CN106395034A - Reinspection assembly line - Google Patents
Reinspection assembly line Download PDFInfo
- Publication number
- CN106395034A CN106395034A CN201610918243.2A CN201610918243A CN106395034A CN 106395034 A CN106395034 A CN 106395034A CN 201610918243 A CN201610918243 A CN 201610918243A CN 106395034 A CN106395034 A CN 106395034A
- Authority
- CN
- China
- Prior art keywords
- reinspection
- streamline
- recheck
- roller
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65B—MACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
- B65B65/00—Details peculiar to packaging machines and not otherwise provided for; Arrangements of such details
- B65B65/003—Packaging lines, e.g. general layout
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Warehouses Or Storage Devices (AREA)
- Handcart (AREA)
Abstract
The invention relates to a reinspection assembly line. The reinspection assembly line is characterized in that the reinspection assembly line comprises a transversely-arranged reinspection assembly line rack (2.1), a reinspection assembly line roller way (2.2) is arranged from right to left in the middle of the top of the reinspection assembly line rack (2.1), the front side and the back side of the top of the reinspection assembly line rack (2.1) are each provided with a reinspection assembly line table-board (2.3), three reinspection tables (2.4) are arranged on each of the front outer side and the back outer side of the reinspection assembly line rack (2.1) and closely attached to the corresponding reinspection assembly line table-board (2.3), a stool (2.5) is arranged on the right of each reinspection table (2.4), a feeding circulation trolley (4) is arranged on the outer side of each reinspection table (2.4). A turbine reinspection system composed of the reinspection assembly line has the advantages of being clear in orderliness, small in floor space, good in compactness and high in reinspection efficiency.
Description
Technical field
The present invention relates to a kind of recheck streamline.
Background technology
Turbine needs to carry out the reinspection of batch after the completion of producing, and traditional reinspection does not have good line production effect, multiple
Inspection efficiency is low, and floor space is big, rechecks process more mixed and disorderly.Therefore seek a kind of orderliness clear, floor space is little, compactedness
Good, the turbine reinspection system rechecking efficiency high is particularly important.
Content of the invention
It is an object of the invention to overcoming above-mentioned deficiency, one kind is provided to be used for assembling orderliness clearly, floor space is little, compact
Property good, recheck efficiency high turbine recheck system reinspection streamline.
The object of the present invention is achieved like this:
A kind of recheck streamline, it includes the reinspection streamline frame of lateral arrangement, recheck the crown center of streamline frame from
A dextrad left side is provided with reinspection streamline roller-way, rechecks on front side of the top of streamline frame and rear side is respectively arranged with reinspection streamline
Table top, the outside in front and back of described reinspection streamline frame is close to reinspection streamline table top and is provided with three reinspection platforms, each reinspection
The right of platform is provided with bench, and the outside rechecking platform is provided with feeding revolution trolley;
Described streamline frame of rechecking is provided with top positioned at the region rechecking streamline roller-way and recheck above streamline table top
Canopy, described ceiling is forwardly and rearwardly provided with inclined-plane obliquely from crown center, and the least significant end on inclined-plane is provided with horizontal gear
Bar.
The right-hand member rechecking streamline table top and the right-hand member rechecking streamline roller-way flush, and the left end rechecking streamline roller-way is stretched
Go out to recheck beyond the left end of streamline table top.
The described left end rechecking platform is provided with reinspection station board upwards.
Compared with prior art, the invention has the beneficial effects as follows:
The turbine of present invention assembling is rechecked system and is had orderliness clearly, and floor space is little, and compactedness is good, rechecks the excellent of efficiency high
Point.
Brief description
Fig. 1 rechecks the top view of system for turbine.
Fig. 2 is that the reinspection in Fig. 1 is got the raw materials ready line schematic diagram.
Fig. 3 is the A-A sectional view of Fig. 2.
Fig. 4 is the lift beam raised configuration schematic diagram in Fig. 3.
Fig. 5 is for placing the schematic diagram of magazine on line roller-way of getting the raw materials ready in Fig. 3.
Fig. 6 is the schematic diagram that in Fig. 4, the magazine got the raw materials ready on line roller-way is lifted by roller.
Fig. 7 is the reinspection streamline schematic diagram in Fig. 1.
Fig. 8 removes the schematic diagram of ceiling for Fig. 7.
Fig. 9 is the B-B sectional view of Fig. 7.
