig. 6 is step D construction schematic diagram in odd-shaped cross section cantilever beam sections slug matching construction method.
Fig. 7 is step E to F construction drawing in odd-shaped cross section cantilever beam sections slug matching construction method.
Fig. 8 is to complete step F construction drawing in odd-shaped cross section cantilever beam sections slug matching construction method.
Fig. 9 is step G construction drawing in odd-shaped cross section cantilever beam sections slug matching construction method.
Figure 10 is step H construction drawing in odd-shaped cross section cantilever beam sections slug matching construction method.
Figure 11 is step I form removal construction drawing in odd-shaped cross section cantilever beam sections slug matching construction method.
Figure 12 is step I demoulding construction drawing in odd-shaped cross section cantilever beam sections slug matching construction method.
Specific embodiment
The present invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
As shown in figure 1, in the present embodiment, taking urban rail transit elevated circuit beam structure as a example.As shown in Fig. 2 The beam sections truncation surface of continuous beam is odd-shaped cross section.Beam sections truncation surface top has the new cross-sectional configuration of U 1, bottom single box double room Box-type section construction 2.The new cross-sectional configuration of U 1 side setting shear connector, single box double room box-type section construction 2 bottom have pre- Stress steel Shu Zhangla hole 4.Across based on 50-55m, part of nodes main span reaches 70m to bridge main.For the section for 50-70m for the main span Point bridge, using the construction of section assembling technology.The continuous beam section of section assembling adopts U-shaped and welded box cross column, mainly by case Back plate (i.e. sections U beam base plate), box beam base plate, box girder web, sections U back plate, sections U web and median ventral plate composition. Main spanning divides 70m, 55m, 50m tri- kinds of specifications, 11.44 meters of deck-siding, deck-molding 2.05-4.2 rice, sections partition length 2.0~3.5 Rice.
As shown in figure 3, odd-shaped cross section cantilever beam sections slug matching constructing device, including:Two groups pour set of molds 100th, crampon 200, lifting bracket 300, carrier bar 400 and driving 500.
Lifting bracket 300 can move on the track on ground.Carrier bar 400 is fixed on lifting bracket 300.Driving 500 move on carrier bar 400, and crampon 200 is fixed in driving 500.
Every group pours set of molds 100 and has:Fixing end mould 10, the first bed die 21, the first chassis 31, the second bed die 22, Two chassis 32, side form 40 and internal model 50.Fixing end mould 10 makees panel by δ 10mm steel plate, with the support being fixed on ground after putting more energy into Anchor support connects.Two bed dies are separately positioned on two chassis.Coupling beam section X is had on the first bed die 21, mates beam section X Coupling face as opposite side end mould.Coupling beam section X is placed on the three-dimensional position of setting.Second bed die 22 and the second chassis 32 It is arranged between fixing end mould 10 and coupling beam section X.Side form 40 is arranged on fixing end mould 10 and the both sides at coupling two ends.Internal model 50 In the mould that insertion fixing end mould 10, coupling face and side form 40 are formed.
As shown in figure 4, chassis 30 is provided with perpendicular, horizontal each 4 hydraulic jack, can be used for the three of bed die and coupling beam section Dimension position adjustment.When pouring, under bed die insertion poker vibrator vibrate based on when pouring as a plug vibrator vibrate.
Crampon 200 hangs in the second bed die 22 and the second chassis 32 between first bed die 21, fixing end mould 10.Lifting Suspension hook 200 can take into account multiple movements pouring bed die and chassis in set of molds 100.Arrange two groups in this enforcement and pour set of molds 100, can be arranged according to live place and greater number of pour set of molds 100.Pouring set of molds 100 can longitudinally, laterally square Battle array arrangement.Lifting bracket 300 drives crampon 200 to move forward and backward, and chassis drives crampon 200 to move left and right.Hoisting hook Hook 200 can be also used for framework of steel reinforcement, and the transport pouring the beam section completing.
After completing to pour, first bed die the second bed die, the first chassis can be exchanged with the second chassis.
Odd-shaped cross section cantilever beam sections slug matching construction method comprises the following steps:
Step A, the fixing end mould 10 of beam section Y side to be poured positions.
End mould includes fixing end mould and the coupling face of coupling beam section.Fixing end mould makees panel by δ 10mm steel plate, after putting more energy into The support anchor support being fixed on ground connects.Fixing end mould is provided with shear connector, because prefabricated beam section present position is different, cuts Power bond number amount also occurs difference.Therefore it is designed as bolt to the Partial Shear key needing to change to fix, easy to disassemble.Its remaining part Point then using being welded and fixed.In whole template system, the required precision highest of fixing end mould, control in the following manner:
1) line traffic control in:On fixing end mould, the bottom surface of top surface and inner chamber respectively sets an axial line control point, during measurement, The measurement baseline between this two control point and two measurement towers is asked to overlap.
2) degree control:Measure upper and lower two center line control point to the level measuring basic point (measuring instrument erection point) Distance, and adjust and make it apart from equal it is ensured that vertical axis is vertical (horizontal range is equal).Measurement is symmetricly set on fixing end The absolute altitude of mould flange plate both sides and plan-position control point to the distance measuring basic point and adjust and make it equal it is ensured that fixing end mould (horizontal range is equal) in 90 ° with beam section axis to be poured.
3) levelness controls:Measurement is symmetricly set on two absolute altitudes of fixing end mould flange plate both sides and plan-position controls The relative elevation of point, controls fixing end mould top surface levelness.
Step B, the end mould of current beam section Y opposite side is using the coupling face mating beam section;The coupling face positioning of coupling beam section. Coupling beam section i.e. beam section X of previous preparation.
Coupling beam section positioning is the important ring in the construction of short-term matching beam, takes following steps:
1) survey crew measures according to beam section Y to be poured data and beam section Y to be poured with mate beam section mutual alignment Relation, calculates when pouring beam section Y and be prefabricated by specialized procedure, the position that coupling beam section X should be located.
2) survey crew provides the positional distance that coupling beam section mates face X and fixing end mould 10.
3) the positional distance data that site operation technical staff provides according to survey crew, carries out preliminary to coupling beam section X Positioning.
4) survey crew observation coupling beam section, commanding operates the hydraulic jack on bottom die trolley to carry out vertical, horizontal And horizontal absolute altitude is accurately positioned.
5) screw off four spiral spikes on bed die after coupling beam section X positioning, and make its stress, drop bottom die trolley very heavy Top, completes the conversion of fulcrum force.
6) to monitoring programme, precision reaches requirement and passes through error repetition measurement coupling beam section X control point coordinates, and input data Check and then close up side form, such as do not reach requirement, then jack is reorientated.
Step C, installs bed die 20 and the chassis 30 of beam section Y to be poured, and bed die panel adopts δ 10mm steel plate, vertical, horizontal If ribbed stiffener.Each precast pedestal is equipped with two sets of bed dies (being respectively used to mate beam section and beam section to be poured), mutually exchanges between them Position, adopts bottom die trolley, adopts crampon during shift-in during removal.Bottom die trolley is provided with perpendicular, horizontal each 4 hydraulic jacks Top, can be used for the three-dimensional position adjustment of bed die and coupling beam section.
Step D, installs beam section Y side form 40 to be poured.
Side form adopts the thick quality steel plate of δ 8mm, joins vertical, horizontal rib, is supported by steel structure support, support sets Adjustable diameter and screw adjusting system, can horizontally and vertically be adjusted.Side form moved by the spiral regulating device that support supports and Positioning, after the completion of positioning, top opening and bottom by pull bar to drawing.Side form stent bolt is connected on the built-in fitting on pedestal basis.
Step E, installs the internal model 50 of beam section Y to be poured.
Internal model is made up of δ 8mm steel plate, if ribbed stiffener.In order to adapt to the change of chamber size and convenient assembly and disassembly behaviour in each beam section Make, internal model is designed to the gang form of fritter, gang form is divided into calibrated bolck and special-shaped block, needs to carry out according to each beam precast Combination.Internal model is mainly made up of side form in top board bed die, web and angle mould, with bolts between each template, by adjustable support Bar supports.Whole inner formwork system is fixed on crossbeam, can complete vertical direction by hydraulic system and stretch and horizontal unlatching, closure, And integrally hung away by straddle truck.
