CN106377889A - Liquid resistance type mountain climbing simulation body-building device - Google Patents
Liquid resistance type mountain climbing simulation body-building device Download PDFInfo
- Publication number
- CN106377889A CN106377889A CN201611014642.2A CN201611014642A CN106377889A CN 106377889 A CN106377889 A CN 106377889A CN 201611014642 A CN201611014642 A CN 201611014642A CN 106377889 A CN106377889 A CN 106377889A
- Authority
- CN
- China
- Prior art keywords
- plunger
- right support
- plunger case
- pin
- time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63B—APPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
- A63B69/00—Training appliances or apparatus for special sports
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63B—APPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
- A63B21/00—Exercising apparatus for developing or strengthening the muscles or joints of the body by working against a counterforce, with or without measuring devices
- A63B21/008—Exercising apparatus for developing or strengthening the muscles or joints of the body by working against a counterforce, with or without measuring devices using hydraulic or pneumatic force-resisters
Landscapes
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Physical Education & Sports Medicine (AREA)
- Life Sciences & Earth Sciences (AREA)
- Biophysics (AREA)
- Orthopedic Medicine & Surgery (AREA)
- Actuator (AREA)
- Details Of Reciprocating Pumps (AREA)
Abstract
The invention discloses a liquid resistance type mountain climbing simulation body-building device. The liquid resistance type mountain climbing simulation body-building device comprises a left bracket, a first pin shaft, a right bracket, a first step, a second step, a throttle valve, a second pin shaft, a third pin shaft, a fourth pin shaft, a fifth pin shaft, a first plunger-type cylinder, a first pin seat, a second pin seat and a second plunger-type cylinder. The liquid resistance type mountain climbing simulation body-building device provided by the invention can be used for simulating mountain climbing simulation movement of body builders; double feet of the body builders do alternate upward movement, the weight of bodies is improved and the energy of the bodies is consumed, so that the body-building aim is realized; and meanwhile, in the liquid resistance type mountain climbing simulation body-building device, hydraulic damping is generated before and after oil flows through the throttle valves according to a liquid resistance principle and acts on the hydraulic motor, so that a restoring torque is generated, and the gravitational potential energy of the body-builders is consumed and absorbed. The size of an opening of the throttle valve is adjusted so that the up-down movement speed of the steps can be changed, and the mountain climbing simulation exercising movement amount of the mountain climbing simulation body-builders is adjusted. The liquid resistance type mountain climbing simulation body-building device is simple in structure and convenient to adjust, is very suitable for domestic utilization and gymnasium utilization and has a wide market space.
Description
Technical field
The present invention relates to a kind of body-building apparatus are and in particular to climb the mountain simulating fitness equipment to a kind of hydraulic resistance, belong to electrically with
Field of electromechanical technology.
Background technology
With the raising of people's standard of living, healthy requirement is also improved constantly, so, body-building be one very well
Selection, body-building is divided into outdoor body-building and indoor body-building, for indoor body-building, usually relies on body-building apparatus, simulation is outdoor
Motion, reaches the purpose of body-building.Now, the species for the body-building apparatus of indoor body-building is also relatively more, than if any conventional act
Weigh, ride, running and various ball activity.
Content of the invention
The present invention proposes a kind of hydraulic resistance mountain-climbing simulating fitness equipment, simulates body builder's mountaineering, the both feet of body builder exist
Realize alternately up during, lift body wt, consume body energy, reach body-building purpose, meanwhile, hydraulic resistance mountain-climbing simulation
In fitness equipment, principle is hindered according to liquid, the flowing of fluid produces hydraulic damping before and after choke valve, acts on hydraulic motor, produce
The raw moment of reaction, consumes and absorbs the gravitional force of body builder.Adjust the openings of sizes of choke valve, thus it is possible to vary mark time up and down
Translational speed, adjusts the exercise motion amount of mountain-climbing simulation body builder.Present configuration is simple, easy to adjust, is especially suitable for family
Use with body-building venue, there is the wide market space.
The technical solution used in the present invention is:A kind of hydraulic resistance is climbed the mountain simulating fitness equipment, including left socle, the first bearing pin,
Right support, first mark time, second mark time, choke valve, the second bearing pin, the 3rd bearing pin, the 4th bearing pin, the 5th bearing pin, the first plunger
Cylinder, the first key seat, the second key seat and the second plunger case;Described left socle by left socle first crossbeam, left socle second cross beam,
Left socle the 3rd crossbeam and left socle first column, left socle second column form a framework closed, and left socle first stands
Post, the middle part of left socle second column offer left socle first pin-and-hole and left socle second pin-and-hole respectively;Described right support by
Right support first crossbeam, right support second cross beam and right support first column, right support second column, right support the 3rd column group
Become the framework of a closing, the top of described right support first column has fixedly mounted right support first connecting seat, the described right side
The front portion of frame first connecting seat offers right support first pin-and-hole, and the top of described right support the 3rd column has fixedly mounted right
Frame second connecting seat, the front portion of described right support second connecting seat offers right support second pin-and-hole, and described right support first stands
Post, right support second column, the bottom of right support the 3rd column have fixedly mounted key seat installing rack, a left side for described key seat installing rack
Fixedly mount the first key seat in the middle of portion, in the middle of the right part of key seat installing rack, fixedly mount the second key seat, described right support
Form first between one crossbeam, right support second cross beam and right support first column, right support second column to mark time chute, described
Form second between right support first crossbeam, right support second cross beam and right support second column, right support the 3rd column to mark time
Chute;Described right support inserts the lower portion of left socle, connects left socle first pin-and-hole and right respectively by the first bearing pin
Frame first pin-and-hole and connect left socle second pin-and-hole and right support second pin-and-hole so that left socle and right support realize hinged;
Described first mark time by the first step plate, first mark time gripper shoe, first mark time right sliding surface, first mark time left sliding surface and
One marks time slide block composition, and described first marks time the first of slide block marks time in the middle of inside front vertical plate and be installed with the first stepping pin
Seat, described first marks time offers first on key seat and marks time pin-and-hole;Described second marks time by the second step plate, second marks time support
Plate, the second mark time right sliding surface, the second left sliding surface and second of marking time are marked time slide block composition, and described second marks time the second of slide block
Mark time and be installed with second in the middle of inside front vertical plate and mark time key seat, described second marks time offers the second stepping pin on key seat
Hole;Described first plunger case is by the first plunger cylinder plug, the first plunger case upper end cover, the first plunger case bottom end cover, the first plunger
Cylinder cylinder barrel forms, and the top of described first plunger cylinder plug carries the first plunger, the first plunger offers pin-and-hole, the first plunger
The bottom of cylinder plug carries the first plunger case stopper head, and described first plunger case bottom end cover bottom carries the second plunger, the second pin
Pin-and-hole is offered, the first plunger case bottom end cover right side central offers the first oil through, described first plunger case upper end cover on head
It is separately mounted to the upper and lower end parts of the first plunger case cylinder barrel, the first plunger case upper end cover, the first post with the first plunger case bottom end cover
Between plug cylinder bottom end cover and the first plunger case cylinder barrel, sealing member is installed, described first plunger cylinder plug is arranged on the first plunger case
Inside cylinder barrel, its top passes from the centre bore of the first plunger case upper end cover, the first plunger cylinder plug and the first plunger case upper end
Between the centre bore of lid, sealing member, guidance tape and dust ring are installed;Described second plunger case by the second plunger cylinder plug, second
Plunger case upper end cover, the second plunger case bottom end cover, the second plunger case cylinder barrel composition, the top of described second plunger cylinder plug carries
3rd plunger, the 3rd plunger offers pin-and-hole, and the bottom of the second plunger cylinder plug carries the second plunger case stopper head, and described the
Two plunger case bottom end cover bottoms carry the 4th plunger, the 4th plunger offer pin-and-hole, the second plunger case bottom end cover left side central portion
Offer the second oil through, described second plunger case upper end cover and the second plunger case bottom end cover are separately mounted to the second plunger case cylinder
The upper and lower end parts of cylinder, are provided with sealing between the second plunger case upper end cover, the second plunger case bottom end cover and the second plunger case cylinder barrel
Part, described second plunger cylinder plug is arranged on inside the second plunger case cylinder barrel, and its top is from the center of the second plunger case upper end cover
Hole passes, and is provided with sealing member, guidance tape and dust-proof between the centre bore of the second plunger cylinder plug and the second plunger case upper end cover
Circle;Described first marks time is arranged on the first of right support and marks time in chute, and its first slide block insertion first of marking time is marked time in chute,
First left and right sides marking time slide block is pressed close to first respectively and is marked time inner side about chute, first mark time right sliding surface, first mark time
Left sliding surface presses close to right support first column, the upper surface of right support second column respectively, and first marks time the first of right support
Mark time and be capable of sliding up and down in chute;Described second marks time is arranged on the second of right support and marks time in chute, equally, second
Mark time and mark time in chute the second of right support, its second slide block insertion of marking time second is marked time in chute, second marks time slide block
The left and right sides is pressed close to second respectively and is marked time inner side about chute, and the second mark time right sliding surface, the second left sliding surface of marking time pastes respectively
Nearly right support second column, the upper surface of right support the 3rd column, second marks time, and mark time the second of right support can in chute
Realization slides up and down;The bottom of described first plunger case is by between the pin-and-hole in the second plunger, the 3rd bearing pin and the first key seat
Form hinged installation, on pin-and-hole in the first plunger is passed through on the top of described first plunger case, the second bearing pin and first is marked time
First marks time forms hinged installation between key seat;The bottom of described second plunger case is by the pin-and-hole in the 4th plunger, the 5th pin
Form hinged installation, the top of described second plunger case is by the pin-and-hole in the 3rd plunger, the 4th pin between axle and the second key seat
Axle and second mark time on second mark time and between key seat, form hinged installation;The oil-in of described choke valve pass through the first pipeline with
The first oil through on the right side of first plunger case bottom end cover is connected, and the oil-out of choke valve passes through the second pipeline and the second plunger case
The second oil through on the left of bottom end cover is connected;Described first plunger case, the first oil through, the first pipeline, choke valve, second pipe
Road, the second oil through, the inside of the second plunger case are full of fluid;Described first marks time and the second initial position marked time when installing
Necessarily be formed and misplace up and down, such as, the first initial position marked time is in lowest order, and the second initial position marked time is in highest
Position.
When needing to carry out mountain-climbing simulation body-building, a kind of hydraulic resistance mountain-climbing simulating fitness equipment is started working, due to hydraulic resistance
Mountain-climbing simulating fitness equipment in, first mark time and second mark time install when initial position exist misplace up and down, such as, first marks time
Initial position be in lowest order, the second initial position marked time is in highest order, and one first foot of body builder is climbed up first and stepped on
Step, climbs up second when body builder's another foot and marks time, and just produces an action of ascending a height, and body builder needs to overcome the gravity of itself,
Play consumption physical ability, reach the purpose of body-building, due to the effect of human bady gravitational, second marks time can produce a sliding force, this
Sliding force by second marks time second mark time key seat, the 4th bearing pin, pass to the 3rd plunger, act on the second plunger cylinder plug
On, promote the second plunger cylinder plug to move down, and be internally formed oil pressure in the second plunger case cylinder barrel, in the second plunger case cylinder barrel
The fluid in portion flows into the interior of the first plunger case by the second oil through, the second pipeline, choke valve, the first pipeline, the first oil through
Portion, due to, in fluid flow process, can form hydraulic damping, the retroaction producing on the second plunger cylinder plug on choke valve
Power, balanced human's gravity, consume gravitational potential energy of human body, second marks time slow slide downward, meanwhile, fluid flows into the first plunger case
Inside, oil pressure acts on the first plunger cylinder plug, by the first plunger cylinder plug, the first plunger, the second bearing pin and first
Mark time key seat, drive first to mark time upper shifting, finally, first marks time is in extreme higher position, and second marks time is in extreme lower position;If
Next, body builder climbs up first marking time, first marks time can produce a sliding force, this sliding force mark time by first
One mark time key seat, the second bearing pin passes to the first plunger, acts on the first plunger cylinder plug, promote the first plunger cylinder plug to
Lower movement, and be internally formed oil pressure in the first plunger case cylinder barrel, the fluid within the first plunger case cylinder barrel pass through the first oil through,
First pipeline, choke valve, the second pipeline, the second oil through flow into the inside of the second plunger case, due in fluid flow process, meeting
Hydraulic damping, the counteracting force producing on the first plunger cylinder plug, balanced human's gravity are formed on choke valve, consumes human body
Gravitional force, first marks time slow slide downward, and meanwhile, fluid flows into the inside of the second plunger case, and oil pressure acts on the second post
On plug cylinder plunger, marked time key seat by the second plunger cylinder plug, the 3rd plunger, the 4th bearing pin and second, drive second mark time on
Move, finally, second marks time is in extreme higher position, and first marks time is in extreme lower position, form circulation.By adjusting opening of choke valve
Mouthful size, it is possible to achieve first marks time and second mark time and move up and down the speed of speed, adjusts the exercise of mountain-climbing simulation body builder
Quantity of motion.
Described hydraulic motor is it is also possible to be replaced with hydraulic oil pump.
It is also possible to achieve a fixed connection between described left socle and right support.
The invention has the beneficial effects as follows:
Hydraulic resistance mountain-climbing simulating fitness equipment proposed by the present invention, can simulate body builder's mountaineering, the both feet of body builder are in reality
Now replace up during, lift body wt, consume body energy, reach body-building purpose, meanwhile, hydraulic resistance mountain-climbing simulation is strong
In body device, principle is hindered according to liquid, the flowing of fluid produces hydraulic damping before and after choke valve, acts on hydraulic motor, produce
The moment of reaction, consumes and absorbs the gravitional force of body builder.
Adjust the openings of sizes of choke valve, thus it is possible to vary mark time and move up and down speed, adjust the forging of mountain-climbing simulation body builder
Refining quantity of motion.Present configuration is simple, easy to adjust, is especially suitable for family and body-building venue uses, have wide market empty
Between.
Brief description
The embodiment being given below in conjunction with the accompanying drawings is described in more detail to the present invention.
Fig. 1 is the structural representation of the present invention;
Fig. 2 be in Fig. 1 A to schematic diagram;
Fig. 3 is the structural representation of left socle;
Fig. 4 is the structural representation of right support;
Fig. 5 is the left view of Fig. 4;
Fig. 6 is the right view of Fig. 4;
Fig. 7 is the first structural representation marked time;
Fig. 8 is the B of Fig. 7 to schematic diagram;
Fig. 9 is the second structural representation marked time;
Figure 10 is the C of Fig. 9 to schematic diagram.
Specific embodiment
As Fig. 1 -- shown in 10, a kind of hydraulic resistance is climbed the mountain simulating fitness equipment, including left socle 1, the first bearing pin 2, right support 3,
First marks time 4, second marks time 12, choke valve 5, the second bearing pin 6, the 3rd bearing pin 7, the 4th bearing pin 8, the 5th bearing pin 9, the first plunger
Cylinder 10, the first key seat 11, the second key seat 13 and the second plunger case 14;Left socle 1 is by left socle first crossbeam 1-1, left socle
Second cross beam 1-2, left socle the 3rd crossbeam 1-3 and left socle the first column 1-4, left socle the second column 1-5 form an envelope
The framework closing, left socle the first column 1-4, the middle part of left socle the second column 1-5 offer left socle the first pin-and-hole 1-6 respectively
With left socle the second pin-and-hole 1-7;Right support 3 is by right support first crossbeam 3-1, right support second cross beam 3-2 and right support first
Column 3-3, right support the second column 3-4, right support the 3rd column 3-5 form the framework of a closing, right support first column
The top of 3-3 has fixedly mounted right support the first connecting seat 3-8, and the front portion of right support the first connecting seat 3-8 offers right support
The top of the first pin-and-hole 3-6, right support the 3rd column 3-5 has fixedly mounted right support the second connecting seat 3-9, and right support second is even
The front portion of joint chair 3-9 offers right support the second pin-and-hole 3-7, right support the first column 3-3, right support the second column 3-4, the right side
The bottom of frame the 3rd column 3-5 has fixedly mounted key seat installing rack 3-10, fixed installation in the middle of the left part of key seat installing rack 3-10
First key seat 11, has fixedly mounted the second key seat 13 in the middle of the right part of key seat installing rack 3-10, right support first crossbeam 3-1,
Form first between right support second cross beam 3-2 and right support the first column 3-3, right support the second column 3-4 to mark time chute 3-
11, right support first crossbeam 3-1, right support second cross beam 3-2 and right support the second column 3-4, right support the 3rd column 3-5 it
Between form second and mark time chute 3-12;Right support 3 inserts the lower portion of left socle 1, connects left respectively by the first bearing pin 2
Frame the first pin-and-hole 1-6 and right support the first pin-and-hole 3-6 and connection left socle the second pin-and-hole 1-7 and right support the second pin-and-hole 3-7,
Make left socle 1 and right support 3 realize hinged;First mark time 4 by the first step plate 4-1, first mark time gripper shoe 4-2, first
Mark time right sliding surface 4-3, the first left sliding surface 4-4 and first that marks time marks time slide block 4-5 composition, and first marks time the of slide block 4-5
One marks time is installed with first and marks time key seat 4-6 in the middle of inside front vertical plate 4-8, first marks time offers first on key seat 4-6
Mark time pin-and-hole 4-7;Second mark time 12 by the second step plate 12-1, second mark time gripper shoe 12-2, second mark time right sliding surface 12-
3rd, the second left sliding surface 12-4 and second that marks time marks time slide block 12-5 composition, and second marks time the second of slide block 12-5 marks time front vertical plate
It is installed with second in the middle of inside 12-8 to mark time key seat 12-6, second marks time offers second on key seat 12-6 and mark time pin-and-hole
12-7;First plunger case 10 is by the first plunger cylinder plug 10-2, the first plunger case upper end cover 10-3, the first plunger case bottom end cover
10-7, the first plunger case cylinder barrel 10-5 composition, the top of the first plunger cylinder plug 10-2 carries the first plunger 10-1, the first plunger
Pin-and-hole is offered on 10-1, the bottom of the first plunger cylinder plug 10-2 carries the first plunger case stopper head 10-4, the first plunger case
Bottom end cover 10-7 bottom carries the second plunger 10-8, the second plunger 10-8 offers pin-and-hole, the first plunger case bottom end cover 10-7
Right side central offers the first oil through 10-6, the first plunger case upper end cover 10-3 and the first plunger case bottom end cover 10-7 and pacifies respectively
Be contained in the upper and lower end parts of the first plunger case cylinder barrel 10-5, the first plunger case upper end cover 10-3, the first plunger case bottom end cover 10-7 and
Between first plunger case cylinder barrel 10-5, sealing member is installed, the first plunger cylinder plug 10-2 is arranged on the first plunger case cylinder barrel 10-5
Inside, its top passes from the centre bore of the first plunger case upper end cover 10-3, the first plunger cylinder plug 10-2 and the first plunger case
Sealing member, guidance tape and dust ring are installed between the centre bore of upper end cover 10-3;Second plunger case 14 is by the second plunger case post
Plug 14-2, the second plunger case upper end cover 14-3, the second plunger case bottom end cover 14-7, the second plunger case cylinder barrel 14-5 composition, second
The top of plunger cylinder plug 14-2 carries the 3rd plunger 14-1, the 3rd plunger 14-1 offers pin-and-hole, the second plunger cylinder plug
The bottom of 14-2 carries the second plunger case stopper head 14-4, and the second plunger case bottom end cover 14-7 bottom carries the 4th plunger 14-8,
Pin-and-hole is offered, the second plunger case bottom end cover 14-7 left side central portion offers the second oil through 14-6 in 4th plunger 14-8, the
Two plunger case upper end cover 14-3 and the second plunger case bottom end cover 14-7 are separately mounted to the upper and lower side of the second plunger case cylinder barrel 14-5
Portion, is provided with close between the second plunger case upper end cover 14-3, the second plunger case bottom end cover 14-7 and the second plunger case cylinder barrel 14-5
Sealing, the second plunger cylinder plug 14-2 is arranged on inside the second plunger case cylinder barrel 14-5, and its top is from the second plunger case upper end cover
The centre bore of 14-3 passes, and is provided with close between the centre bore of the second plunger cylinder plug 14-2 and the second plunger case upper end cover 14-3
Sealing, guidance tape and dust ring;First marks time 4 is arranged on the first of right support 3 and marks time in chute 3-11, and it first is marked time slide block
4-5 insertion first is marked time in chute 3-11, and it is left that first left and right sides marking time slide block 4-5 presses close to the first chute 3-11 that marks time respectively
Right Inboard, first mark time right sliding surface 4-3, first mark time left sliding surface 4-4 press close to respectively right support the first column 3-3, right
The upper surface of frame the second column 3-4, first marks time 4 marks time the first of right support 3 and is capable of sliding up and down in chute 3-11;
Second marks time 12 is arranged on the second of right support 3 and marks time in chute 3-12, and equally, second marks time 12 steps on the second of right support 3
In step chute 3-12, its second slide block 12-5 insertion of marking time second is marked time in chute 3-12, the second left and right marking time slide block 12-5
Both sides press close to respectively second mark time chute 3-12 about inner side, second mark time right sliding surface 12-3, second mark time left sliding surface 12-
4 press close to right support the second column 3-4, the upper surface of right support the 3rd column 3-5 respectively, and second marks time 12 the of right support 3
Two mark time is capable of sliding up and down in chute 3-12;The bottom of the first plunger case 10 pass through the second plunger 10-8 on pin-and-hole,
Form hinged installation, the top of the first plunger case 10 is passed through in the first plunger 10-1 between 3rd bearing pin 7 and the first key seat 11
What pin-and-hole, the second bearing pin 6 and first were marked time on 4 first marks time and forms hinged installation between key seat 4-6;Under second plunger case 14
Portion passes through pin-and-hole in the 4th plunger 14-8, forms hinged installation between the 5th bearing pin 9 and the second key seat 13, the second plunger case
Pin-and-hole in the 3rd plunger 14-1 is passed through on 14 top, the 4th bearing pin 8 and second is marked time on 12 second mark time key seat 12-6 it
Between form hinged installation;The oil-in of choke valve 5 passes through first on the right side of the first pipeline 5-1 and the first plunger case bottom end cover 10-7
Oil through 10-6 is connected, and the oil-out of choke valve 5 passes through on the left of the second pipeline 5-2 and the second plunger case bottom end cover 14-7 the
Two oil through 14-6 are connected;First plunger case 10, the first oil through 10-6, the first pipeline 5-1, choke valve 5, the second pipeline 5-
2nd, the second oil through 14-6, the inside of the second plunger case 14 are full of fluid;First mark time 4 and second mark time 12 installation when initial
Position necessarily be formed and misplaces up and down, and such as, the first mark time 4 initial position is in lowest order, second mark time 12 initial position
It is in highest order.
When needing to carry out mountain-climbing simulation body-building, a kind of hydraulic resistance mountain-climbing simulating fitness equipment is started working, due to hydraulic resistance
Mountain-climbing simulating fitness equipment in, first mark time 4 and second mark time 12 installation when initial position exist misplace up and down, such as, first
4 initial position of marking time is in lowest order, and the second mark time 12 initial position is in highest order, and one first foot of body builder is climbed up
First marks time 4, when body builder's another foot climb up second mark time 12 when, just produce an action of ascending a height, body builder needs to overcome
The gravity of itself, plays consumption physical ability, reaches the purpose of body-building, and due to the effect of human bady gravitational, second marks time 12 can produce one
Individual sliding force, this sliding force by second mark time 12 second mark time key seat 12-6, the 4th bearing pin 8, pass to the 3rd plunger
14-1, acts on the second plunger cylinder plug 14-2, promotes the second plunger cylinder plug 14-2 to move down, and in the second plunger case
Cylinder barrel 14-5 is internally formed oil pressure, and the fluid within the second plunger case cylinder barrel 14-5 passes through the second oil through 14-6, the second pipeline
5-2, choke valve 5, the first pipeline 5-1, the first oil through 10-6 flow into the inside of the first plunger case 10, due to fluid flow process
In, hydraulic damping, the counteracting force producing on the second plunger cylinder plug 14-2, balanced human's weight can be formed on choke valve 5
Power, consumes gravitational potential energy of human body, and second marks time 12 slow slide downward, and meanwhile, fluid flows into the inside of the first plunger case 10, oil
Pressure acts on the first plunger cylinder plug 10-2, by the first plunger cylinder plug 10-2, the first plunger 10-1, the second bearing pin 6 and
First marks time key seat 4-6, drives first to mark time on 4 and moves, and finally, first marks time 4 is in extreme higher position, and second marks time 12 is in
Lower position;If next, body builder climbs up first marks time 4, first marks time 4 can produce a sliding force, and this sliding force leads to
Cross first mark time 4 the first mark time key seat 4-6, the second bearing pin 6 and pass to the first plunger 10-1, act on the first plunger cylinder plug
On 10-2, promote the first plunger cylinder plug 10-2 to move down, and be internally formed oil pressure in the first plunger case cylinder barrel 10-5, first
Fluid within plunger case cylinder barrel 10-5 pass through the first oil through 10-6, the first pipeline 5-1, choke valve 5, the second pipeline 5-2, the
Two oil through 14-6 flow into the inside of the second plunger case 14, due to, in fluid flow process, can form hydraulic pressure resistance on choke valve 5
Buddhist nun, the counteracting force producing on the first plunger cylinder plug 10-2, balanced human's gravity, consume gravitational potential energy of human body, first steps on
Walk 4 slow slide downward, meanwhile, fluid flows into the inside of the second plunger case 14, and oil pressure acts on the second plunger cylinder plug 14-2
On, marked time key seat 12-6 by the second plunger cylinder plug 14-2, the 3rd plunger 14-1, the 4th bearing pin 8 and second, drive second to step on
Move in step 12, finally, second marks time 12 is in extreme higher position, first marks time 4 is in extreme lower position, forms circulation.By adjusting
The openings of sizes of choke valve 5, it is possible to achieve first marks time 4 and second marks time 12 speeds moving up and down speed, adjusts mountain-climbing mould
Intend the exercise motion amount of body builder.
In the present invention, hydraulic motor 7 is it is also possible to be replaced with hydraulic oil pump.
It is also possible to achieve a fixed connection between left socle 1 and right support 3 in the present invention.
Hydraulic resistance mountain-climbing simulating fitness equipment proposed by the present invention, can simulate body builder's mountaineering, the both feet of body builder
During realization is alternately up, lifts body wt, consume body energy, reach body-building purpose, meanwhile, hydraulic resistance mountain-climbing mould
Intend, in fitness equipment, hindering principle according to liquid, the flowing of fluid produces hydraulic damping before and after choke valve, acts on hydraulic motor,
Produce the moment of reaction, consume and absorb the gravitional force of body builder.
Adjust the openings of sizes of choke valve, thus it is possible to vary mark time and move up and down speed, adjust the forging of mountain-climbing simulation body builder
Refining quantity of motion.Present configuration is simple, easy to adjust, is especially suitable for family and body-building venue uses, have wide market empty
Between.
The above be only the preferred embodiment of the present invention it should be pointed out that:Ordinary skill people for the art
For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should
It is considered as protection scope of the present invention.
Claims (3)
1. a kind of hydraulic resistance mountain-climbing simulating fitness equipment it is characterised in that:Including left socle(1), the first bearing pin(2), right support
(3), first mark time(4), second mark time(12), choke valve(5), the second bearing pin(6), the 3rd bearing pin(7), the 4th bearing pin(8),
Five bearing pins(9), the first plunger case(10), the first key seat(11), the second key seat(13)And second plunger case(14);Described left
Frame(1)By left socle first crossbeam(1-1), left socle second cross beam(1-2), left socle the 3rd crossbeam(1-3)With left socle
One column(1-4), left socle second column(1-5)The framework of one closing of composition, left socle first column(1-4), left socle
Second column(1-5)Middle part offer left socle first pin-and-hole respectively(1-6)With left socle second pin-and-hole(1-7);The described right side
Support(3)By right support first crossbeam(3-1), right support second cross beam(3-2)With right support first column(3-3), right support
Second column(3-4), right support the 3rd column(3-5)The framework of one closing of composition, described right support first column(3-3)'s
Top has fixedly mounted right support first connecting seat(3-8), described right support first connecting seat(3-8)Front portion offer right
Frame first pin-and-hole(3-6), described right support the 3rd column(3-5)Top fixedly mounted right support second connecting seat(3-9),
Described right support second connecting seat(3-9)Front portion offer right support second pin-and-hole(3-7), described right support first column
(3-3), right support second column(3-4), right support the 3rd column(3-5)Bottom fixedly mounted key seat installing rack(3-
10), described key seat installing rack(3-10)Left part in the middle of fixedly mounted the first key seat(11), key seat installing rack(3-10)The right side
The second key seat has been fixedly mounted in the middle of portion(13), described right support first crossbeam(3-1), right support second cross beam(3-2)And the right side
Support first column(3-3), right support second column(3-4)Between form first and mark time chute(3-11), described right support
One crossbeam(3-1), right support second cross beam(3-2)With right support second column(3-4), right support the 3rd column(3-5)Between
Form second to mark time chute(3-12);Described right support(3)Insertion left socle(1)Lower portion, by the first bearing pin(2)Point
Lian Jie not left socle first pin-and-hole(1-6)With right support first pin-and-hole(3-6)And connect left socle second pin-and-hole(1-7)And the right side
Support second pin-and-hole(3-7)So that left socle(1)And right support(3)Realize hinged;Described first marks time(4)Marked time by first
Plate(4-1), first mark time gripper shoe(4-2), first mark time right sliding surface(4-3), first mark time left sliding surface(4-4)With first
Mark time slide block(4-5)Composition, described first marks time slide block(4-5)First mark time front vertical plate(4-8)Fixed installation in the middle of inner side
First is had to mark time key seat(4-6), described first marks time key seat(4-6)On offer first and mark time pin-and-hole(4-7);Described second steps on
Step(12)By the second step plate(12-1), second mark time gripper shoe(12-2), second mark time right sliding surface(12-3), second mark time
Left sliding surface(12-4)Mark time slide block with second(12-5)Composition, described second marks time slide block(12-5)Second mark time front vertical plate
(12-8)It is installed with second in the middle of inner side to mark time key seat(12-6), described second marks time key seat(12-6)On offer second
Mark time pin-and-hole(12-7);Described first plunger case(10)By the first plunger cylinder plug(10-2), the first plunger case upper end cover(10-
3), the first plunger case bottom end cover(10-7), the first plunger case cylinder barrel(10-5)Composition, described first plunger cylinder plug(10-2)'s
Top carries the first plunger(10-1), the first plunger(10-1)On offer pin-and-hole, the first plunger cylinder plug(10-2)Bottom
With the first plunger case stopper head(10-4), described first plunger case bottom end cover(10-7)Bottom carries the second plunger(10-8),
Second plunger(10-8)On offer pin-and-hole, the first plunger case bottom end cover(10-7)Right side central offers the first oil through(10-
6), described first plunger case upper end cover(10-3)With the first plunger case bottom end cover(10-7)It is separately mounted to the first plunger case cylinder barrel
(10-5)Upper and lower end parts, the first plunger case upper end cover(10-3), the first plunger case bottom end cover(10-7)With the first plunger case cylinder
Cylinder(10-5)Between sealing member is installed, described first plunger cylinder plug(10-2)It is arranged on the first plunger case cylinder barrel(10-5)Interior
Portion, its top is from the first plunger case upper end cover(10-3)Centre bore pass, the first plunger cylinder plug(10-2)With the first plunger
Cylinder upper end cover(10-3)Centre bore between sealing member, guidance tape and dust ring are installed;Described second plunger case(14)By
Two plunger cylinder plugs(14-2), the second plunger case upper end cover(14-3), the second plunger case bottom end cover(14-7), the second plunger case cylinder
Cylinder(14-5)Composition, described second plunger cylinder plug(14-2)Top carry the 3rd plunger(14-1), the 3rd plunger(14-1)
On offer pin-and-hole, the second plunger cylinder plug(14-2)Bottom carry the second plunger case stopper head(14-4), described second post
Plug cylinder bottom end cover(14-7)Bottom carries the 4th plunger(14-8), the 4th plunger(14-8)On offer pin-and-hole, the second plunger case
Bottom end cover(14-7)Left side central portion offers the second oil through(14-6), described second plunger case upper end cover(14-3)With the second post
Plug cylinder bottom end cover(14-7)It is separately mounted to the second plunger case cylinder barrel(14-5)Upper and lower end parts, the second plunger case upper end cover(14-
3), the second plunger case bottom end cover(14-7)With the second plunger case cylinder barrel(14-5)Between sealing member is installed, described second plunger
Cylinder plug(14-2)It is arranged on the second plunger case cylinder barrel(14-5)Inside, its top is from the second plunger case upper end cover(14-3)In
Heart hole passes, the second plunger cylinder plug(14-2)With the second plunger case upper end cover(14-3)Centre bore between sealing is installed
Part, guidance tape and dust ring;Described first marks time(4)It is arranged on right support(3)First mark time chute(3-11)Interior, it first
Mark time slide block(4-5)Insertion first is marked time chute(3-11)Interior, first marks time slide block(4-5)The left and right sides press close to first respectively
Mark time chute(3-11)Inside left and right, first marks time right sliding surface(4-3), first mark time left sliding surface(4-4)Press close to the right side respectively
Support first column(3-3), right support second column(3-4)Upper surface, first marks time(4)In right support(3)First step on
Step chute(3-11)Inside it is capable of sliding up and down;Described second marks time(12)It is arranged on right support(3)Second mark time chute
(3-12)Interior, second marks time(12)In right support(3)Second mark time chute(3-12)Interior, it second is marked time slide block(12-5)Insert
Enter second to mark time chute(3-12)Interior, second marks time slide block(12-5)The left and right sides press close to second respectively and mark time chute(3-12)
Inside left and right, second marks time right sliding surface(12-3), second mark time left sliding surface(12-4)Press close to right support second column respectively
(3-4), right support the 3rd column(3-5)Upper surface, second marks time(12)In right support(3)Second mark time chute(3-12)
Inside it is capable of sliding up and down;Described first plunger case(10)Bottom pass through the second plunger(10-8)On pin-and-hole, the 3rd pin
Axle(7), and the first key seat(11)Between form hinged installation, described first plunger case(10)Top pass through the first plunger(10-
1)On pin-and-hole, the second bearing pin(6)Mark time with first(4)On first mark time key seat(4-6)Between form hinged installation;Described
Second plunger case(14)Bottom pass through the 4th plunger(14-8)On pin-and-hole, the 5th bearing pin(9), and the second key seat(13)Between
Form hinged installation, described second plunger case(14)Top pass through the 3rd plunger(14-1)On pin-and-hole, the 4th bearing pin(8)With
Second marks time(12)On second mark time key seat(12-6)Between form hinged installation;Described choke valve(5)Oil-in pass through
First pipeline(5-1)With the first plunger case bottom end cover(10-7)First oil through on right side(10-6)It is connected, choke valve(5)'s
Oil-out passes through the second pipeline(5-2)With the second plunger case bottom end cover(14-7)Second oil through in left side(14-6)It is connected;
Described first plunger case(10), the first oil through(10-6), the first pipeline(5-1), choke valve(5), the second pipeline(5-2),
Two oil throughs(14-6), the second plunger case(14)Inside be full of fluid;Described first marks time(4)Mark time with second(12)Install
When initial position formed and misplace up and down.
2. a kind of hydraulic resistance mountain-climbing simulating fitness equipment according to claim 1 it is characterised in that:Described hydraulic motor(7)
Can be replaced with hydraulic oil pump.
3. a kind of hydraulic resistance mountain-climbing simulating fitness equipment according to claim 1 it is characterised in that:Described left socle(1)With
Right support(3)Between be fixedly connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611014642.2A CN106377889B (en) | 2016-11-17 | 2016-11-17 | A kind of hydraulic resistance mountain-climbing simulating fitness equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611014642.2A CN106377889B (en) | 2016-11-17 | 2016-11-17 | A kind of hydraulic resistance mountain-climbing simulating fitness equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106377889A true CN106377889A (en) | 2017-02-08 |
CN106377889B CN106377889B (en) | 2019-05-10 |
Family
ID=57959141
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611014642.2A Expired - Fee Related CN106377889B (en) | 2016-11-17 | 2016-11-17 | A kind of hydraulic resistance mountain-climbing simulating fitness equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106377889B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5169361A (en) * | 1992-06-05 | 1992-12-08 | Hsu Hsien Long | Hydraulic cylinder assembly for climbing exercisers |
US5370592A (en) * | 1994-01-10 | 1994-12-06 | Cheng-Shiung Chang | Modified mechanism for the adjusting valve on the hydraulic cylinder of a stepper |
CN101642614A (en) * | 2008-08-07 | 2010-02-10 | 陈昱廷 | Slant walking rehabilitation device |
CN104288981A (en) * | 2014-10-10 | 2015-01-21 | 青岛润鑫伟业科贸有限公司 | Mountain-climbing exercise instrument |
US20150087482A1 (en) * | 2013-09-24 | 2015-03-26 | Southern Taiwan University Of Science And Technology | Water resistance lower body reciprocating exerciser |
-
2016
- 2016-11-17 CN CN201611014642.2A patent/CN106377889B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5169361A (en) * | 1992-06-05 | 1992-12-08 | Hsu Hsien Long | Hydraulic cylinder assembly for climbing exercisers |
US5370592A (en) * | 1994-01-10 | 1994-12-06 | Cheng-Shiung Chang | Modified mechanism for the adjusting valve on the hydraulic cylinder of a stepper |
CN101642614A (en) * | 2008-08-07 | 2010-02-10 | 陈昱廷 | Slant walking rehabilitation device |
US20150087482A1 (en) * | 2013-09-24 | 2015-03-26 | Southern Taiwan University Of Science And Technology | Water resistance lower body reciprocating exerciser |
CN104288981A (en) * | 2014-10-10 | 2015-01-21 | 青岛润鑫伟业科贸有限公司 | Mountain-climbing exercise instrument |
Also Published As
Publication number | Publication date |
---|---|
CN106377889B (en) | 2019-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106861181B (en) | Detachable platform type bicycle exercise training device | |
CN106377889A (en) | Liquid resistance type mountain climbing simulation body-building device | |
CN105854223A (en) | Pedaled fitness equipment | |
CN206715240U (en) | Damp type skating experiencing machine | |
CN106377888A (en) | Liquid resistance type mountain climbing simulation body-building device | |
CN106563261A (en) | Hydraulic damping mountaineering simulation exerciser | |
CN106334304A (en) | Hydraulic Resistance Mountain-climbing Simulating Fitness Equipment | |
CN106377890A (en) | Liquid resistance type mountain climbing simulation body-building device | |
CN106474710B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN106621253B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN114404879B (en) | Multi-body feeling fitness system based on virtual reality | |
CN106334305A (en) | Hydraulic Resistance Mountain-climbing Simulating Fitness Equipment | |
CN106621254A (en) | Liquid-obstructing mode mountain-climbing simulation fitness equipment | |
CN106334306A (en) | Hydraulic Resistance Mountain-climbing Simulating Fitness Equipment | |
CN106669128A (en) | Fluid resistance type mountaineering simulation body builder | |
CN106621252A (en) | Liquid-resistance type mountaineering simulating fitness equipment | |
CN211798550U (en) | Juggling exercise bicycle | |
CN201223669Y (en) | Air treading apparatus | |
CN206660443U (en) | Horizontal pedal treadmills | |
CN218458564U (en) | Arm strength body builder | |
CN110665179B (en) | Belladonna exercise bicycle and application method thereof | |
CN206934673U (en) | The special step configuration device of callisthenics | |
CN213375048U (en) | Shot throwing auxiliary training device | |
CN202983042U (en) | Lifting adjusting mechanism of treadmill | |
CN204745483U (en) | Treadmill of adjustable shock attenuation intensity |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190510 Termination date: 20211117 |
|
CF01 | Termination of patent right due to non-payment of annual fee |