CN106401025A - Construction method for lightgage steel joist system capable of preventing partition wall from cracking - Google Patents

Construction method for lightgage steel joist system capable of preventing partition wall from cracking Download PDF

Info

Publication number
CN106401025A
CN106401025A CN201610890891.1A CN201610890891A CN106401025A CN 106401025 A CN106401025 A CN 106401025A CN 201610890891 A CN201610890891 A CN 201610890891A CN 106401025 A CN106401025 A CN 106401025A
Authority
CN
China
Prior art keywords
draconis
sky
joist
ground
ground joist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610890891.1A
Other languages
Chinese (zh)
Other versions
CN106401025B (en
Inventor
王辉平
王利雄
连珍
刘淳
陈帅
邓惠根
葛倩华
周漪芳
陈莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Building Decoration Engineering Group Co Ltd
Original Assignee
Shanghai Building Decoration Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Building Decoration Engineering Group Co Ltd filed Critical Shanghai Building Decoration Engineering Group Co Ltd
Priority to CN201610890891.1A priority Critical patent/CN106401025B/en
Publication of CN106401025A publication Critical patent/CN106401025A/en
Application granted granted Critical
Publication of CN106401025B publication Critical patent/CN106401025B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/76Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/82Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
    • E04B2/821Connections between two opposed surfaces (i.e. floor and ceiling) by means of a device offering a restraining force acting in the plane of the partition
    • E04B2/824Connections between two opposed surfaces (i.e. floor and ceiling) by means of a device offering a restraining force acting in the plane of the partition restrained elastically at one surface and inelastically at the opposing surface

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Finishing Walls (AREA)

Abstract

The invention provides a construction method for a lightgage steel joist system capable of preventing a partition wall from cracking. For solving the problem that in a conventional joist system, in case of serious influence of self deformation and structural settlement, a whole partition wall cracks, so that the appearance requirement and the using function are influenced, by use of a new constraint method and change of the connection ways of joists and a structure, the whole joist has a certain activity space in the vertical direction, skin plates and a new joist system are convenient for being fixed, the skin plates are allowed to displace in the vertical direction, and the skin plates have a certain activity space in the vertical direction in the plane of the skin plates; when the building structure displaces or deforms, the skin plates can do limited unconstrained simple activity through vertically telescopic ceiling joists, longitudinal stress is relieved, and the cracking risk of a gypsum board wall, which is caused by building settlement and horizontal air pressure, is reduced; the cracking-preventing partition wall is simple, innovative and efficient; and rubber gaskets reserved for deformation cushioning do not need to be additionally arranged between the ceiling joists and the top wall of a building and between ground joists and the ground of the building.