Step F, tie with reinforcing bar simultaneously lifts into pouring mould, and for preventing from deforming, framework of steel reinforcement adopts special hanger many Point balancing lifting, before handling, adjusting each suspension centre lifting rope makes its uniform force.For ensureing the accurate of corrugated tube position and docking port, The boring of corrugated tube design attitude is pressed on fixing end mould, the method being bolted duroplasts plug carrys out precise control corrugated pipe orifice Position.At coupling face, to coupling beam section corresponding corrugated tube PP-R internal lining pipe, beam section to be poured guarantees that its connection is straight.
Step G, casting concrete, to carry out second pouring beam base plate using tumbling barrel from the direct cloth of top board square hole hollowing out Material cast.To there is the beam section of standard inner formwork system then using hanging tumbling barrel in fixing end mould top surface and be delivered to base plate through chute On poured.Based on during bottom slab concreting, vibrator vibrates as a plug, in the reinforcing bar compact district of base plate and web junction, Base plate two ends respectively install 4 attached vibrator auxiliary additional and vibrate.Web adopts the symmetrical blanking in both sides, and vibrate vibrator as a plug Based on vibrating, can vibrate by form vibrator auxiliary in web bottom.For the beam section having base plate anchor block, need to especially note Meaning base plate anchor block inner concrete vibrate it is ensured that this position concrete compaction.
Step H, concrete curing, steam curing must strictly divide quiet stop, heat up, constant temperature, the four-stage such as cooling are carried out. Different according to temperature, (start timing after beam body concrete all irrigates completion) between the quiet stopping time different, about little 6~10 When;Temperature rise period, heat up per hour and cannot be greater than 15 DEG C, until rising to 55 DEG C, terminating the temperature rise period, entering thermostatic control rank Section;Constant temperature period curing temperature is maintained at 55 ± 5 DEG C, continues curing time depending on concrete strength development and schedule requirement; Temperature-fall period:The temperature-fall period of beam body maintenance when concrete strength reaches 70%, can be entered, cooling rate cannot be greater than 15 DEG C/ h.
Step I, form removal, the demoulding.
1) form removal:
Remove the side form 40 outside fine strain of millet section Y, beam section X and fine strain of millet section Y will be mated and separate, and remove internal model 50.
During form removal, beam body surface temperature and natural environment temperature-difference are not more than 15 DEG C, and beam body band mould time delay otherwise should be allowed to drop Temperature.
2) demoulding:
By beam section Y and fixing end moulding/demoulding, when the difference of beam body surface temperature and ambient temperature is not more than 15 DEG C, just allow de- Mould.Fine strain of millet section X is transported through, deposits.
The end mould of the fine strain of millet section that beam section Y pours as the next one, repeat step A to step J circulates preparation fine strain of millet section.
The invention discloses a kind of odd-shaped cross section cantilever beam sections slug matching construction method and device, it is particularly well-suited to The transverse section of beam sections is compound cross-section, is combined by the U-shaped section in top+bottom single box double room box-type section, due to box Section-bottom presses second-degree parabola change along span direction, therefore for a variable cross-section abnormity combination beam.The applying of bed rearrangement bridge Work method is that a Continuous Bridge is divided into several sections, using in factory's concentration pre-casting, transports to scene through shear connector It is spliced to form beam structure with tensioning steel bundle, bridge is urban track traffic two-wire continuous U beam.Beam sections prefabrication Method adopts short-term pedestal matching method prefabricated construction technology, and the way of short-term pedestal matching method is that the perfusion of each beam sections all exists Carry out in same certain moduli plate, its one end is the end mould of a fixation, the other end is to pour beam section, and the position of beam to be irrigated is not Become, obtain a kind of construction method of flat, the vertical curve set arbitrarily, this construction by the geometric position that adjustment has irrigated matching beam Method has that floor space is little, short construction period;Beam body prefabricated and bridge substructure construction can parallel operations, greatly shorten The bridge construction duration;Beam sections concrete shrinkage and creep is little, and after completion, the linear change of beam body is little;The segment girder precast life of batch production Produce, be easy to organization of production and the control of integral construction quality;Beam sections concentration pre-casting produces, beneficial to protection periphery ecological environment, Make the harmful effect that engineering is brought reach minimum degree, and while reducing difficulty of construction, ensure that the height of construction Safety.

