- Prior art keywords
- expander roll
- drive mechanism
- workbench
- expander
- guide rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D39/00—Application of procedures in order to connect objects or parts, e.g. coating with sheet metal otherwise than by plating; Tube expanders
- B21D39/08—Tube expanders
- B21D39/20—Tube expanders with mandrels, e.g. expandable
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D53/00—Making other particular articles
- B21D53/02—Making other particular articles heat exchangers or parts thereof, e.g. radiators, condensers fins, headers
- B21D53/06—Making other particular articles heat exchangers or parts thereof, e.g. radiators, condensers fins, headers of metal tubes
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Heat Treatment Of Articles (AREA)
Abstract
The invention discloses a kind of pipe expanding equipment for finned tube, including:Support frame, tube expansion head, the first drive mechanism and the second drive mechanism.Tube expansion head includes expander roll workbench and expander roll mounting seat.Expander roll workbench is slidably matched with support frame.Expander roll mounting seat is slidably matched with expander roll workbench.First drive mechanism is used to drive expander roll mounting seat to slide relative to expander roll workbench, and the second drive mechanism is used to drive expander roll workbench to slide relative to support frame.The above-mentioned pipe expanding equipment for finned tube, expander roll workbench can move under the driving of the second drive mechanism relative to support frame, with closer or far from the workpiece placement station for placing the heat transmission equipment for treating tube expansion processing.So, during loading and unloading, by the second drive mechanism expander roll workbench can be driven, so as to facilitate staff's loading and unloading, operating efficiency to be improved away from workpiece placement station.
Description
Technical field
The present invention relates to a kind of pipe expanding equipment, more particularly, to a kind of pipe expanding equipment for finned tube.
Background technology
The tube expansion head of traditional pipe expanding equipment is closer to put for placing the workpiece for the heat transmission equipment for treating tube expansion processing
Platform is put, and tube expansion head can not integrally be away from the workpiece placement station direction movement for placing the heat transmission equipment for treating tube expansion processing, such as
After this causes the finned tube of heat transmission equipment to complete tube expansion operation, it has not been convenient to which staff changes heat exchange in workpiece placement station and set
Standby, operating efficiency is relatively low.
The content of the invention
Based on this, the defects of the invention reside in prior art is overcome, there is provided a kind of pipe expanding equipment for finned tube, it is just
In staff's loading and unloading, operating efficiency can be improved.
Its technical scheme is as follows:A kind of pipe expanding equipment for finned tube, including:Support frame;Tube expansion head, the support
Frame includes chassis, support and lifting seat, and the chassis coordinates with the bracket slide, and the lifting seat is matched somebody with somebody with the bracket slide
Close;The tube expansion head includes expander roll workbench and expander roll mounting seat, and the expander roll workbench is slidably matched with support frame as described above,
The expander roll mounting seat is used to install expander roll, and the expander roll mounting seat is slidably matched with the expander roll workbench;First driving machine
Structure and the second drive mechanism, first drive mechanism are used to drive the expander roll mounting seat to slide relative to the expander roll workbench
Dynamic, second drive mechanism is used to drive the expander roll workbench to slide relative to support frame as described above;Also include the 3rd driving
Mechanism and the 4th drive mechanism, the 3rd drive mechanism are used to drive the support to slide relative to the chassis, and described the
Four drive mechanisms are used to drive the lifting seat relative to the bracket slide.
In one of the embodiments, the expander roll workbench is provided with the first guide rail, and the expander roll mounting seat is provided with and institute
The first sliding part that the first guide rail is slidably matched is stated, first sliding part is installed on first guide rail;Described first drives
Motivation structure is used to drive the expander roll mounting seat to slide along first guide rail direction relative to the expander roll workbench.
In one of the embodiments, the expander roll workbench is provided with the second guide rail, and support frame as described above is provided with and described the
The second sliding part that two guide rails are slidably matched, second sliding part are installed on second guide rail;Second driving machine
Structure is used to drive the expander roll workbench to slide along second guide rail direction relative to support frame as described above.
In one of the embodiments, support frame as described above includes chassis, support and lifting seat, the chassis and the support
It is slidably matched, the lifting seat coordinates with the bracket slide;Also include the 3rd drive mechanism and the 4th drive mechanism, described the
Three drive mechanisms are used to drive the support to slide relative to the chassis, and the 4th drive mechanism is used to drive the lifting
Seat is relative to the bracket slide.
In one of the embodiments, the chassis is provided with the 3rd guide rail, and the support is provided with to be slided with the 3rd guide rail
Dynamic the 3rd sliding part coordinated, the 3rd sliding part are installed on the 3rd guide rail;3rd drive mechanism is used to drive
The support is moved to slide along the 3rd guide rail direction relative to the chassis.
In one of the embodiments, the support is provided with the 4th guide rail, and the lifting seat is provided with and the 4th guide rail
The 4th sliding part being slidably matched, the 4th sliding part are installed on the 4th guide rail;4th drive mechanism is used for
The lifting seat is driven to be slided relative to the support along the 4th guide rail direction.
