CN106401281A - Novel revetment device used for building construction - Google Patents

Novel revetment device used for building construction Download PDF

Info

Publication number
CN106401281A
CN106401281A CN201610965228.3A CN201610965228A CN106401281A CN 106401281 A CN106401281 A CN 106401281A CN 201610965228 A CN201610965228 A CN 201610965228A CN 106401281 A CN106401281 A CN 106401281A
Authority
CN
China
Prior art keywords
wall body
body plate
ash wall
pillar
support rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610965228.3A
Other languages
Chinese (zh)
Other versions
CN106401281B (en
Inventor
叶丽琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Qingniu Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610965228.3A priority Critical patent/CN106401281B/en
Publication of CN106401281A publication Critical patent/CN106401281A/en
Application granted granted Critical
Publication of CN106401281B publication Critical patent/CN106401281B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/1413Post-and-rail fences, e.g. without vertical cross-members
    • E04H17/1417Post-and-rail fences, e.g. without vertical cross-members with vertical cross-members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/16Fences constructed of rigid elements, e.g. with additional wire fillings or with posts using prefabricated panel-like elements, e.g. wired frames
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02SGENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES
    • H02S40/00Components or accessories in combination with PV modules, not provided for in groups H02S10/00 - H02S30/00
    • H02S40/30Electrical components
    • H02S40/38Energy storage means, e.g. batteries, structurally associated with PV modules
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a novel revetment device used for building construction. The novel revetment device comprises a left supporting post (10) and a right supporting post (11), wherein a supporting cross rod (7) is connected between the left supporting post (10) and the right supporting post (11); the left end part of the supporting cross rod (7) penetrates through the left supporting post (10) and extends out of the left side of the left supporting post (10); the right end part of the supporting cross rod (7) penetrates through the right supporting post (11) and extends out of the right side of the right supporting post (11); the left end part and the right end part of the supporting cross rod (7) are separately fixedly connected with the left supporting post (10) and the right supporting post (11) through locking nuts (9); the left end part and the right end part of the supporting cross rod (7) are separately provided with outer threads (8) which are matched with the locking nuts (9); and more than two wall body plates (1) are sequentially arrayed on the supporting cross rod (7).

Description

A kind of building construction revetment device
Technical field
The present invention relates to a kind of building construction revetment device.
Background technology
At present, in the periphery in construction building site, it is required for setting up enclosure wall, building site is completely cut off by enclosure wall, it is to avoid inoperative Personnel enter into the inside of construction site, also avoid non-working person to enter into the generation that the inside of construction site causes the accident, Also avoid construction material in construction site to be stolen, enclosure wall of the prior art mostly is masonry structure simultaneously, therefore building and Need larger manpower and materials during dismounting, so will result in larger quantities, and the enclosure wall of masonry structure is after dismounting Cannot reuse, larger waste in resource can be caused, input cost is larger.
Content of the invention
The technical problem to be solved in the present invention is to provide a kind of building construction revetment device.
For solving the above problems, the present invention adopts the following technical scheme that:
A kind of building construction revetment device of the present invention, including left pillar and right pillar, described left pillar and the described right side It is connected with support rail, the left part of described support rail passes through described left pillar and extends described left pillar between pillar Left side, the right part of described support rail passes through described right pillar and extends the right side of described right pillar, described support rail Left part and the right part of described support rail pass through locking nut and described left pillar respectively and described right pillar is fixing even Connect, the right part of the left part of described support rail and described support rail is provided with the outer spiral shell coordinating described locking nut Line, is arranged in order the ash wall body plate being provided with more than two pieces on described support rail, the left surface of described ash wall body plate is provided with Insertion groove, the right flank of described ash wall body plate is provided with coordinate the insertion of described insertion groove to protrude, before described ash wall body plate It is provided with hanging block at end face upper position, be provided with support strip at the front end face upper position of described ash wall body plate, described supporting Bar is connected with two balancing poles by jointed shaft, and two described balancing poles are provided with taper away from that one end of described jointed shaft Head, the bottom of described ash wall body plate is provided with the insertion section in triangular shape, offers and join with described support rail in described hanging block The cooperation groove closing, the inside of described cooperation groove is arc-shaped in order to convenient and described support rail cooperation, described hanging block Latter half of in be provided with counterbore, be provided with intercommunicating pore in the first half of described hanging block, described counterbore is inserted into being combined with lock Rationed marketing, described counterbore is identical with the angle of inclination of described intercommunicating pore, and described counterbore is identical with the diameter of described intercommunicating pore, described lock Rationed marketing extends in described counterbore through described intercommunicating pore, and described stop pin departs from after being installed in order to prevent described ash wall body plate With the fixation of described support rail, it is provided with positioning on the base of described left pillar and on the base of right pillar and protrudes, two Described positioning protrusion is oppositely arranged and the tops of two described positioning protrusions are provided with U-type groove, and two described U-type groove set relatively Put, two described U-type groove be connected with locating rod, the trench bottom of described U-type groove is flushed with the top of described support strip, Described locating rod is located on described support strip and is conflicted with described support strip and described ash wall body plate, described locating rod with described Support cross bar Relative vertical setting, is provided with rotatably on described left pillar and right pillar and near the side of described ash wall body plate Lamp socket, described lamp socket is provided with LED spotlight, described LED spotlight in order to use in night illumination, described left pillar and right pillar Top be provided with solar panels, the bottom of described solar panels is provided with storage respectively and described left pillar and right pillar between Battery, described solar panels, battery and LED spotlight are sequentially connected electrically, thus solar energy is changed into electricity by solar panels Can be stored in described battery and power use for described LED spotlight.
Further, described counterbore and the angle of inclination of described intercommunicating pore are 45 degree.
Further, the bottom of described insertion section to described support strip distance be less than described balancing pole length.
Further, described left pillar and described right pillar are provided with the cross bar hole passing through for described support rail.
Further, described hanging block and described ash wall body plate are fixedly connected by welding, described support strip and described body of wall Plate is fixedly connected by welding.
Further, described insertion groove is identical with the size that described insertion is protruded, in two pieces of described ash wall body plate cooperations, its In the described insertion of one piece of described ash wall body plate protrude and coordinate to realize two pieces with the described insertion groove of other one piece of described ash wall body plate The tight fit of described ash wall body plate.
Further, the upper and lower ends that described insertion is protruded are provided with chamfering, and the setting of described chamfering is in order to convenient described Insertion protrusion is rapidly inserted into cooperation in described insertion groove.
Further, the height of described ash wall body plate is not less than 120cm, and the width of every piece of described ash wall body plate is 60cm-80cm.
Further, described ash wall body plate is solid construction, and described ash wall body plate is made up of PVC plastic.
The beneficial effect of building construction revetment device of the present invention is:By the body of wall to more than two pieces for the support rail Plate is supported, and the insertion section of ash wall body plate is inserted into underground, and ash wall body plate is balanced support using two balancing poles, increases Ash wall body plate stationarity after mounting, is connected between the ash wall body plate being made more than two pieces by the cooperation that insertion groove and insertion are protruded Connect is more firm, by the support coordinating in order to prevent ash wall body plate disengaging support rail of stop pin and counterbore, by positioning Bar carries out perpendicular positioning to ash wall body plate, prevents ash wall body plate from tilting to put, also increases wind resistance, the anti-pressure ability of ash wall body plate, make Used time, the base of left pillar and right pillar is cast and fixes on the ground, ash wall body plate is provided with one end of hanging block towards applying In work building site, other end is towards outside construction site, thus preventing ash wall body plate stolen, this device can be rapidly completed and build, Later stage dismounting is convenient to, and also any part will be caused damage lead to use, saved throwing in demolishing process Enter cost, its structure is simple, easy accessibility, convenient transport is with low cost, is suitable for promoting the use of.
Brief description
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing Have technology description in required use accompanying drawing be briefly described it should be apparent that, drawings in the following description be only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, acceptable Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the overall co-ordination structural representation of building construction revetment device of the present invention;
Fig. 2 is the front view of ash wall body plate in Fig. 1;
Fig. 3 is the left view of ash wall body plate in Fig. 1;
Fig. 4 is the sectional view of hanging block in Fig. 2, and wherein, stop pin is not inserted in intercommunicating pore and counterbore.
Fig. 5 is the left view positioning protrusion in Fig. 1.
Fig. 6 is the top view of Fig. 5.
Specific embodiment
Below in conjunction with the accompanying drawings the preferred embodiments of the present invention are described in detail, so that advantages and features of the invention energy It is easier to be readily appreciated by one skilled in the art, thus protection scope of the present invention is made apparent clearly defining.
Refering to shown in Fig. 1-6, a kind of building construction revetment device of the present invention, including left pillar 10 and right pillar 11, it is connected with support rail 7 between described left pillar 10 and described right pillar 11, the left part of described support rail 7 passes through institute State left pillar 10 and extend the left side of described left pillar 10, the right part of described support rail 7 passes through described right pillar 11 simultaneously Extend the right side of described right pillar 11, the left part of described support rail 7 and the right part of described support rail 7 are passed through respectively Locking nut 9 is fixedly connected with described left pillar 10 and described right pillar 11, the left part of described support rail 7 and described support The external screw thread 8 coordinating described locking nut 9 is provided with the right part of cross bar 7, described support rail 7 is arranged in order and sets It is equipped with more than two pieces of ash wall body plate 1, the left surface of described ash wall body plate 1 is provided with insertion groove 12, the right flank of described ash wall body plate 1 On be provided with to coordinate the insertion of described insertion groove 12 to protrude 13, be provided with the front end face upper position of described ash wall body plate 1 Hanging block 2, is provided with support strip 4 at the front end face upper position of described ash wall body plate 1, described support strip 4 is connected by jointed shaft 5 There are two balancing poles 6, two described balancing poles 6 are provided with conical head 61, described ash wall body plate away from that one end of described jointed shaft 5 1 bottom is provided with the insertion section 3 in triangular shape, offers logical with the cooperation of described support rail 7 cooperation in described hanging block 2 Groove 22, the inside of described cooperation groove 22 is that arc-shaped is coordinated with described support rail 7 in order to convenient, after described hanging block 2 It is provided with counterbore 23 in half portion, in the first half of described hanging block 2, is provided with intercommunicating pore 24, described counterbore 23 is inserted into being combined with Stop pin 25, described counterbore 23 is identical with the angle of inclination of described intercommunicating pore 24, and described counterbore 23 is straight with described intercommunicating pore 24 Footpath is identical, and described stop pin 25 extends in described counterbore 23 through described intercommunicating pore 24, and described stop pin 25 is in order to prevent State ash wall body plate 1 to depart from after being installed and the fixation of described support rail 7, on the base of described left pillar 10 and right pillar 11 Positioning protrusion 101 is provided with base, two described positioning are protruded 101 and are oppositely arranged and two described positioning protrude 101 Top is provided with U-type groove 110, and two described U-type groove 110 are oppositely arranged, and are connected with two described U-type groove 110 Locating rod 100, the trench bottom of described U-type groove 110 is flushed with the top of described support strip 4, and described locating rod 100 is located at described Hold on bar 4 and conflict with described support strip 4 and described ash wall body plate 1, described locating rod 100 is relative vertical with described support rail 7 Straight setting, is provided with rotatable lamp socket on described left pillar 10 and right pillar 11 and near the side of described ash wall body plate 1 103, described lamp socket 103 is provided with LED spotlight 102, described LED spotlight 102 is in order to use in night illumination, thus conveniently existing Night installs to described ash wall body plate 1, described ash wall body plate 1 is stolen at night prevented also from illegal person, described left The top of post 10 and right pillar 11 is provided with solar panels 113, the bottom of described solar panels 113 respectively with described left pillar It is provided with battery 112, described solar panels 113, battery 112 and LED spotlight 102 are electrically connected successively between 10 and right pillar 11 Connect, thus by solar panels 113, solar energy being changed into electrical power storage is described LED spotlight 102 in described battery 112 Power supply uses, can effectively save existing electric power resource using solar electrical energy generation.
Wherein, described counterbore 23 and the angle of inclination of described intercommunicating pore 24 are 45 degree.
Wherein, the bottom of described insertion section 3 to described support strip 4 distance be less than described balancing pole 6 length.
Wherein, described left pillar 10 and described right pillar 11 are provided with the cross bar hole passing through for described support rail 7.
Wherein, described hanging block 2 and described ash wall body plate 1 are fixedly connected by welding, described support strip 4 and described ash wall body plate 1 is fixedly connected by welding.
Wherein, described insertion groove 12 is identical with the size that described insertion protrudes 13, in two pieces of described ash wall body plate 1 cooperations, The described insertion of one of described ash wall body plate 1 protrude 13 with the described insertion groove 12 of other one piece of described ash wall body plate 1 coordinate with Realize the tight fit of two pieces of described ash wall body plate 1.
Wherein, the upper and lower ends of described insertion protrusion 13 are provided with chamfering 130, and the setting of described chamfering 130 is in order to convenient Described insertion is protruded 13 and is rapidly inserted into cooperation in described insertion groove 12.
Wherein, the height of described ash wall body plate 1 is not less than 120cm, and the width of every piece of described ash wall body plate 1 is 60cm-80cm.
Wherein, described ash wall body plate 1 is solid construction, and described ash wall body plate 1 is made up of PVC plastic.
The beneficial effect of building construction revetment device of the present invention is:By the body of wall to more than two pieces for the support rail Plate is supported, and the insertion section of ash wall body plate is inserted into underground, and ash wall body plate is balanced support using two balancing poles, increases Ash wall body plate stationarity after mounting, is connected between the ash wall body plate being made more than two pieces by the cooperation that insertion groove and insertion are protruded Connect is more firm, by the support coordinating in order to prevent ash wall body plate disengaging support rail of stop pin and counterbore, by positioning Bar carries out perpendicular positioning to ash wall body plate, prevents ash wall body plate from tilting to put, also increases wind resistance, the anti-pressure ability of ash wall body plate, make Used time, the base of left pillar and right pillar is cast and fixes on the ground, ash wall body plate is provided with one end of hanging block towards applying In work building site, other end is towards outside construction site, thus preventing ash wall body plate stolen, this device can be rapidly completed and build, Later stage dismounting is convenient to, and also any part will be caused damage lead to use, saved throwing in demolishing process Enter cost, its structure is simple, easy accessibility, convenient transport is with low cost, is suitable for promoting the use of.
General principle, principal character and the advantages of the present invention of the present invention have been shown and described above.The technology of the industry , it should be appreciated that the present invention is not restricted to the described embodiments, the simply explanation described in above-described embodiment and specification is originally for personnel Invention principle, without departing from the spirit and scope of the present invention the present invention also have various changes and modifications, these change Change and improvement both falls within scope of the claimed invention.Claimed scope by appending claims and its Equivalent defines.

Claims (9)

1. a kind of building construction with revetment device it is characterised in that:Including left pillar(10)With right pillar(11), a described left side Pillar(10)With described right pillar(11)Between be connected with support rail(7), described support rail(7)Left part pass through described Left pillar(10)And extend described left pillar(10)Left side, described support rail(7)Right part pass through described right pillar (11)And extend described right pillar(11)Right side, described support rail(7)Left part and described support rail(7)The right side End passes through locking nut respectively(9)With described left pillar(10)With described right pillar(11)It is fixedly connected, described support rail (7)Left part and described support rail(7)Right part on be provided with cooperation described locking nut(9)External screw thread(8), In described support rail(7)On be arranged in order the ash wall body plate being provided with more than two pieces(1), described ash wall body plate(1)Left surface on It is provided with insertion groove(12), described ash wall body plate(1)Right flank on be provided with to coordinate described insertion groove(12)Insertion convex Go out(13), described ash wall body plate(1)Front end face upper position at be provided with hanging block(2), described ash wall body plate(1)Front end face lean on It is provided with support strip at lower position(4), described support strip(4)By jointed shaft(5)It is connected with two balancing poles(6), two institutes State balancing pole(6)Away from described jointed shaft(5)That one end be provided with conical head(61), described ash wall body plate(1)Bottom setting There is the insertion section in triangular shape(3), described hanging block(2)In offer and described support rail(7)The cooperation groove of cooperation (22), described cooperation groove(22)Inside be arc-shaped in order to convenient with described support rail(7)Cooperation, described suspension Block(2)Latter half of in be provided with counterbore(23), described hanging block(2)First half in be provided with intercommunicating pore(24), described heavy Hole(23)It is inserted into being combined with stop pin(25), described counterbore(23)With described intercommunicating pore(24)Angle of inclination identical, described Counterbore(23)With described intercommunicating pore(24)Diameter identical, described stop pin(25)Through described intercommunicating pore(24)Extend to described Counterbore(23)Interior, described stop pin(25)In order to prevent described ash wall body plate(1)Depart from and described support rail after being installed(7) Fixation, described left pillar(10)Base on and right pillar(11)Base on be provided with positioning protrude(101), two institutes State positioning to protrude(101)It is oppositely arranged and two described positioning are protruded(101)Top be provided with U-type groove(110), two institutes State U-type groove(110)It is oppositely arranged, in two described U-type groove(110)In be connected with locating rod(100), described U-type groove (110)Trench bottom and described support strip(4)Top flush, described locating rod(100)Positioned at described support strip(4)On and With described support strip(4)With described ash wall body plate(1)Conflict, described locating rod(100)With described support rail(7)Relative vertical sets Put, described left pillar(10)With right pillar(11)Upper and close described ash wall body plate(1)Side be provided with rotatable lamp socket (103), described lamp socket(103)On be provided with LED spotlight(102), described LED spotlight(102)In order to use in night illumination, institute State left pillar(10)With right pillar(11)Top be provided with solar panels(113), described solar panels(113)Bottom divide Not with described left pillar(10)With right pillar(11)Between be provided with battery(112), described solar panels(113), battery (112)And LED spotlight(102)It is sequentially connected electrically, thus passing through solar panels(113)Solar energy is changed into electrical power storage in institute State battery(112)Interior for described LED spotlight(102)Power supply uses.
2. building construction according to claim 1 with revetment device it is characterised in that:Described counterbore(23)With described Intercommunicating pore(24)Angle of inclination be 45 degree.
3. building construction according to claim 1 with revetment device it is characterised in that:Described insertion section(3)Bottom Hold described support strip(4)Distance be less than described balancing pole(6)Length.
4. building construction according to claim 1 with revetment device it is characterised in that:Described left pillar(10)And institute State right pillar(11)On be provided with for described support rail(7)The cross bar hole passing through.
5. building construction according to claim 1 with revetment device it is characterised in that:Described hanging block(2)With institute State ash wall body plate(1)It is fixedly connected by welding, described support strip(4)With described ash wall body plate(1)It is fixedly connected by welding.
6. building construction according to claim 1 with revetment device it is characterised in that:Described insertion groove(12)With institute State insertion to protrude(13)Size identical, in two pieces of described ash wall body plate(1)During cooperation, one of described ash wall body plate(1)Institute State insertion to protrude(13)With other one piece of described ash wall body plate(1)Described insertion groove(12)Cooperation is to realize two pieces of described ash wall body plate (1)Tight fit.
7. building construction according to claim 6 with revetment device it is characterised in that:Described insertion is protruded(13)'s Upper and lower ends are provided with chamfering(130), described chamfering(130)Setting in order to facilitate described insertion protrude(13)It is rapidly inserted into Described insertion groove(12)Interior cooperation.
8. building construction according to claim 1 with revetment device it is characterised in that:Described ash wall body plate(1)Height Degree is not less than 120cm, every piece of described ash wall body plate(1)Width be 60cm-80cm.
9. building construction according to claim 8 with revetment device it is characterised in that:Described ash wall body plate(1)For reality Core structure, described ash wall body plate(1)It is made up of PVC plastic.
CN201610965228.3A 2016-11-04 2016-11-04 A kind of construction revetment device Active CN106401281B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610965228.3A CN106401281B (en) 2016-11-04 2016-11-04 A kind of construction revetment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610965228.3A CN106401281B (en) 2016-11-04 2016-11-04 A kind of construction revetment device

Publications (2)

Publication Number Publication Date
CN106401281A true CN106401281A (en) 2017-02-15
CN106401281B CN106401281B (en) 2019-03-15

Family

ID=58015056

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610965228.3A Active CN106401281B (en) 2016-11-04 2016-11-04 A kind of construction revetment device

Country Status (1)

Country Link
CN (1) CN106401281B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110042926A (en) * 2019-05-06 2019-07-23 徐其兵 Build board house

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08114047A (en) * 1994-10-18 1996-05-07 Masayuki Sawazaki Safety device for construction work
CN203769423U (en) * 2014-01-09 2014-08-13 杜昌君 Combined type enclosure for construction
CN203867281U (en) * 2014-01-28 2014-10-08 国家电网公司 Fast assembly safety rail
CN203905613U (en) * 2013-12-04 2014-10-29 重庆港标物资有限公司 Safety caution sleeve rod, fence rod and fence
CN203924811U (en) * 2014-07-12 2014-11-05 军鹏特种装备有限公司 A kind of field operations parking lot
CN204343790U (en) * 2014-12-19 2015-05-20 内蒙古东部电力有限公司 The embedded electric power safety fence rod that a kind of warning tape is connected firmly

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08114047A (en) * 1994-10-18 1996-05-07 Masayuki Sawazaki Safety device for construction work
CN203905613U (en) * 2013-12-04 2014-10-29 重庆港标物资有限公司 Safety caution sleeve rod, fence rod and fence
CN203769423U (en) * 2014-01-09 2014-08-13 杜昌君 Combined type enclosure for construction
CN203867281U (en) * 2014-01-28 2014-10-08 国家电网公司 Fast assembly safety rail
CN203924811U (en) * 2014-07-12 2014-11-05 军鹏特种装备有限公司 A kind of field operations parking lot
CN204343790U (en) * 2014-12-19 2015-05-20 内蒙古东部电力有限公司 The embedded electric power safety fence rod that a kind of warning tape is connected firmly

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110042926A (en) * 2019-05-06 2019-07-23 徐其兵 Build board house

Also Published As

Publication number Publication date
CN106401281B (en) 2019-03-15

Similar Documents

Publication Publication Date Title
CN106401281A (en) Novel revetment device used for building construction
CN209228086U (en) A kind of floor edge temporary protection device
CN207714901U (en) A kind of power construction safety guide rail
CN106382055B (en) A kind of construction revetment component
CN205092422U (en) Device that hangs down is prevented to simple and easy switch board door
CN209587894U (en) A kind of solar street light being easily installed angular adjustment
CN205299429U (en) Lighting fixture for building site
CN208088968U (en) A kind of fire-fighting platform folding safety fence
CN210828603U (en) Civil engineering construction rail guard device
CN206944044U (en) Municipal solar street light
CN110307123A (en) The mounting structure of road wind power facility on the base
CN208272526U (en) A kind of tunnel cable ditch bracket
CN106522652B (en) A kind of construction revetment device
CN206195686U (en) Distributed power station
CN105604261A (en) Stable type glass guard bar
CN210088713U (en) High-strength solar LED street lamp
CN105525677A (en) Safety balcony
CN210262807U (en) Base for combined signal lamp pole
CN210441131U (en) Lighting device for tunnel construction
CN217076568U (en) Wiring device is used in construction of municipal administration road bridge
CN220397414U (en) Lighting device for job site
CN105019376A (en) Road protecting fence
CN215954732U (en) Identification means for hydraulic engineering reconnaissance design
CN215494281U (en) Line supports transition device for communication engineering
CN211949713U (en) Warning device for road administration engineering construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190221

Address after: 444100 No. 10, Group 4, Guanlingmiao Village, Yuquan Office, Dangyang City, Yichang City, Hubei Province

Applicant after: HUBEI ZHIKUN CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: 362402 No. 50, Tu Lou, Peng Ge Village, Penglai Town, Anxi, Quanzhou, Fujian

Applicant before: Ye Liqin

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190904

Address after: 430000 Wuhan Economic and Technological Development Zone, Hubei Province, 33-storey Building B2-6, S5-2, Zone B, Kaiwanda Plaza

Patentee after: Hubei Qingniu Construction Engineering Co.,Ltd.

Address before: 444100 No. 10, Group 4, Guanlingmiao Village, Yuquan Office, Dangyang City, Yichang City, Hubei Province

Patentee before: HUBEI ZHIKUN CONSTRUCTION ENGINEERING Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A protective wall device for construction

Granted publication date: 20190315

Pledgee: Wuhan Rural Commercial Bank Co.,Ltd. Caidian sub branch

Pledgor: Hubei Qingniu Construction Engineering Co.,Ltd.

Registration number: Y2024980005103