Figure 10 is the schematic diagram of the reinspection pack thread in Fig. 1.
Figure 11 is the feeding revolution trolley schematic diagram in Fig. 1.
Figure 12 is the C-C sectional view of Figure 11.
Wherein:
Reinspection get the raw materials ready line 1, recheck get the raw materials ready line frame 1.1, line roller-way 1.2 of getting the raw materials ready, line blanking device 1.3 of getting the raw materials ready, bottom girder 1.31, step on
Plate 1.32, source of the gas 1.33, intermediate beam 1.34, cylinder block 1.35, cylinder 1.36, guide rail 1.37, lift beam 1.38, rolling wheel support
1.39th, roller 1.310, trachea 1.311
Recheck streamline 2, recheck streamline frame 2.1, recheck streamline roller-way 2.2, recheck streamline table top 2.3, recheck platform
2.4th, station board 2.41, bench 2.5, ceiling 2.6, inclined-plane 2.7, blend stop 2.8, crossbeam 2.9, daylight lamp 2.10 are rechecked
Recheck pack thread 3, recheck pack thread frame 3.1, recheck pack thread roller-way 3.2, recheck pack thread table top 3.3, first again
Inspection packing charging roller 3.4, second recheck packing charging roller the 3.5, the 3rd recheck packing charging roller 3.6, baling press 3.7,
Weighing instrument 3.8, utility cart 3.9
Feeding revolution trolley 4, vehicle frame 4.1, placement table 4.2, housing 4.21, buttress brace 4.22, front panel 4.3, squab panel 4.4,
Left coaming plate 4.5, deflector roll 4.6, universal wheel 4.7
Magazine 5.
Specific embodiment
Referring to Fig. 1 ~ Figure 12, system rechecked by a kind of turbine according to the present invention, it include reinspection get the raw materials ready line 1, recheck flowing water
Line 2, reinspection pack thread 3 and many feeding revolution trolleys 4, described reinspection streamline 2 lateral arrangement is in the middle part in room, described
Recheck line 1 of getting the raw materials ready to be longitudinally arranged in the right rechecking streamline 2, and in order to save floor occupying area, recheck the right hand edge of line 1 of getting the raw materials ready
Wall on the right side of room, recheck get the raw materials ready line 1 front end abutment room on front side of wall, described reinspection pack thread 3 be longitudinally arranged in
Recheck the left of streamline 2.
The described reinspection reinspection that line 1 includes being longitudinally arranged of getting the raw materials ready is got the raw materials ready line frame 1.1, and described reinspection is got the raw materials ready line frame 1.1
Top be provided with, from rear to front, line roller-way 1.2 of getting the raw materials ready, described reinspection is got the raw materials ready and is provided with multiple line blanking devices of getting the raw materials ready on line 1
1.3, the side of line blanking device 1.3 of getting the raw materials ready is provided with feeding revolution trolley 4, as a kind of preferably, drawing be provided with three groups standby
Stockline blanking device 1.3, has one group to be arranged at reinspection and gets the raw materials ready line frame 1.1 rear end, has two groups to be arranged at reinspection and gets the raw materials ready line frame
1.1 stage casing, described line blanking device 1.3 of getting the raw materials ready includes the bottom girder 1.31 of lateral arrangement, and bottom girder 1.31 is set up in reinspection and gets the raw materials ready
Between the bottom of line frame 1.1, the left end on described bottom girder 1.31 is provided with pedal 1.32, the bottom girder 1.31 of pedal 1.32 right
On be provided with source of the gas 1.33, the gas source switch of pedal 1.32 and source of the gas 1.33 is connected, and described line blanking device 1.3 of getting the raw materials ready also includes
Three intermediate beams 1.34 of lateral arrangement, three intermediate beams 1.34 are set up between the middle part rechecking line frame 1.1 of getting the raw materials ready, and often
The lengthwise position of root intermediate beam 1.34 is located between the two neighboring conveying roller in front and back of line roller-way 1.2 of getting the raw materials ready, described intermediate beam
It is respectively arranged with a cylinder block 1.35 on left section and right section of 1.34, cylinder block 1.35 is provided with cylinder 1.36 upwards,
The left end of described intermediate beam 1.34 and right-hand member have set up guide rail 1.37 respectively, and guide rail 1.37 is vertically fixed on reinspection gets the raw materials ready line
In frame 1.1, it is equipped with the lift beam 1.38 of lateral arrangement, the bottom of lift beam 1.38 and a left side between the guide rail 1.37 of left and right two
The top of two cylinders 1.36 of right arrangement connects, and the top of lift beam 1.38 is provided with multiple rolling wheel supports from left to right
1.39, the top that figure only show every lift beam 1.38 is provided with four rolling support 1.39, rolling wheel support from left to right
The row's roller 1.310 being provided with 1.39 on the roller 1.310 of lateral arrangement, that is, each lift beam 1.38 is located at standby
Before and after stockline roller-way 1.2 between two neighboring conveying roller, the gas outlet of source of the gas 1.33 is connected respectively by many tracheas 1.311
Each cylinder 1.36, when pedal 1.32 is not stepped on, the height of roller 1.310 is less than the conveying roller height of line roller-way 1.2 of getting the raw materials ready,
When pedal 1.32 is stepped on, source of the gas 1.33 supplies to cylinder 1.36, and lift beam 1.38 rises so that the height of roller 1.310 is high
Conveying roller height in line roller-way 1.2 of getting the raw materials ready.The magazine 5 being now placed in getting the raw materials ready on line roller-way 1.2 is lifted by roller 1.310, material
Box 5 can be moved to the left along roller 1.310, thus reaching the purpose being easy to blanking.
The described top rechecked the reinspection streamline frame 2.1 that streamline 2 includes lateral arrangement, recheck streamline frame 2.1
It is provided with reinspection streamline roller-way 2.2 in the middle of portion from right to left, recheck and set respectively with rear side on front side of the top of streamline frame 2.1
It is equipped with reinspection streamline table top 2.3, the right-hand member rechecking streamline table top 2.3 and the right-hand member rechecking streamline roller-way 2.2 flush, multiple
The left end of inspection streamline roller-way 2.2 stretches out beyond the left end rechecking streamline table top 2.3, described reinspection streamline frame 2.1
Outside in front and back(Namely recheck the outside of streamline table top 2.3)It is close to reinspection streamline table top 2.3 and be provided with three reinspection platforms
2.4, the right that each rechecks platform 2.4 is provided with bench 2.5, and the described left end rechecking platform 2.4 is provided with reinspection station upwards
Board 2.41, the outside rechecking platform 2.4 is provided with feeding revolution trolley 4.Described reinspection streamline frame 2.1 is located at rechecks streamline
Roller-way 2.2 and the region rechecked above streamline table top 2.3 are provided with ceiling 2.6, and described ceiling 2.6 is from crown center forward
It is provided with inclined-plane 2.7 obliquely backward, the least significant end on inclined-plane 2.7 is provided with horizontal blend stop 2.8, in use,
Empty magazine 5 can be positioned on the inclined-plane 2.7 of blend stop 2.8 top, by the spacing of blend stop 2.8 so that magazine 5 is held on
On the inclined-plane of ceiling 2.6.The lower section of described ceiling 2.6 is additionally provided with crossbeam 2.9, and crossbeam 2.9 is provided with multiple being longitudinally arranged
Daylight lamp 2.10.
The described top rechecked the reinspection pack thread frame 3.1 that pack thread 3 includes being longitudinally arranged, recheck pack thread frame 3.1
It is provided with reinspection pack thread roller-way 3.2 in the middle of portion from front to back, recheck the top left side of pack thread frame 3.1 and right side sets respectively
It is equipped with reinspection pack thread table top 3.3, the rear and front end of the reinspection pack thread table top 3.3 in left side is respectively arranged with laterally to be arranged to the right
The first reinspection packing charging roller 3.4 and second recheck packing charging roller 3.5, first rechecks packing charging roller 3.4
And second recheck packing charging roller 3.5 side be provided with feeding revolution trolley 4, the reinspection pack thread table top 3.3 on right side
Stage casing be respectively arranged with arrange laterally to the left the 3rd reinspection packing charging roller 3.6, the 3rd recheck packing charging roller 3.6
Position with recheck streamline roller-way 2.2 right end position correspondings, reinspection pack thread frame 3.1 rear be provided with baling press
3.7, the right side of baling press 3.7 is provided with weighing instrument 3.8, and the right side of weighing instrument 3.8 is provided with utility cart 3.9.
Described feeding revolution trolley 4 includes vehicle frame 4.1, and the bottom of described vehicle frame 4.1 is provided with four universal wheels 4.7, institute
The top stating vehicle frame 4.1 is provided with placement table 4.2, and placement table 4.2 includes the housing 4.21 of rectangle, the middle setting of housing 4.21
There is the buttress brace 4.22 of a longitudinal direction, the front and back of described placement table 4.2 is respectively arranged with front panel 4.3 and squab panel
4.4, the left of described placement table 4.2 is provided with left coaming plate 4.5, and the right-hand member of described front panel 4.3 and squab panel 4.4 stretches out to the right
Beyond the right hand edge of placement table 4.2, setting up between described front panel 4.3 and the right-hand member of squab panel 4.4 has the deflector roll being longitudinally arranged
4.6, the height of deflector roll 4.6 is higher than the height of placement table 4.2, and the size of placement table 4.2 is exactly the size of a magazine 5, when
After magazine 5 is positioned on placement table 4.2, front panel 4.3, squab panel 4.4, left coaming plate 4.5 and deflector roll 4.6 are respectively to magazine 5
Four sides all around carry out spacing.
Operation principle:
Recheck and place the to be rechecked turbine filling magazine, blank stock line blanking device on line of getting the raw materials ready, reinspection is got the raw materials ready on line
Magazine push feeding revolution trolley, then by feeding revolution trolley be pushed into recheck streamline feeding revolution trolley station, work
The turbine that people takes in magazine nearby is rechecked, and empty magazine can be positioned on the inclined-plane of ceiling temporarily, and reinspection completes
Turbine reloads magazine and is incorporated to put into reinspection streamline roller-way and enter lower rechecks operation, after rechecking and all terminating, dress together
The magazine of full turbine delivers to the 3rd reinspection packing charging roller rechecking pack thread, cooperation from first recheck packing charging roller with
And second recheck the packing packing cratess sent of charging roller, carry out vanning, through rechecking pack thread roller-way after the completion of vanning
Deliver to baling press to be packed, then weighed successively, finally transported with utility cart.
Claims (5)
1. a kind of reinspection streamline is it is characterised in that it includes the reinspection streamline frame of lateral arrangement(2.1), recheck streamline
Frame(2.1)Crown center from right to left be provided with reinspection streamline roller-way(2.2), recheck streamline frame(2.1)Top
It is respectively arranged with and rechecks streamline table top with rear side on front side of portion(2.3), described reinspection streamline frame(2.1)Before and after outside tight
Patch rechecks streamline table top(2.3)It is provided with three reinspection platforms(2.4), each rechecks platform(2.4)Right be provided with bench
(2.5), recheck platform(2.4)Outside be provided with feeding revolution trolley(4).
2. according to claim 1 a kind of recheck streamline it is characterised in that described feeding revolution trolley(4)Including vehicle frame
(4.1), described vehicle frame(4.1)Bottom be provided with four universal wheels(4.7), described vehicle frame(4.1)Top be provided with and shelve
Platform(4.2), placement table(4.2)Housing including rectangle(4.21), housing(4.21)Middle setting have the reinforcement of a longitudinal direction
Beam(4.22), described placement table(4.2)Front and back be respectively arranged with front panel(4.3)And squab panel(4.4), described put
Put platform(4.2)Left be provided with left coaming plate(4.5), described front panel(4.3)And squab panel(4.4)Right-hand member stretch out to the right and put
Put platform(4.2)Right hand edge beyond, described front panel(4.3)And squab panel(4.4)Right-hand member between set up to have and be longitudinally arranged
Deflector roll(4.6), deflector roll(4.6)Height be higher than placement table(4.2)Height, placement table(4.2)A size exactly material
Box(5)Size, work as magazine(5)It is positioned over placement table(4.2)After upper, front panel(4.3), squab panel(4.4), left coaming plate
(4.5)And deflector roll(4.6)Respectively to magazine(5)Four sides all around carry out spacing.
3. according to claim 1 a kind of recheck streamline it is characterised in that described reinspection streamline frame(2.1)It is located at
Recheck streamline roller-way(2.2)And recheck streamline table top(2.3)The region of top is provided with ceiling(2.6), described ceiling
(2.6)Forwardly and rearwardly it is provided with inclined-plane obliquely from crown center(2.7), inclined-plane(2.7)Least significant end be provided with laterally
Blend stop(2.8).
4. a kind of reinspection streamline according to claim 1 is it is characterised in that recheck streamline table top(2.3)Right-hand member and
Recheck streamline roller-way(2.2)Right-hand member flush, recheck streamline roller-way(2.2)Left end stretch out reinspection streamline table top
(2.3)Left end beyond.
5. according to claim 1 a kind of recheck streamline it is characterised in that described reinspection platform(2.4)Left end be provided with
Reinspection station board upwards(2.41).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610918243.2A CN106395034B (en) | 2016-10-21 | 2016-10-21 | Recheck assembly line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610918243.2A CN106395034B (en) | 2016-10-21 | 2016-10-21 | Recheck assembly line |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106395034A true CN106395034A (en) | 2017-02-15 |
CN106395034B CN106395034B (en) | 2019-05-24 |
Family
ID=58012981
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610918243.2A Active CN106395034B (en) | 2016-10-21 | 2016-10-21 | Recheck assembly line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106395034B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11859267B2 (en) | 2016-10-12 | 2024-01-02 | Oxford University Innovation Limited | Nickel-based alloy |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63277124A (en) * | 1987-05-08 | 1988-11-15 | Daifuku Co Ltd | Dividing conveying device |
FR2704844A3 (en) * | 1993-03-16 | 1994-11-10 | Ali Spa | Deflection device for trays which can be fitted to washing and drying machines |
CN203998024U (en) * | 2014-08-07 | 2014-12-10 | 山东大学 | Stone plate planer-type automatic loading and unloading device |
KR101519008B1 (en) * | 2014-10-13 | 2015-05-11 | (주)인템 | Visual inspector conveyor system |
CN204489922U (en) * | 2015-01-05 | 2015-07-22 | 东莞启益电器机械有限公司 | charger detection device |
-
2016
- 2016-10-21 CN CN201610918243.2A patent/CN106395034B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63277124A (en) * | 1987-05-08 | 1988-11-15 | Daifuku Co Ltd | Dividing conveying device |
FR2704844A3 (en) * | 1993-03-16 | 1994-11-10 | Ali Spa | Deflection device for trays which can be fitted to washing and drying machines |
CN203998024U (en) * | 2014-08-07 | 2014-12-10 | 山东大学 | Stone plate planer-type automatic loading and unloading device |
KR101519008B1 (en) * | 2014-10-13 | 2015-05-11 | (주)인템 | Visual inspector conveyor system |
CN204489922U (en) * | 2015-01-05 | 2015-07-22 | 东莞启益电器机械有限公司 | charger detection device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11859267B2 (en) | 2016-10-12 | 2024-01-02 | Oxford University Innovation Limited | Nickel-based alloy |
Also Published As
Publication number | Publication date |
---|---|
CN106395034B (en) | 2019-05-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106379617A (en) | Reinspection material preparation line | |
CN209156997U (en) | A kind of cable cutting device | |
CN108263453A (en) | A kind of steel plate feeding vehicle in elevator production process | |
CN206665743U (en) | A kind of hydraulic pressure loading platform | |
CN107572179A (en) | Large Copacity frame loader | |
CN206202853U (en) | Reinspection is got the raw materials ready line | |
CN106395034A (en) | Reinspection assembly line | |
CN205631526U (en) | Bonder is folded to carton | |
CN203033456U (en) | Stacking device for large aluminum profiles | |
CN206202852U (en) | Recheck pack thread | |
CN206485680U (en) | Recheck streamline | |
CN206327914U (en) | Turbine rechecks system | |
CN106315234A (en) | Turbine rechecking system | |
CN206382459U (en) | Feeding device for gas bottle necking-in machine | |
CN202864439U (en) | Movable type side body assembly material receiving device | |
CN206527715U (en) | A kind of product design typesetting workbench | |
CN110920074A (en) | A waste recovery device for production of 3D printing consumables | |
CN207157338U (en) | A kind of dumpable intake type car body support meanss | |
CN206959517U (en) | A kind of drier | |
CN204913154U (en) | Visitor car roof skeleton welding frock | |
CN211768725U (en) | Turnover frame for forged products | |
CN206461029U (en) | Accumulator grid curing frame | |
CN205521613U (en) | Cardboard rolls angle machine | |
CN202175077U (en) | Trailed flower carrying trolley | |
CN207983315U (en) | A kind of circulating material frame of production line fitting case |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |