CN110469299A - A kind of exploitation of oil-extracting well water injection takes effect effect evaluation method - Google Patents

A kind of exploitation of oil-extracting well water injection takes effect effect evaluation method Download PDF

Info

Publication number
CN110469299A
CN110469299A CN201910733312.6A CN201910733312A CN110469299A CN 110469299 A CN110469299 A CN 110469299A CN 201910733312 A CN201910733312 A CN 201910733312A CN 110469299 A CN110469299 A CN 110469299A
Authority
CN
China
Prior art keywords
effect
well
oil
production
takes effect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910733312.6A
Other languages
Chinese (zh)
Other versions
CN110469299B (en
Inventor
张原立
王晶
刘俊刚
李洪畅
王小娟
王睿恒
欧泉旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201910733312.6A priority Critical patent/CN110469299B/en
Publication of CN110469299A publication Critical patent/CN110469299A/en
Application granted granted Critical
Publication of CN110469299B publication Critical patent/CN110469299B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/20Displacing by water
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Mining
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • Mining & Mineral Resources (AREA)
  • Economics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Strategic Management (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Development Economics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Primary Health Care (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Public Health (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Water Supply & Treatment (AREA)
  • Operations Research (AREA)
  • Geophysics (AREA)
  • Agronomy & Crop Science (AREA)
  • Animal Husbandry (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Cosmetics (AREA)
  • Fats And Perfumes (AREA)
  • Investigating Or Analysing Materials By Optical Means (AREA)

Abstract

The invention belongs to oil field development technical fields, and in particular to a kind of exploitation of oil-extracting well water injection takes effect effect evaluation method, introduces take effect lapse rate and two parameters of coefficient that take effect, content includes: to collect Production Wells data;Determine target producing well, need quantify take effect effect production time node and the timing node under actual production yield;Selection standard well;Calculate nominal decline rate;Target producing well is calculated to take effect theoretical yield;Target producing well is calculated to take effect coefficient.The method overcome the qualitative judgements that it is good or bad that conventional method is only capable of carrying out taking effect to single producing well, the defect of the further degree evaluation that takes effect can not be carried out to entire oil reservoir, it can be laid the foundation with the effect that takes effect of individual well and oil reservoir entirety in rapid qualitative difference production period for the research of further oil reservoir.