In one of the embodiments, the tube expansion head also include clamping jaw, pawl set, first crossbeam, second cross beam and
5th drive mechanism, the clamping jaw and the expander roll relative set, the clamping jaw are installed on the first crossbeam, the pawl set
For being installed in the second cross beam, the pawl set is set in that the clamping jaw is outer and the clamping jaw part stretch out in it is described
Pawl set is outer, and the first crossbeam is installed on the expander roll workbench, and the second cross beam is slided with the expander roll workbench
Dynamic to coordinate, the 5th drive mechanism is connected with the first crossbeam, the second cross beam.
In one of the embodiments, the tube expansion head also includes more than one expander roll guide pad, and the expander roll is oriented to
For block between the first crossbeam and the expander roll mounting seat, the expander roll guide pad, which is provided with, is used for the expander roll passes through the
One through hole, the expander roll guide pad are slidably matched with the expander roll workbench;The tube expansion head also includes guide rod, described to lead
It is connected to bar with the first crossbeam, the expander roll guide pad, which is provided with, is used for the second through hole that guide rod passes through, the expander roll peace
Dress seat, which is provided with, is used for the third through-hole that guide rod passes through, and the guide rod is arranged by second through hole, the third through-hole
In the expander roll guide pad and the expander roll mounting seat, and the expander roll guide pad can be relative to institute with the expander roll mounting seat
State guide rod movement.
In one of the embodiments, the tube expansion head also includes drawstring, described drawstring one end and the first crossbeam
It is connected, the drawstring other end is connected with expander roll mounting seat, and drawstring described in the expander roll guide pad is connected.
In one of the embodiments, in addition to flaring mechanism, the flaring mechanism are installed on the expander roll workbench,
The flaring mechanism includes the flaring head for expander.
Principle, the effect of the present invention are further illustrated with reference to above-mentioned technical proposal:
1st, the above-mentioned pipe expanding equipment for finned tube, expander roll workbench can the second drive mechanism driving under relative to
Support frame moves, with closer or far from the workpiece placement station for placing the heat transmission equipment for treating tube expansion processing.So, loading and unloading
When, expander roll workbench can be driven by the second drive mechanism away from workpiece placement station, so as to facilitate staff's loading and unloading,
Operating efficiency can be improved.
2nd, expander roll workbench is provided with the first guide rail, and expander roll mounting seat is provided with first to be slidably matched with the first guide rail and slided
Part.First sliding part is installed on the first guide rail.First drive mechanism drive expander roll mounting seat relative to expander roll workbench along
After first guide rail direction is slided, expander roll mounting seat accordingly drives expander roll to carry out tube expansion work.
3rd, expander roll workbench is provided with the second guide rail, and support frame is provided with the second sliding part being slidably matched with the second guide rail.The
Two sliding parts are installed on the second guide rail.Second drive mechanism drives expander roll workbench relative to support frame along the second guide rail side
To when sliding, distance of the expander roll workbench relative to workpiece placement station can be adjusted to facilitate, in favor of staff's loading and unloading.
4th, chassis and bracket slide coordinate.Lifting seat coordinates with bracket slide.3rd drive mechanism is used for driving arm phase
Slided for chassis, the 4th drive mechanism is used to drive lifting seat relative to bracket slide.In this way, the 3rd drive mechanism can be used
Moved in driving arm relative to chassis horizontal direction, the 4th drive mechanism can be used for driving lifting seat vertical relative to support
Direction lifting moving, conveniently complete the expander workpiece docking operation in the expander roll and heat transmission equipment in expander roll mounting seat.
5th, chassis is provided with the 3rd guide rail.Support is provided with the 3rd sliding part being slidably matched with the 3rd guide rail, and the 3rd slides
Part is installed on the 3rd guide rail.3rd drive mechanism driving arm relative to chassis along the 3rd guide rail direction slide when,
To facilitate position of the adjustment support on chassis, in favor of the finned tube in the heat transmission equipment on tube expansion head and workpiece placement station
Alignment function.
6th, support is provided with the 4th guide rail.Lifting seat is provided with the 4th sliding part being slidably matched with the 4th guide rail, and institute the 4th is slided
Moving part is installed on the 4th guide rail.4th drive mechanism drive lifting seat relative to support along the 4th guide rail direction slide when,
Can be to facilitate position of the adjustment support on chassis, in favor of the wing in the heat transmission equipment on tube expansion head and workpiece placement station
Piece pipe alignment function.
7th, tube expansion head also includes more than one expander roll guide pad.Expander roll guide pad is located at first crossbeam and expander roll mounting seat
Between, expander roll guide pad, which is provided with, is used for the first through hole that expander roll passes through, and expander roll guide pad is slidably matched with expander roll workbench.It is oriented to
Bar is connected with first crossbeam.Guide rod is sheathed in expander roll guide pad and expander roll mounting seat by the second through hole, third through-hole, and
Expander roll guide pad can move with expander roll mounting seat relative to guide rod.Expander roll mounting seat drive expander roll is pushed into the pipe of heat transmission equipment
In road, expander roll guide pad be avoided that expander roll in pipe process is pushed into because of the phenomenon that occured bending and deformation by resistance, so as to
Ensure the tube expansion effect of heat exchanging equipment.
8th, tube expansion head also includes drawstring.Drawstring one end is connected with first crossbeam, the drawstring other end and expander roll mounting seat phase
Even.Expander roll guide pad drawstring is connected.So, expander roll mounting seat promotes expander roll to enter in the pipe process of heat transmission equipment, drawstring
Naturally close up, expander roll mounting seat drives expander roll guide pad to be stacked together, and completes an expander roll.Expander roll mounting seat will be swollen
From heat transmission equipment in extraction, drawstring is gradually straightened bar, during drawstring stretches synchronous drive expander roll guide pad along
First guide rail is slided so that each expander roll guide pad is scattered to be arranged at intervals on expander roll workbench.
9th, the pipe expanding equipment for finned tube also includes flaring mechanism.Flaring mechanism is installed on expander roll workbench, enlarging
Mechanism includes the flaring head for expander.After the completion of heat transmission equipment tube expansion, tube enlarging operation will be treated in flaring head and heat transmission equipment
Expander workpiece docked, by the second drive mechanism drive expander roll movable workbench, expander roll workbench drive flaring head simultaneously
Flaring head is pushed into expander workpiece, to complete the operation of the tube expansion of expander workpiece.In this way, it will be changed relative to of the prior art
The mode that the tube expansion of hot equipment is carried out with enlarging in different station, the present invention is after heat exchanging equipment tube expansion terminates, heat transmission equipment
Still in workpiece placement station, and enlarging operation can be carried out with heat exchanging equipment, is transferred to accordingly without heat transmission equipment is removed
Enlarging station, accordingly simplify so as to eliminate clamping material step, tube expansion expander technique up and down, the tube expansion enlarging of heat transmission equipment
Operating efficiency is improved.
Brief description of the drawings
Fig. 1 is the front view for the pipe expanding equipment for being used for finned tube described in the embodiment of the present invention;
Fig. 2 is the side view for the pipe expanding equipment for being used for finned tube described in the embodiment of the present invention;
Fig. 3 is the structural representation one of torque steer mechanism described in the embodiment of the present invention one;
Fig. 4 is the structural representation two of torque steer mechanism described in the embodiment of the present invention one;
Fig. 5 is the structural representation one of torque steer mechanism described in the embodiment of the present invention two;
Fig. 6 is sectional views of the Fig. 5 at A-A;
The enlarging apparatus that Fig. 7 illustrates described in the embodiment of the present invention for finned tube is provided with the structure chart of flaring mechanism
One;
Fig. 8 is enlarged diagram at B in Fig. 7;
Fig. 9 is the structural representation for the enlarging apparatus middle gear case for being used for finned tube described in the embodiment of the present invention;
Figure 10 is sectional view at C-C in Fig. 9;
Figure 11 is the structural representation one for being used for flaring head in the enlarging apparatus of finned tube described in the embodiment of the present invention;
Figure 12 is the structural representation two for being used for flaring head in the enlarging apparatus of finned tube described in the embodiment of the present invention.
Description of reference numerals:
10th, support frame, 11, chassis, the 111, the 3rd guide rail, 12, support, the 121, the 3rd sliding part, the 122, the 4th guide rail,
13rd, lifting seat, the 131, second sliding part, 20, tube expansion head, 21, expander roll workbench, the 211, first guide rail, the 212, second guide rail,
22nd, expander roll mounting seat, the 221, first sliding part, the 23, clamping jaw, 24, pawl set, 25, first crossbeam, 26, second cross beam, the 27, the 5th
Drive mechanism, the 28, the 7th sliding part, the 40, second drive mechanism, the 41, second motor, 42, second gear, the 43, second rack,
51st, the 3rd motor, the 52, the 3rd gear, the 53, the 3rd rack, 54, first rotating shaft, the 611, the 4th motor, the 612, second rotating shaft,
613rd, torque steer mechanism, 6131, torque input shaft, 6132, torque output shaft, 6133, scroll bar, 6134, turbine, 6135,
One bevel gear, the 6136, second bevel gear, 6137, casing, 62, screw mandrel, 63, thread bush, 70, expander roll guide pad, the 71, the 6th slides
Moving part, 80, guide rod, 90, flaring mechanism, 91, flaring head, 911, flat zone, 92, base, the 921, the 5th guide rail, 93, cylinder,
94th, gear-box, 941, torque input shaft, 942, driving wheel, 943, driven pulley, 944, torque output shaft, the 95, the 5th motor, 96,
Connecting rod, 100, expander roll, 120, heat transmission equipment, 121, expander workpiece, 140, workpiece placement station.
Embodiment
Embodiments of the invention are described in detail below:
As shown in Figure 1-2, the pipe expanding equipment of the present invention for finned tube, including:Support frame 10, tube expansion head
20th, the first drive mechanism and the second drive mechanism 40.
The tube expansion head 20 includes expander roll workbench 21 and expander roll mounting seat 22.The expander roll workbench 21 and the branch
Support 10 is slidably matched.The expander roll mounting seat 22 is used to install expander roll 100, and the expander roll mounting seat 22 works with the expander roll
Platform 21 is slidably matched.First drive mechanism is used to drive the expander roll mounting seat 22 to slide relative to the expander roll workbench 21
Dynamic, second drive mechanism 40 is used to drive the expander roll workbench 21 to slide relative to support frame as described above 10.
The above-mentioned pipe expanding equipment for finned tube, expander roll workbench 21 can be relative under the driving of the second drive mechanism 40
Moved in support frame 10, with closer or far from the workpiece placement station 140 for placing the heat transmission equipment 120 for treating tube expansion processing.This
Sample, during loading and unloading, expander roll workbench 21 can be driven by the second drive mechanism 40 away from workpiece placement station 140, so as to side
Just staff's loading and unloading, operating efficiency can be improved.