Description

The construction method of the lightgauge steel joist system of prevention cracks on partition walls
Technical field
The present invention relates to a kind of construction method of the lightgauge steel joist system of prevention cracks on partition walls.
Background technology
Traditional keel of partition wall system, using nailing, bolt, partition wall is integrally fastened on up-down structure, Os Draconis and partition wall it Between the impact that consolidating settlement brings is alleviated using rubber blanket.This kind of constrained procedure, self-deformation and structure that rubber blanket is alleviated Sedimentation is limited, and when rubber blanket loses activity after, partition wall easily deforms cracking, and then so that wallpaper with partition wall as basic unit, There is craze and transfiguration in the surface layers such as ceramic tile, affect aesthetic and use function.
Content of the invention
It is an object of the invention to provide a kind of construction method of the lightgauge steel joist system of prevention cracks on partition walls, can prevent Between cracks on partition walls, and sky Os Draconis and building roof, it is no longer necessary between ground joist and building ground to increase rubber blanket and buffers Deformation is reserved.
For solving the above problems, the present invention provides a kind of construction method of the lightgauge steel joist system of prevention cracks on partition walls, bag Include:
Building roof press can vertical telescopic sky Os Draconis width snap the line, and the width bullet pressing ground joist in building ground Line, determines the position of sky Os Draconis and ground joist, determines the position of centre keel, punching Os Draconis and stull Os Draconis according to the size of skin plate Put;
By described snap the line position place described ground joist and can vertical telescopic sky Os Draconis, by described ground joist and Gekko Swinhonis Bone is fixed temporarily and is corrected horizontal level, the described ground joist of fixation and sky Os Draconis afterwards to be corrected;
Centre keel can the sky Os Draconis of vertical telescopic, ground joist be attached with described respectively;
Punching Os Draconis are extended vertically through each centre keel;
Size according to skin plate and the arrangement of quantity set stull Os Draconis, by stull Os Draconis and erect dragon according to described arrangement Bone is attached.
Further, in the above-mentioned methods, the sky Os Draconis of vertical telescopic can include being fixed on cutting of building roof when described Face is U-shaped sky Os Draconis A, and the section being sheathed in described sky Os Draconis A is U-shaped sky Os Draconis B, described sky Os Draconis A and sky Os Draconis B When including the side of keel that Os Draconis roof is connected with described Os Draconis roof respectively,
Place described ground joist and sky Os Draconis by the position of described snap the line, fixed temporarily and correct horizontal level, treat Ground joist and the position of sky Os Draconis is fixed after correction, including:
Place described ground joist, sky Os Draconis A by the position of described snap the line, fixed temporarily and correct horizontal level, treat Ground joist, sky Os Draconis location A is fixed after correction;
Sky Os Draconis B is sheathed in day Os Draconis A, and fixes interim for sky Os Draconis B with sky Os Draconis A, described sky Os Draconis A and sky It is separated by predeterminable range between the Os Draconis roof of Os Draconis B.
Further, in the above-mentioned methods, centre keel respectively and can the sky Os Draconis of vertical telescopic, ground joist be attached Afterwards, also include:
After described centre keel installs, release the interim fixation of sky Os Draconis A and sky Os Draconis B.
Further, in the above-mentioned methods, centre keel respectively and can the sky Os Draconis of vertical telescopic, ground joist be carried out even Connect, including:Centre keel is attached with sky Os Draconis B, ground joist respectively.
Further, in the above-mentioned methods, also include after punching Os Draconis being extended vertically through each centre keel:
Fixed using fastener in described punching Os Draconis and centre keel junction.
Compared with prior art, the present invention by being sunk by self-deformation and structure integrally for traditional grid system, partition wall It is serious that impact is dropped, the features such as affect appearance requirement and use function of ftractureing, by using new constrained procedure, change Os Draconis and knot , so that Os Draconis integrally have certain activity space in vertical direction, skin plate and new grid system are solid for the connected mode of structure Fixed, Admissible displacement in vertical direction, and then make there is certain movable sky in skin plate vertical direction in its plane Between, when building structure is subjected to displacement or itself deforms upon, skin plate can be by the sky Os Draconis of vertical telescopic carrying out itself Limited no constraint freely-supported activity, alleviates longitudinal stress, the plaster board wall surface cracking that minimizing building settlement, horizontal blast cause A kind of risk, there is provided the curtain wall structure of simple, innovation, efficiently pre- crack resistence, between sky Os Draconis and building roof, ground joist Being no longer necessary to increase rubber blanket and building ground between, to do buffering deformation reserved.
