CN106408138A - Oil well short-term production index abnormity early warning method - Google Patents

Oil well short-term production index abnormity early warning method Download PDF

Info

Publication number
CN106408138A
CN106408138A CN201611049959.XA CN201611049959A CN106408138A CN 106408138 A CN106408138 A CN 106408138A CN 201611049959 A CN201611049959 A CN 201611049959A CN 106408138 A CN106408138 A CN 106408138A
Authority
CN
China
Prior art keywords
early warning
oil well
production
oil
index
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611049959.XA
Other languages
Chinese (zh)
Inventor
杜新龙
卢立泽
王贺华
李建东
邓强
张小平
符奇
张春琳
付辉
韩绪军
王荣新
曹剑
何巍
蒋利平
马成
臧克
臧克一
徐兵
刘榧
张健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu North Petroleum Exploration & Development Technology Ltd
Original Assignee
Chengdu North Petroleum Exploration & Development Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu North Petroleum Exploration & Development Technology Ltd filed Critical Chengdu North Petroleum Exploration & Development Technology Ltd
Priority to CN201611049959.XA priority Critical patent/CN106408138A/en
Publication of CN106408138A publication Critical patent/CN106408138A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • G06Q10/06375Prediction of business process outcome or impact based on a proposed change
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses an oil well short-term production index abnormity early warning method. The problems of large data amount and poor early warning timeliness of an early warning method with high accuracy in the prior art are solved. The method provided by the invention comprises the steps that the production data of production indexes of an oil well in a period of time are collected; the average value of oil well production indexes in the period of time is calculated; the standard deviation sigma of the oil well production indexes in the period of time is calculated; an production index abnormity degree A is calculated; and the early warning level is determined according to the specific value of the index abnormity degree A. The oil well short-term production index abnormity early warning method provided by the invention has the advantages of high early warning timeliness, high accuracy, simple operation and the like.

Description

A kind of abnormal method of early warning oil well short-term production target
Technical field
The present invention relates to a kind of method for early warning of oil well Indexes Abnormality is and in particular to a kind of early warning oil well short-term production target Abnormal method.
Background technology
Summarized and analysis by the substantial amounts of condition of production, well oil output, Liquid output, the production target such as aqueous are in a short time (as one week) should be in a relatively stable state, and if there is larger change, then abnormal, needs in oil well production Find out reason in time, and resume production.This is also one of groundwork of oil well production management.Generally divided using production curve Analysis, creation data on the two contrast and produce abnormal oil well to find out.But typically oilfield quantity is many, creation data is many, adopts Find out the abnormal well of production target with production curve analysis and carry out early warning and be one wasting time and energy from numerous creation datas Work.In creation data contrast on the two, radix yield is chosen larger on the impact of early warning result.As the product liquid in K well three days Measure as 15m3/ d, 10m3/ d, 10m3/ d, during with the Liquid output of first day for radix, this well product liquid of the 3rd day reduces amplitude relatively Greatly, produce extremely, but if using the Liquid output of second day as radix, then produce within the 3rd day normal.
In order to obtain more accurate judgment mode, disclose in " research of oil well production dynamic early-warning " of the prior art A kind of decision method, the method carries out resampling to output fluctuation rate using Bootstrap method, with 3 σ methods, production target is entered Row early warning.Although the method can be carried out to production target could be accurate during early warning, only data volume larger (at least above 10) Really judge, when data volume is less than 10, the method lost efficacy.And, when data volume is more than 10, it is possible that alert has been sent out Early warning information just occurs after raw many days, early warning ageing poor.
Content of the invention
The technical problem to be solved is:The higher method for early warning desired data amount of existing accuracy rate is larger and pre- Alert ageing poor it is therefore intended that providing a kind of early warning oil well short-term production target abnormal method, solve early warning requisite number According to amount is big, poor in timeliness problem.
The present invention is achieved through the following technical solutions:
A kind of abnormal method of early warning oil well short-term production target, including:
The creation data of step one, collection oil well production target interior for a period of time;
Step 2, calculate the mean value of oil well production index in this time
Step 3, calculate the standard deviation of oil well production index in this time;
Step 4, employingCalculate production target intensity of anomaly A;Concrete number according to Indexes Abnormality degree A Value determines warning level.
The inventive method can rapidly find out the abnormal oil well of production target, and eliminate in numerous creation datas The impact to early warning result for the selection of radix yield, improves the accuracy of early warning judgement, oil well management personnel can be according to pre- Alert condition is analyzed in time, proposes countermeasure and resumes production, effectively improves production management efficiency and the managerial skills of oil well.And, this The short-term production target that the method for invention is less than 10 mainly for data volume carries out early warning, has higher ageing and accurate Property, make technical staff analyze the reason alert occurs in time, resume production as early as possible.
Meanwhile, the method for the present invention only needs to calculate the average of production target and standard deviation (general spreadsheet all may be used Realized with quick) can be carried out the calculating of production target intensity of anomaly, and carry out grading forewarning system according to warning index, operation is more Plus easy, therefore the present invention has very big actual promotional value.
Further, the dividing mode of described warning level has multiple, can directly be carried out using calculated former numerical value A Divide it is also possible to divide again after former numerical value A is processed, such as when the numerical value of production target intensity of anomaly A expands 100 times Afterwards, its division data is as follows:
When the numerical value of production target intensity of anomaly A is former numerical value, concrete partition of the level is as follows:
Preferably, described production target includes producing liquid, day oil-producing, water content, gas-oil ratio, gas production, aquifer yield, oil daily One or more of pressure, casing pressure, stream pressure index.
Preferably, described production target include the water injection rate of water injection well and gas injection well, gas injection rate, oil pressure, in casing pressure index One or more.
The present invention compared with prior art, has such advantages as and beneficial effect:
1st, the method for the present invention can eliminate the impact chosen to early warning result of radix yield, can accurately judge data simultaneously Amount is less than the intensity of anomaly of 10 short-term production target, and then effectively judges warning level, and the ageing and accuracy of early warning is equal Higher;
2nd, the method for the present invention can quickly be realized using general spreadsheet, the computing mode of realization is simpler, Operation is easier, has high promotional value.
Specific embodiment
For making the object, technical solutions and advantages of the present invention become more apparent, with reference to embodiment, the present invention is made Further detailed description, the exemplary embodiment of the present invention and its explanation are only used for explaining the present invention, are not intended as to this The restriction of invention.
Embodiment 1
A kind of abnormal method of present invention early warning oil well short-term production target, including:
The creation datas such as step one, the daily output liquid collected in oil well one week, day oil-producing, water content;
Step 2, calculate daily output liquid, day oil-producing, the mean value of water content in this time
Step 3, calculate daily output liquid, day oil-producing, the standard deviation of water content in this time;
Step 4, employingCalculate the different of day oil-producing Chang Chengdu Ao, daily output liquid intensity of anomaly Al, the intensity of anomaly A of water contentwc;Wherein,For the mean value of day oil-producing,For day Produce the mean value of liquid,For the mean value that day is aqueous, σoFor the standard deviation of day oil-producing, σlFor producing the standard deviation of liquid, σ dailywc For the standard deviation that day is aqueous.
According to Indexes Abnormality degree Ao、AlAnd AwcOccurrence be combined with the dividing mode of following warning levels and to determine Concrete warning level.The dividing mode of described warning level is as follows:
As:Certain oilfield producing well 511 and 134 produces liquid, daily output between the date in October 71 day to 2016 October in 2016 daily Oil, the data of water-content indicator, calculate the occurrence of intensity of anomaly, concrete data is as shown in table 1 by the inventive method:
Table 1
By above-mentioned table 1:Early warning is carried out according to this method, result display K-134 production target is normal, K-511 day Product liquid is yellow early warning, day oil-producing be blue early warning, aqueous normal.Found by analysis, the daily output of 511 1, well 2016 on October Liquid is 25.3m3/ d, on October 7th, 2016 daily output liquid is 11.1m3/ d, daily output liquid decreases 14.2m3/ d, declines by a big margin, Oil well production goes wrong, and should take measures in time to resume production.The warning level of day oil-producing is blueness, less than daily output liquid early warning Rank, is mainly affected by aqueous reduction.Accordingly, it would be desirable to analyze the main cause that 511 well Liquid output decline as early as possible, recover in time Produce.
Embodiment 2
The present embodiment is with the difference of embodiment 1, is counted only with the Liquid output in K well three days in the present embodiment Calculate, the Liquid output in this K well three days is 15m/d3, 10m/d3, 10m/d3.
Being calculated intensity of anomaly using the inventive method is 24.7, and early warning is classified as blueness.
Using the pre-judging method in " research of oil well production dynamic early-warning " in background technology, learn K well the 2nd day and the 3rd day Output fluctuation rate is respectively -33.3 and 0.0, belongs to negative sense abnormality within second day, but belongs to positive abnormality within the 3rd day, with Actual production is not inconsistent.
Embodiment 3
The present embodiment is with the difference of embodiment 1, is counted using the Liquid output of K-511 well fortnight in the present embodiment Calculate, the Liquid output of this K-511 well fortnight is 25.3m3/d、19.4m3/d、14.2m3/d、13.9m3/d、14.7m3/d、 11.4m3/d、11.1m3/d、10.1m3/d、10.4m3/d、14.5m3/d、8.9m3/d、5.4m3/d、4.8m3/d、6.6m3/d.
Being calculated intensity of anomaly using the inventive method is 45.2, and early warning is classified as yellow.
Using the pre-judging method in " research of oil well production dynamic early-warning " in background technology, learn:2nd, 3,11 days is negative Abnormal, it is within the 10th, 14 days normal anomaly, remaining number of days is normal production.
In fact K-511 well Liquid output in 14 days have dropped 18.7m3, this time is all in abnormality.
By above-mentioned data, when data volume is more than 10, background is compared using the accuracy that the method for the present invention records In technology, forwarding method, closer to reality, proves further:The method of the present invention, while having higher ageing it is ensured that The accuracy of early warning.
Above-described specific embodiment, has been carried out to the purpose of the present invention, technical scheme and beneficial effect further Describe in detail, be should be understood that the specific embodiment that the foregoing is only the present invention, be not intended to limit the present invention Protection domain, all any modification, equivalent substitution and improvement within the spirit and principles in the present invention, done etc., all should wrap It is contained within protection scope of the present invention.

Claims (4)

1. a kind of abnormal method of early warning oil well short-term production target is it is characterised in that include:
The creation data of step one, collection oil well production target interior for a period of time;
Step 2, calculate the mean value of oil well production index in this time
Step 3, calculate the standard deviation of oil well production index in this time;
Step 4, employingCalculate production target intensity of anomaly A;Concrete numerical value according to Indexes Abnormality degree A determines Warning level.
2. a kind of abnormal method of early warning oil well short-term production target according to claim 1 produces it is characterised in that working as After the numerical value of Indexes Abnormality degree A expands 100 times, the dividing mode of described warning level is as follows:
3. a kind of abnormal method of early warning oil well short-term production target according to claim 1 is it is characterised in that described life Produce index to include producing liquid, day oil-producing, water content, gas-oil ratio, gas production, aquifer yield, oil pressure, casing pressure daily, flow pressing in index Plant or multiple.
4. a kind of abnormal method of early warning oil well short-term production target according to claim 1 is it is characterised in that described life Produce index and include one or more of the water injection rate of water injection well and gas injection well, gas injection rate, oil pressure, casing pressure index.
CN201611049959.XA 2016-11-24 2016-11-24 Oil well short-term production index abnormity early warning method Pending CN106408138A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611049959.XA CN106408138A (en) 2016-11-24 2016-11-24 Oil well short-term production index abnormity early warning method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611049959.XA CN106408138A (en) 2016-11-24 2016-11-24 Oil well short-term production index abnormity early warning method

Publications (1)

Publication Number Publication Date
CN106408138A true CN106408138A (en) 2017-02-15

Family

ID=58081693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611049959.XA Pending CN106408138A (en) 2016-11-24 2016-11-24 Oil well short-term production index abnormity early warning method

Country Status (1)

Country Link
CN (1) CN106408138A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112627800A (en) * 2019-09-24 2021-04-09 中国石油化工股份有限公司 Detection method and detection system for daily gas yield measurement deviation of water-cut gas well

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5131471A (en) * 1989-08-16 1992-07-21 Chevron Research And Technology Company Single well injection and production system
CN102004962A (en) * 2010-12-01 2011-04-06 福州维胜信息技术有限公司 Method for realizing intelligent collation on personal comprehensive performance for appraisal
CN102094626A (en) * 2010-12-20 2011-06-15 中国石油天然气股份有限公司 Real-time fault early warning method and system of oil well
CN104196506A (en) * 2014-08-01 2014-12-10 中国石油大学(北京) Injection and production parameter joint debugging method, device and system for SAGD single well set
CN105006113A (en) * 2014-04-25 2015-10-28 中国石油化工股份有限公司 Ultra-high-water-content oil field exploitation early-warning method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5131471A (en) * 1989-08-16 1992-07-21 Chevron Research And Technology Company Single well injection and production system
CN102004962A (en) * 2010-12-01 2011-04-06 福州维胜信息技术有限公司 Method for realizing intelligent collation on personal comprehensive performance for appraisal
CN102094626A (en) * 2010-12-20 2011-06-15 中国石油天然气股份有限公司 Real-time fault early warning method and system of oil well
CN105006113A (en) * 2014-04-25 2015-10-28 中国石油化工股份有限公司 Ultra-high-water-content oil field exploitation early-warning method
CN104196506A (en) * 2014-08-01 2014-12-10 中国石油大学(北京) Injection and production parameter joint debugging method, device and system for SAGD single well set

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112627800A (en) * 2019-09-24 2021-04-09 中国石油化工股份有限公司 Detection method and detection system for daily gas yield measurement deviation of water-cut gas well
CN112627800B (en) * 2019-09-24 2024-03-29 中国石油化工股份有限公司 Method and system for detecting daily gas production measurement deviation of water gas well

Similar Documents

Publication Publication Date Title
CN102128022B (en) Drilling engineering early warning method and system thereof
CN107390661A (en) A kind of method for early warning of process flow industry process abnormal state
CN102282552A (en) System, method and computer program for pattern based intelligent control, monitoring and automation
CN105376260A (en) Network abnormity flow monitoring system based on density peak value cluster
CN105335603B (en) A kind of method for measuring diversion irrigation area degree of drought
CN104318058B (en) Debris flow early-warning method based on rainfall monitoring
CN110137947B (en) Grid voltage sag severity assessment method based on ITIC curve
CN114580752B (en) Engineering construction progress intelligent management system based on BIM technology
CN105976114A (en) Transaction monitoring method and system
CN104281779A (en) Abnormal data judging and processing method and device
CN110502398A (en) A kind of exchange fault forecasting system and method based on artificial intelligence
CN107633325A (en) A kind of shale gas pressure break down-hole accident early diagnosis alarm method and device
CN104500141B (en) Prominent method for early warning based on ore pressure monitor behavioral characteristics
CN103308334B (en) A kind of component fatigue appraisal procedure of Nonlinear Cumulative
CN110469299A (en) A kind of exploitation of oil-extracting well water injection takes effect effect evaluation method
CN105260253A (en) Server failure measurement and calculation method and device
CN104615123B (en) K-nearest neighbor based sensor fault isolation method
CN109978059B (en) Early warning method for tower flushing faults of primary distillation tower in crude oil distillation process
CN103942266A (en) Data analysis method capable of achieving self-defining of complex service computational logic on basis of OLAP
CN103529337B (en) The recognition methods of nonlinear correlation relation between equipment failure and electric quantity information
CN106408138A (en) Oil well short-term production index abnormity early warning method
CN108182178A (en) Groundwater level analysis method and system based on event text data mining
CN106382102A (en) Overflow early warning method based on clustering algorithm
CN103675357A (en) Anemometer fault warning method and system
CN105006113A (en) Ultra-high-water-content oil field exploitation early-warning method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170215