The expander roll workbench 21 is provided with the first guide rail 211, and the expander roll mounting seat 22 is provided with and first guide rail 211
The first sliding part 221 being slidably matched.First sliding part 221 is installed on first guide rail 211.First driving
Mechanism includes the first motor, first gear and the first rack.First motor is connected with the expander roll mounting seat 22 transmission.Institute
The torque output shaft for stating the first motor is connected with first gear transmission, and the first gear is mutually nibbled with first rack
Close, first rack is installed on the expander roll workbench 21 and the setting direction of the first rack and the first guide rail 211 are set
It is identical to put direction.In this way, after the first motor rotates, the torque output shaft driving first gear of the first motor rotates, first gear
It will be moved along the first rack and drive the first motor to move, the edge of expander roll mounting seat 22 is accordingly driven in the first motor moving process
The first guide rail 211 to slide, so as to can be to carry out tube expansion work.
The expander roll workbench 21 is provided with the second guide rail 212, and support frame as described above 10 is provided with and slided with second guide rail 212
The second sliding part 131 coordinated.Second sliding part 131 is installed on second guide rail 212.Second drive mechanism
40 include the second motor 41, the rack 43 of second gear 42 and second.Second motor 41 is installed on support frame as described above 10, institute
The torque output shaft for stating the second motor 41 is connected with the second gear 42 transmission.The second gear 42 and second rack
43 are meshed.Second rack 43 is installed on the expander roll workbench 21 and the setting direction and second of the second rack 43
The setting direction of guide rail 212 is identical.In this way, after the second motor 41 rotates, the torque output shaft of the second motor 41 drives the second tooth
Wheel 42 is rotated, and second gear 42 will be moved along the second rack 43 and drive the second motor 41 to move, and the second motor 41 is moved through
Accordingly expander roll workbench 21 is driven to be slided along the second guide rail 212 in journey, so as to which the phase of expander roll workbench 21 can be adjusted to facilitate
For the distance of workpiece placement station 140, in favor of staff's loading and unloading.
Support frame as described above 10 includes chassis 11, support 12 and lifting seat 13.The chassis 11 slides with the support 12 matches somebody with somebody
Close.The lifting seat 13 is slidably matched with the support 12, and the lifting seat 13 be provided with second sliding part 131 with it is described
Second motor 41.The pipe expanding equipment for finned tube also includes the 3rd drive mechanism and the 4th drive mechanism.Described 3rd
Drive mechanism is used to drive the support 12 to slide relative to the chassis 11, and the 4th drive mechanism is used to drive the liter
Drop seat 13 slides relative to the support 12.In this way, the 3rd drive mechanism can be used for driving arm 12 relative to the water of chassis 11
Square to movement, the 4th drive mechanism can be used for driving lifting seat 13 relative to the vertical direction lifting moving of support 12, convenient
Complete the expander roll 100 in expander roll mounting seat 22 and the docking operation of expander workpiece 121 in heat transmission equipment 120.
Referring again to Fig. 1, the chassis 11 is provided with the 3rd guide rail 111.The support 12 is provided with and the 3rd guide rail 111
The 3rd sliding part 121 being slidably matched, and the 3rd sliding part 121 is installed on the 3rd guide rail 111.Described 3rd drives
Motivation structure includes the 3rd motor 51, the 3rd gear 52 and the 3rd rack 53.3rd motor 51 is installed on the support 12,
The torque output shaft of 3rd motor 51 is connected with the 3rd gear 52 transmission.3rd gear 52 and the 3rd tooth
Bar 53 is meshed, and the 3rd rack 53 is installed on the chassis 11 and the setting direction of the 3rd rack 53 and the 3rd guide rail
111 setting direction is identical.After 3rd motor 51 rotates, the torque output shaft of the 3rd motor 51 drives the 3rd gear 52 to rotate,
3rd gear 52 will move along the 3rd rack 53 and drive the 3rd motor 51 to move, corresponding band in the moving process of the 3rd motor 51
Dynamic support 12 slides along the 3rd guide rail 111, so that can be to facilitate position of the adjustment support 12 on chassis 11, in favor of swollen
Pipe die 20 and the finned tube alignment function in the heat transmission equipment 120 in workpiece placement station 140.
Referring to Fig. 2, the 3rd guide rail 111 is two articles and is located at the both ends of support 12 respectively, so that support 12 is in chassis
Movement is more steady on 11.First rotating shaft 54 is provided between the torque output shaft and the 3rd gear 52 of 3rd motor 51.First turn
Axle 54 is rotatably installed on support 12, and the both ends of first rotating shaft 54 are respectively equipped with the 3rd gear 52.The torque of 3rd motor 51 is defeated
Shaft drives first rotating shaft 54 to rotate by gear structure.After the 3rd motor 51 driving first rotating shaft 54 rotates, first rotating shaft
54 will drive two synchronous axial systems of the 3rd gear 52, and the 3rd gear 52 accordingly moves along the 3rd rack 53, and drives support 12
Moved along chassis 11.
The support 12 is provided with the 4th guide rail 122.The lifting seat 13 is provided with what is be slidably matched with the 4th guide rail 122
4th sliding part, the 4th sliding part are installed on the 4th guide rail 122.4th drive mechanism exports including torque
Mechanism, screw mandrel 62 and thread bush 63.The torque output mechanism is used to drive the screw mandrel 62 to rotate.The thread bush 63 is installed
On the lifting seat 13, and the thread bush 63 is set on the screw mandrel 62.