Description

A kind of exploitation of oil-extracting well water injection takes effect effect evaluation method
Technical field
The invention belongs to oil field development technical fields, and in particular to a kind of exploitation of oil-extracting well water injection takes effect effect assessment side Method.
Background technique
Waterflooding extraction is a kind of widely used one of the method for improving oil reservoir ultimate recovery of oil field development.Water injection well note After water, strata pressure improves and constantly along grain direction to producing well propagation, and after pressure conduction is to producing well, producing well starts It takes effect, realizes the raising of development effectiveness.With Water injected reservoir develop further precision management, need to carry out development effectiveness into The evaluation of one step.
Usually other than it development index can be used integrally to measure oil reservoir, also require to carry out the waterflooding effect of oil reservoir Evaluation, but in fact, due to oil reservoir heterogeneity, the waterflooding effect of each plane domain is different.This is just needed It is refine to individual well, the effect that takes effect of every mouth producing well is evaluated, to determine the waterflooding effect in Different Plane region, thus Formulate reasonable, targeted development of injection-production policy.Currently, judging that the method that producing well takes effect has the judgement of production curve form Method, using the value-added approach of hundred meters of tired oil-producings.
Wherein most widely used to produce tracing pattern judgment method, main thought is that oil well output rises or puts down Surely, production curve morphologic appearance is that perhaps linear rise formation pressure rises or steadily, aqueous holding is steady for linear type, " U " type It is fixed, that is, think that the well takes effect.But this method has the following deficiencies: first is that taking effect to be qualitative for this method identification, not energetic; Second is that this method speed is slower, requires a great deal of time and observe the production curve of every mouth oil well, and need exclude because Element is more;Third is that the degree evaluation that takes effect cannot integrally be carried out to oil reservoir.
Summary of the invention
The purpose of the present invention is to provide a kind of oil-extracting well water injections to develop the effect evaluation method that takes effect, and the prior art is overcome to deposit Above-mentioned technical problem, with the effect that takes effect of the producing well of the quantization waterflooding extraction of creation data accurate quick.
For this purpose, technical solution provided by the invention is as follows:
A kind of exploitation of oil-extracting well water injection takes effect effect evaluation method, comprising the following steps:
Step 1) collects the moon creation data of producing well all in oil reservoir, obtains daily oil production;
Step 2) determines that target producing well needs to quantify the production time node M of effect of taking effect0And production time node M0Under practical daily oil production Qn
Step 3) selection standard well;
The initial stage daily oil production Q of step 4) calculating standard well0t
Step 5) is according to the initial stage daily oil production Q of standard well0tWith standard well in the production time for needing to quantify to take effect effect Node M0Under day oil-producing Q0, calculate the lapse rate D that takes effect of standard well0
The initial stage daily oil production Q of step 6) calculating target producing wellnt
Step 7) is according to the lapse rate D that takes effect of standard well0, target producing well initial stage daily oil production Qnt, calculate target and adopt Oil well needs to quantify the production time node M of effect of taking effect0The theoretical daily output Q ' that takes effectn
Step 8) is according to the theoretical daily output Q ' that takes effectnWith target producing well in production time node M0Under practical day oil-producing Measure Qn, calculate target producing well and need to quantify the production time node M of effect of taking effect0The coefficient η that takes effectn
Step 9) is developed the effect that takes effect to target oil-extracting well water injection and is evaluated, and following three classes are divided into:
ηn≤ 0.2 is classified as I class, 0.2 < ηn≤ 0.4 is classified as II class, and I class and II class are to take effect;0.4 < ηn≤ 1 is classified as loseing Effect.
The moon creation data of producing well described in step 1) has been all months creation datas since operation.
Target producing well needs to quantify the production time node M of effect of taking effect in step 2)0Not less than 6 months.
Standard well described in step 3) is that productive life is greater than 3 years, production process zero defects, has 3 years and with overlying strata The producing well that takes effect of pressure test data, and in M0In a month, standard well effective response for water flood always, while to exclude other non-notes The yield effect that water takes effect.