Brief description
Fig. 1 is the sky Os Draconis A scheme of installation of one embodiment of the invention;
Fig. 2 is that the sky Os Draconis B and sky Os Draconis A of one embodiment of the invention fix schematic diagram temporarily;
Fig. 3 is the ground joist scheme of installation of one embodiment of the invention;
Fig. 4 is the centre keel structure chart of one embodiment of the invention;
Fig. 5 is the centre keel scheme of installation of one embodiment of the invention;
Fig. 6 is the punching keel installation schematic diagram of one embodiment of the invention;
Fig. 7 is the stull keel installation schematic diagram of one embodiment of the invention;
Fig. 8 is the skin plate scheme of installation of one embodiment of the invention;
Fig. 9 is that the skin plate of one embodiment of the invention installs tapping screw schematic diagram;
Figure 10 is the skin plate top scheme of installation of one embodiment of the invention;
Figure 11 is the skin plate bottom scheme of installation of one embodiment of the invention.
Specific embodiment
Understandable for enabling the above objects, features and advantages of the present invention to become apparent from, below in conjunction with the accompanying drawings and specifically real The present invention is further detailed explanation to apply mode.
As shown in Fig. 1~11, the present invention relates to a kind of partition wall of pre- crack resistence, including:
Be directly fixed on building roof 1 can vertical telescopic sky Os Draconis;
It is directly fixed on the ground joist 3 of building ground 2;Specifically, as shown in figure 3, ground joist and building ground pass through spiral shell Bolt 4 connects, and is not added with rubber blanket therebetween, and bolt 4 constant spacing takes 600mm, and first fixing point be about 100 from adjacent side wall~ 150mm;
The centre keel 5 being connected with described sky Os Draconis and ground joist 3 respectively;Specifically, as shown in Figures 4 and 5, described centre keel Upper end and described sky Os Draconis B pass through self-drilling connection, tapping screw is passed through with described ground joist in the lower end of described centre keel Connect, depending on described centre keel spacing is according to partition wall panel size, no more than 400mm can be set, in practice of construction, for making partition wall Panel stays seam, sets and is slightly larger than 403mm, behind centre keel position and vertical correction fixes it with sky ground joist, installs centre keel Centre keel level and spacing should be verified by root;
Run through each centre keel 5 and the punching Os Draconis 6 vertical with each centre keel;Specifically, as shown in fig. 6, described punching is imperial The concrete gear number of bone 6 depending on partition wall height, herein respectively centre keel 600mm, 1800mm, 3000mm, 4200mm height On be respectively mounted 4 grades of punching Os Draconis, in order to prevent punching Os Draconis from rocking, the junction of described punching Os Draconis and centre keel is passed through Fastener is fixed;
Connect the stull Os Draconis 7 between two adjacent centre keels 5, the position of described stull Os Draconis 7 and quantity and skin plate 8 Size is corresponding with quantity;Specifically, as shown in fig. 7, described stull Os Draconis are connected with centre keel by self-plugging rivet, particular location Combine length and width and the typesetting of skin plate 8 with gear number depending on;
It is fixed on the skin plate 8 on described stull Os Draconis 7 and centre keel 5, close to described building roof 1 or building ground 2 Skin plate 8 and building roof 1 or building ground 2 between be spaced predeterminable range, to form gap, in described gap, be filled with bullet Property material 9.Specifically, described skin plate and the lap of centre keel are not less than 15mm, as shown in figure 11, close to described building Gap between the skin plate on ground and building ground is more than 10mm, as shown in Figure 10, close to the skin plate of described building roof Gap and building roof between is more than 20mm~25mm, as shown in figure 9, described skin plate 8 passes through self threading pin or rifle nail 10 is solid On described stull Os Draconis 7 and centre keel 6, described self threading pin or rifle follow closely 10 depth being absorbed in skin plate 0.5mm~1mm, cover On panel periphery, the constant spacing of self threading pin or rifle nail is advisable with 200mm, the constant spacing of self threading pin or rifle nail in the middle of skin plate It is advisable with 300mm, tapping screw or rifle nail are 10mm~15mm with the distance at skin plate edge, if