Claims (10)

1. a kind of odd-shaped cross section cantilever beam sections slug matching construction method it is characterised in that:Comprise the following steps,
Step A, the side fixing end mould positioning of beam section to be poured;
Step B, the end mould of the opposite side of beam section to be poured, using the coupling face of coupling beam section, mate face positioning;
Step C, the bed die installing beam section to be poured and chassis, and adjust bed die and the three-dimensional position mating beam section;
Step D, the side form of beam section to be poured is installed;
Step E, the internal model of beam section to be poured is installed;
Step F, tie with reinforcing bar simultaneously lift the mould into beam section to be poured;
Step G, casting concrete;
Step H, concrete curing;
Step I, form removal, the demoulding.
2. odd-shaped cross section cantilever beam sections slug matching construction method according to claim 1 it is characterised in that:Wherein In step A, fixing end mould positioning has steps of,
Step A-1, middle line traffic control:Respectively set an axial line control point in the top surface of fixing end mould and bottom surface, during measurement it is desirable to this two Measurement baseline between individual control point and two measurement towers overlaps.
Step A-2, degree control:Measure upper and lower two center line control point to the horizontal range measuring basic point, and adjust and make it Apart from equal it is ensured that vertical axis is vertical;Measurement is symmetricly set on absolute altitude and the plan-position of fixing end mould flange plate both sides Control point is to measuring the distance of basic point and adjust and make it equal it is ensured that fixing end mould is in 90 ° with beam section axis to be poured;
Step A-3, levelness control:Measurement is symmetricly set on two absolute altitudes and the plan-position control of fixing end mould flange plate both sides The relative elevation of system point, controls fixing end mould top surface levelness.
3. odd-shaped cross section cantilever beam sections slug matching construction method according to claim 1 it is characterised in that:Wherein In step B, coupling face positioning has steps of,
Step B-1, the data according to beam section to be poured measurement and beam section to be poured with mate beam section mutual alignment relation, calculating Go out when pouring beam precast, the position that coupling beam section should be located;
Step B-2, determination coupling beam section mate the positional distance of face and fixing end mould;
Step B-3, according to positional distance, Primary Location is carried out to coupling beam section.
Step B-4, to operate the hydraulic jack on the bottom die trolley of beam section to be poured to carry out vertical, horizontal and horizontal absolute altitude accurately fixed Position.
Screw off four spiral spikes on bed die after step B-5, coupling beam section positioning, and make its stress, drop bottom die trolley thousand Jin top, completes the conversion of fulcrum force.
4. odd-shaped cross section cantilever beam sections slug matching construction method according to claim 3 it is characterised in that:Wherein Step B also includes,
Step B-6, repetition measurement coupling beam section control point coordinate, whether detection positioning reaches pre-provisioning request;Detection is unqualified, again enters Row positioning, return to step B-1.
5. odd-shaped cross section cantilever beam sections slug matching construction method according to claim 1 it is characterised in that:Wherein Step H includes, quiet stop, heat up, constant temperature, cooling four-stage carry out;At 6~10 hours between the quiet stopping time;Temperature rise period, per hour Intensification cannot be greater than 15 DEG C, until rising to 55 DEG C, terminating the temperature rise period, entering the thermostatic control stage;Constant temperature period maintenance temperature Degree is maintained at 55 ± 5 DEG C;Temperature-fall period:The temperature-fall period of beam body maintenance, cooling speed when concrete strength reaches 70%, can be entered Degree cannot be greater than 15 DEG C/h.
6. odd-shaped cross section cantilever beam sections slug matching construction method according to claim 1 it is characterised in that:Form removal Carry out when the difference of beam body surface temperature and ambient temperature is not more than 15 DEG C with the demoulding.
7. odd-shaped cross section cantilever beam sections slug matching construction method according to claim 1 it is characterised in that:Prefabricated Bridge belong to the U-shaped beam bridge of two-wire prestressed concrete continuous beam, beam bottom press 1.8 power parabolas change, full prestressing with bond Bundle, the section of beam sections is special-shaped compound cross-section.
8. a kind of odd-shaped cross section cantilever beam sections slug matching constructing device it is characterised in that:Including least one set pours mould Tool group;
Every group pours set of molds and has:Fixing end mould, the first bed die, the first chassis, the second bed die, the second chassis, side form and interior Mould;
The support anchor support that fixing end mould is fixed on ground connects;Two bed dies are separately positioned on the first bed die on two chassis On there is coupling beam section;Second bed die and the second chassis are arranged between fixing end mould and coupling beam section;Side form is arranged on fixation End mould and the both sides at coupling two ends;Internal model is inserted in the mould that fixing end mould, coupling face and side form are formed.
9. odd-shaped cross section cantilever beam sections slug matching constructing device according to claim 8 it is characterised in that:Also wrap Include crampon, lifting bracket, carrier bar and driving;
Lifting bracket moves on the track on ground;Carrier bar is fixed on lifting bracket;Driving is moved on carrier bar, lifting Suspension hook is fixed in driving;
Crampon hangs in the second bed die and the second chassis between the first bed die, fixing end mould.
10. odd-shaped cross section cantilever beam sections slug matching constructing device according to claim 8 it is characterised in that:
Chassis is provided with hydraulic jack, can be used for adjusting and mate the three-dimensional position of beam section;
Under bed die pluggable poker vibrator vibrate based on when pouring as a plug vibrator vibrate.
CN201610729412.8A 2016-08-25 2016-08-25 Constructing method and constructing device for cantilever sectional beam with specially-shaped cross section through short-line matching method Pending CN106436578A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610729412.8A CN106436578A (en) 2016-08-25 2016-08-25 Constructing method and constructing device for cantilever sectional beam with specially-shaped cross section through short-line matching method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610729412.8A CN106436578A (en) 2016-08-25 2016-08-25 Constructing method and constructing device for cantilever sectional beam with specially-shaped cross section through short-line matching method

Publications (1)

Publication Number Publication Date
CN106436578A true CN106436578A (en) 2017-02-22

Family

ID=58183027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610729412.8A Pending CN106436578A (en) 2016-08-25 2016-08-25 Constructing method and constructing device for cantilever sectional beam with specially-shaped cross section through short-line matching method

Country Status (1)

Country Link
CN (1) CN106436578A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476191A (en) * 2017-07-17 2017-12-15 中交二航局第二工程有限公司 Slug matching installs the anchoring temporarily method of pier top box beam
CN108312307A (en) * 2018-02-24 2018-07-24 佛山市知而行信息科技有限公司 The mold system of short-line prefabrication beam sections
CN108385504A (en) * 2018-02-07 2018-08-10 中交公局第二工程有限公司 A kind of variable cross-section beam sections short-term precast assembly method
CN108385527A (en) * 2018-02-07 2018-08-10 中交公局第二工程有限公司 A kind of superelevation runoff section segment girder precast measures and monitoring method
CN108412196A (en) * 2018-05-16 2018-08-17 中铁十局集团第五工程有限公司 The construction method of the general roof plate template component of continuous beam and continuous beam top plate
CN108978473A (en) * 2018-07-13 2018-12-11 广州瀚阳工程咨询有限公司 A kind of construction method using short-line prefabrication bridge subsection
CN109555027A (en) * 2019-01-26 2019-04-02 中铁三局集团广东建设工程有限公司 A kind of beam sections concrete casting system and its construction method
CN111452208A (en) * 2020-06-02 2020-07-28 中交二航局第四工程有限公司安徽混凝土装配化构件分公司 Section beam prefabricating assembly line adopting stub matching method
CN112305989A (en) * 2020-11-04 2021-02-02 山东淄博环宇桥梁模板有限公司 Automatic adjusting control system and control method for segment prefabricated assembly beam template
CN113293704A (en) * 2021-05-21 2021-08-24 中铁十六局集团第三工程有限公司 End template of super-tonnage precast box girder and installation method
CN113360971A (en) * 2021-05-12 2021-09-07 同济大学建筑设计研究院(集团)有限公司 Semi-automatic design method and system for structural framework of steel-concrete composite beam
CN113370380A (en) * 2021-05-21 2021-09-10 中交三航局第二工程有限公司 Novel prefabricating process for producing suspension tunnel pipe joint
CN113524430A (en) * 2021-06-10 2021-10-22 中铁隧道局集团建设有限公司 Method for prefabricating bridge deck by using stub matching method
CN113858412A (en) * 2021-09-23 2021-12-31 中交第二航务工程局有限公司 Segment beam short line matching prefabrication intelligent measurement and control system and use method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08142034A (en) * 1994-11-24 1996-06-04 Kumagai Gumi Co Ltd Automatic control device of form for short line match casting
JP2005171638A (en) * 2003-12-11 2005-06-30 Oriental Construction Co Ltd Displacement adjusting method in overhanging installing construction method for concrete girder
CN101028726A (en) * 2006-09-21 2007-09-05 中铁大桥局股份有限公司 Precast PC case beam process by short-line method
CN101368373A (en) * 2008-09-19 2009-02-18 中铁大桥局股份有限公司 Long continuous structural steel box beam or combination box beam construction method
CN101713169A (en) * 2008-10-06 2010-05-26 中交第三航务工程局有限公司 Method for manufacturing segmental box girder
CN101713168A (en) * 2008-10-06 2010-05-26 中交第三航务工程局有限公司 Process for mounting template for manufacturing sectional box girders
CN102259388A (en) * 2011-08-17 2011-11-30 中铁二十三局集团轨道交通工程有限公司 Construction process for precasting prestressed pretensioned concrete U-shaped beams in rail transit
CN102733311A (en) * 2012-07-02 2012-10-17 中铁大桥局集团武汉桥梁科学研究院有限公司 Line shape control method for short line method segment prefabrication construction
CN103422443A (en) * 2013-08-22 2013-12-04 中交第三航务工程局有限公司 Frame culvert segment longline multidirectional matching precasting process and frame culvert segment die plate system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08142034A (en) * 1994-11-24 1996-06-04 Kumagai Gumi Co Ltd Automatic control device of form for short line match casting
JP2005171638A (en) * 2003-12-11 2005-06-30 Oriental Construction Co Ltd Displacement adjusting method in overhanging installing construction method for concrete girder
CN101028726A (en) * 2006-09-21 2007-09-05 中铁大桥局股份有限公司 Precast PC case beam process by short-line method
CN101368373A (en) * 2008-09-19 2009-02-18 中铁大桥局股份有限公司 Long continuous structural steel box beam or combination box beam construction method
CN101713169A (en) * 2008-10-06 2010-05-26 中交第三航务工程局有限公司 Method for manufacturing segmental box girder
CN101713168A (en) * 2008-10-06 2010-05-26 中交第三航务工程局有限公司 Process for mounting template for manufacturing sectional box girders
CN102259388A (en) * 2011-08-17 2011-11-30 中铁二十三局集团轨道交通工程有限公司 Construction process for precasting prestressed pretensioned concrete U-shaped beams in rail transit
CN102733311A (en) * 2012-07-02 2012-10-17 中铁大桥局集团武汉桥梁科学研究院有限公司 Line shape control method for short line method segment prefabrication construction
CN103422443A (en) * 2013-08-22 2013-12-04 中交第三航务工程局有限公司 Frame culvert segment longline multidirectional matching precasting process and frame culvert segment die plate system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
艾宗良: "箱梁短线匹配预制及悬臂拼装施工技术研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476191A (en) * 2017-07-17 2017-12-15 中交二航局第二工程有限公司 Slug matching installs the anchoring temporarily method of pier top box beam
CN107476191B (en) * 2017-07-17 2018-10-23 中交二航局第二工程有限公司 Slug matching installs the anchoring temporarily method of pier top box beam
CN108385504A (en) * 2018-02-07 2018-08-10 中交公局第二工程有限公司 A kind of variable cross-section beam sections short-term precast assembly method
CN108385527A (en) * 2018-02-07 2018-08-10 中交公局第二工程有限公司 A kind of superelevation runoff section segment girder precast measures and monitoring method
CN108312307A (en) * 2018-02-24 2018-07-24 佛山市知而行信息科技有限公司 The mold system of short-line prefabrication beam sections
CN108412196A (en) * 2018-05-16 2018-08-17 中铁十局集团第五工程有限公司 The construction method of the general roof plate template component of continuous beam and continuous beam top plate
CN108412196B (en) * 2018-05-16 2023-05-23 中铁十一局集团第五工程有限公司 Roof template assembly universal for continuous beam and construction method of continuous beam roof
CN108978473A (en) * 2018-07-13 2018-12-11 广州瀚阳工程咨询有限公司 A kind of construction method using short-line prefabrication bridge subsection
CN109555027A (en) * 2019-01-26 2019-04-02 中铁三局集团广东建设工程有限公司 A kind of beam sections concrete casting system and its construction method
CN109555027B (en) * 2019-01-26 2023-12-26 中铁三局集团广东建设工程有限公司 Segmental beam concrete pouring system and construction method thereof
CN111452208B (en) * 2020-06-02 2021-07-13 中交二航局第四工程有限公司 Section beam prefabricating assembly line adopting stub matching method
CN111452208A (en) * 2020-06-02 2020-07-28 中交二航局第四工程有限公司安徽混凝土装配化构件分公司 Section beam prefabricating assembly line adopting stub matching method
CN112305989A (en) * 2020-11-04 2021-02-02 山东淄博环宇桥梁模板有限公司 Automatic adjusting control system and control method for segment prefabricated assembly beam template
CN112305989B (en) * 2020-11-04 2023-09-29 山东淄博环宇桥梁模板有限公司 Automatic adjustment control system and control method for segmental prefabrication assembly beam templates
CN113360971A (en) * 2021-05-12 2021-09-07 同济大学建筑设计研究院(集团)有限公司 Semi-automatic design method and system for structural framework of steel-concrete composite beam
CN113293704A (en) * 2021-05-21 2021-08-24 中铁十六局集团第三工程有限公司 End template of super-tonnage precast box girder and installation method
CN113370380A (en) * 2021-05-21 2021-09-10 中交三航局第二工程有限公司 Novel prefabricating process for producing suspension tunnel pipe joint
CN113293704B (en) * 2021-05-21 2022-12-06 中铁十六局集团第三工程有限公司 End template of super-tonnage precast box girder and installation method
CN113524430A (en) * 2021-06-10 2021-10-22 中铁隧道局集团建设有限公司 Method for prefabricating bridge deck by using stub matching method
CN113858412A (en) * 2021-09-23 2021-12-31 中交第二航务工程局有限公司 Segment beam short line matching prefabrication intelligent measurement and control system and use method thereof
CN113858412B (en) * 2021-09-23 2022-11-11 中交第二航务工程局有限公司 Segment beam short line matching prefabrication intelligent measurement and control system and use method thereof
WO2023045402A1 (en) * 2021-09-23 2023-03-30 中交第二航务工程局有限公司 Intelligent measurement and control system for short-line matching prefabrication of segmental girder, and use method thereof

Similar Documents

Publication Publication Date Title
CN106436578A (en) Constructing method and constructing device for cantilever sectional beam with specially-shaped cross section through short-line matching method
CN108914785B (en) Hanging basket cantilever pouring construction method of multi-chamber corrugated steel web continuous beam bridge
CN102691270B (en) Efficient and quick movable mould frame
CN112060307A (en) Segment box girder short line matching control and prefabricating construction method
CN101481902A (en) V type pier inclined leg combined type support for continuous rigid frame bridge and layered cast-in-situ construction method
CN106827193B (en) Multiple box culvert makes mold and the method using three hole box culvert molds production box culvert
CN105365036A (en) Process for mounting template for manufacturing sectional box girders
CN105269664A (en) Installation technique for segment box beam manufacturing formwork
CN107386246B (en) A kind of lock chamber wall Construction Through Form on Traveler method
CN109555027A (en) A kind of beam sections concrete casting system and its construction method
CN110029580A (en) A kind of length knot conjunction matching prefabricated subsection unit construction bridge panel construction method
CN110700105B (en) Synchronous construction method for high pier column and tie beam and template used in same
CN113266397A (en) Hydraulic formwork trolley for small-section chamber lining and construction method
CN109505271A (en) A kind of complete construction of mobile hydraulic trolley arch culvert
CN110374012A (en) A kind of prefabricated engineering method of T beam original position Support Method
CN113339055B (en) Filling body pouring and curing device and using method thereof
KR20020035038A (en) mould form apparatus for box girder of ILM and method of construction for box-girder
CN108049316A (en) Concrete high pier construction plate device
CN114717968A (en) Construction method for main tower of cable-stayed bridge
CN113059685A (en) Precast beam construction system and construction method
CN202214674U (en) Straddle-type track traffic engineering support saddle anchoring box installation and adjusting device
CN112240111A (en) Subway prefabricated assembly column type inspection pit structure and construction method
CN111206493A (en) Construction method for improving yield of pier stud steel bar protection layer and template device used by same
CN115162165B (en) Construction method for closing middle tower column of highway-railway dual-purpose river-crossing A-type cable-stayed bridge
CN216040734U (en) Continuous rigid frame side span straight-line segment hanging basket cast-in-place device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170222