Lifting seat 13 is two with leading screw and is separately positioned on the both sides of support 12, and such screw mandrel 62 drives lifting seat 13
It is more steady along the lifting moving process of the 4th guide rail 122.Accordingly, torque output mechanism includes 611, second turns of the 4th motor
Axle 612 and Liang Ge torque steers mechanism 613.The torque output shaft of 4th motor 611 passes through gear structure and the phase of the second rotating shaft 612
Even, for driving the second rotating shaft 612 to rotate.Second rotating shaft 612 is horizontal and is rotatably provided on support 12, the second rotating shaft 612
Torque input shaft 6131 of the both ends respectively with Liang Ge torque steers mechanism 613 is connected.The torque output shaft of torque steer mechanism 613
6132 are connected with screw mandrel 62 respectively, and torque steer mechanism 613 is used to vertical direction torque changing horizontally torque.When
, can be to realize that two screw mandrels 62 of the sidepiece of support 12 accordingly rotate, so as to realize driving lifting seat after four motors 611 rotate
13 lifting actions.
Fig. 3 and Fig. 4 are referred to, torque steer mechanism 613 includes worm screw and turbine 6134.Worm screw and torque input shaft 6131
Transmission is connected, and turbine 6134 is connected with the transmission of torque output shaft 6132.Turbine 6134 is meshed with worm screw.Worm screw and turbine 6134
Casing 6137 can be provided with outside.After torque input shaft 6131 rotates, torque input shaft 6131 drives worm screw to rotate, worm screw band
Dynamic turbine 6134 rotates, and turbine 6134 accordingly drives torque output shaft 6132 to rotate, so as to realize vertical direction torque to water
Square to torque switching.
Fig. 5 and Fig. 6 are referred to, in another embodiment, torque steer mechanism 613 includes the first bevel gear 6135 and the
Two bevel gears 6136.First bevel gear 6135 is connected with the transmission of torque input shaft 6131, and the second bevel gear 6136 exports with torque
The transmission of axle 6132 is connected.First bevel gear 6135 is meshed with the second bevel gear 6136.First bevel gear 6135 and the second umbrella tooth
Casing 6137 can be provided with outside wheel 6136.After torque input shaft 6131 rotates, torque input shaft 6131 drives the first umbrella tooth
Wheel 6135 rotates, and the first bevel gear 6135 drives the second bevel gear 6136 to rotate, and 6136 corresponding band dynamic torque of the second bevel gear is defeated
Shaft 6132 rotates, so as to realize switching of the vertical direction torque to horizontal direction torque.
Refer to Fig. 7-8, the tube expansion head 20 also include clamping jaw 23, pawl set 24, first crossbeam 25, second cross beam 26 with
And the 5th drive mechanism 27.The clamping jaw 23 and the relative set of expander roll 100, the clamping jaw 23 are installed in the first crossbeam
On 25.The pawl set 24 is used to be installed in the second cross beam 26, and it is outer and described that the pawl set 24 is set in the clamping jaw 23
The part of clamping jaw 23 is stretched out in outside the pawl set 24.The first crossbeam 25 is installed on the expander roll workbench 21, institute
Second cross beam 26 is stated to be slidably matched with the expander roll workbench 21.Specifically, second cross beam 26 is connected with the 5th sliding part, the 5th
Sliding part is installed on the first guide rail 211, and the 5th sliding part can slide along the first slide rail.5th drive mechanism 27 with it is described
First crossbeam 25, the second cross beam 26 are connected.In embodiments of the present invention, the 5th drive mechanism 27 is cylinder, oil cylinder, hydraulic pressure
Cylinder or the driving structure of screw mandrel 62.
The tube expansion head also includes more than one expander roll guide pad 70.The expander roll guide pad 70 is horizontal positioned at described first
Between beam 25 and the expander roll mounting seat 22, the expander roll guide pad 70, which is provided with, is used for the first through hole that the expander roll 100 passes through,
The expander roll guide pad 70 is slidably matched with the expander roll workbench 21.In embodiments of the present invention, expander roll guide pad 70 connects
There is the 6th sliding part 71, the 6th sliding part 71 is installed on the first guide rail 211 and can slided along the first guide rail 211.The tube expansion
Head also includes guide rod 80.The guide rod 80 is connected with the first crossbeam 25.The expander roll guide pad 70, which is provided with, to be used for
The second through hole that guide rod 80 passes through, the expander roll mounting seat 22, which is provided with, is used for the third through-hole that guide rod 80 passes through.It is described to lead
The expander roll guide pad 70 and the expander roll mounting seat 22 are sheathed on by second through hole, the third through-hole to bar 80
In, and the expander roll guide pad 70 can move with the expander roll mounting seat 22 relative to the guide rod 80.Expander roll mounting seat 22
Expander roll 100 is driven to be pushed into the pipeline of heat transmission equipment 120, expander roll guide pad 70 is avoided that expander roll 100 in push-in pipe process
It is middle because of the phenomenon that occured bending and deformation by resistance, so as to can guarantee that the tube expansion effect of heat exchanging equipment 120.
The tube expansion head 20 also includes drawstring.Described drawstring one end is connected with the first crossbeam 25, and the drawstring is another
One end is connected with expander roll mounting seat 22.Drawstring described in the expander roll guide pad 70 is connected.So, expander roll mounting seat 22 promotes expander roll
100 enter in the pipe process of heat transmission equipment 120, and drawstring closes up naturally, and expander roll mounting seat 22 drives the phase of expander roll guide pad 70
Mutually it is stacked, and completes an expander roll.Expander roll mounting seat 22 in extraction, draws expander roll 100 from heat transmission equipment 120
Rope is gradually straightened, and synchronous drive expander roll guide pad 70 slides along the first guide rail 211 during drawstring stretches so that each swollen
Bar guide pad 70 is scattered to be arranged at intervals on expander roll workbench 21.
Referring again to Fig. 7, the pipe expanding equipment for finned tube also includes flaring mechanism 90.The flaring mechanism 90 fills
It is located on the expander roll workbench 21, the flaring mechanism 90 includes the flaring head 91 for expander.The tube expansion of heat transmission equipment 120 is complete
Cheng Hou, flaring head 91 is docked with the expander workpiece 121 for treating tube enlarging operation in heat transmission equipment 120, pass through the second driving
Mechanism 40 drives expander roll workbench 21 to move, and expander roll workbench 21 drives flaring head 91 and flaring head 91 is pushed into expander workpiece
In 121, to complete the operation of the tube expansion of expander workpiece 121.In this way, relative to the tube expansion of the prior art by heat transmission equipment 120
The mode carried out with enlarging in different station, after the tube expansion of heat exchanging equipment 120 terminates, heat transmission equipment 120 still exists the present invention
In workpiece placement station 140, and enlarging operation can be carried out with heat exchanging equipment 120, phase is transferred to without heat transmission equipment 120 is removed
The enlarging station answered, accordingly simplify so as to eliminate clamping material step, tube expansion expander technique up and down, the tube expansion of heat transmission equipment 120
The operating efficiency of enlarging is improved.
The flaring mechanism 90 includes base 92, cylinder 93, the motor 95 of gear-box 94 and the 5th.Base 92 and expander roll work
Make platform 21 to be slidably matched.In embodiments of the present invention, base 92 is provided with the 5th guide rail 921, and expander roll workbench 21 is provided with and the 5th
The 7th sliding part 28 that guide rail 921 is slidably matched, the 7th sliding part 28 are installed on the 5th guide rail 921.Cylinder 93 is installed in swollen
On bar workbench 21, cylinder 93 is used to drive base 92 to move relative to expander roll workbench 21.Gear-box 94 is installed in base 92
On.
Fig. 9 and Figure 10 are referred to, gear-box 94 has a torque input shaft 941, driving wheel 942, multiple driven pulleys 943
With multiple torque output shafts 944.Torque input shaft 941 is by torque transmission to driving wheel 942, driving wheel 942 and the phase of driven pulley 943
Mutually engagement, driving wheel 942 are respectively connected with torque output shaft 944 with driven pulley 943.Torque input shaft 941 and the torque of motor are defeated
Shaft 944 is connected, and the torque output shaft 944 of gear-box 94 is connected with flaring head 91.In this way, after the 5th motor 95 rotates, pass through
Gear-box 94 drives multiple synchronous axial systems of flaring head 91, it is possible to achieve multiple tunnel synchronization tube enlarging operations.
Figure 11 is referred to, flaring head 91 is connected by connecting rod 96 with torque output shaft 944.In the expander of expander workpiece 121
Before operation, drive base 92 to be moved along the 5th guide rail 921 of expander roll workbench 21 by cylinder 93, flaring head 91 is stretched
Go out so that flaring head 91 is relative with expander workpiece 121 to be connect, to be prepared to enter into the follow-up enlarging of expander workpiece 121 operation.Expander
Part 121 terminates tube enlarging operation and then drives base 92 to be moved along the 5th guide rail 921 of expander roll workbench 21 by cylinder 93
It is dynamic, then flaring head 91 is withdrawn.
Figure 12 is referred to, flaring head 91 is cone-shaped, and the side wall and the angle a of the axial direction of flaring head 91 of flaring head 91 are
10~20 degree.So, flaring head 91 is advanced in expander workpiece 121 that suffered resistance is smaller, and expander workpiece 121 is in expander mistake
Just metaboly is susceptible in journey.Preferably, flaring head 91 is advanced to by the mistake of expander workpiece 121 using expander roll workbench 21
Cheng Zhong, the 5th motor 95 driving flaring head 91 rotate, rotate propulsion mode, can directly push away mode relative to prior art, can be significantly
Reduce the resistance suffered by flaring head 91, flaring head 91 can be easy to carry out tube enlarging operation to expander workpiece 121.
The side wall of cone-shaped flaring head 91 is provided with more than one recess or more than one flat zone 911, and recess or flat
Flat area 911 is set around the side wall of flaring head 91.There is flat zone 911 or recess on flaring head 91, in the rotation process of flaring head 91,
Entirety remains as cone-shaped, can normally realize tube enlarging operation.Recess or flat zone 911 on flaring head 91 cause flaring head 91
Form gap between the madial wall of expander workpiece 121, in order to expander workpiece 121 in expanding procedure inside and outside airflow, and
And it is easy in time distribute caused heat in expanding procedure.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality
Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously
Can not therefore it be construed as limiting the scope of the patent.It should be pointed out that come for one of ordinary skill in the art
Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention
Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (9)
- A kind of 1. pipe expanding equipment for finned tube, it is characterised in that including:Support frame, support frame as described above include chassis, support and lifting seat, and the chassis coordinates with the bracket slide, the liter Seat is dropped with the bracket slide to coordinate;Tube expansion head, the tube expansion head include expander roll workbench and expander roll mounting seat, the expander roll workbench and the support Frame is slidably matched, and the expander roll mounting seat is used to install expander roll, and the expander roll mounting seat is slidably matched with the expander roll workbench;First drive mechanism and the second drive mechanism, first drive mechanism are used to drive the expander roll mounting seat relative to institute The slip of expander roll workbench is stated, second drive mechanism is used to drive the expander roll workbench to slide relative to support frame as described above;Also include the 3rd drive mechanism and the 4th drive mechanism, the 3rd drive mechanism is used to drive the support relative to institute Chassis slip is stated, the 4th drive mechanism is used to drive the lifting seat relative to the bracket slide.
- 2. the pipe expanding equipment according to claim 1 for finned tube, it is characterised in that the expander roll workbench is provided with the One guide rail, the expander roll mounting seat are provided with the first sliding part being slidably matched with first guide rail, the first sliding part dress On first guide rail;First drive mechanism is used to drive the expander roll mounting seat relative to the expander roll workbench Slided along first guide rail direction.
- 3. the pipe expanding equipment according to claim 1 for finned tube, it is characterised in that the expander roll workbench is provided with the Two guide rails, support frame as described above are provided with the second sliding part being slidably matched with second guide rail, and second sliding part is installed in On second guide rail;Second drive mechanism is used to drive the expander roll workbench relative to support frame as described above along described Second guide rail direction is slided.
- 4. the pipe expanding equipment according to claim 1 for finned tube, it is characterised in that the chassis is led provided with the 3rd Rail, the support are provided with the 3rd sliding part that is slidably matched with the 3rd guide rail, and the 3rd sliding part is installed in described the On three guide rails;3rd drive mechanism is used to drive the support to slide along the 3rd guide rail direction relative to the chassis It is dynamic.
- 5. the pipe expanding equipment according to claim 1 for finned tube, it is characterised in that the support is led provided with the 4th Rail, the lifting seat are provided with the 4th sliding part being slidably matched with the 4th guide rail, and the 4th sliding part is installed in described On 4th guide rail;4th drive mechanism is used to drive the lifting seat relative to the support along the 4th guide rail side To slip.
- 6. the pipe expanding equipment according to claim 1 for finned tube, it is characterised in that the tube expansion head also includes folder Pawl, pawl set, first crossbeam, second cross beam and the 5th drive mechanism, the clamping jaw and the expander roll relative set, the clamping jaw It is installed on the first crossbeam, the pawl is covered for being installed in the second cross beam, and the pawl set is set in the clamping jaw Outside and the clamping jaw part is stretched out in outside the pawl set, and the first crossbeam is installed on the expander roll workbench, institute State second cross beam to be slidably matched with the expander roll workbench, the 5th drive mechanism and the first crossbeam, second horizontal stroke Beam is connected.
- 7. the pipe expanding equipment according to claim 6 for finned tube, it is characterised in that the tube expansion head also includes one Individual above expander roll guide pad, the expander roll guide pad is between the first crossbeam and the expander roll mounting seat, the expander roll Guide pad, which is provided with, is used for the first through hole that the expander roll passes through, and the expander roll guide pad is slidably matched with the expander roll workbench; The tube expansion head also includes guide rod, and the guide rod is connected with the first crossbeam, and the expander roll guide pad, which is provided with, to be used for The second through hole that guide rod passes through, the expander roll mounting seat, which is provided with, is used for the third through-hole that guide rod passes through, and the guide rod leads to Cross second through hole, the third through-hole is sheathed in the expander roll guide pad and the expander roll mounting seat, and the expander roll Guide pad can move with the expander roll mounting seat relative to the guide rod.
- 8. the pipe expanding equipment according to claim 7 for finned tube, it is characterised in that the tube expansion head also includes drawing Rope, described drawstring one end are connected with the first crossbeam, and the drawstring other end is connected with expander roll mounting seat, and the expander roll is oriented to Drawstring is connected described in block.
- 9. the pipe expanding equipment according to claim 1 for finned tube, it is characterised in that described also including flaring mechanism Flaring mechanism is installed on the expander roll workbench, and the flaring mechanism includes the flaring head for expander.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611076731.XA CN106424394B (en) | 2016-11-28 | 2016-11-28 | A kind of pipe expanding equipment for finned tube |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611076731.XA CN106424394B (en) | 2016-11-28 | 2016-11-28 | A kind of pipe expanding equipment for finned tube |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106424394A CN106424394A (en) | 2017-02-22 |
CN106424394B true CN106424394B (en) | 2018-03-30 |
Family
ID=58222882
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611076731.XA Active CN106424394B (en) | 2016-11-28 | 2016-11-28 | A kind of pipe expanding equipment for finned tube |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106424394B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106914555A (en) * | 2017-03-28 | 2017-07-04 | 珠海格力智能装备技术研究院有限公司 | Expanding device and the air-conditioner processing unit (plant) with it |
CN107175287B (en) * | 2017-06-22 | 2018-12-25 | 南京理工大学 | A kind of tubular part inner circle single-point progressive molding processing unit (plant) |
CN108213233B (en) * | 2017-11-30 | 2024-01-30 | 珠海格力智能装备有限公司 | Workbench mechanism and pipe expander with same |
CN108031760B (en) * | 2017-11-30 | 2024-03-08 | 珠海格力智能装备有限公司 | Pipe expanding operation device and pipe expander with same |
CN109702101A (en) * | 2019-01-30 | 2019-05-03 | 无锡东逸电液伺服技术有限公司 | With multivariant automatic tube expanding machine |
CN111014481A (en) * | 2019-12-17 | 2020-04-17 | 南通精丰智能设备有限公司 | Combined pipe expander with cantilever structure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5533251A (en) * | 1993-05-18 | 1996-07-09 | Vetter; Klaus-Dieter | Automatic hairpinlacing apparatus |
US5685066A (en) * | 1995-10-23 | 1997-11-11 | Ford Global Technologies, Inc. | Tube expanding assembly |
CN203791505U (en) * | 2014-01-28 | 2014-08-27 | 宁波精达成形装备股份有限公司 | Flaring device of pipe expander |
CN105642771A (en) * | 2015-10-10 | 2016-06-08 | 浙江邦得利环保科技股份有限公司 | Manufacture method of heat exchanger |
CN206215783U (en) * | 2016-11-28 | 2017-06-06 | 中山市中科智能制造研究院有限公司 | A kind of pipe expanding equipment for finned tube |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2696663B2 (en) * | 1993-11-05 | 1998-01-14 | 京進工業株式会社 | Pipe expansion device |
JP2002205133A (en) * | 2001-10-23 | 2002-07-23 | Kyoshin Kogyo Kk | Working plate of tube expanding apparatus |
JP5052858B2 (en) * | 2006-10-18 | 2012-10-17 | 株式会社Afrex | Flare tube expansion equipment |
-
2016
- 2016-11-28 CN CN201611076731.XA patent/CN106424394B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5533251A (en) * | 1993-05-18 | 1996-07-09 | Vetter; Klaus-Dieter | Automatic hairpinlacing apparatus |
US5685066A (en) * | 1995-10-23 | 1997-11-11 | Ford Global Technologies, Inc. | Tube expanding assembly |
CN203791505U (en) * | 2014-01-28 | 2014-08-27 | 宁波精达成形装备股份有限公司 | Flaring device of pipe expander |
CN105642771A (en) * | 2015-10-10 | 2016-06-08 | 浙江邦得利环保科技股份有限公司 | Manufacture method of heat exchanger |
CN206215783U (en) * | 2016-11-28 | 2017-06-06 | 中山市中科智能制造研究院有限公司 | A kind of pipe expanding equipment for finned tube |
Also Published As
Publication number | Publication date |
---|---|
CN106424394A (en) | 2017-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106424394B (en) | A kind of pipe expanding equipment for finned tube | |
CN208729355U (en) | A kind of stainless steel tube outer surface wire drawing device | |
CN106424399B (en) | A kind of enlarging apparatus for finned tube | |
CN109049073A (en) | A kind of industrial pipes ring cutting device | |
CN207521898U (en) | A kind of chuck mechanism and laser cutting clamping device | |
CN206392730U (en) | A kind of enlarging apparatus for finned tube | |
CN103121053A (en) | Horizontal bending machine | |
CN105730734A (en) | Automatic adhesive tape winding mechanism | |
CN206215783U (en) | A kind of pipe expanding equipment for finned tube | |
CN107187659A (en) | Recrater is positioned and guider | |
CN204912392U (en) | Pipeline bending machine | |
CN207209797U (en) | A kind of sponge holder gearshift | |
CN107803327A (en) | A kind of six axles movement heat lamp | |
CN108116025A (en) | Doorframe plate forming coating production line | |
CN207386197U (en) | Tube Drawing device | |
CN206795160U (en) | A kind of automatic edge knurling machine | |
CN205914940U (en) | A welding jig that is used for welding on oil tank body with oil pipe , oil drain nut | |
CN108273906A (en) | A kind of wind turbine cylinder automatic flanging puncher | |
CN206382622U (en) | A kind of stainless steel pressure pipe automatic cutting device | |
CN104259226B (en) | A kind of pneumatic jaw type drawbench | |
CN204724648U (en) | Annular backing plate processing unit (plant) | |
CN206270172U (en) | A kind of single screw stepping device for testing steel pipe pressure | |
CN207071725U (en) | Aluminum bar peeling machine moves rod assembly | |
CN206392623U (en) | Widely applicable flange straightener | |
CN207077245U (en) | Aluminum bar peeling machine goes out rod assembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder |
Address after: 528400 Number Trade Building, No. 6 Xiangxing Road, Central District of Zhongshan Torch Development Zone, Guangdong Province, 2 Building 215 Patentee after: Zhongshan Zhongke intelligent manufacture Research Institute Co., Ltd. Address before: Room 310, Office Building No. 1 Daxin Road, South District, Zhongshan City, Guangdong Province Patentee before: Zhongshan Zhongke intelligent manufacture Research Institute Co., Ltd. |
|
CP02 | Change in the address of a patent holder |