CN106400808B - A kind of no water proof bolt underwater grouting constructing device and its application method - Google Patents

A kind of no water proof bolt underwater grouting constructing device and its application method Download PDF

Info

Publication number
CN106400808B
CN106400808B CN201611107811.7A CN201611107811A CN106400808B CN 106400808 B CN106400808 B CN 106400808B CN 201611107811 A CN201611107811 A CN 201611107811A CN 106400808 B CN106400808 B CN 106400808B
Authority
CN
China
Prior art keywords
hopper
conduit
concrete
water proof
proof bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611107811.7A
Other languages
Chinese (zh)
Other versions
CN106400808A (en
Inventor
杨光
王建平
张胜利
刘巧伶
吕新会
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINJIANG XINGONGKAN GEOTECHNICAL ENGINEERING SURVEY AND DESIGN INSTITUTE Co Ltd
Original Assignee
XINJIANG XINGONGKAN GEOTECHNICAL ENGINEERING SURVEY AND DESIGN INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINJIANG XINGONGKAN GEOTECHNICAL ENGINEERING SURVEY AND DESIGN INSTITUTE Co Ltd filed Critical XINJIANG XINGONGKAN GEOTECHNICAL ENGINEERING SURVEY AND DESIGN INSTITUTE Co Ltd
Priority to CN201611107811.7A priority Critical patent/CN106400808B/en
Publication of CN106400808A publication Critical patent/CN106400808A/en
Application granted granted Critical
Publication of CN106400808B publication Critical patent/CN106400808B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/06Placing concrete under water

Abstract

The invention discloses a kind of no water proof bolt underwater grouting constructing devices, including suspender, the suspender is connected by the top of steel wire and hopper, the bottom connecting conduit of hopper, conduit extends downwardly into the inner bottom of steel reinforcement cage, and the outside on the hopper is equipped with operating platform, and fence is equipped in the top outermost of operating platform, it is evenly arranged on fence and telescopic rod is installed, the top of telescopic rod is equipped with headlamp.Conduit is put into stake holes by the present invention using crane, sling large-scale hopper in top, feed hopper bottom mouth is equipped with valve, and enough concrete are disposably full of in hopper, then open feed hopper bottom valve, concrete is disposably circulated into drilling in hopper, is excluded mud and air in conduit by the pressure that its own weight generates, is completed construction;This compares embolization catheter method, has lacked the step of being pre-placed suitable water proof bolt, and summation process is wanted without what the smooth degree to pipe inner wall did excessive harshness.

Description

A kind of no water proof bolt underwater grouting constructing device and its application method
Technical field
The present invention relates to building construction technology apparatus field, specifically a kind of no water proof bolt underwater grouting constructing device and its Application method.
Background technology
Cast-in-situ bored pile is because having many advantages, such as high capacity, can pass through soft or hard soil layer and easy for construction, in China coast It is widely used in regional and interior ground ground foundation engineering.This method is simple, widely applicable with operational procedure, is easy to slap Hold, quickly, economy, significant effect the features such as, in pile foundation construction especially city pile foundation construction have boundless foreground.
Development of the bored pile construction method in China has had the history of decades, and road is widely used in China In the constructions such as traffic, basic pile foundation.Research and development with China's Architectural Equipment machinery especially rotary drilling rig equipment in nearest 4 or five years And it is universal, underwater grouting is also gradually recognized and is applied, and industry and civil buildings, highway subgrade and airport have been widely used in In the engineerings such as runway.Rotary drilling rig is generally applicable in clay, silt, sand, muck soil, artificial backfill and contains part ovum The stratum of stone, rubble.Rotary drilling rig and construction technology have been obtained for popularizing quickly in the northern area of China.
Underwater gliders are also referred to as tremie concrete perfusion, are the conduits by concrete by setting, by concrete Gravity pressure carry out underwater grouting method.It is the critical process successfully carried out in underwater grouting pile quality control that drills, If method for filling is inappropriate to will result in the defects of pressing from both sides mud between broken pile or stake, or even causes stake holes to scrap and shifted with pile foundation, to Difficult and loss is brought to Engineering Project Construction.Therefore, it is improved in filling concrete under water and uses rational pouring construction Control measure are to ensure that construction quality seems particularly significant.
Without water proof bolt underwater cast-in-place pile method, as the term suggests i.e. under water in filling process, especially for the first time in filling process, It is not by concrete with the water and air in water proof bolt discharge conduit without water barrier device and facility between concrete and water, and It is directly by there is concrete of strong potential energy itself that the water of bottom hole and sediment are evoked and arranged.
In recent years, many plot level of ground water was higher in construction market, and subaqueous concreting technology is increasingly mature, but builds It builds in market and often occurs not taking dewatering measure that conduit is directly reached underwater the case where being irrigated, easily cause concrete Underwater isolation and pile-forming effect is not good enough, major quality accident occurs etc..This just forces the generation of underwater perfusion technique, makes Underwater grouting method is more succinct, and effect becomes apparent from, and technological process is more easy to be combined with other techniques.
Invention content
The purpose of the present invention is to provide a kind of no water proof bolt underwater grouting constructing device and its application methods, in solution State the problem of being proposed in background technology.
To achieve the above object, the present invention provides the following technical solutions:
A kind of no water proof bolt underwater grouting constructing device, including suspender, the suspender at the top of steel wire and hopper by connecting It connects, the bottom connecting conduit of hopper, conduit extends downwardly into the inner bottom of steel reinforcement cage, and the outside on the hopper is equipped with Operating platform is equipped with fence in the top outermost of operating platform, is evenly arranged on fence and is equipped with telescopic rod, telescopic rod Top be equipped with headlamp;The hopper is divided to two sections, and epimere is cylindric, and hypomere is taper, columned bottom and taper Top connects, and hanging ring C corresponding with hanging ring A, cylindric and taper joint have been evenly arranged within one week at columned top Columned outside be evenly arranged within one week several pin holes, valve is installed at the outlet at bottom of the taper;The conduit Upper end on the inside of be equipped with bellmouth, bellmouth is internally provided with socket hoop, and the lower end of conduit is equipped with socket, and spigot is equipped with socket ring, Adjacent catheter is inserted into the bellmouth of lower end conduit by the socket of upper end conduit and realizes connection, and clip is equipped in the outside of junction It is fixed;The suspender includes hanging ring A, and hanging ring A is mounted on the end of arm, and the beginning of arm is connect with hanging ring B, described to hang Arm is equipped with three, is in 120 ° between two adjacent arms.
As a further solution of the present invention:The bottom of the operating platform is equipped with axis pin, is arranged on axis pin and hopper Pin hole is correspondingly arranged.
As a further solution of the present invention:The clip includes two semicircular card slots, one end hinge of two card slots The other end is connect equipped with the jackscrew for making clamp connection fasten.
The application method of above-mentioned no water proof bolt underwater grouting constructing device is:Include the following steps:
The first step:Suspender is sling by hanging ring B using hanging device, hopper is sling by steel wire in the bottom of suspender, from And conduit is sling;
Second step:Insert a catheter into the inside of drilling;
Third walks:Concrete is injected into hopper, is waited for that the amount inside concrete injection hopper reaches and is wanted concrete perfusion When amount or full hopper, valve is opened, the concrete in hopper is disposably circulated into drilling and completes once grouting.
4th step:The operation in third step is repeated until filling to meeting the requirements.
Compared with prior art, conduit is put into stake holes by the present invention using crane, and large-scale hopper, hopper bottom are sling in top Portion mouthful is equipped with valve, and enough concrete are disposably full of in hopper, then opening feed hopper bottom valve, coagulation in hopper Soil is disposably circulated into drilling, is excluded mud and air in conduit by the pressure that its own weight generates, is completed construction; This compares embolization catheter method, has lacked the step of being pre-placed suitable water proof bolt, had been done without the smooth degree to pipe inner wall That divides harshness wants summation process, not only avoids plugging problem, is further without excessively processing pipe inner wall, can save a large amount of work Work amount and working time.
Description of the drawings
Fig. 1 is the structural schematic diagram of single unit system;
Fig. 2 is the structural schematic diagram of hopper;
Fig. 3 is the structure chart of suspender;
Fig. 4 is the structural schematic diagram of operating platform;
Fig. 5 is the sectional view of conduit;
Fig. 6 is the structural schematic diagram of clip;
Fig. 7 is that concrete quantity needed for first batch of filling concrete calculates schematic diagram;
Fig. 8 is that funnel base opening is higher by the hole water surface or the necessary height of stake top calculates schematic diagram.
In figure:1- suspenders, 101- hanging ring A, 102- arm, 103- hanging ring B, 2- steel wire, 3- headlamps, 4- telescopic rods, 5- Fence, 6- operating platforms, 601- axis pins, 7- hoppers, 701- hanging ring C, 702- pin hole, 703- valves, 8- conduits, 801- bellmouths Ring, 802- bellmouths, 803- sockets, 804- sockets ring, 9- steel reinforcement cages, 10- clips, 1001- card slots, 1002- jackscrews.
Specific implementation mode
The technical solution of this patent is described in more detail With reference to embodiment.
Please refer to Fig.1-8, a kind of no water proof bolt underwater grouting constructing device and its application method, including suspender 1, it is described to hang Tool 1 is connect by steel wire 2 with the top of hopper 7, and the bottom connecting conduit 8 of hopper 7, conduit 8 extends downwardly into steel reinforcement cage 9 Inner bottom, the outside on the hopper 7 is equipped with operating platform 6, fence 5 is equipped in the top outermost of operating platform 6, It is evenly arranged on fence 5 and telescopic rod 4 is installed, the top of telescopic rod 4 is equipped with headlamp 3.The setting of headlamp 3 can facilitate It carries on construction work at night.
The suspender 1 include hanging ring A 101, hanging ring A 101 be mounted on arm 102 end, the beginning of arm 102 with hang The connections of ring B 103, the arm 102 are equipped with three, are in 120 ° between two adjacent arms 102.
The hopper 7 is divided to two sections, and epimere is cylindric, and hypomere is taper, the top connection of columned bottom and taper, It has been evenly arranged within one week hanging ring C 701 corresponding with hanging ring A 101 at columned top, it is cylindric and taper joint Columned outside has been evenly arranged several pin holes 702 for one week, and valve 703 is equipped at the outlet at bottom of the taper.
The bottom of the operating platform 6 is equipped with axis pin 601, and axis pin 601 is correspondingly arranged with the pin hole 702 being arranged on hopper 7.
Bellmouth 802 is equipped on the inside of the upper end of the conduit 8, bellmouth 802 is internally provided with socket hoop 801, the lower end of conduit 8 Equipped with socket 803, socket ring 804 is equipped at socket 803, adjacent catheter 8 is inserted into lower end conduit by the socket 803 of upper end conduit Bellmouth 802 in realize connection, be fixed equipped with clip 10 in the outside of junction.
The clip 10 includes two semicircular card slots 1001, and one end of two card slots 1001 is hinged the other end and is equipped with Jackscrew 1002 for making the connection fastening of clip 10.
The application method of above-mentioned no water proof bolt underwater grouting constructing device is:Include the following steps:
The first step:Suspender is sling by hanging ring B using hanging device, hopper is sling by steel wire in the bottom of suspender, from And conduit is sling;
Second step:Insert a catheter into the inside of drilling;
Third walks:Concrete is injected into hopper, is waited for that the amount inside concrete injection hopper reaches and is wanted concrete perfusion When amount or full hopper, valve is opened, the concrete in hopper is disposably circulated into drilling and completes once grouting.
4th step:The operation in third step is repeated until filling to meeting the requirements.
Conduit is put into stake holes using crane, large-scale hopper is sling on top, is equipped with valve at feed hopper bottom mouth, and expecting It is disposably full of enough concrete in bucket, then opens valve, concrete is disposably circulated into drilling in hopper, by it The pressure that own wt generates excludes the mud and air in conduit, completes construction.
This compares embolization catheter method, has lacked the step of being pre-placed suitable water proof bolt, without to the smooth of pipe inner wall What degree did excessive harshness wants summation process.Not only avoid plugging problem, be only not required to excessively to handle one nothing of pipe inner wall every Water bolt method can save prodigious workload and working time.
In the case where the parameters such as working specification, hopper height calculate errorless, no water proof bolt underwater cast-in-place pile final effect It is no different with quality and traditional embolization catheter method, is better than whether the integrality of pile body and entire work progress are smooth etc. Embolization catheter method.
Compared with embolization catheter method underwater gliders, no water proof bolt method is easy for construction, simple, time saving and energy saving, economical Cost is lower.It not will produce and generate plugging because water proof bolt riding position is inaccurate or catheter interior has residual concrete block etc. Situation.But it is noted that when pouring for the first time, conduit bottom end can should be once embedded to 0.8~1.5m by beginning quantity, and be retained in conduit Concrete height, it is sufficient to resist drilling in slurry compounding conduit.
It is extensive without water proof bolt Underwater pile construction engineering method applicable elements, it is general using underwater grouting mode, should all be Drilling equipment pore-forming also needs mud or cylinder-wall protecting if stratum ground is loose in drilling machine pore forming process.The method is conveniently in underground The not high pile foundation engineering of water level, water-column is not preferably greater than 10m in hole.For in terms of hole depth, general drilling substantially can Implement without water proof bolt underwater grouting, only hole depth cannot excessively shallow (being less than 4m) or too deep (being more than 20m), excessively it is shallow can cause it is first batch of The amount of pouring into of concrete overflows the cost for causing to waste and increase post-processing too much;Original of the too deep meeting because of pipe inner wall friction Whereabouts potential energy weakens caused by, influences perfusion effect.Aperture requires to be 0.6-1.0m.
It is obtained by understood example:Liaoning power plant uses this technique, aperture 0.6m, hole depth 8-10m, height of water level 6.0m, it is especially good using the method effect;Bei Xin groups mansion pattern foundation pit supporting structure project support pile stake diameter 1.0m is also used well This method simultaneously obtains good result.
Without water proof bolt underwater cast-in-place pile method, it is to use hanging device, conduit is lifted to certain height, one in hopper Secondary property is full of enough concrete, after concrete is enough, feed hopper bottom cover board or interim embolism is opened, concrete in hopper It is disposably circulated into drilling, in the moment for touching mud, huge impact energy generates very high surge, excludes to lead Mud in pipe, to play the role of mud in discharge conduit.
Principle without water proof bolt underwater cast-in-place pile method is fairly simple.It is collected in the hopper of top and buries bottom conduit nozzle enough Amount of concrete, be then disposably circulated into drilling, full of conduit concrete potential energy Transient transformation at kinetic energy, concrete During falling at high speeds, with the mud contacts in conduit, the pressure generated by concrete own wt will be in conduit Mud and water are extruded into outside conduit, then coordinate above carrying for conduit, complete the perfusion operation of entire pile body.
Correlation computations without water proof bolt underwater cast-in-place pile method Construction Principle:
According to the first buried depth h2=1.5m of conduit, conduit bottom gap h3=0.5m is filled, static level is extremely in hole Stake bottom depth capacity is 10m, and mud and water mixing severe are γ slurries=12N/m in hole3, concrete severe γ concretes=24N/m3Meter It calculates.
1, concrete quantity needed for first batch of filling concrete calculates:
The quantity of its required concrete is calculated as follows (such as Fig. 7):
H concretes=h2-h3=1.5+0.5=2.0m
H1 >=γ starches H slurries/γ concretes=12* (10-2)/24=4.0m
V head >=π r2h1+πR2H concretes=π * 0.1252*4+π*0.52* 2=1.77m3
In formula:V:Concrete requirement m for the first time3
r:Conduit radius m;
R:Stake holes radius m;
H concretes:Required wellhole inner concrete face is perfused when first batch of concrete to the height m of bottom hole;
h1:When wellhole concrete surface height reaches H concretes, the height m of conduit inner concrete;
h2:The first buried depth m of conduit;
h3:Conduit bottom end is away from foot of hole distance m;
H is starched:The depth m of the above mud in wellhole inner concrete face and aqueous mixtures.
2, the impact energy that first batch of concrete falls:
E=0.5m*v2(wherein v=gt, impact force F=mg)
Therefore
In formula:E impacts:The impact energy J that concrete falls on the water surface at 5.0m;
m:First batch of concrete quality kg;
v:Concrete falling speed m/s
t:Concrete fall time s
V1:Volume of concrete m in the outer concrete height lower opening of pipe3
V2:Remove the pipe inner concrete volume m managed under outer concrete height3
3, the calculating of hopper level is perfused:
In perfusion latter stage, funnel base opening is higher by the hole water surface or the necessary height of stake top calculates (such as Fig. 8):
H concretes >=(Pc+ γ slurry H slurries)/γ concretes=(150+12*1)/24=6.75m
In formula:H concretes:More than well inner concrete face, conduit inner concrete (calculates to funnel base opening) height m;
Pc:Conduit inner concrete is set to fall to conduit bottom and by concrete lift-up outside conduit when required over pressure.;
H concretes:Mud more than wellhole inner concrete face and aqueous mixtures depth m.
Major parameter table:
The better embodiment of this patent is explained in detail above, but this patent is not limited to above-mentioned embodiment party Formula, one skilled in the relevant art within the scope of knowledge, can also be under the premise of not departing from this patent objective It makes a variety of changes.

Claims (4)

1. a kind of no water proof bolt underwater grouting constructing device, which is characterized in that including suspender, the suspender passes through steel wire and hopper Top connection, the bottom connecting conduit of hopper, conduit extends downwardly into the inner bottom of steel reinforcement cage, on the hopper Outside is equipped with operating platform, is equipped with fence in the top outermost of operating platform, be evenly arranged on fence be equipped with it is flexible The top of bar, telescopic rod is equipped with headlamp;The hopper is divided to two sections, and epimere is cylindric, and hypomere is taper, columned bottom It is connect with the top of taper, hanging ring C corresponding with hanging ring A, cylindric and cone has been evenly arranged within one week at columned top The columned outside of shape joint has been evenly arranged several pin holes for one week, and valve is equipped at the outlet at bottom of the taper; Bellmouth is equipped on the inside of the upper end of the conduit, bellmouth is internally provided with socket hoop, and the lower end of conduit is equipped with socket, and spigot is equipped with Socket ring, adjacent catheter are inserted into the bellmouth of lower end conduit by the socket of upper end conduit and realize connection, the outside in junction It is fixed equipped with clip;The suspender includes hanging ring A, and hanging ring A is mounted on the end of arm, and beginning and the hanging ring B of arm connect It connects, the arm is equipped with three, is in 120 ° between two adjacent arms.
2. no water proof bolt underwater grouting constructing device according to claim 1, which is characterized in that the bottom of the operating platform Portion is equipped with axis pin, and axis pin is correspondingly arranged with the pin hole being arranged on hopper.
3. no water proof bolt underwater grouting constructing device according to claim 2, which is characterized in that the clip includes two One end of semicircular card slot, two card slots is hinged the other end equipped with the jackscrew for making clamp connection fasten.
4. a kind of application method of no water proof bolt underwater grouting constructing device as described in any one of claims 1-3, feature exist In including the following steps:
The first step:Suspender is sling by hanging ring B using hanging device, hopper is sling by steel wire in the bottom of suspender, thus will Conduit is sling;
Second step:Insert a catheter into the inside of drilling;
Third walks:Concrete is injected into hopper, wait for concrete injection hopper inside amount reach the amount for wanting concrete perfusion or When full hopper, valve is opened, the concrete in hopper is disposably circulated into drilling and completes once grouting;
4th step:The operation in third step is repeated until filling to meeting the requirements.
CN201611107811.7A 2016-12-06 2016-12-06 A kind of no water proof bolt underwater grouting constructing device and its application method Active CN106400808B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611107811.7A CN106400808B (en) 2016-12-06 2016-12-06 A kind of no water proof bolt underwater grouting constructing device and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611107811.7A CN106400808B (en) 2016-12-06 2016-12-06 A kind of no water proof bolt underwater grouting constructing device and its application method

Publications (2)

Publication Number Publication Date
CN106400808A CN106400808A (en) 2017-02-15
CN106400808B true CN106400808B (en) 2018-10-16

Family

ID=58083564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611107811.7A Active CN106400808B (en) 2016-12-06 2016-12-06 A kind of no water proof bolt underwater grouting constructing device and its application method

Country Status (1)

Country Link
CN (1) CN106400808B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101886391A (en) * 2010-06-25 2010-11-17 武汉一冶交通工程有限责任公司 Waterproof guide pipe for underwater concrete filling pile
CN102720186A (en) * 2012-07-10 2012-10-10 上海港务工程公司 Underwater once pouring method for variable cross-section bored cast-in-place pile
CN204780928U (en) * 2015-06-25 2015-11-18 辽宁有色基础工程公司 Major diameter bored concrete pile concrete first set groundwater increment controlling means
CN205153503U (en) * 2015-11-02 2016-04-13 浙江舜士建设有限公司 Multi -use architecture scaffold
CN205296168U (en) * 2015-12-29 2016-06-08 浙江大学城市学院 Concreting device under water
CN206279531U (en) * 2016-12-06 2017-06-27 新疆新工勘岩土工程勘察设计院有限公司 One kind is without water proof bolt underwater grouting constructing device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3765063B2 (en) * 1996-02-08 2006-04-12 大成建設株式会社 Concrete placement method
KR100420074B1 (en) * 2001-02-20 2004-02-25 (주)한석엔지니어링 A Construction Method of Underwater Concreting

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101886391A (en) * 2010-06-25 2010-11-17 武汉一冶交通工程有限责任公司 Waterproof guide pipe for underwater concrete filling pile
CN102720186A (en) * 2012-07-10 2012-10-10 上海港务工程公司 Underwater once pouring method for variable cross-section bored cast-in-place pile
CN204780928U (en) * 2015-06-25 2015-11-18 辽宁有色基础工程公司 Major diameter bored concrete pile concrete first set groundwater increment controlling means
CN205153503U (en) * 2015-11-02 2016-04-13 浙江舜士建设有限公司 Multi -use architecture scaffold
CN205296168U (en) * 2015-12-29 2016-06-08 浙江大学城市学院 Concreting device under water
CN206279531U (en) * 2016-12-06 2017-06-27 新疆新工勘岩土工程勘察设计院有限公司 One kind is without water proof bolt underwater grouting constructing device

Also Published As

Publication number Publication date
CN106400808A (en) 2017-02-15

Similar Documents

Publication Publication Date Title
CN101487252A (en) Construction process of cast-in-situ bored pile
CN102286984A (en) Water-stop curtain and construction method thereof
CN104912065B (en) Dowel pile construction method under water
CN107130633A (en) A kind of steel tube concrete clay model bag stake is combined soil-baffling structure construction technology
CN101270576A (en) Secondary segmenting slip casting method for miniature pile
CN108978644A (en) Energy saving and environment friendly bored pile construction method
CN105442532A (en) Construction method for pile-head-expanded bored pile
CN105256795A (en) End support type thread core composite pile and construction device and method for end support type thread core composite pile
CN202194149U (en) Water-proof curtain
CN104818713A (en) Profile steel cement soil pile construction method adaptive to various stratums
CN104711973A (en) Construction method for small-diameter pile composite foundation
CN204662430U (en) A kind of end holds type screw-type Squeezing Soil Pile pile-forming equipment
CN107587502A (en) A kind of spiral-digging pore pressure pour water soil occlusion curtain pile construction method
CN110777775A (en) Foundation pit structure and construction method thereof
CN204252164U (en) A kind of Submersed type active well
CN109083591A (en) A kind of cast-in-situ bored pile pile body drilling and forming hole method integrated with pile cover
CN113154979A (en) Static rock breaking construction method of large-inclination-angle wet drilling expanding agent
CN206279531U (en) One kind is without water proof bolt underwater grouting constructing device
CN111877321A (en) Cast-in-place pile applied to underground reinforced concrete structure and construction method thereof
CN106400808B (en) A kind of no water proof bolt underwater grouting constructing device and its application method
CN201671104U (en) Combined tower type crane base
CN204608773U (en) Pile work drilling machine coordinated type breast wall apparatus
CN103866787B (en) A kind of spacious reverse masonry method concrete cut that digs builds construction technology
CN110306540A (en) A kind of construction method of full circle swinging casing pile foundation pore-forming
CN206706748U (en) Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant