CN106400842A - Soil slag falling prevention device - Google Patents
Soil slag falling prevention device Download PDFInfo
- Publication number
- CN106400842A CN106400842A CN201510457250.2A CN201510457250A CN106400842A CN 106400842 A CN106400842 A CN 106400842A CN 201510457250 A CN201510457250 A CN 201510457250A CN 106400842 A CN106400842 A CN 106400842A
- Authority
- CN
- China
- Prior art keywords
- groove
- groove edge
- soil slag
- dropping device
- soil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The invention discloses a soil slag falling prevention device, and belongs to the field of municipal construction tools. The soil slag falling prevention device comprises a falling groove (3). A groove edge (6) is arranged at the top end of the falling groove (3). The outer diameter of the groove edge (6) is smaller than the inner diameter of an inspection well. A sealing ring (2) is arranged on the outer side of the groove edge (6). A pair of handles (4) is fixedly arranged on the top face of the groove edge (6). At least three bolt holes (1) are further fixedly arranged on the top face of the groove edge (6). Screws (5) are in threaded connection with bolt holes (1) and are horizontally arranged. The structure is simple, mounting and dismounting are convenient, and the situation that soil slag and structural mixtures fall into the inspection well in the wellhead hidden backfill or excavation process is ingeniously avoided; and the soil slag and the like fall into the falling groove (3), and cleaning is facilitated.
Description
Technical field
The present invention relates to municipal construction field of tool, particularly to one kind anti-soil slag dropping device.
Background technology
In Municipal Road Engineering construction, road range check well is numerous, is smoothed out for accessible the paving of guarantee, improves service efficiency and the job area of decking and rolling machinery, improves the construction quality of each structure sheaf of road(Reduce mixture segregation, improve flatness), we need hidden for the covering of manhole shaft position under road foundation, dig opening after the construction of road structure layer finishes, expose shaft location, build and build pit shaft, well lid is installed, intermediate demand is repeatedly hidden and excavates repeatedly, in backfill and digging process, originally concrete cover plate is used to cover hidden, more than 20 centimetres above ground level, do not meet the design concept of the accessible construction that paves, form the new barrier that paves, the reason such as mechanical collision during subsequent job, position offsets, well head covers imprecision, it is indoor that native slag easily enters well, easily cause flowing line blocking, the accidents such as special pipelines destruction.Because the well interior space is narrow and small, later stage cleaning is extremely difficult, and workload is very big.
Content of the invention
In order to make up above deficiency, the invention provides structure is simple, native slag etc. can be avoided to fall into the anti-soil slag dropping device in inspection shaft.
The technical scheme is that:
A kind of anti-soil slag dropping device it is characterised in that:Including falling groove 3, described groove 3 top of falling is provided with groove along 6, and the external diameter along 6 for the described groove is less than the internal diameter of inspection shaft;Described groove is provided with sealing ring 2 along outside 6;Described groove is fixedly installed a pair of handle 4 along along 6 top surfaces, and described groove is also fixedly installed at least three bolts hole 1 along along 6 top surfaces;Screw rod 5 is threadeded with bolt hole 1, and screw rod 5 is horizontally disposed with.
Preferably, described groove is fixedly installed three bolts hole 1 along along 6 top surfaces.
Further, three described bolts hole 1 are uniformly distributed in described groove along along 6 top surface.
Preferably, the external diameter at least 20mm less than the internal diameter of inspection shaft along 6 for the described groove.Lateral gap sealing ring 2 is adjusted.
Preferably, described sealing ring 2 is rubber seal.
In the hidden backfill of well head or digging process, fall in inspection shaft to prevent and treat native slag and road structure compound, install the anti-soil slag dropping device of the present invention in well head additional.During construction, add a circle spacing collar close to the well inwall of well head, and several fixing holes are added on the borehole wall;Hand-held handle, will fall groove 3 and put at well head, after putting down, groove is just contacted with spacing collar along 6, rotary screw 5, and the end of screw rod 5 is more and more nearer away from the borehole wall, finally, screw rod 5 is threaded into the fixing in the hole on the borehole wall, and the installation realizing the present invention anti-soil slag dropping device is fixed.Because groove is provided with sealing ring 2 along outside 6, it is further ensured that and avoids native slag and road structure compound to fall into inspection shaft.
Beneficial effects of the present invention are:
Present configuration is simple, installs and convenient disassembly, cleverly avoids in the hidden backfill of well head or digging process, native slag and structure compound fall in inspection shaft;Native slag etc. falls into and falls in groove 3, and native slag falls in falling in groove 3, is convenient to clean.
Brief description
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, the accompanying drawing of required use in embodiment or description of the prior art will be briefly described below, apparently, drawings in the following description are only some embodiments of the present invention, for those of ordinary skill in the art, without having to pay creative labor, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of the present invention anti-soil slag dropping device;
1- bolt hole;2- sealing ring;3- falls groove;4- handle;5- screw rod;6- groove edge.
Specific embodiment
Embodiment 1
As shown in figure 1, the anti-soil slag dropping device of the present invention falls groove 3, there is no particular/special requirement to the depth falling groove 3, typically its depth is between 30mm-300mm.Fall groove 3 top and be provided with groove along 6, the external diameter at least 20mm less than the internal diameter of inspection shaft along 6 for the groove.Groove is provided with rubber seal 2 along outside 6.
Groove is fixedly installed a pair of handle 4 along along 6 top surfaces, is easy to move;Groove is also fixedly installed three bolts hole 1 along along 6 top surfaces, and three bolts hole 1 are uniformly distributed in described groove along along 6 top surface.Screw rod 5 is threadeded with bolt hole 1, and screw rod 5 is horizontally disposed with.
In the hidden backfill of well head or digging process, fall in inspection shaft to prevent and treat native slag and road structure compound, install the anti-soil slag dropping device of the present invention in well head additional.
During construction, add a circle spacing collar close to the well inwall of well head, and several fixing holes are added on the borehole wall;Hand-held handle, will fall groove 3 and put at well head, after putting down, groove is just contacted with spacing collar along 6, rotary screw 5, and the end of screw rod 5 is more and more nearer away from the borehole wall, finally, screw rod 5 is threaded into the fixing in the hole on the borehole wall, and the installation realizing the present invention anti-soil slag dropping device is fixed.Because groove is provided with sealing ring 2 along outside 6, it is further ensured that and avoids native slag and road structure compound to fall into inspection shaft.
Using the present invention, native slag etc. falls into and falls in groove 3, thus avoiding in the hidden backfill of well head or digging process, native slag and structure compound fall in inspection shaft.
Claims (5)
1. a kind of anti-soil slag dropping device it is characterised in that:Including falling groove(3), described fall groove(3)Top is provided with groove edge(6), described groove edge(6)External diameter be less than inspection shaft internal diameter;Described groove edge(6)Outside is provided with sealing ring(2);Described groove edge(6)A pair of handle is fixedly installed on top surface(4), described groove edge(6)At least three bolts hole are also fixedly installed on top surface(1);Screw rod(5)With bolt hole(1)Threaded, and screw rod(5)It is horizontally disposed with.
2. as claimed in claim 1 anti-soil slag dropping device it is characterised in that:Described groove edge(6)Three bolts hole are fixedly installed on top surface(1).
3. as claimed in claim 2 anti-soil slag dropping device it is characterised in that:Three described bolts hole(1)It is uniformly distributed in described groove edge(6)Top surface on.
4. as claimed in claim 1 anti-soil slag dropping device it is characterised in that:Described groove edge(6)External diameter at least 20mm less than the internal diameter of inspection shaft.