a certain edge of skin plate is to cut Cut edge, then described tapping screw or the distance on cut-out side described in rifle pitch of nails are 16mm~20mm.The present invention is directed to traditional Os Draconis system System, partition wall are integrally affected seriously by self-deformation and structure sediment, and the features such as affect appearance requirement and use function of ftractureing is passed through Using new constrained procedure, change the connected mode of Os Draconis and structure so that Os Draconis integrally exist in vertical direction necessarily lives Dynamic space, skin plate and new grid system are fixed, Admissible displacement in vertical direction, and then make skin plate in its plane Certain movable space is existed on vertical direction, when building structure is subjected to displacement or itself deforms upon, skin plate can lead to Cross and the sky Os Draconis of vertical telescopic can carry out itself limited no constraint freely-supported activity, alleviate longitudinal stress, reduce building settlement, water A kind of risk of plaster board wall surface that flat blast causes cracking, there is provided the partition wall knot of simple, innovation, efficiently pre- crack resistence Structure, between sky Os Draconis and building roof, being no longer necessary to increase rubber blanket between ground joist and building ground, to do buffering deformation reserved.
Preferably, as illustrated in fig. 1 and 2, described can the sky Os Draconis of vertical telescopic to include being fixed on the section of building roof be U The sky Os Draconis A of type, the section being sheathed in described sky Os Draconis A is U-shaped sky Os Draconis B, and described sky Os Draconis A and sky Os Draconis B is respectively The side of keel being connected with described Os Draconis roof including Os Draconis roof, between described sky Os Draconis A and the Os Draconis roof of sky Os Draconis B Separated by a distance, described skin plate is connected with sky Os Draconis B.Specifically, described sky Os Draconis A and sky Os Draconis B includes Os Draconis respectively The side of keel that roof connection is connected with described Os Draconis roof, thus Formation cross-section is U-shaped sky Os Draconis A and sky Os Draconis B, Gekko Swinhonis Bone A, sky Os Draconis B, all using U-shaped steel.Described sky Os Draconis A is directly connected to by nailing with building roof, and sky Os Draconis A is pushed up with building It is not added with rubber blanket, nailing spacing can use 600mm, first fixing point is about 100~150mm from adjacent side wall between wall.My god Os Draconis B is stuck on the downside of day Os Draconis A, and sky Os Draconis B and sky Os Draconis A fix temporarily, do not adopt other connected mode, for the side of installation Just, using fixing temporarily, after centre keel installation, remove and fix temporarily, the Os Draconis top of described sky Os Draconis A and sky Os Draconis B Spacing between wall can be 25mm, and the upper end of skin plate of nearly building roof and sky Os Draconis B are fixed by tapping screw, forbid cover Panel and sky Os Draconis A produce any connection, thus it is empty to ensure that skin plate can have certain freely activity in vertical direction Between, when building structure is subjected to displacement or itself deforms upon, partition wall can be alleviated by itself limited no constraint freely-supported activity Longitudinal stress, reduces the risk of cracking, solves a difficult problem for partition wall strain cracking.
Preferably, as shown in Fig. 1 is to 3, described sky Os Draconis A, sky Os Draconis B and ground joist are all using U-shaped steel.
Preferably, the edge of described skin plate is formed with groove, and the gap being easy between the skin plate adjacent to two pieces is entered Row filleting is processed.
Detailed, as shown in Fig. 1~11, the present invention provides a kind of applying of lightgauge steel joist system of above-mentioned prevention cracks on partition walls Work method, including:
Building roof 1 press can vertical telescopic sky Os Draconis width snap the line, and the width pressing ground joist in building ground 2 Snap the line, determines sky Os Draconis and the position of ground joist 3, determines centre keel 5, punching Os Draconis 6 and stull dragon according to the size of skin plate 8 The position of bone 7;Specifically, snap the line requirement is clear, and position is accurate, in addition, pressing design requirement, in conjunction with the length and width stepping of skin plate, To determine the position of centre keel, punching Os Draconis and stull Os Draconis;
By the position of described snap the line place described ground joist 3 and can vertical telescopic sky Os Draconis, by described ground joist and sky Os Draconis are fixed temporarily and are corrected horizontal level, the described ground joist of fixation and sky Os Draconis afterwards to be corrected;
Centre keel 5 can the sky Os Draconis of vertical telescopic, ground joist 3 be attached with described respectively;Specifically, by centre keel Be attached can the sky Os Draconis of vertical telescopic, ground joist respectively and by tapping screw;
Punching Os Draconis 6 are extended vertically through each centre keel 5;
Size according to skin plate 8 and the arrangement of quantity set stull Os Draconis 7, and erect stull Os Draconis according to described arrangement Os Draconis are attached;Specifically, stull Os Draconis and centre keel can be connected by self-plugging rivet according to described arrangement.Specifically, Subsequently described skin plate 8 can be fixed on described stull Os Draconis 7 and centre keel 5, between adjacent skin plate, leave gap, close Between the skin plate of described building roof or building ground and building roof or building ground, interval predeterminable range is to form gap; Specifically, as shown in figure 11, the skin plate 8 close to described building ground can be more than 10mm apart from building ground, it is to avoid directly with Flooring contacts, and is filled using elastomeric material 9, as shown in Figure 10, close to the skin plate distance building roof of described building roof 20mm~25mm, is filled using elastomeric material 9;Filling elastic material 9 in described gap.Specifically, the present invention is directed to tradition Grid system, partition wall are integrally affected seriously by self-deformation and structure sediment, and cracking affects appearance requirement and using spies such as functions Point, by using new constrained procedure, changes the connected mode of Os Draconis and structure so that Os Draconis integrally exist in vertical direction Certain activity space, skin plate and new grid system are fixed, Admissible displacement in vertical direction, and then make skin plate at it Certain movable space, when building structure is subjected to displacement or itself deforms upon, cover are existed on vertical direction in plane Plate can be alleviated longitudinal stress, reduce building by the sky Os Draconis of vertical telescopic carrying out itself limited no constraint freely-supported activity The risk of the plaster board wall surface cracking that sedimentation, horizontal blast cause, there is provided a kind of simple, innovation, efficiently pre- crack resistence Curtain wall structure, between sky Os Draconis and building roof, is no longer necessary between ground joist and building ground to increase rubber blanket and does buffering and become Shape is reserved.
Preferably, when described can the sky Os Draconis of vertical telescopic to include being fixed on the section of building roof be U-shaped sky Os Draconis A, the section being sheathed in described sky Os Draconis A is U-shaped sky Os Draconis B, and described sky Os Draconis A and sky Os Draconis B include Os Draconis top respectively During the side of keel that wall is connected with described Os Draconis roof,
Place described ground joist and sky Os Draconis by the position of described snap the line, fixed temporarily and correct horizontal level, treat Ground joist and the position of sky Os Draconis is fixed after correction, including:
Place described ground joist, sky Os Draconis A by the position of described snap the line, fixed temporarily and correct horizontal level, treat Ground joist, sky Os Draconis location A is fixed after correction;
Sky Os Draconis B is sheathed in day Os Draconis A, and fixes interim for sky Os Draconis B with sky Os Draconis A, described sky Os Draconis A and sky It is separated by predeterminable range it is preferred that being separated by between described sky Os Draconis A and the Os Draconis roof of sky Os Draconis B between the Os Draconis roof of Os Draconis B Distance controlling is in 25mm.Specifically, pass through tapping screw near the upper end of skin plate of building roof and sky Os Draconis B solid Calmly, skin plate and sky Os Draconis A is forbidden to produce any connection, thus ensureing that skin plate can have certain oneself in vertical direction By activity space, when building structure is subjected to displacement or itself deforms upon, partition wall can pass through itself limited no constraint freely-supported Activity, alleviates longitudinal stress, reduces the risk of cracking.
Preferably, centre keel is included can the sky Os Draconis of vertical telescopic, ground joist be attached after respectively and also:
After described centre keel installs, release the interim fixation of sky Os Draconis A and sky Os Draconis B.
Preferably, centre keel respectively and can the sky Os Draconis of vertical telescopic, ground joist be attached, including:By centre keel It is attached with sky Os Draconis B, ground joist respectively.
Preferably, also include after punching Os Draconis being extended vertically through each centre keel:
Fixed using fastener in described punching Os Draconis and centre keel junction, to prevent punching Os Draconis from rocking.
Preferably, described skin plate is fixed on described stull Os Draconis and centre keel, including:
Start order from the side termination of partition wall and skin plate is installed, adjacent two pieces of skin plates are drawn close naturally, wherein, by cover Plate is vertically laid, and long by described skin plate is fixed on centre keel in (when packing) seam, by the minor face of described skin plate Seam is fixed on stull Os Draconis, sky Os Draconis B or ground joist, and between described skin plate, the fissure of displacement is installed;Preferably, described skin plate The lap of long side seam and centre keel be not less than 15mm, the peace as shown in figure 8, Os Draconis both sides monolayer skin plate must be avoided the peak hour Dress, inside and outside Os Draconis one side, two-layer skin plate must be installed the fissure of displacement.
Preferably, as shown in figure 9, the long side seam of described skin plate is fixed on centre keel, by described skin plate Minor face seam is fixed on stull Os Draconis, sky Os Draconis B or ground joist, including:
When described skin plate 8 is installed, fixing to four side tapping screws of plate or rifle nail 10 from the middle part of plate, once beat Enter, the depth being absorbed in skin plate 0.5mm~1mm followed closely by self threading pin or rifle, the constant spacing of self threading pin or rifle nail on skin plate periphery Constant spacing for self threading pin in the middle of 200mm, skin plate or rifle nail is 300mm, the long side of tapping screw or rifle nail and skin plate The distance of seam or minor face seam is 10mm~15mm, if skin plate a certain long when seam or minor face seam are cut-out, institute The distance stating cut-out side described in tapping screw or rifle pitch of nails is 16mm~20mm.
Preferably, the minor face seam of described skin plate is fixed on stull Os Draconis, including:
When the minor face seam of described skin plate is not on described sky Os Draconis B or ground joist, described not in described Gekko Swinhonis Minor face seam on bone B or ground joist adds stull Os Draconis, by the described not minor face seam on described sky Os Draconis B or ground joist It is fixed on the stull Os Draconis of described interpolation.
Preferably, when the edge of described skin plate is formed with groove, described skin plate is fixed on described stull Os Draconis After on centre keel, also include,
After surface dust in plate stitch between groove is removed totally, the glue solution of one 50% concentration of brush;Specifically, cover When plate is installed, suitably stay seam (general 3~6mm) at plate stitch, groove is connected with groove;
With little scraper, putty is embedded on the glue solution in the plate stitch between groove, by embedding for plate stitch full embedding reality, by seam Putty is scraped and is flushed to groove, after putty parches, checks whether have stricture of vagina to produce at filleting, produces and analyze reason during crack, weight New filleting;
Scrape the thick putty of about 1mm at described groove, then on the thick putty of described 1mm, paste glass fibre belt, will be described Paste glass fibre belt compacting to strike off;
When the thick putty of described 1mm starts solidification and is still in dampness, then scrape one on described stickup glass fibre belt Road putty, glass fibre belt is imbedded in putty, and plate stitch is filled up strikes off.Specifically, the same flush joint of plate stitch processing method of inner corner trim.
The present invention is by integrally being affected seriously, to ftracture by self-deformation and structure sediment for traditional grid system, partition wall The features such as affect appearance requirement and use function, by using new constrained procedure, changes the connected mode of Os Draconis and structure, makes Obtain Os Draconis and integrally there is certain activity space in vertical direction, skin plate and new grid system are fixed, in vertical direction Admissible displacement, and then make there is certain movable space, when building structure is sent out in skin plate vertical direction in its plane Raw displacement or when itself deforming upon, skin plate can be by the sky Os Draconis of vertical telescopic carrying out itself limited no constraint freely-supported Activity, alleviates longitudinal stress, the risk of the plaster board wall surface cracking that minimizing building settlement, horizontal blast cause, there is provided a kind of Simply, the curtain wall structure of innovation, efficient pre- crack resistence, between sky Os Draconis and building roof, between ground joist and building ground Being no longer necessary to increase rubber blanket, to do buffering deformation reserved.
In this specification, each embodiment is described by the way of going forward one by one, and what each embodiment stressed is and other The difference of embodiment, between each embodiment identical similar portion mutually referring to.
Obviously, those skilled in the art can carry out the various changes and modification spirit without deviating from the present invention to invention And scope.So, if these modifications of the present invention and modification belong to the claims in the present invention and its equivalent technologies scope it Interior, then the present invention is also intended to including these changes and modification.

Claims (5)

1. a kind of construction method of the lightgauge steel joist system of prevention cracks on partition walls is it is characterised in that include:
Building roof press can vertical telescopic sky Os Draconis width snap the line, and press the width snap the line of ground joist in building ground, Determine the position of sky Os Draconis and ground joist, determine the position of centre keel, punching Os Draconis and stull Os Draconis according to the size of skin plate;
By described snap the line position place described ground joist and can vertical telescopic sky Os Draconis, described ground joist and sky Os Draconis are entered Row is temporarily fixing and corrects horizontal level, rear fixing described ground joist to be corrected and sky Os Draconis;
Centre keel can the sky Os Draconis of vertical telescopic, ground joist be attached with described respectively;
Punching Os Draconis are extended vertically through each centre keel;
Stull Os Draconis and centre keel are entered by the size according to skin plate and the arrangement of quantity set stull Os Draconis according to described arrangement Row connects.
2. the construction method of the lightgauge steel joist system of prevention cracks on partition walls as claimed in claim 1 is it is characterised in that work as described Can the sky Os Draconis of vertical telescopic to include being fixed on the section of building roof be U-shaped sky Os Draconis A, be sheathed in described sky Os Draconis A Section be U-shaped sky Os Draconis B, described sky Os Draconis A and sky Os Draconis B is included Os Draconis roof respectively and is connected with described Os Draconis roof Side of keel when,
Place described ground joist and sky Os Draconis by the position of described snap the line, fixed temporarily and correct horizontal level, to be corrected Fix the position of ground joist and sky Os Draconis afterwards, including:
Place described ground joist, sky Os Draconis A by the position of described snap the line, fixed temporarily and correct horizontal level, to be corrected Fix ground joist, sky Os Draconis location A afterwards;
Sky Os Draconis B is sheathed in day Os Draconis A, and fixes interim for sky Os Draconis B with sky Os Draconis A, described sky Os Draconis A and sky Os Draconis It is separated by predeterminable range between the Os Draconis roof of B.
3. the construction method of the lightgauge steel joist system of prevention cracks on partition walls as claimed in claim 2 is it is characterised in that by perpendicular dragon Bone includes can the sky Os Draconis of vertical telescopic, ground joist be attached after respectively and also:
After described centre keel installs, release the interim fixation of sky Os Draconis A and sky Os Draconis B.
4. the construction method of the lightgauge steel joist system of prevention cracks on partition walls as claimed in claim 2 is it is characterised in that by perpendicular dragon Bone respectively and can the sky Os Draconis of vertical telescopic, ground joist be attached, including:Centre keel is entered with sky Os Draconis B, ground joist respectively Row connects.
5. the construction method of the lightgauge steel joist system of prevention cracks on partition walls as claimed in claim 1 is it is characterised in that by punching Os Draconis also include after extending vertically through each centre keel:
Fixed using fastener in described punching Os Draconis and centre keel junction.
CN201610890891.1A 2016-10-12 2016-10-12 The construction method for preventing the lightgauge steel joist system of cracks on partition walls Active CN106401025B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610890891.1A CN106401025B (en) 2016-10-12 2016-10-12 The construction method for preventing the lightgauge steel joist system of cracks on partition walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610890891.1A CN106401025B (en) 2016-10-12 2016-10-12 The construction method for preventing the lightgauge steel joist system of cracks on partition walls

Publications (2)

Publication Number Publication Date
CN106401025A true CN106401025A (en) 2017-02-15
CN106401025B CN106401025B (en) 2019-02-19

Family

ID=59228361

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610890891.1A Active CN106401025B (en) 2016-10-12 2016-10-12 The construction method for preventing the lightgauge steel joist system of cracks on partition walls

Country Status (1)

Country Link
CN (1) CN106401025B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3122694A1 (en) * 1981-06-06 1982-12-23 Dietmar 5509 Thalfang Gruben Ceiling connection profile for the sliding connection of wall and ceiling
WO2013059952A1 (en) * 2011-10-27 2013-05-02 Pontificia Universidad Católica De Chile Partition wall dissipator
WO2013076663A2 (en) * 2011-11-24 2013-05-30 Faculdade De Ciências E Tecnologia Da Universidade Nova De Lisboa Mobile interior space divider module
CN104294968A (en) * 2014-10-14 2015-01-21 黄淮学院 Method for producing cast-in-suit cement straw plate solid light energy-saving grouted wall
CN205421627U (en) * 2016-03-07 2016-08-03 中国建筑第二工程局有限公司 Fireproof sealing structure of partition wall and roofing junction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3122694A1 (en) * 1981-06-06 1982-12-23 Dietmar 5509 Thalfang Gruben Ceiling connection profile for the sliding connection of wall and ceiling
WO2013059952A1 (en) * 2011-10-27 2013-05-02 Pontificia Universidad Católica De Chile Partition wall dissipator
WO2013076663A2 (en) * 2011-11-24 2013-05-30 Faculdade De Ciências E Tecnologia Da Universidade Nova De Lisboa Mobile interior space divider module
CN104294968A (en) * 2014-10-14 2015-01-21 黄淮学院 Method for producing cast-in-suit cement straw plate solid light energy-saving grouted wall
CN205421627U (en) * 2016-03-07 2016-08-03 中国建筑第二工程局有限公司 Fireproof sealing structure of partition wall and roofing junction

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘斌,易锐,刘小斌,冀海玲: "《建筑装饰材料与施工技术》", 31 August 2014, 中南大学出版社 *
郭爱云: "《建筑工程施工现场实用技术问答500例——施工员》", 31 May 2015, 机械工业出版社 *

Also Published As

Publication number Publication date
CN106401025B (en) 2019-02-19

Similar Documents

Publication Publication Date Title
CN106567476B (en) The construction method of pre- crack resistence partition wall
CN106401024B (en) The partition wall of pre- crack resistence
CN203440831U (en) Novel basement concrete shear wall guide wall structure
CN104790595A (en) Construction method for adjustable tile hanging system of pitched roof
CN206220306U (en) Prevent the lightgauge steel joist system of cracks on partition walls
CN106401026B (en) The lightgauge steel joist system for preventing cracks on partition walls
CN101476361B (en) Inner partition plate system and its construction method
CN111042392A (en) Construction method of SDHH type disassembly-free formwork foam concrete partition wall
CN110905219A (en) Frame structure and filler wall interface combined anti-crack structure and construction method
CN108643496A (en) A kind of wall construction method and structure
CN209942071U (en) Flashing joint structure for steel skeleton light plate roof and parapet wall
CN103526863B (en) One can effectively prevent the vertical cracking of mounting process of light internal wall batten
CN204081148U (en) Assembled wall panels
CN206220301U (en) The partition wall of pre- crack resistence
CN106401025A (en) Construction method for lightgage steel joist system capable of preventing partition wall from cracking
CN102677908B (en) Construction method of outer wall splitting decoration bricks of filling wall
CN105525700A (en) Method for building indoor wall body by high-precision building blocks and wall body structure
CN205502377U (en) Hanging wallboard is partly inlayed to unit -installment light
KR20180138315A (en) Clay bricks that can be construction without masonry joints
CN213774051U (en) Light steel keel thistle board furred ceiling
CN210767347U (en) Insulation structure of ALC external wall panel
CN210713375U (en) Light steel keel wall structure
CN103352543B (en) The deformable marching method of concrete roof and sheet-metal roofing and deformable connected structure
CN204781431U (en) High accuracy building block interior wall structure
CN204876401U (en) Prefabricated staircase that compressive capacity is strong

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant