CN106381872A - Ground wire pile pulling out device - Google Patents

Ground wire pile pulling out device Download PDF

Info

Publication number
CN106381872A
CN106381872A CN201610783332.0A CN201610783332A CN106381872A CN 106381872 A CN106381872 A CN 106381872A CN 201610783332 A CN201610783332 A CN 201610783332A CN 106381872 A CN106381872 A CN 106381872A
Authority
CN
China
Prior art keywords
wire pile
positioning
earth wire
extracting apparatus
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610783332.0A
Other languages
Chinese (zh)
Other versions
CN106381872B (en
Inventor
宗东晨
余春
张守仁
高建
陶红政
龚治滨
韩国英
代炳晓
程东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Bohai Drilling Engineering Co Ltd
Original Assignee
CNPC Bohai Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Bohai Drilling Engineering Co Ltd filed Critical CNPC Bohai Drilling Engineering Co Ltd
Priority to CN201610783332.0A priority Critical patent/CN106381872B/en
Publication of CN106381872A publication Critical patent/CN106381872A/en
Application granted granted Critical
Publication of CN106381872B publication Critical patent/CN106381872B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/02Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention provides a ground wire pile pulling out device, which belongs to the field of well drilling auxiliary equipment. The ground wire pile pulling out device comprises a positioning component and a skid-mounted component, wherein the positioning component comprises a bottom plate and a support frame vertical to the upper side of the bottom plate, one side of the support frame is provided with two support plates disposed in parallel, the support plates are provided with a plurality of chutes disposed in parallel and open outwards, the skid-mounted component comprises a chuck and a pry bar, one end of the chuck is fixedly connected to one end of the pry bar, one end of the chuck away from the pry bar is provided with a neck, positioning plates are symmetrically disposed on both ends of the lower end surface of the chuck, the ends of the positioning plates away from the pry bar are provided with positioning holes, positioning pins are disposed by being matched with the positioning holes, positioning levers are disposed at the lower end surface of the pry bar, and the positioning lever is disposed by being matched with the chutes. The ground wire pile pulling out device is stable in operation, a ground wire pile can be loosened by pulling at first, then a fulcrum height or distance of the pry bar can be randomly adjusted till the ground wire pile is pulled out, and the aims of safety, easiness and quickness are achieved.

Description

Earth wire pile extracting apparatus
Technical field
The invention belongs to oil drilling auxiliary equipment field, it is related to earth wire pile extracting apparatus.
Background technology
Drilling crew needs before tearing the equipment of getting rid of open to remove nearly hundred earth wire piles, and workload is larger, does not have suitable instrument, can only be with bulky Head strikes, the method such as pipe wrench turns, crowbar pad brick, and operating personnel is many for participation, time-consuming effort, and the activity duration is long, and inefficiency takes When laborious, poor stability, there is percussion operating risk.In the case of freezing in the winter time, winter topsoil and earth wire pile are frozen in Together, extract pounds extremely difficult into the deep earth wire pile in 1.2 meters of underground, needs by crane toward going out firmly to hang, increased crane Use time and cost, suspender belt is easily damaged or ruptures, and crowbar ejects suddenly easily to swing and hurts sb.'s feelings, and delays production timeliness, deposits simultaneously In lifting operation risk, and often patch panel is pounded, earth wire pile sled is curved to be scrapped, in addition, the angle due to suspension hook tilts, Earth wire pile is often deformed by stretch bending or scraps, and increased material consumption and drilling cost, and increased material cost.
Content of the invention
In view of this, it is contemplated that proposing a kind of structure simply, easy to use, it is possible to decrease the earth wire pile of labor intensity pulls out Go out device.
For reaching above-mentioned purpose, the technical scheme is that and be achieved in that:Earth wire pile extracting apparatus, including positioning group Part and skid assembly, described positioning component includes base plate and the bracing frame above base plate, and the side of support frame as described above sets Have two gripper shoes be arrangeding in parallel, described gripper shoe be provided with multiple be arranged in parallel and outward opening skewed slot, described skid Assembly includes dop and ripping bar, and one end of described dop is fixedly connected with one end of described ripping bar, and described dop is away from described sled One end of bar is provided with draw-in groove, and the two ends of the lower surface of described dop are arranged with location-plate, and described location-plate is away from described ripping bar One end be provided with location hole, mate with described location hole setting have alignment pin, the lower surface of described ripping bar is provided with positioning lever, Described positioning lever mates setting with described skewed slot.
Further, described skewed slot is U-lag, and the centrage of described skewed slot is 50~70 with the angle of vertical centrage Degree, the depth of described skewed slot is the 1/2~3/4 of described gripper shoe width.
Further, the vertical dimension between two described gripper shoes is the 1/3~1/2 of support frame as described above width.
Further, described base plate is provided with the locating slot of outward opening, and described locating slot is U-shaped through hole, described positioning The centrage of groove is overlapped with the symmetrical center line of two described gripper shoes.
Further, the upper end of two described gripper shoes and support frame as described above is arranged with reinforcement, on described reinforcement It is provided with fixed via, support frame as described above is hung with L-shaped locating rod, described L-shaped locating rod is straight away from support frame as described above one end Footpath and the diameter being slightly less than described fixed via.
Further, the quantity of described positioning lever is two, and two described positioning levers be arranged in parallel, and two described fixed Position is the 1/3~1/2 of described crowbar to the distance between lever.
Further, the outside of described location-plate is installed with retainer ring, and described alignment pin is fixed on institute by flexible cable State in retainer ring.
Further, support frame as described above is welded by two symmetrically arranged angle steel.
Further, described ripping bar is circle.
Further, described base plate is circle, and the center of gravity of support frame as described above is overlapped with the center of gravity of described base plate, described support The ratio that the lower surface area of frame accounts for described base areas is less than 1/4.
Compared with prior art, the present invention has the advantages and positive effects that:Present configuration is simple, former using lever Reason, dop can stick into earth wire pile, and alignment pin can achieve the positioning of earth wire pile, and the positioning lever on ripping bar, as fixed pivot, is joined Close the gripper shoe of adjustable fulcrum height, time saving and energy saving, high working efficiency;2nd, smooth operation, safe and reliable, laborsaving, it is to avoid Large-scale crane operation, reduces operating risk;3rd, operation sequence is simple, reduces operating personnel, reduces labor intensity;4th, protect ground wire Stake does not damage or flexural deformation, reduces material cost;5th, save crane use time, save on transport costs, improve and produce timeliness, reduce Drilling cost, economic benefit is obvious;6th, small volume, lightweight, be easy to carry about with one, easy to use;7th, manufacturing process is simple, practicality By force, durable in use, there is larger popularizing application prospect.
Brief description
The accompanying drawing constituting the part of the present invention is used for providing a further understanding of the present invention, the schematic reality of the present invention Apply example and its illustrate, for explaining the present invention, not constituting inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the structural representation of positioning component of the present invention;
Fig. 2 is the structural representation of skid assembly of the present invention;
Fig. 3 is the structural representation of earth wire pile extracting apparatus use state of the present invention.
Description of reference numerals:
1- base plate;11- locating slot;2- bracing frame;3- gripper shoe;31- skewed slot;4- reinforcement;41- fixed via;5-L shape Locating rod;6- dop;61- draw-in groove;7- ripping bar;71- positioning lever;8- location-plate;81- location hole;9- retainer ring;10- positions Pin;101- flexible cable;20- positioning component;30- skid assembly.
Specific embodiment
It should be noted that in the case of not conflicting, the embodiment in the present invention and the feature in embodiment can phases Mutually combine.
In describing the invention it is to be understood that term " " center ", " longitudinal ", " horizontal ", " on ", D score, The orientation of instruction such as "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outward " or position relationship are Based on orientation shown in the drawings or position relationship, it is for only for ease of the description present invention and simplifies description, rather than instruction or dark Show the device of indication or element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that right The restriction of the present invention.Additionally, term " first ", " second " etc. are only used for describing purpose, and it is not intended that indicating or hint phase To importance or the implicit quantity indicating indicated technical characteristic.Thus, the feature defining " first ", " second " etc. can To express or to implicitly include one or more this feature.In describing the invention, unless otherwise stated, " multiple " It is meant that two or more.
In describing the invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or is integrally connected;Can To be to be mechanically connected or electrical connection;Can be to be joined directly together it is also possible to be indirectly connected to by intermediary, Ke Yishi The connection of two element internals.For the ordinary skill in the art, above-mentioned term can be understood by concrete condition Concrete meaning in the present invention.
Below in conjunction with the accompanying drawings the specific embodiment of the present invention is elaborated.
As depicted in figs. 1 and 2, the present invention is earth wire pile extracting apparatus, including positioning component 20 and skid assembly 30, positions Assembly includes base plate 1 and the bracing frame 2 perpendicular to base plate 1 top, and the side of bracing frame 2 is provided with two gripper shoes be arrangeding in parallel 3, gripper shoe 3 be provided with multiple be arranged in parallel and outward opening skewed slot 31, skid assembly includes dop 6 and ripping bar 7, dop 6 One end be fixedly connected with one end of ripping bar 7, dop 6 is provided with draw-in groove 61 away from one end of ripping bar 7, the two of the lower surface of dop 6 End is arranged with location-plate 8, and location-plate 8 is provided with location hole 81 away from one end of ripping bar 7, mates having of setting with location hole 81 fixed Position pin 10, the lower surface of ripping bar 7 is provided with positioning lever 71, and positioning lever 71 mates setting with skewed slot 31, and base plate 1 can increase and ground The contact area in face, the different soil environment such as suitable hard and chiltern, there is a good hard point, the scope of application is more Extensively.
Preferably, skewed slot 31 is U-lag, and the centrage of skewed slot 31 is 50~70 degree with the angle of vertical centrage, preferably For 60 degree it is ensured that ripping bar 7 skids off skewed slot 31, the stability of lift structure during prizing;The depth of skewed slot 31 is to prop up It is ensured that certain depth, the stress point of the ripping bar 7 being is in skewed slot 31 near the one of bracing frame 2 for the 1/2~3/4 of fagging 3 width Side, by be forced through bracing frame 2 be delivered to lower section base plate 1 on, then ground is delivered to by base plate 1 it is ensured that stress steady Qualitative.
Preferably, the vertical dimension between two gripper shoes 3 is the 1/3~1/2 of bracing frame 2 width, between gripper shoe 3 Span is bigger, and intensity is better.
Preferably, base plate 1 is provided with the locating slot 11 of outward opening, and locating slot 11 is U-shaped through hole, the center of locating slot 11 Line is overlapped with the symmetrical center line of two gripper shoes 3, and in practical process, the opening direction of locating slot 11 is directed at the position of earth wire pile Put, the operation of convenient ripping bar 7, it is to avoid many experiments carry out the positioning of device, the convenience that lifting device uses.
Preferably, the upper end of two gripper shoes 3 and bracing frame 2 is arranged with reinforcement 4, and reinforcement 4 is provided with fixing logical Hole 41, bracing frame 2 is hung with L-shaped locating rod 5, and L-shaped locating rod 5 is led to being slightly less than to fix away from the diameter of bracing frame 2 one end The diameter in hole 41, in actual practical process, admittedly on bracing frame 2, the other end inserts fixed via 41 for L-shaped locating rod 5 one end In, it is to avoid during prizing, two gripper shoes 3 are flared out, and the intensity of lifting gripper shoe 3 is it is preferable that L-shaped locating rod 5 Two ends be separately fixed in two gripper shoes 3.
Preferably, the quantity of positioning lever 71 is two, and two positioning levers 71 be arranged in parallel, two positioning levers 71 it Between distance be the 1/3~1/2 of crowbar, the length of two positioning levers 71 is different, arranges different length, can be according to earth wire pile Specification select different torque arm length, using more convenient.
Preferably, the outside of location-plate 8 is installed with retainer ring 9, and alignment pin 10 is fixed on retainer ring by flexible cable 101 On 9, alignment pin 10 is fixedly installed, and facilitates insertion into the operation of location hole 81, it is to avoid leave about conveniently, is difficult to find, and is conducive to Overall carrying, not easy to lose.
Preferably, bracing frame 2 is welded by two symmetrically arranged angle steel, and structure is simple, low cost, and intensity Height, it is highly preferred that the outer surface of bracing frame 2 and two gripper shoes 3 is provided with sprayed coating, reduces oxidized probability, extends and use Life-span.
Preferably, ripping bar 7 is circle, the grasping manipulation in strong operating process, and circle is conducive to operating, and is difficult to operation Person damages.
Preferably, base plate 1 is circle, and the center of gravity of bracing frame 2 is overlapped with the center of gravity of base plate 1, the lower surface area of bracing frame 2 The ratio accounting for base plate 1 area is less than 1/4, and stress is more stable.
In actual operating process, as shown in figure 3, using the angle bar of 50 × 50 × 6mm, making one 0.5 meter high Bracing frame 2 and gripper shoe 3, uniform gas cutting goes out multiple skewed slots 31 it is therefore an objective to adjust the position of fulcrum at any time according to the height of earth wire pile Put, adjustment ripping bar suitably push angle be 60 degree, then by integral solder on the chassis 1 of an a diameter of 30mm, with Soft ground makes it will not be pressed in soil, with the ripping bar 7 of an a diameter of 25mm, the front end welding dop of ripping bar 7, dop Width ratio earth wire pile slightly wide, the front end of the location-plate 8 of dop 6 lower end setting location hole 81, coordinate with alignment pin 10, prevent from prizing Bar 7 slips, and welds two positioning levers 71 in the downside of ripping bar 7 one end away from dop 6, can be propped up according to the elastic adjustment of earth wire pile The distance of point, changes the size of the arm of force, and positioning lever 71 and skewed slot 31 coordinate, and then operator pushes ripping bar 7 away from dop 6 One end, dop 6 can exert a force to earth wire pile, and then extracts earth wire pile.
Above one embodiment of the present of invention is described in detail, but described content has been only the preferable enforcement of the present invention Example is it is impossible to be considered the practical range for limiting the present invention.All impartial changes made according to the present patent application scope and improvement Deng all should still belong within the patent covering scope of the present invention.

Claims (10)

1. earth wire pile extracting apparatus it is characterised in that:Including positioning component (20) and skid assembly (30), described positioning component bag Include base plate (1) and the bracing frame (2) above base plate (1), the side of support frame as described above (2) is provided with two be arrangeding in parallel Gripper shoe (3), described gripper shoe (3) be provided with multiple be arranged in parallel and outward opening skewed slot (31), described skid assembly bag Include dop (6) and ripping bar (7), one end of described dop (6) is fixedly connected with one end of described ripping bar (7), described dop (6) is remote It is provided with draw-in groove (61) from one end of described ripping bar (7), the two ends of the lower surface of described dop (6) are arranged with location-plate (8), institute The one end stating location-plate (8) away from described ripping bar (7) is provided with location hole (81), mates having of setting with described location hole (81) fixed Position pin (10), the lower surface of described ripping bar (7) is provided with positioning lever (71), described positioning lever (71) and described skewed slot (31) Arranging is put.
2. earth wire pile extracting apparatus according to claim 1 it is characterised in that:Described skewed slot (31) is U-lag, described oblique The centrage of groove (31) and the angle of vertical centrage are 50~70 degree, and the depth of described skewed slot (31) is described gripper shoe (3) The 1/2~3/4 of width.
3. earth wire pile extracting apparatus according to claim 1 it is characterised in that:Hanging down between two described gripper shoes (3) Straight distance is the 1/3~1/2 of support frame as described above (2) width.
4. earth wire pile extracting apparatus according to claim 1 it is characterised in that:Described base plate (1) is provided with outward opening Locating slot (11), described locating slot (11) be U-shaped through hole, the centrage of described locating slot (11) and two described gripper shoes (3) symmetrical center line overlaps.
5. earth wire pile extracting apparatus according to claim 1 it is characterised in that:Two described gripper shoes (3) and described The upper end of support (2) is arranged with reinforcement (4), and described reinforcement (4) is provided with fixed via (41), support frame as described above (2) On be hung with L-shaped locating rod (5), described L-shaped locating rod (5) away from support frame as described above (2) one end diameter be slightly less than described The diameter of fixed via (41).
6. earth wire pile extracting apparatus according to claim 1 it is characterised in that:The quantity of described positioning lever (71) is two Individual, two described positioning levers (71) be arranged in parallel, and the distance between two described positioning levers (71) are the 1/3 of described crowbar ~1/2, the length of two described positioning levers (71) is different.
7. earth wire pile extracting apparatus according to claim 1 it is characterised in that:The outside of described location-plate (8) is installed with Retainer ring (9), described alignment pin (10) is fixed in described retainer ring (9) by flexible cable (101).
8. earth wire pile extracting apparatus according to claim 1 it is characterised in that:Support frame as described above (2) is symmetrically set by two The angle steel put is welded.
9. earth wire pile extracting apparatus according to claim 1 it is characterised in that:Described ripping bar (7) is circle.
10. earth wire pile extracting apparatus according to claim 1 it is characterised in that:Described base plate (1) is circle, described The center of gravity of support (2) is overlapped with the center of gravity of described base plate (1), and the lower surface area of support frame as described above (2) accounts for described base plate (1) face Long-pending ratio is less than 1/4.
CN201610783332.0A 2016-08-31 2016-08-31 Earth wire pile extracting apparatus Active CN106381872B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610783332.0A CN106381872B (en) 2016-08-31 2016-08-31 Earth wire pile extracting apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610783332.0A CN106381872B (en) 2016-08-31 2016-08-31 Earth wire pile extracting apparatus

Publications (2)

Publication Number Publication Date
CN106381872A true CN106381872A (en) 2017-02-08
CN106381872B CN106381872B (en) 2018-07-03

Family

ID=57938606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610783332.0A Active CN106381872B (en) 2016-08-31 2016-08-31 Earth wire pile extracting apparatus

Country Status (1)

Country Link
CN (1) CN106381872B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115003048A (en) * 2022-06-24 2022-09-02 浪潮商用机器有限公司 CPU slot removing jig

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09163876A (en) * 1995-12-15 1997-06-24 Yamaguchi Kaki Engei:Kk Pile pulling device
US20100301289A1 (en) * 2009-06-01 2010-12-02 Gilles Rivard Anchorage extractor
CN101905846A (en) * 2010-07-16 2010-12-08 西北工业大学 Combined multifunctional rescue tool
CN201924361U (en) * 2010-11-03 2011-08-10 湖州电力局 Cable traction pile extractor
CN102493456A (en) * 2011-12-28 2012-06-13 镇江普森电气有限公司 Combined manual pile extractor
CN104328784A (en) * 2014-10-29 2015-02-04 中国石油集团西部钻探工程有限公司 Ground wire pile extraction tool
CN105369807A (en) * 2015-11-18 2016-03-02 中国建筑第八工程局有限公司 Pile extracting device and pile extracting method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09163876A (en) * 1995-12-15 1997-06-24 Yamaguchi Kaki Engei:Kk Pile pulling device
US20100301289A1 (en) * 2009-06-01 2010-12-02 Gilles Rivard Anchorage extractor
CN101905846A (en) * 2010-07-16 2010-12-08 西北工业大学 Combined multifunctional rescue tool
CN201924361U (en) * 2010-11-03 2011-08-10 湖州电力局 Cable traction pile extractor
CN102493456A (en) * 2011-12-28 2012-06-13 镇江普森电气有限公司 Combined manual pile extractor
CN104328784A (en) * 2014-10-29 2015-02-04 中国石油集团西部钻探工程有限公司 Ground wire pile extraction tool
CN105369807A (en) * 2015-11-18 2016-03-02 中国建筑第八工程局有限公司 Pile extracting device and pile extracting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115003048A (en) * 2022-06-24 2022-09-02 浪潮商用机器有限公司 CPU slot removing jig

Also Published As

Publication number Publication date
CN106381872B (en) 2018-07-03

Similar Documents

Publication Publication Date Title
CN206309110U (en) Electric pole pole centralizing device
CN201031390Y (en) Tools type enlarged footing plucking resistance pile
CN106381872A (en) Ground wire pile pulling out device
CN202483437U (en) Trestle type pneumatic drilling machine
CN102494861B (en) Operating device for heavy hammer for impact vibration test of bridge substructure
CN102364033A (en) Frame column type pneumatic drill and operating method thereof
CN206128814U (en) Iron tower is salvageed chevron shape and is embraced pole
CN107882028B (en) A kind of caterpillar telescopic arm piling machine
CN205328494U (en) That easily conveys in sections simply carries native device
CN206158322U (en) Pole ware is held up to portable components of a whole that can function independently hydraulic pressure
CN204385716U (en) A kind of portable manually extracts light-duty cone penetrometer
CN204472838U (en) Wrapping reel type multi function pipeline transportation group is to car
CN204449402U (en) A kind of high-altitude punch device
CN103326138B (en) Electric power circuit ground rod assembly and disassembly device
CN206951856U (en) A kind of portable manual Multipurpose bending machine
CN206128815U (en) Single armful of pole is salvageed to iron tower
CN207436056U (en) A kind of timber piling equipment
CN206998122U (en) One kind carries vehicle carriage handling gripper
CN201362860Y (en) Building concrete pile detection device
CN206660520U (en) A kind of new basketry mesh paving device
CN201241627Y (en) Assembling-disassembling safe platform of headframe pin
CN206071598U (en) Self-propelled for tunnel excavation supporting bores quick-fried chassis
CN105174157B (en) Crowbar
CN216559089U (en) A insert borer device safely for soil and water conservation monitoring
CN214116610U (en) Drilling, stirring and hammering composite pile machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211027

Address after: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC Bohai Drilling Engineering Co.,Ltd.

Address before: No.106 Huanghai Road, Binhai New Economic and Technological Development Zone, Tianjin 300457

Patentee before: CNPC Bohai Drilling Engineering Co.,Ltd.

TR01 Transfer of patent right