The initial stage daily oil production Q of standard well described in step 4)0tCalculation formula is as follows:
In formula, q01、q02、q03The daily output for the first trimester that respectively yield arranges from high to low in standard well operation half a year Individual well day oil-producing.
The lapse rate that takes effect described in step 5) D0Calculation formula is as follows:
The initial stage daily oil production Q of target producing well described in step 6)ntCalculation formula is as follows:
In formula, q1、q2、q3The day for the first trimester that respectively yield arranges from high to low in target producing well operation half a year Produce individual well day oil-producing.
Take effect theoretical daily output Q ' described in step 7)nCalculation formula is as follows:
Q′n=Qnt×D0×(M0-6)。
Take effect coefficient η described in step 8)nCalculation formula is as follows:
Judgment criteria well takes effect the following conditions to be met:
(1) continuous 3 years strata pressures rising or steady;
(2) yield rising or stable yield in production process;
(3) the recovered water saliferous of oil well is between injection water and water flooding.
The beneficial effects of the present invention are:
This oil-extracting well water injection exploitation provided by the invention takes effect effect evaluation method, introduces to take effect and lapse rate and take effect Two parameters of coefficient overcome conventional method and are only capable of carrying out taking effect to single producing well good or bad qualitative judgement, can not The defect that the further degree evaluation that takes effect is carried out to entire oil reservoir, can be with individual well and oil reservoir in rapid qualitative difference production period The whole effect that takes effect lays the foundation for the research of further oil reservoir.
For above content of the invention can be clearer and more comprehensible, preferred embodiment is cited below particularly, and in conjunction with attached drawing, make detailed It is described as follows.
Detailed description of the invention
Fig. 1 is that I class takes effect well A production curve;
Fig. 2 is that II class takes effect well B production curve;
Fig. 3 is ineffective well C production curve.
Specific embodiment
Embodiments of the present invention are illustrated by particular specific embodiment below, those skilled in the art can be by this specification Revealed content is understood other advantages and efficacy of the present invention easily.
Description introduces exemplary embodiments of the present invention, however, the present invention can use many different forms Implement, and be not limited to the embodiment described herein, providing these embodiments is at large and fully disclose this Invention, and the scope of the present invention is sufficiently conveyed to person of ordinary skill in the field.For the example being illustrated in the accompanying drawings Term in property embodiment is not limitation of the invention.
Unless otherwise indicated, term (including scientific and technical terminology) used herein has person of ordinary skill in the field It is common to understand meaning.Further it will be understood that with the term that usually used dictionary limits, should be understood as and its The context of related fields has consistent meaning, and is not construed as Utopian or too formal meaning.
Embodiment 1:
A kind of exploitation of oil-extracting well water injection is present embodiments provided to take effect effect evaluation method, comprising the following steps:
Step 1) collects the moon creation data of producing well all in oil reservoir, obtains daily oil production;
Step 2) determines that target producing well needs to quantify the production time node M of effect of taking effect0And production time node M0Under practical daily oil production Qn
Step 3) selection standard well;
The initial stage daily oil production Q of step 4) calculating standard well0t
Step 5) is according to the initial stage daily oil production Q of standard well0tWith standard well in the production time for needing to quantify to take effect effect Node M0Under day oil-producing Q0, calculate the lapse rate D that takes effect of standard well0
The initial stage daily oil production Q of step 6) calculating target producing wellnt
Step 7) is according to the lapse rate D that takes effect of standard well0, target producing well initial stage daily oil production Qnt, calculate target and adopt Oil well needs to quantify the production time node M of effect of taking effect0The theoretical daily output Q ' that takes effectn
Step 8) is according to the theoretical daily output Q ' that takes effectnWith target producing well in production time node M0Under practical day oil-producing Measure Qn, calculate target producing well and need to quantify the production time node M of effect of taking effect0The coefficient η that takes effectn
Step 9) is developed the effect that takes effect to target oil-extracting well water injection and is evaluated, and following three classes are divided into:
ηn≤ 0.2 is classified as I class, 0.2 < ηn≤ 0.4 is classified as II class, and I class and II class are to take effect;0.4 < ηn≤ 1 is classified as loseing Effect.
This oil-extracting well water injection provided by the invention develops the effect evaluation method that takes effect, and overcomes conventional method and is only capable of to list One producing well carries out the good or bad qualitative judgement that takes effect, and can not carry out the degree evaluation that further takes effect to entire oil reservoir Defect can be established with the effect that takes effect of individual well and oil reservoir entirety in rapid qualitative difference production period for the research of further oil reservoir Fixed basis.
Embodiment 2:
A kind of exploitation of oil-extracting well water injection is present embodiments provided to take effect effect evaluation method, comprising the following steps:
Step 1) collects the moon creation data of producing well all in oil reservoir, obtains daily oil production;The moon of the producing well Creation data has been all months creation datas since operation;
Step 2) determines that target producing well needs to quantify the production time node M of effect of taking effect0And production time node M0Under practical daily oil production Qn;Wherein, target producing well needs to quantify the production time node M of effect of taking effect0Not less than 6 Month;
For example, it is desired to quantify the effect that takes effect that producing well A produces the moon at the 24th, M0Value is 24, actual production Qn
Step 3) selection standard well;Standard well is that productive life is greater than 3 years, production process zero defects, has 3 years or more The producing well that takes effect of formation pressure test data, and in M0In a month, standard well effective response for water flood always, while to exclude other The yield effect of non-effective response for water flood;
Wherein, judgment criteria well takes effect the following conditions to be met:
(1) continuous 3 years strata pressures rising or steady;
(2) yield rising or stable yield in production process;
(3) the recovered water saliferous of oil well is between injection water and water flooding;
After standard well determines, by the quantization for the effect that carries out taking effect based on the well.It is required that in M0A month production time It is interior, standard well effective response for water flood always, and to exclude the yield effect of other non-effective response for water flood.For example, it is desired to quantify producing well A The effect that takes effect that the moon is produced at the 24th then requires standard well effective response for water flood always in 24 production moons, and to exclude other The yield effect of non-effective response for water flood.
The initial stage daily oil production Q of step 4) calculating standard well0t
The initial stage daily oil production Q of standard well0tCalculation formula is as follows:
In formula, q01、q02、q03Respectively yield is arranged from high to low in standard well operation half a year The daily output individual well day oil-producing of the first trimester of column.
Step 5) is according to the initial stage daily oil production Q of standard well0tWith standard well in the production time for needing to quantify to take effect effect Node M0Under day oil-producing Q0, calculate the lapse rate D that takes effect of standard well0
The lapse rate that takes effect D0Calculation formula is as follows:
The initial stage daily oil production Q of step 6) calculating target producing wellnt
The initial stage daily oil production Q of target producing wellntCalculation formula is as follows:
In formula, q1、q2、q3The day for the first trimester that respectively yield arranges from high to low in target producing well operation half a year Produce individual well day oil-producing;
Step 7) is according to the lapse rate D that takes effect of standard well0, target producing well initial stage daily oil production Qnt, calculate target and adopt Oil well needs to quantify the production time node M of effect of taking effect0The theoretical daily output Q ' that takes effectn
Take effect theoretical daily output Q 'nCalculation formula is as follows:
Q′n=Qnt×D0×(M0-6);
Step 8) is according to the theoretical daily output Q ' that takes effectnWith target producing well in production time node M0Under practical day oil-producing Measure Qn, calculate target producing well and need to quantify the production time node M of effect of taking effect0The coefficient η that takes effectn
Take effect coefficient ηnCalculation formula is as follows:
Step 9) is developed the effect that takes effect to target oil-extracting well water injection and is evaluated, and following three classes are divided into:
ηn≤ 0.2 is classified as I class, 0.2 < ηn≤ 0.4 is classified as II class, and I class and II class are to take effect;0.4 < ηn≤ 1 is classified as loseing Effect.
This method is suitable for the directional well and horizontal well of waterflooding extraction.
Embodiment 3:
Certain waterflooding reservoir is chosen, on the basis of embodiment 2, the present embodiment quantifies to recover the oil in oil reservoir in the method The effect that takes effect of well (horizontal well).
Step 1: collecting the moon creation data (day oil production level) of the oil reservoir;
Step 2: determining the production time node M of target level well A, the effect that needs to quantify to take effect0=24 and this when segmentum intercalaris Actual production production Q under pointn=6.19t/d;
Step 3: by collecting the dynamic monitoring information of oil reservoir well, the production curve of each producing well of observation, selecting GP0 is mark Quasi- well;
Step 4: the initial production of GP0 is calculated, is extracted by data, q01=8.37t/d, q02=8.22t/d, q03= 7.77t/d calculates Q0t=8.12t/d;
Step 5: calculating the lapse rate D that takes effect0, extracted by data, standard well produces the day oil-producing Q that the moon is 240=5.34t/ D calculates D0=0.019;
Step 6: calculating the initial production Q of producing well Ant, extracted by data, q1=11.00t/d, q2=11.00t/d, q3=10.99t/d, calculates Qnt=10.99t/d;
Step 7: calculating the theoretical yield Q ' that takes effect that producing well A produces the moon at the 24thn, calculate Q 'n=7.03t/d;
Step 8: calculating the coefficient η that takes effect that producing well A produces the moon at the 24thn, calculate ηn=0.12;
Step 9: according to quantitative assessment as a result, producing well A is classified as I class.Producing well A production curve is as shown in Figure 1.
Embodiment 4:
Certain waterflooding reservoir is taken, quantifies the effect that takes effect of producing well in oil reservoir in the method.
Step 1: collecting the moon creation data (day oil production level) of the oil reservoir;
Step 2: determining the production time node M of target level well B, the effect that needs to quantify to take effect0=24 and this when segmentum intercalaris Actual production production Q under pointn=5.26t/d;
Step 3: by collecting the dynamic monitoring information of oil reservoir well, the production curve of each producing well of observation, selecting GP0 is mark Quasi- well;
Step 4: the initial production of GP0 is calculated, is extracted by data, q01=8.37t/d, q02=8.22t/d, q03= 7.77t/d calculates Q0t=8.12t/d;
Step 5: calculating the lapse rate D that takes effect0, extracted by data, standard well produces the day oil-producing Q that the moon is 240=5.34t/ D calculates D0=0.019;
Step 6: calculating the initial production Q of producing well Bnt, extracted by data, q1=15.56t/d, q2=9.65t/d, q3 =9.48t/d, calculates Qnt=11.56t/d;
Step 7: calculating the theoretical yield Q ' that takes effect that producing well B produces the moon at the 24thn, calculate Q 'n=7.58t/d;
Step 8: calculating the coefficient η that takes effect that producing well B produces the moon at the 24thn, calculate ηn=0.31;
Step 9: according to quantitative assessment as a result, horizontal well B is classified as II class.Producing well B production curve is as shown in Figure 2.
Embodiment 5:
Certain waterflooding reservoir is chosen, quantifies the effect that takes effect of producing well in oil reservoir in the method.
Step 1: collecting the moon creation data (day oil production level) of the oil reservoir;
Step 2: determining that target level well C needs to quantify the production time node M of effect of taking effect0=24 and the timing node Under actual production production Qn=2.87t/d;
Step 3: by collecting the dynamic monitoring information of oil reservoir well, the production curve of each producing well of observation, selecting GP0 is mark Quasi- well;
Step 4: the initial production of GP0 is calculated, is extracted by data, q01=8.37t/d, q02=8.22t/d, q03= 7.77t/d calculates Q0t=8.12t/d;
Step 5: calculating the lapse rate D that takes effect0, extracted by data, standard well produces the day oil-producing Q that the moon is 240=5.34t/ D calculates D0=0.019;
Step 6: calculating the initial production Q of producing well Cnt, extracted by data, q1=10.45t/d, q2=10.31t/d, q3=10.21t/d, calculates Qnt=10.32t/d;
Step 7: calculating the theoretical yield Q ' that takes effect that producing well C produces the moon at the 24thn, calculate Q 'n=6.79t/d;
Step 8: calculating the coefficient η that takes effect that producing well C produces the moon at the 24thn, calculate ηn=0.58;
Step 9: according to quantitative assessment as a result, horizontal well C is classified as ineffective.Producing well C production curve is as shown in Figure 3.
It will be understood by those skilled in the art that the respective embodiments described above are to realize specific embodiments of the present invention, And in practical applications, can to it, various changes can be made in the form and details, without departing from the spirit and scope of the present invention.

Claims (10)

  1. The effect evaluation method 1. a kind of oil-extracting well water injection exploitation takes effect, which comprises the following steps:
    Step 1) collects the moon creation data of producing well all in oil reservoir, obtains daily oil production;
    Step 2) determines that target producing well needs to quantify the production time node M of effect of taking effect0And production time node M0Under Practical daily oil production Qn
    Step 3) selection standard well;
    The initial stage daily oil production Q of step 4) calculating standard well0t
    Step 5) is according to the initial stage daily oil production Q of standard well0tWith standard well in the production time node of effect that needs to quantify to take effect M0Under day oil-producing Q0, calculate the lapse rate D that takes effect of standard well0
    The initial stage daily oil production Q of step 6) calculating target producing wellnt
    Step 7) is according to the lapse rate D that takes effect of standard well0, target producing well initial stage daily oil production Qnt, calculate target producing well It needs to quantify the production time node M of effect of taking effect0The theoretical daily output Q ' that takes effectn
    Step 8) is according to the theoretical daily output Q ' that takes effectnWith target producing well in production time node M0Under practical daily oil production Qn, Target producing well is calculated to need to quantify the production time node M of effect of taking effect0The coefficient η that takes effectn
    Step 9) is developed the effect that takes effect to target oil-extracting well water injection and is evaluated, and following three classes are divided into:
    ηn≤ 0.2 is classified as I class, 0.2 < ηn≤ 0.4 is classified as II class, and I class and II class are to take effect;0.4 < ηn≤ 1 be classified as it is ineffective.
  2. The effect evaluation method 2. a kind of oil-extracting well water injection exploitation according to claim 1 takes effect, it is characterised in that: step 1) Described in the moon creation data of producing well be all months creation datas since operation.
  3. The effect evaluation method 3. a kind of oil-extracting well water injection exploitation according to claim 1 takes effect, it is characterised in that: step 2) Middle target producing well needs to quantify to take effect the production time node M of effect0Not less than 6 months.
  4. The effect evaluation method 4. a kind of oil-extracting well water injection exploitation according to claim 1 takes effect, which is characterized in that step 3) Described in standard well be that productive life is greater than 3 years, production process zero defects, has 3 years and above formation pressure test data Take effect producing well, and in M0In a month, standard well effective response for water flood always, while to exclude the yield shadow of other non-effective response for water flood It rings.
  5. The effect evaluation method 5. a kind of oil-extracting well water injection exploitation according to claim 1 takes effect, which is characterized in that step 4) Described in standard well initial stage daily oil production Q0tCalculation formula is as follows:
    In formula, q01、q02、q03The daily output individual well for the first trimester that respectively yield arranges from high to low in standard well operation half a year Day oil-producing.
  6. The effect evaluation method 6. a kind of oil-extracting well water injection exploitation according to claim 1 takes effect, which is characterized in that step 5) Described in take effect lapse rate D0Calculation formula is as follows:
  7. The effect evaluation method 7. a kind of oil-extracting well water injection exploitation according to claim 1 takes effect, which is characterized in that step 6) Described in target producing well initial stage daily oil production QntCalculation formula is as follows:
    In formula, q1、q2、q3The daily output list for the first trimester that respectively yield arranges from high to low in target producing well operation half a year Well day oil-producing.
  8. The effect evaluation method 8. a kind of oil-extracting well water injection exploitation according to claim 1 takes effect, which is characterized in that step 7) Described in take effect theoretical daily output Q 'nCalculation formula is as follows:
    Q′n=Qnt×D0×(M0-6)。
  9. The effect evaluation method 9. a kind of oil-extracting well water injection exploitation according to claim 1 takes effect, which is characterized in that step 8) Described in take effect coefficient ηnCalculation formula is as follows:
  10. The effect evaluation method 10. a kind of oil-extracting well water injection exploitation according to claim 4 takes effect, it is characterised in that: judgement Standard well takes effect the following conditions to be met:
    (1) continuous 3 years strata pressures rising or steady;
    (2) yield rising or stable yield in production process;
    (3) the recovered water saliferous of oil well is between injection water and water flooding.
CN201910733312.6A 2019-08-09 2019-08-09 Evaluation method for effectiveness of water injection development of oil production well Active CN110469299B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910733312.6A CN110469299B (en) 2019-08-09 2019-08-09 Evaluation method for effectiveness of water injection development of oil production well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910733312.6A CN110469299B (en) 2019-08-09 2019-08-09 Evaluation method for effectiveness of water injection development of oil production well

Publications (2)

Publication Number Publication Date
CN110469299A true CN110469299A (en) 2019-11-19
CN110469299B CN110469299B (en) 2021-07-30

Family

ID=68510308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910733312.6A Active CN110469299B (en) 2019-08-09 2019-08-09 Evaluation method for effectiveness of water injection development of oil production well

Country Status (1)

Country Link
CN (1) CN110469299B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111810118A (en) * 2020-07-06 2020-10-23 中国海洋石油集团有限公司 Method for rapidly and quantitatively evaluating improved development effect of oil well extract
CN111915171A (en) * 2020-07-21 2020-11-10 中国石油大学(华东) Comprehensive evaluation method for deep plugging and adjusting effect
CN111997596A (en) * 2020-08-14 2020-11-27 中国石油天然气股份有限公司 Water absorption effect evaluation method of water injection well and application
CN112228051A (en) * 2020-10-23 2021-01-15 中国石油天然气股份有限公司 Evaluation method for injection and production wells in same well

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1995017581A1 (en) * 1993-12-20 1995-06-29 Atlantic Richfield Company A method for real time process control of well stimulation
CN104484556A (en) * 2014-11-28 2015-04-01 中国石油天然气股份有限公司 Oilfield development evaluation method
CN105626009A (en) * 2015-12-17 2016-06-01 中国石油天然气股份有限公司 Fracture-cavern type carbonate oil reservoir single well water injection oil substituting effect quantitative evaluation method
CN106600441A (en) * 2016-12-02 2017-04-26 中国石油大学(北京) Low-permeability oil reservoir profile control effect dynamic evaluation method
CN106651158A (en) * 2016-12-08 2017-05-10 中国石油天然气股份有限公司 Ultra-low permeability tight oil reservoir horizontal well waterflooding response degree quantitative evaluation method
CN107451924A (en) * 2016-05-30 2017-12-08 中国石油天然气股份有限公司 A kind of effect of reservoir development evaluation method
CN107965301A (en) * 2017-10-26 2018-04-27 中国石油天然气股份有限公司 A kind of quantitative evaluation method for digitizing oil-field flooding process
CN108229811A (en) * 2017-12-29 2018-06-29 中国石油化工股份有限公司 A kind of method for evaluating fracture and vug carbonate reservoir flood effectiveness

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1995017581A1 (en) * 1993-12-20 1995-06-29 Atlantic Richfield Company A method for real time process control of well stimulation
CN104484556A (en) * 2014-11-28 2015-04-01 中国石油天然气股份有限公司 Oilfield development evaluation method
CN105626009A (en) * 2015-12-17 2016-06-01 中国石油天然气股份有限公司 Fracture-cavern type carbonate oil reservoir single well water injection oil substituting effect quantitative evaluation method
CN107451924A (en) * 2016-05-30 2017-12-08 中国石油天然气股份有限公司 A kind of effect of reservoir development evaluation method
CN106600441A (en) * 2016-12-02 2017-04-26 中国石油大学(北京) Low-permeability oil reservoir profile control effect dynamic evaluation method
CN106651158A (en) * 2016-12-08 2017-05-10 中国石油天然气股份有限公司 Ultra-low permeability tight oil reservoir horizontal well waterflooding response degree quantitative evaluation method
CN107965301A (en) * 2017-10-26 2018-04-27 中国石油天然气股份有限公司 A kind of quantitative evaluation method for digitizing oil-field flooding process
CN108229811A (en) * 2017-12-29 2018-06-29 中国石油化工股份有限公司 A kind of method for evaluating fracture and vug carbonate reservoir flood effectiveness

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111810118A (en) * 2020-07-06 2020-10-23 中国海洋石油集团有限公司 Method for rapidly and quantitatively evaluating improved development effect of oil well extract
CN111915171A (en) * 2020-07-21 2020-11-10 中国石油大学(华东) Comprehensive evaluation method for deep plugging and adjusting effect
CN111915171B (en) * 2020-07-21 2024-02-13 中国石油大学(华东) Comprehensive evaluation method for depth plugging effect
CN111997596A (en) * 2020-08-14 2020-11-27 中国石油天然气股份有限公司 Water absorption effect evaluation method of water injection well and application
CN111997596B (en) * 2020-08-14 2024-03-01 中国石油天然气股份有限公司 Water absorption effect evaluation method of water injection well and application
CN112228051A (en) * 2020-10-23 2021-01-15 中国石油天然气股份有限公司 Evaluation method for injection and production wells in same well
CN112228051B (en) * 2020-10-23 2023-07-25 中国石油天然气股份有限公司 Evaluation method for same-well injection and production well

Also Published As

Publication number Publication date
CN110469299B (en) 2021-07-30

Similar Documents

Publication Publication Date Title
CN110469299A (en) A kind of exploitation of oil-extracting well water injection takes effect effect evaluation method
CN105569646B (en) A kind of oil/gas well technologically recoverable reserves prediction technique
CN105696986B (en) A kind of NEW TYPE OF COMPOSITE drives oil displacement experiment/test simulation method
CN107577831B (en) Method for calculating scale of karst cave of fracture-cavity carbonate oil-gas reservoir
RU2013148583A (en) METHOD FOR DYNAMIC EVALUATION OF COMPLIANCE WITH OIL COLLECTOR TECHNICAL REQUIREMENTS AND INCREASE OF PRODUCTION AND OIL PRODUCTION USING ASYMMETRIC ANALYSIS OF WORK INDICATORS
CN104343427B (en) A kind of prediction CO2the method of oil reservoirs inorganic scaling trend
WO2019242296A1 (en) Method for obtaining relationship model between water injection well and oil production well, and method for determining production rate and water injection amount
CN109236273B (en) Dynamic data processing method for oil field development and production
CN104314547A (en) HAFD segmented optimization method and system
CN103867184A (en) Gas well critical liquid carrying flow rate determining method and device
CN105719097A (en) Dynamic analysis and waterflooding management system of fractured-vuggy type reservoir
CN103912248A (en) Method for predicting water contents of water-drive oilfields
CN106875286A (en) A kind of polymer flooding oil field overall process notes poly- parameter hierarchy optimization decision-making technique
CN105893679A (en) Afterflow correction well test interpretation method of low-production horizontal well
CN112016212B (en) Reservoir longitudinal heterogeneity evaluation method based on seepage control equation
CN106909757A (en) A kind of Advance Water Injection in Low-Permeability Reservoir stratum Reasonable Pressure Level determines method
CN109918769B (en) Method for calculating unsteady water invasion volume of fracture-cavity oil reservoir by using transient equation
Davudov et al. Integration of capacitance resistance model with reservoir simulation
CN107247816B (en) Method for judging farthest construction radius of cold recovery chemical viscosity reduction for heavy oil reservoir
CN104806215B (en) A kind of recognition methodss that the extraction well performance degree of association is injected for chemical flooding
US20230266502A1 (en) Collaborative optimization method for gas injection huff-n-puff parameters in tight oil reservoirs
Sivon et al. Developing guidelines for selection of appropriate fracture models in the numerical simulation of well performance behavior for liquid rich ultra-low permeability ULP reservoirs
CN107013207A (en) A kind of method for obtaining Complex Fault Block Oil Reservoir sand body underground well location information
CN104632138B (en) Method for establishing thin-layer oil deposit capacity formula of narrow river channel
CN105696988A (en) Determination method applied to combination flooding efficient oil flooding scheme under industrial well pattern condition and combination flooding efficient oil flooding scheme

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant