CN106400703A - No-expansion repairing method for non-structural crack of bridge - Google Patents

No-expansion repairing method for non-structural crack of bridge Download PDF

Info

Publication number
CN106400703A
CN106400703A CN201610807228.0A CN201610807228A CN106400703A CN 106400703 A CN106400703 A CN 106400703A CN 201610807228 A CN201610807228 A CN 201610807228A CN 106400703 A CN106400703 A CN 106400703A
Authority
CN
China
Prior art keywords
crack
sky
base joint
cleaning
type base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610807228.0A
Other languages
Chinese (zh)
Inventor
冯冲
常军辉
孙永
赵芳
王树信
师慧
张士英
刘铁
胡连华
高燕
张冲冲
张学智
张莺飞
叶永迪
尹学博
杨英媛
张阔
王婧
安朋
陶涛
陈民国
柴亚
贾莎莎
蔡玉文
杨芳
刘婷婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Highway Qingyin Management Office
Original Assignee
Hebei Highway Qingyin Management Office
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Highway Qingyin Management Office filed Critical Hebei Highway Qingyin Management Office
Priority to CN201610807228.0A priority Critical patent/CN106400703A/en
Publication of CN106400703A publication Critical patent/CN106400703A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a no-expansion repairing method for a non-structural crack of a bridge and belongs to the technical field of maintenance construction of the bridge. The method comprises the following steps: measuring the crack; treating the crack; washing the crack; filling the crack; coating the crack with a coating layer. According to the expansion-free repairing method disclosed by the invention, by utilizing physical properties of a crack sealant, the crack can be sealed in a way that the crack is filled firstly and coated secondly; the construction is simple and convenient; during a crack repairing process, the crack is not expanded, is hard to expand after being repaired, has certain toughness and compensative shrinkage property, is high in high temperature resistance and freezing and thawing circulation resistance, and is excellent in durability.

Description

Bridge non-structural crack no expands method for repairing and mending
Technical field
The invention belongs to bridge inspection and maintenance technical field of construction is and in particular to a kind of bridge non-structural crack no expands repairing Method.
Background technology
Bridge member crack class disease is one of common disease of bridge, and bridge member crack is with thermal cracking, concrete Based on the non-structural cracks such as contraction fissure, fracture width is below 0.15 under normal circumstances.Because crack is chronically exposed to In complex environment, in the presence of extraneous physics, chemical factor, constantly produce and extend, cause concrete carbonization, protective layer stripping Fall, reinforcement corrosion, make the strength and stiffness of concrete weakened, durability reduces, when serious, even collapse accident occur, danger The normal use of evil structure, impact bridge service life and bridge security are it is therefore necessary to be controlled by.
Causing further to destroy for avoiding " air water " to enter crack adopts joint seal to process under normal circumstances.Using joint seal The prescribed limits in the crack processing(The i.e. Breadth Maximum in crack)Should meet《Code for design of concrete structures》Requirement.Generally feelings Under condition, fracture carries out closing and adopts epoxy resin adhesive, holds because epoxy resin adhesive has aging fast, winter Shortcoming easy to crack, needs often the crack closed to be checked, workload is big, and joint seal intractability is also relatively simultaneously Greatly, the characteristic based on epoxy resin adhesive, joint seal effect is bad, and color distortion is big, and appearance is unsightly.
Ji grind SKY-GF type base joint grouting glue be by Hebei Jian Yan Materials Technology Ltd. produce a for concrete The material of crack repairing, is a kind of A, B bi-component rubber modified epoxy resin class adhesive, by multiple organic and inorganic modified Material cladding forms.Product has that viscosity is low, mobility and permeability are strong, can inject the wide microcrack of 0.1mm, heat release after hardening Low, high with the caking ability of crack two wall, shrinkage is little, and elastic modelling quantity is high, anti-aging, media-resistant(Acid, alkali, water)Performance is good, right Concrete reinforcing steel non-corroding acts on, and high temperature resistant and freeze-thawing resistant circulation ability is strong, and 5 DEG C of -40 DEG C of temperature ranges all can be constructed, Gu Change speed.A during configuration:B weight is than for 2:1, the finished product mixing is close with concrete color.
Content of the invention
The technical problem to be solved in the invention is to provide a kind of crack repairing effect good, no expands, after repairing during repairing Crack no longer extends, and the color bridge non-structural crack consistent with former concrete no expands method for repairing and mending.
For solving above-mentioned technical problem, the technical solution adopted in the present invention is:
A kind of bridge non-structural crack no expands method for repairing and mending, comprises the following steps:
A, crack measurement
Fracture width measures, and sees whether fracture width exceedes respective members crack prescribed limits, and fracture width is on rule Crack below threshold value carries out processing by subsequent step;
B, crack treatment
Fracture both sides carry out dirt of polishing, and form the 5cm width sanding belt centered on crack;
C, Fracture cleaning
Sanding belt is carried out wipe cleaning using cleaning agent acetone;
D, gap perfusion
SKY-GF type base joint grouting glue is ground using Ji and carries out cementation of fissures process, cementation of fissures mode adopts syringe injection system;
E, coating cover layer
Cover layer is coated in the 30-50 minute after the completion of the perfusion of step D gap on sanding belt, coating scrapes, using pressurization, the side of smearing Formula is carried out, and overburden cover controls in 2-3mm.
Further, before described step C carries out to sanding belt using cleaning agent acetone wiping cleaning, empty using compression Gas fracture and sanding belt carry out impurity cleaning it is ensured that not having dust and impurity in crack, and using cleaning agent acetone After sanding belt being carried out wipe cleaning, a few minutes to be dried, then carry out the perfusion of step D gap.
Preferably, coat described in step E grinds SKY-GF type base joint grouting glue, cement, white cement by a certain percentage by Ji Mix together, during mixing, the component A first cement, white cement and Ji being ground SKY-GF type base joint grouting glue is fully mixed Conjunction stirs, and is subsequently adding Ji and grinds the B component of SKY-GF type base joint grouting glue and quickly stirs.
Preferably, described Ji grind SKY-GF type base joint grouting glue, cement, white cement part by weight be 4:3:1, wherein Ji is ground The A of SKY-GF type base joint grouting glue, B component weight are than for 2:1.
Due to employing technique scheme, the technological progress that the present invention obtains is:
The present invention adopts joint seal to process the process of Bridge Crack, and in joint seal before processing, first fracture both sides carry out polishing decontamination Dirt process, be beneficial to base joint grouting glue, coat can with crack tight bond, strengthen joint seal effect, after polishing, to polishing part with And crack is carried out, using two ways cleaning, removes impurity and the dust in crack first with compressed air, then use acetone Remove the dust on surface it is ensured that adhesive surface cleaning, the cementation of fissures using the base joint grouting glue with premium properties, because cementation of fissures adhesiveness is low, Mobility and permeability are strong, easy construction, can filling gap at short notice each corner, after the completion of the cementation of fissures, in the cementation of fissures Before gelling is solid, using cover layer, buffed surface is coated, coating method scrapes, using pressurization, the mode of smearing, coating material can be made to enter Enter crack, be pressed further by base joint grouting glue, make base joint grouting glue filling more abundant, coating material is interpolation cement on the basis of base joint grouting glue Mix with white cement, because base joint grouting glue color and concrete color are close, add cement and white cement toning, can make to cover Cap rock is consistent with concrete color, makes more attractive in appearance after crack repairing.Due to the main component in base joint grouting glue and coat all It is base joint grouting glue, and after base joint grouting glue hardening, heat release is low, high with the caking ability of crack two wall, shrinkage is little, and elastic modelling quantity is high, anti-ageing Change, media-resistant(Acid, alkali, water)Performance is good, so during crack repairing, crack will not be expanded, is difficult to extend, has after repairing Certain toughness and compensation shrinkage, high temperature resistant and freeze-thawing resistant circulation ability is strong, excellent in te pins of durability.
Specific embodiment
With reference to embodiment, the present invention is described in further details:
The present invention is that a kind of bridge member non-structural crack no expands method for repairing and mending, and the method is applied to non-crack of transfiniting (Fracture width meets《Code for design of concrete structures》Require)Closed(Crack closure, also referred to as joint seal)Process.In order to protect Card sealing effect, inventor carried out contrast experiment to the product of multiple long families, have selected and builds by Hebei that to grind material technology limited SKY-GF type base joint grouting glue is ground in the Ji that company produces, and the enclosure method of the cooperation present invention is carried out at joint seal to the crack meeting condition Reason.This joint seal glue color is close with concrete, and shear strength is high, good endurance, and constructing operation is convenient, quick simultaneously.
A kind of bridge non-structural crack no expands method for repairing and mending, comprises the following steps:
A, crack measurement
Fracture width measures, and sees whether fracture width exceedes respective members crack prescribed limits(I.e.《Xoncrete structure sets Meter specification》Specified in the Breadth Maximum in crack that allowed of concrete component), fracture width splitting below prescribed limits Seam carries out processing by subsequent step;
B, crack treatment
Because crack is very narrow, typically maximum is less than 0.3mm(Breadth Maximum), for ensureing sealing effect, need fracture both sides Carry out dirt of polishing, then closed, at grinding process, form the 5cm width sanding belt centered on crack;
C, Fracture cleaning
Sanding belt is carried out wipe cleaning using cleaning agent acetone;Because acetone is volatile, can be dried quickly, even if not doing Dry, being also used as solvent dilution joint seal glue, not affecting sealing effect, if cleaned using water, not only drying time is long, if Thoroughly it is not dried, is just closed, staying the moisture in gap can damage to the crack closed;
D, gap perfusion
SKY-GF type base joint grouting glue is ground using Ji and carries out cementation of fissures process, cementation of fissures mode adopts syringe injection system;Using injection Device injection can be to the certain pressure of base joint grouting glue so as to can be with Fast Filling gap;
E, coating cover layer
Cover layer is coated in the 30-50 minute after the completion of the perfusion of step D gap on sanding belt, coating scrapes, using pressurization, the side of smearing Formula is carried out, and overburden cover controls in 2-3mm.This is in the 30-50 minute after the completion of gap perfusion after the completion of step D is beating Coat cover layer on grinding belt, refer to 30 minutes start to coat cover layer later, and coated in 20 minutes and complete, so, just have The time of 30 minutes can allow potting compound sufficiently be permeated, with each corner of more preferable filling.
In order to ensure that the impurity in crack and dust can thoroughly be removed, using cleaning agent acetone, sanding belt is being entered Before row wipes cleaning, first impurity cleaning is carried out using compressed air fracture and sanding belt, thoroughly remove the ash in crack Particulate matter that dirt, impurity and polishing produce etc., after sanding belt being carried out using cleaning agent acetone wiping cleaning, re-dry A few minutes, then carry out gap perfusion.
In order to ensure the performances such as intensity, the toughness of coating material, the coat described in step E grinds SKY-GF type by Ji Base joint grouting glue, cement, white cement mix together by a certain percentage, during mixing, first cement, white cement and Ji are ground SKY- The component A of GF type base joint grouting glue carries out being sufficiently mixed stirring, be subsequently adding Ji grind SKY-GF type base joint grouting glue B component quick Stir.What such order by merging can somewhat extend one section of coating material can coating time.
Consistent with concrete color in order to ensure coat, SKY-GF type base joint grouting glue, cement, white cement are ground in described Ji Part by weight is 4:3:1, the A of SKY-GF type base joint grouting glue, B component weight are ground than for 2 in wherein Ji:1.Certainly, said ratio It is more satisfactory proportioning, those skilled in the art can also adopt other proportionings, such as constant in cement, white cement proportioning In the case of, increase merely or reduce base joint grouting glue, thus changing the proportioning between base joint grouting glue and cement, white cement.Work as the cementation of fissures The ratio increase of glue is to a certain extent, it is convenient to omit falls the perfusion of step D gap, but using the material of coat, gap is carried out Perfusion.

Claims (4)

1. a kind of bridge non-structural crack no expands method for repairing and mending, comprises the following steps:
A, crack measurement
Fracture width measures, and sees whether fracture width exceedes respective members crack prescribed limits, and fracture width is on rule Crack below threshold value carries out processing by subsequent step;
B, crack treatment
Fracture both sides carry out dirt of polishing, and form the 5cm width sanding belt centered on crack;
C, Fracture cleaning
Sanding belt is carried out wipe cleaning using cleaning agent acetone;
D, gap perfusion
SKY-GF type base joint grouting glue is ground using Ji and carries out cementation of fissures process, cementation of fissures mode adopts syringe injection system;
E, coating cover layer
Cover layer is coated in the 30-50 minute after the completion of the perfusion of step D gap on sanding belt, coating scrapes, using pressurization, the side of smearing Formula is carried out, and overburden cover controls in 2-3mm.
2. bridge non-structural crack according to claim 1 no expand method for repairing and mending it is characterised in that:In described step Before C carries out to sanding belt wiping cleaning using cleaning agent acetone, impurity is carried out using compressed air fracture and sanding belt Cleaning is not it is ensured that have dust and impurity in crack, and after sanding belt being carried out using cleaning agent acetone wiping cleaning, A few minutes are dried, then carry out the perfusion of step D gap.
3. bridge non-structural crack according to claim 1 no expand method for repairing and mending it is characterised in that:Institute in step E State that coat grinds SKY-GF type base joint grouting glue by Ji, cement, white cement mix together by a certain percentage, during mixing, first will The component A that SKY-GF type base joint grouting glue is ground in cement, white cement and Ji carries out being sufficiently mixed stirring, and is subsequently adding Ji and grinds The B component of SKY-GF type base joint grouting glue quickly stirs.
4. bridge non-structural crack according to claim 3 no expand method for repairing and mending it is characterised in that:Described Ji is ground SKY-GF type base joint grouting glue, cement, the part by weight of white cement are 4:3:1, the A of SKY-GF type base joint grouting glue, B component are ground in wherein Ji Weight is than for 2:1.
CN201610807228.0A 2016-09-07 2016-09-07 No-expansion repairing method for non-structural crack of bridge Pending CN106400703A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610807228.0A CN106400703A (en) 2016-09-07 2016-09-07 No-expansion repairing method for non-structural crack of bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610807228.0A CN106400703A (en) 2016-09-07 2016-09-07 No-expansion repairing method for non-structural crack of bridge

Publications (1)

Publication Number Publication Date
CN106400703A true CN106400703A (en) 2017-02-15

Family

ID=57999450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610807228.0A Pending CN106400703A (en) 2016-09-07 2016-09-07 No-expansion repairing method for non-structural crack of bridge

Country Status (1)

Country Link
CN (1) CN106400703A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202559218U (en) * 2012-04-12 2012-11-28 闫炳润 Head of rubber strip gas welding torch for crack pouring of pavements
CN102912741A (en) * 2012-11-06 2013-02-06 河北工业大学 Method for reinforcing highway bridge transformed from simple-supported girder into continuous girder
JP2014077253A (en) * 2012-10-09 2014-05-01 Highway Technology Research Center Device and method for monitoring structure crack, and disconnection gauge
KR20140093373A (en) * 2013-01-16 2014-07-28 한국유지관리 주식회사 System for inspecting cable using movable robot
JP2014149285A (en) * 2013-02-01 2014-08-21 Fuji Giken Center Kk Deterioration degree diagnosis method for floor slab through elastic wave velocity ratio
JP2014148834A (en) * 2013-02-01 2014-08-21 Railway Technical Research Institute Structure and construction method for repairing and reinforcing vertical-girder and cross-girder joint of existing steel girder
CN104674676A (en) * 2013-12-02 2015-06-03 黑龙江融德建筑技术开发有限公司 Short stand column on arch as hinge assembly
CN104727232A (en) * 2015-02-26 2015-06-24 北京公联信达智能交通技术有限责任公司 Partial remanufacturing method for repairing longitudinal crack of U-shaped abutment

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202559218U (en) * 2012-04-12 2012-11-28 闫炳润 Head of rubber strip gas welding torch for crack pouring of pavements
JP2014077253A (en) * 2012-10-09 2014-05-01 Highway Technology Research Center Device and method for monitoring structure crack, and disconnection gauge
CN102912741A (en) * 2012-11-06 2013-02-06 河北工业大学 Method for reinforcing highway bridge transformed from simple-supported girder into continuous girder
KR20140093373A (en) * 2013-01-16 2014-07-28 한국유지관리 주식회사 System for inspecting cable using movable robot
JP2014149285A (en) * 2013-02-01 2014-08-21 Fuji Giken Center Kk Deterioration degree diagnosis method for floor slab through elastic wave velocity ratio
JP2014148834A (en) * 2013-02-01 2014-08-21 Railway Technical Research Institute Structure and construction method for repairing and reinforcing vertical-girder and cross-girder joint of existing steel girder
CN104674676A (en) * 2013-12-02 2015-06-03 黑龙江融德建筑技术开发有限公司 Short stand column on arch as hinge assembly
CN104727232A (en) * 2015-02-26 2015-06-24 北京公联信达智能交通技术有限责任公司 Partial remanufacturing method for repairing longitudinal crack of U-shaped abutment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周万银: "公路桥的预应力混凝土箱梁非结构性裂缝的处治", 《2012年7月建筑科技与管理学术交流会论文集》 *

Similar Documents

Publication Publication Date Title
KR101188742B1 (en) A Method for Waterproofing and Repairing of Crack in Structure
KR100971910B1 (en) Waterproof composition for concrete structure
KR101160540B1 (en) Repair material for asphalted road and method of road repair using thereof
KR102161838B1 (en) Method for repairing and reinforcing concrete crack or damage
KR102194464B1 (en) Repairing method of concrete structure
CN106958716B (en) A kind of PCCP pipe joint caulking joint construction method
KR101790990B1 (en) Elastomeric Concrete Composition and Constructing Methods Using Thereof
CN109371860A (en) A kind of construction method for repairing Bridge Crack
CN108425692A (en) A kind of tunnel outer waterproofing layer construction method
KR102115211B1 (en) Repair method of crack in concrete
KR101009743B1 (en) Repairing agent for reinforcing the concrete
KR100677899B1 (en) Method for repairing crack of construction structure
WO2020003430A1 (en) Concrete repairing method and repairing agent
CN106400703A (en) No-expansion repairing method for non-structural crack of bridge
KR101140102B1 (en) Method for repairing section of progressive concrete structure using eco-friendly geopolymer mortar
CN105777045B (en) Osmosis type interface processing coating construction method under a kind of wet environment
KR101168722B1 (en) The prevention method of neutralization and deterioration of a concrete structure
JP2016056607A (en) Method of repairing concrete structure
CN106479299A (en) A kind of new concrete accelerated surface renovation agent and construction method
CN204418011U (en) The bridge asphalt pavement structure of the triple water-proof system of a kind of rubber asphalt double sum
JP2001020532A (en) Method for modifying and reinforcing concrete
CN113605471A (en) Method for treating shallow cracks on concrete surface
Umar et al. Strengthening of historic buildings through structural repair works: Review of the methods and process
KR102287547B1 (en) Surface reinforcement and repair method of waterway concrete structures
KR101155414B1 (en) Repairing method for a concrete

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Feng Chong

Inventor after: Gao Yan

Inventor after: Zhang Chongchong

Inventor after: Zhang Xuezhi

Inventor after: Zhang Yingfei

Inventor after: Ye Yongdi

Inventor after: Yin Xuebo

Inventor after: Yang Yingyuan

Inventor after: Zhang Kuo

Inventor after: Wang Jing

Inventor after: An Peng

Inventor after: Chang Junhui

Inventor after: Tao Tao

Inventor after: Cui Yan

Inventor after: Chen Minguo

Inventor after: Chai Ya

Inventor after: Jia Shasha

Inventor after: Cai Yuwen

Inventor after: Yang Fang

Inventor after: Liu Tingting

Inventor after: Sun Yong

Inventor after: Zhao Fang

Inventor after: Wang Shuxin

Inventor after: Shi Hui

Inventor after: Zhang Shiying

Inventor after: Liu Tie

Inventor after: Hu Lianhua

Inventor before: Feng Chong

Inventor before: Gao Yan

Inventor before: Zhang Chongchong

Inventor before: Zhang Xuezhi

Inventor before: Zhang Yingfei

Inventor before: Ye Yongdi

Inventor before: Yin Xuebo

Inventor before: Yang Yingyuan

Inventor before: Zhang Kuo

Inventor before: Wang Jing

Inventor before: An Peng

Inventor before: Chang Junhui

Inventor before: Tao Tao

Inventor before: Chen Minguo

Inventor before: Chai Ya

Inventor before: Jia Shasha

Inventor before: Cai Yuwen

Inventor before: Yang Fang

Inventor before: Liu Tingting

Inventor before: Sun Yong

Inventor before: Zhao Fang

Inventor before: Wang Shuxin

Inventor before: Shi Hui

Inventor before: Zhang Shiying

Inventor before: Liu Tie

Inventor before: Hu Lianhua

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170215