5. as described in any one of claim 1-4 anti-soil slag dropping device it is characterised in that:Described sealing ring(2)For rubber seal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510457250.2A CN106400842A (en) | 2015-07-30 | 2015-07-30 | Soil slag falling prevention device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510457250.2A CN106400842A (en) | 2015-07-30 | 2015-07-30 | Soil slag falling prevention device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106400842A true CN106400842A (en) | 2017-02-15 |
Family
ID=58009367
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510457250.2A Pending CN106400842A (en) | 2015-07-30 | 2015-07-30 | Soil slag falling prevention device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106400842A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04124394A (en) * | 1990-09-14 | 1992-04-24 | Takuma Nagamatsu | Divided type footholding hardware |
CN103195095A (en) * | 2013-03-31 | 2013-07-10 | 陈俊达 | Falling-preventing safety inspection shaft cover base |
CN203284810U (en) * | 2013-06-08 | 2013-11-13 | 淮南联合大学 | Inspection well cover |
CN203531011U (en) * | 2013-06-09 | 2014-04-09 | 上海天原集团胜德塑料有限公司 | Anti-falling safety protection net used for inspection well |
CN204252166U (en) * | 2014-09-02 | 2015-04-08 | 朱健 | A kind of Cover of inspection well and anti-falling facility |
CN104746629A (en) * | 2015-04-20 | 2015-07-01 | 江苏永通市政园林建设有限公司苏州分公司 | Anti-falling sewage pipeline |
CN204982946U (en) * | 2015-07-30 | 2016-01-20 | 济南汇通联合市政工程有限责任公司 | Prevent native sediment device that drops |
-
2015
- 2015-07-30 CN CN201510457250.2A patent/CN106400842A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04124394A (en) * | 1990-09-14 | 1992-04-24 | Takuma Nagamatsu | Divided type footholding hardware |
CN103195095A (en) * | 2013-03-31 | 2013-07-10 | 陈俊达 | Falling-preventing safety inspection shaft cover base |
CN203284810U (en) * | 2013-06-08 | 2013-11-13 | 淮南联合大学 | Inspection well cover |
CN203531011U (en) * | 2013-06-09 | 2014-04-09 | 上海天原集团胜德塑料有限公司 | Anti-falling safety protection net used for inspection well |
CN204252166U (en) * | 2014-09-02 | 2015-04-08 | 朱健 | A kind of Cover of inspection well and anti-falling facility |
CN104746629A (en) * | 2015-04-20 | 2015-07-01 | 江苏永通市政园林建设有限公司苏州分公司 | Anti-falling sewage pipeline |
CN204982946U (en) * | 2015-07-30 | 2016-01-20 | 济南汇通联合市政工程有限责任公司 | Prevent native sediment device that drops |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105568816A (en) | Street floor tile | |
US20160097180A1 (en) | Manhole and a method for providing a manhole | |
CN203924137U (en) | Serious seepage block structure of underground continuous wall | |
CN204982946U (en) | Prevent native sediment device that drops | |
CN106400937B (en) | Floor drain protects structure | |
EP1570947A2 (en) | An apparatus for the removal of drilling debris | |
CN107130507A (en) | A kind of crushing protection device of disintegrating machine | |
KR20150025409A (en) | the tunnel structure using the small diameter steel pipe and the construction method thereof | |
CN103276645A (en) | Precast pile, beam and slab renovation technology for diseases of existing line tunnel base | |
CN202925543U (en) | Concentric steel-made double sleeve pipe | |
CN212297912U (en) | Reinforcing structure for outlet of pipe jacking receiving well | |
EP3394346B1 (en) | Adapter | |
CN106400842A (en) | Soil slag falling prevention device | |
CN109989713A (en) | A kind of bidirectional screw drill bit | |
KR100488401B1 (en) | Execution method for repairing manhole and manhole structure repaired by the same execution method | |
CN207003206U (en) | Milling machine knife holder mechanism able to quickly change | |
CN206128667U (en) | Floor drain protection device | |
CN216158533U (en) | Connecting structure of reinforced concrete jacking pipe | |
JP2008101404A (en) | Floating prevention manhole and method of constructing same | |
KR20120066731A (en) | The manhole cover that the levol control system | |
CN114855963B (en) | Basement roof drainage system and construction process | |
CN214363639U (en) | A well lid device that is used for urban road to have and increases function | |
KR102460306B1 (en) | Hight control device for manhole cover | |
CN219158979U (en) | Open caisson reserved hole anti-seepage structure | |
CN217899257U (en) | Civil engineering construction equipment installation is pipeline protection anti-impact device for plumbing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170215 |