CN106377889A - Liquid resistance type mountain climbing simulation body-building device - Google Patents

Liquid resistance type mountain climbing simulation body-building device Download PDF

Info

Publication number
CN106377889A
CN106377889A CN201611014642.2A CN201611014642A CN106377889A CN 106377889 A CN106377889 A CN 106377889A CN 201611014642 A CN201611014642 A CN 201611014642A CN 106377889 A CN106377889 A CN 106377889A
Authority
CN
China
Prior art keywords
plunger
right support
plunger case
pin
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611014642.2A
Other languages
Chinese (zh)
Other versions
CN106377889B (en
Inventor
钱雪松
李庚华
熊桓
杨泽南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Campus of Hohai University
Original Assignee
Changzhou Campus of Hohai University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Campus of Hohai University filed Critical Changzhou Campus of Hohai University
Priority to CN201611014642.2A priority Critical patent/CN106377889B/en
Publication of CN106377889A publication Critical patent/CN106377889A/en
Application granted granted Critical
Publication of CN106377889B publication Critical patent/CN106377889B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B69/00Training appliances or apparatus for special sports
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B21/00Exercising apparatus for developing or strengthening the muscles or joints of the body by working against a counterforce, with or without measuring devices
    • A63B21/008Exercising apparatus for developing or strengthening the muscles or joints of the body by working against a counterforce, with or without measuring devices using hydraulic or pneumatic force-resisters

Landscapes

  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Physical Education & Sports Medicine (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biophysics (AREA)
  • Orthopedic Medicine & Surgery (AREA)
  • Actuator (AREA)
  • Details Of Reciprocating Pumps (AREA)

Abstract

The invention discloses a liquid resistance type mountain climbing simulation body-building device. The liquid resistance type mountain climbing simulation body-building device comprises a left bracket, a first pin shaft, a right bracket, a first step, a second step, a throttle valve, a second pin shaft, a third pin shaft, a fourth pin shaft, a fifth pin shaft, a first plunger-type cylinder, a first pin seat, a second pin seat and a second plunger-type cylinder. The liquid resistance type mountain climbing simulation body-building device provided by the invention can be used for simulating mountain climbing simulation movement of body builders; double feet of the body builders do alternate upward movement, the weight of bodies is improved and the energy of the bodies is consumed, so that the body-building aim is realized; and meanwhile, in the liquid resistance type mountain climbing simulation body-building device, hydraulic damping is generated before and after oil flows through the throttle valves according to a liquid resistance principle and acts on the hydraulic motor, so that a restoring torque is generated, and the gravitational potential energy of the body-builders is consumed and absorbed. The size of an opening of the throttle valve is adjusted so that the up-down movement speed of the steps can be changed, and the mountain climbing simulation exercising movement amount of the mountain climbing simulation body-builders is adjusted. The liquid resistance type mountain climbing simulation body-building device is simple in structure and convenient to adjust, is very suitable for domestic utilization and gymnasium utilization and has a wide market space.

Description

A kind of hydraulic resistance mountain-climbing simulating fitness equipment
Technical field
The present invention relates to a kind of body-building apparatus are and in particular to climb the mountain simulating fitness equipment to a kind of hydraulic resistance, belong to electrically with Field of electromechanical technology.
Background technology
With the raising of people's standard of living, healthy requirement is also improved constantly, so, body-building be one very well Selection, body-building is divided into outdoor body-building and indoor body-building, for indoor body-building, usually relies on body-building apparatus, simulation is outdoor Motion, reaches the purpose of body-building.Now, the species for the body-building apparatus of indoor body-building is also relatively more, than if any conventional act Weigh, ride, running and various ball activity.
Content of the invention
The present invention proposes a kind of hydraulic resistance mountain-climbing simulating fitness equipment, simulates body builder's mountaineering, the both feet of body builder exist Realize alternately up during, lift body wt, consume body energy, reach body-building purpose, meanwhile, hydraulic resistance mountain-climbing simulation In fitness equipment, principle is hindered according to liquid, the flowing of fluid produces hydraulic damping before and after choke valve, acts on hydraulic motor, produce The raw moment of reaction, consumes and absorbs the gravitional force of body builder.Adjust the openings of sizes of choke valve, thus it is possible to vary mark time up and down Translational speed, adjusts the exercise motion amount of mountain-climbing simulation body builder.Present configuration is simple, easy to adjust, is especially suitable for family Use with body-building venue, there is the wide market space.
The technical solution used in the present invention is:A kind of hydraulic resistance is climbed the mountain simulating fitness equipment, including left socle, the first bearing pin, Right support, first mark time, second mark time, choke valve, the second bearing pin, the 3rd bearing pin, the 4th bearing pin, the 5th bearing pin, the first plunger Cylinder, the first key seat, the second key seat and the second plunger case;Described left socle by left socle first crossbeam, left socle second cross beam, Left socle the 3rd crossbeam and left socle first column, left socle second column form a framework closed, and left socle first stands Post, the middle part of left socle second column offer left socle first pin-and-hole and left socle second pin-and-hole respectively;Described right support by Right support first crossbeam, right support second cross beam and right support first column, right support second column, right support the 3rd column group Become the framework of a closing, the top of described right support first column has fixedly mounted right support first connecting seat, the described right side The front portion of frame first connecting seat offers right support first pin-and-hole, and the top of described right support the 3rd column has fixedly mounted right Frame second connecting seat, the front portion of described right support second connecting seat offers right support second pin-and-hole, and described right support first stands Post, right support second column, the bottom of right support the 3rd column have fixedly mounted key seat installing rack, a left side for described key seat installing rack Fixedly mount the first key seat in the middle of portion, in the middle of the right part of key seat installing rack, fixedly mount the second key seat, described right support Form first between one crossbeam, right support second cross beam and right support first column, right support second column to mark time chute, described Form second between right support first crossbeam, right support second cross beam and right support second column, right support the 3rd column to mark time Chute;Described right support inserts the lower portion of left socle, connects left socle first pin-and-hole and right respectively by the first bearing pin Frame first pin-and-hole and connect left socle second pin-and-hole and right support second pin-and-hole so that left socle and right support realize hinged; Described first mark time by the first step plate, first mark time gripper shoe, first mark time right sliding surface, first mark time left sliding surface and One marks time slide block composition, and described first marks time the first of slide block marks time in the middle of inside front vertical plate and be installed with the first stepping pin Seat, described first marks time offers first on key seat and marks time pin-and-hole;Described second marks time by the second step plate, second marks time support Plate, the second mark time right sliding surface, the second left sliding surface and second of marking time are marked time slide block composition, and described second marks time the second of slide block Mark time and be installed with second in the middle of inside front vertical plate and mark time key seat, described second marks time offers the second stepping pin on key seat Hole;Described first plunger case is by the first plunger cylinder plug, the first plunger case upper end cover, the first plunger case bottom end cover, the first plunger Cylinder cylinder barrel forms, and the top of described first plunger cylinder plug carries the first plunger, the first plunger offers pin-and-hole, the first plunger The bottom of cylinder plug carries the first plunger case stopper head, and described first plunger case bottom end cover bottom carries the second plunger, the second pin Pin-and-hole is offered, the first plunger case bottom end cover right side central offers the first oil through, described first plunger case upper end cover on head It is separately mounted to the upper and lower end parts of the first plunger case cylinder barrel, the first plunger case upper end cover, the first post with the first plunger case bottom end cover Between plug cylinder bottom end cover and the first plunger case cylinder barrel, sealing member is installed, described first plunger cylinder plug is arranged on the first plunger case Inside cylinder barrel, its top passes from the centre bore of the first plunger case upper end cover, the first plunger cylinder plug and the first plunger case upper end Between the centre bore of lid, sealing member, guidance tape and dust ring are installed;Described second plunger case by the second plunger cylinder plug, second Plunger case upper end cover, the second plunger case bottom end cover, the second plunger case cylinder barrel composition, the top of described second plunger cylinder plug carries 3rd plunger, the 3rd plunger offers pin-and-hole, and the bottom of the second plunger cylinder plug carries the second plunger case stopper head, and described the Two plunger case bottom end cover bottoms carry the 4th plunger, the 4th plunger offer pin-and-hole, the second plunger case bottom end cover left side central portion Offer the second oil through, described second plunger case upper end cover and the second plunger case bottom end cover are separately mounted to the second plunger case cylinder The upper and lower end parts of cylinder, are provided with sealing between the second plunger case upper end cover, the second plunger case bottom end cover and the second plunger case cylinder barrel Part, described second plunger cylinder plug is arranged on inside the second plunger case cylinder barrel, and its top is from the center of the second plunger case upper end cover Hole passes, and is provided with sealing member, guidance tape and dust-proof between the centre bore of the second plunger cylinder plug and the second plunger case upper end cover Circle;Described first marks time is arranged on the first of right support and marks time in chute, and its first slide block insertion first of marking time is marked time in chute, First left and right sides marking time slide block is pressed close to first respectively and is marked time inner side about chute, first mark time right sliding surface, first mark time Left sliding surface presses close to right support first column, the upper surface of right support second column respectively, and first marks time the first of right support Mark time and be capable of sliding up and down in chute;Described second marks time is arranged on the second of right support and marks time in chute, equally, second Mark time and mark time in chute the second of right support, its second slide block insertion of marking time second is marked time in chute, second marks time slide block The left and right sides is pressed close to second respectively and is marked time inner side about chute, and the second mark time right sliding surface, the second left sliding surface of marking time pastes respectively Nearly right support second column, the upper surface of right support the 3rd column, second marks time, and mark time the second of right support can in chute Realization slides up and down;The bottom of described first plunger case is by between the pin-and-hole in the second plunger, the 3rd bearing pin and the first key seat Form hinged installation, on pin-and-hole in the first plunger is passed through on the top of described first plunger case, the second bearing pin and first is marked time First marks time forms hinged installation between key seat;The bottom of described second plunger case is by the pin-and-hole in the 4th plunger, the 5th pin Form hinged installation, the top of described second plunger case is by the pin-and-hole in the 3rd plunger, the 4th pin between axle and the second key seat Axle and second mark time on second mark time and between key seat, form hinged installation;The oil-in of described choke valve pass through the first pipeline with The first oil through on the right side of first plunger case bottom end cover is connected, and the oil-out of choke valve passes through the second pipeline and the second plunger case The second oil through on the left of bottom end cover is connected;Described first plunger case, the first oil through, the first pipeline, choke valve, second pipe Road, the second oil through, the inside of the second plunger case are full of fluid;Described first marks time and the second initial position marked time when installing Necessarily be formed and misplace up and down, such as, the first initial position marked time is in lowest order, and the second initial position marked time is in highest Position.
When needing to carry out mountain-climbing simulation body-building, a kind of hydraulic resistance mountain-climbing simulating fitness equipment is started working, due to hydraulic resistance Mountain-climbing simulating fitness equipment in, first mark time and second mark time install when initial position exist misplace up and down, such as, first marks time Initial position be in lowest order, the second initial position marked time is in highest order, and one first foot of body builder is climbed up first and stepped on Step, climbs up second when body builder's another foot and marks time, and just produces an action of ascending a height, and body builder needs to overcome the gravity of itself, Play consumption physical ability, reach the purpose of body-building, due to the effect of human bady gravitational, second marks time can produce a sliding force, this Sliding force by second marks time second mark time key seat, the 4th bearing pin, pass to the 3rd plunger, act on the second plunger cylinder plug On, promote the second plunger cylinder plug to move down, and be internally formed oil pressure in the second plunger case cylinder barrel, in the second plunger case cylinder barrel The fluid in portion flows into the interior of the first plunger case by the second oil through, the second pipeline, choke valve, the first pipeline, the first oil through Portion, due to, in fluid flow process, can form hydraulic damping, the retroaction producing on the second plunger cylinder plug on choke valve Power, balanced human's gravity, consume gravitational potential energy of human body, second marks time slow slide downward, meanwhile, fluid flows into the first plunger case Inside, oil pressure acts on the first plunger cylinder plug, by the first plunger cylinder plug, the first plunger, the second bearing pin and first Mark time key seat, drive first to mark time upper shifting, finally, first marks time is in extreme higher position, and second marks time is in extreme lower position;If Next, body builder climbs up first marking time, first marks time can produce a sliding force, this sliding force mark time by first One mark time key seat, the second bearing pin passes to the first plunger, acts on the first plunger cylinder plug, promote the first plunger cylinder plug to Lower movement, and be internally formed oil pressure in the first plunger case cylinder barrel, the fluid within the first plunger case cylinder barrel pass through the first oil through, First pipeline, choke valve, the second pipeline, the second oil through flow into the inside of the second plunger case, due in fluid flow process, meeting Hydraulic damping, the counteracting force producing on the first plunger cylinder plug, balanced human's gravity are formed on choke valve, consumes human body Gravitional force, first marks time slow slide downward, and meanwhile, fluid flows into the inside of the second plunger case, and oil pressure acts on the second post On plug cylinder plunger, marked time key seat by the second plunger cylinder plug, the 3rd plunger, the 4th bearing pin and second, drive second mark time on Move, finally, second marks time is in extreme higher position, and first marks time is in extreme lower position, form circulation.By adjusting opening of choke valve Mouthful size, it is possible to achieve first marks time and second mark time and move up and down the speed of speed, adjusts the exercise of mountain-climbing simulation body builder Quantity of motion.
Described hydraulic motor is it is also possible to be replaced with hydraulic oil pump.
It is also possible to achieve a fixed connection between described left socle and right support.
The invention has the beneficial effects as follows:
Hydraulic resistance mountain-climbing simulating fitness equipment proposed by the present invention, can simulate body builder's mountaineering, the both feet of body builder are in reality Now replace up during, lift body wt, consume body energy, reach body-building purpose, meanwhile, hydraulic resistance mountain-climbing simulation is strong In body device, principle is hindered according to liquid, the flowing of fluid produces hydraulic damping before and after choke valve, acts on hydraulic motor, produce The moment of reaction, consumes and absorbs the gravitional force of body builder.
Adjust the openings of sizes of choke valve, thus it is possible to vary mark time and move up and down speed, adjust the forging of mountain-climbing simulation body builder Refining quantity of motion.Present configuration is simple, easy to adjust, is especially suitable for family and body-building venue uses, have wide market empty Between.
Brief description
The embodiment being given below in conjunction with the accompanying drawings is described in more detail to the present invention.
Fig. 1 is the structural representation of the present invention;
Fig. 2 be in Fig. 1 A to schematic diagram;
Fig. 3 is the structural representation of left socle;
Fig. 4 is the structural representation of right support;
Fig. 5 is the left view of Fig. 4;
Fig. 6 is the right view of Fig. 4;
Fig. 7 is the first structural representation marked time;
Fig. 8 is the B of Fig. 7 to schematic diagram;
Fig. 9 is the second structural representation marked time;
Figure 10 is the C of Fig. 9 to schematic diagram.
Specific embodiment
As Fig. 1 -- shown in 10, a kind of hydraulic resistance is climbed the mountain simulating fitness equipment, including left socle 1, the first bearing pin 2, right support 3, First marks time 4, second marks time 12, choke valve 5, the second bearing pin 6, the 3rd bearing pin 7, the 4th bearing pin 8, the 5th bearing pin 9, the first plunger Cylinder 10, the first key seat 11, the second key seat 13 and the second plunger case 14;Left socle 1 is by left socle first crossbeam 1-1, left socle Second cross beam 1-2, left socle the 3rd crossbeam 1-3 and left socle the first column 1-4, left socle the second column 1-5 form an envelope The framework closing, left socle the first column 1-4, the middle part of left socle the second column 1-5 offer left socle the first pin-and-hole 1-6 respectively With left socle the second pin-and-hole 1-7;Right support 3 is by right support first crossbeam 3-1, right support second cross beam 3-2 and right support first Column 3-3, right support the second column 3-4, right support the 3rd column 3-5 form the framework of a closing, right support first column The top of 3-3 has fixedly mounted right support the first connecting seat 3-8, and the front portion of right support the first connecting seat 3-8 offers right support The top of the first pin-and-hole 3-6, right support the 3rd column 3-5 has fixedly mounted right support the second connecting seat 3-9, and right support second is even The front portion of joint chair 3-9 offers right support the second pin-and-hole 3-7, right support the first column 3-3, right support the second column 3-4, the right side The bottom of frame the 3rd column 3-5 has fixedly mounted key seat installing rack 3-10, fixed installation in the middle of the left part of key seat installing rack 3-10 First key seat 11, has fixedly mounted the second key seat 13 in the middle of the right part of key seat installing rack 3-10, right support first crossbeam 3-1, Form first between right support second cross beam 3-2 and right support the first column 3-3, right support the second column 3-4 to mark time chute 3- 11, right support first crossbeam 3-1, right support second cross beam 3-2 and right support the second column 3-4, right support the 3rd column 3-5 it Between form second and mark time chute 3-12;Right support 3 inserts the lower portion of left socle 1, connects left respectively by the first bearing pin 2 Frame the first pin-and-hole 1-6 and right support the first pin-and-hole 3-6 and connection left socle the second pin-and-hole 1-7 and right support the second pin-and-hole 3-7, Make left socle 1 and right support 3 realize hinged;First mark time 4 by the first step plate 4-1, first mark time gripper shoe 4-2, first Mark time right sliding surface 4-3, the first left sliding surface 4-4 and first that marks time marks time slide block 4-5 composition, and first marks time the of slide block 4-5 One marks time is installed with first and marks time key seat 4-6 in the middle of inside front vertical plate 4-8, first marks time offers first on key seat 4-6 Mark time pin-and-hole 4-7;Second mark time 12 by the second step plate 12-1, second mark time gripper shoe 12-2, second mark time right sliding surface 12- 3rd, the second left sliding surface 12-4 and second that marks time marks time slide block 12-5 composition, and second marks time the second of slide block 12-5 marks time front vertical plate It is installed with second in the middle of inside 12-8 to mark time key seat 12-6, second marks time offers second on key seat 12-6 and mark time pin-and-hole 12-7;First plunger case 10 is by the first plunger cylinder plug 10-2, the first plunger case upper end cover 10-3, the first plunger case bottom end cover 10-7, the first plunger case cylinder barrel 10-5 composition, the top of the first plunger cylinder plug 10-2 carries the first plunger 10-1, the first plunger Pin-and-hole is offered on 10-1, the bottom of the first plunger cylinder plug 10-2 carries the first plunger case stopper head 10-4, the first plunger case Bottom end cover 10-7 bottom carries the second plunger 10-8, the second plunger 10-8 offers pin-and-hole, the first plunger case bottom end cover 10-7 Right side central offers the first oil through 10-6, the first plunger case upper end cover 10-3 and the first plunger case bottom end cover 10-7 and pacifies respectively Be contained in the upper and lower end parts of the first plunger case cylinder barrel 10-5, the first plunger case upper end cover 10-3, the first plunger case bottom end cover 10-7 and Between first plunger case cylinder barrel 10-5, sealing member is installed, the first plunger cylinder plug 10-2 is arranged on the first plunger case cylinder barrel 10-5 Inside, its top passes from the centre bore of the first plunger case upper end cover 10-3, the first plunger cylinder plug 10-2 and the first plunger case Sealing member, guidance tape and dust ring are installed between the centre bore of upper end cover 10-3;Second plunger case 14 is by the second plunger case post Plug 14-2, the second plunger case upper end cover 14-3, the second plunger case bottom end cover 14-7, the second plunger case cylinder barrel 14-5 composition, second The top of plunger cylinder plug 14-2 carries the 3rd plunger 14-1, the 3rd plunger 14-1 offers pin-and-hole, the second plunger cylinder plug The bottom of 14-2 carries the second plunger case stopper head 14-4, and the second plunger case bottom end cover 14-7 bottom carries the 4th plunger 14-8, Pin-and-hole is offered, the second plunger case bottom end cover 14-7 left side central portion offers the second oil through 14-6 in 4th plunger 14-8, the Two plunger case upper end cover 14-3 and the second plunger case bottom end cover 14-7 are separately mounted to the upper and lower side of the second plunger case cylinder barrel 14-5 Portion, is provided with close between the second plunger case upper end cover 14-3, the second plunger case bottom end cover 14-7 and the second plunger case cylinder barrel 14-5 Sealing, the second plunger cylinder plug 14-2 is arranged on inside the second plunger case cylinder barrel 14-5, and its top is from the second plunger case upper end cover The centre bore of 14-3 passes, and is provided with close between the centre bore of the second plunger cylinder plug 14-2 and the second plunger case upper end cover 14-3 Sealing, guidance tape and dust ring;First marks time 4 is arranged on the first of right support 3 and marks time in chute 3-11, and it first is marked time slide block 4-5 insertion first is marked time in chute 3-11, and it is left that first left and right sides marking time slide block 4-5 presses close to the first chute 3-11 that marks time respectively Right Inboard, first mark time right sliding surface 4-3, first mark time left sliding surface 4-4 press close to respectively right support the first column 3-3, right The upper surface of frame the second column 3-4, first marks time 4 marks time the first of right support 3 and is capable of sliding up and down in chute 3-11; Second marks time 12 is arranged on the second of right support 3 and marks time in chute 3-12, and equally, second marks time 12 steps on the second of right support 3 In step chute 3-12, its second slide block 12-5 insertion of marking time second is marked time in chute 3-12, the second left and right marking time slide block 12-5 Both sides press close to respectively second mark time chute 3-12 about inner side, second mark time right sliding surface 12-3, second mark time left sliding surface 12- 4 press close to right support the second column 3-4, the upper surface of right support the 3rd column 3-5 respectively, and second marks time 12 the of right support 3 Two mark time is capable of sliding up and down in chute 3-12;The bottom of the first plunger case 10 pass through the second plunger 10-8 on pin-and-hole, Form hinged installation, the top of the first plunger case 10 is passed through in the first plunger 10-1 between 3rd bearing pin 7 and the first key seat 11 What pin-and-hole, the second bearing pin 6 and first were marked time on 4 first marks time and forms hinged installation between key seat 4-6;Under second plunger case 14 Portion passes through pin-and-hole in the 4th plunger 14-8, forms hinged installation between the 5th bearing pin 9 and the second key seat 13, the second plunger case Pin-and-hole in the 3rd plunger 14-1 is passed through on 14 top, the 4th bearing pin 8 and second is marked time on 12 second mark time key seat 12-6 it Between form hinged installation;The oil-in of choke valve 5 passes through first on the right side of the first pipeline 5-1 and the first plunger case bottom end cover 10-7 Oil through 10-6 is connected, and the oil-out of choke valve 5 passes through on the left of the second pipeline 5-2 and the second plunger case bottom end cover 14-7 the Two oil through 14-6 are connected;First plunger case 10, the first oil through 10-6, the first pipeline 5-1, choke valve 5, the second pipeline 5- 2nd, the second oil through 14-6, the inside of the second plunger case 14 are full of fluid;First mark time 4 and second mark time 12 installation when initial Position necessarily be formed and misplaces up and down, and such as, the first mark time 4 initial position is in lowest order, second mark time 12 initial position It is in highest order.
When needing to carry out mountain-climbing simulation body-building, a kind of hydraulic resistance mountain-climbing simulating fitness equipment is started working, due to hydraulic resistance Mountain-climbing simulating fitness equipment in, first mark time 4 and second mark time 12 installation when initial position exist misplace up and down, such as, first 4 initial position of marking time is in lowest order, and the second mark time 12 initial position is in highest order, and one first foot of body builder is climbed up First marks time 4, when body builder's another foot climb up second mark time 12 when, just produce an action of ascending a height, body builder needs to overcome The gravity of itself, plays consumption physical ability, reaches the purpose of body-building, and due to the effect of human bady gravitational, second marks time 12 can produce one Individual sliding force, this sliding force by second mark time 12 second mark time key seat 12-6, the 4th bearing pin 8, pass to the 3rd plunger 14-1, acts on the second plunger cylinder plug 14-2, promotes the second plunger cylinder plug 14-2 to move down, and in the second plunger case Cylinder barrel 14-5 is internally formed oil pressure, and the fluid within the second plunger case cylinder barrel 14-5 passes through the second oil through 14-6, the second pipeline 5-2, choke valve 5, the first pipeline 5-1, the first oil through 10-6 flow into the inside of the first plunger case 10, due to fluid flow process In, hydraulic damping, the counteracting force producing on the second plunger cylinder plug 14-2, balanced human's weight can be formed on choke valve 5 Power, consumes gravitational potential energy of human body, and second marks time 12 slow slide downward, and meanwhile, fluid flows into the inside of the first plunger case 10, oil Pressure acts on the first plunger cylinder plug 10-2, by the first plunger cylinder plug 10-2, the first plunger 10-1, the second bearing pin 6 and First marks time key seat 4-6, drives first to mark time on 4 and moves, and finally, first marks time 4 is in extreme higher position, and second marks time 12 is in Lower position;If next, body builder climbs up first marks time 4, first marks time 4 can produce a sliding force, and this sliding force leads to Cross first mark time 4 the first mark time key seat 4-6, the second bearing pin 6 and pass to the first plunger 10-1, act on the first plunger cylinder plug On 10-2, promote the first plunger cylinder plug 10-2 to move down, and be internally formed oil pressure in the first plunger case cylinder barrel 10-5, first Fluid within plunger case cylinder barrel 10-5 pass through the first oil through 10-6, the first pipeline 5-1, choke valve 5, the second pipeline 5-2, the Two oil through 14-6 flow into the inside of the second plunger case 14, due to, in fluid flow process, can form hydraulic pressure resistance on choke valve 5 Buddhist nun, the counteracting force producing on the first plunger cylinder plug 10-2, balanced human's gravity, consume gravitational potential energy of human body, first steps on Walk 4 slow slide downward, meanwhile, fluid flows into the inside of the second plunger case 14, and oil pressure acts on the second plunger cylinder plug 14-2 On, marked time key seat 12-6 by the second plunger cylinder plug 14-2, the 3rd plunger 14-1, the 4th bearing pin 8 and second, drive second to step on Move in step 12, finally, second marks time 12 is in extreme higher position, first marks time 4 is in extreme lower position, forms circulation.By adjusting The openings of sizes of choke valve 5, it is possible to achieve first marks time 4 and second marks time 12 speeds moving up and down speed, adjusts mountain-climbing mould Intend the exercise motion amount of body builder.
In the present invention, hydraulic motor 7 is it is also possible to be replaced with hydraulic oil pump.
It is also possible to achieve a fixed connection between left socle 1 and right support 3 in the present invention.
Hydraulic resistance mountain-climbing simulating fitness equipment proposed by the present invention, can simulate body builder's mountaineering, the both feet of body builder During realization is alternately up, lifts body wt, consume body energy, reach body-building purpose, meanwhile, hydraulic resistance mountain-climbing mould Intend, in fitness equipment, hindering principle according to liquid, the flowing of fluid produces hydraulic damping before and after choke valve, acts on hydraulic motor, Produce the moment of reaction, consume and absorb the gravitional force of body builder.
Adjust the openings of sizes of choke valve, thus it is possible to vary mark time and move up and down speed, adjust the forging of mountain-climbing simulation body builder Refining quantity of motion.Present configuration is simple, easy to adjust, is especially suitable for family and body-building venue uses, have wide market empty Between.
The above be only the preferred embodiment of the present invention it should be pointed out that:Ordinary skill people for the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (3)

1. a kind of hydraulic resistance mountain-climbing simulating fitness equipment it is characterised in that:Including left socle(1), the first bearing pin(2), right support (3), first mark time(4), second mark time(12), choke valve(5), the second bearing pin(6), the 3rd bearing pin(7), the 4th bearing pin(8), Five bearing pins(9), the first plunger case(10), the first key seat(11), the second key seat(13)And second plunger case(14);Described left Frame(1)By left socle first crossbeam(1-1), left socle second cross beam(1-2), left socle the 3rd crossbeam(1-3)With left socle One column(1-4), left socle second column(1-5)The framework of one closing of composition, left socle first column(1-4), left socle Second column(1-5)Middle part offer left socle first pin-and-hole respectively(1-6)With left socle second pin-and-hole(1-7);The described right side Support(3)By right support first crossbeam(3-1), right support second cross beam(3-2)With right support first column(3-3), right support Second column(3-4), right support the 3rd column(3-5)The framework of one closing of composition, described right support first column(3-3)'s Top has fixedly mounted right support first connecting seat(3-8), described right support first connecting seat(3-8)Front portion offer right Frame first pin-and-hole(3-6), described right support the 3rd column(3-5)Top fixedly mounted right support second connecting seat(3-9), Described right support second connecting seat(3-9)Front portion offer right support second pin-and-hole(3-7), described right support first column (3-3), right support second column(3-4), right support the 3rd column(3-5)Bottom fixedly mounted key seat installing rack(3- 10), described key seat installing rack(3-10)Left part in the middle of fixedly mounted the first key seat(11), key seat installing rack(3-10)The right side The second key seat has been fixedly mounted in the middle of portion(13), described right support first crossbeam(3-1), right support second cross beam(3-2)And the right side Support first column(3-3), right support second column(3-4)Between form first and mark time chute(3-11), described right support One crossbeam(3-1), right support second cross beam(3-2)With right support second column(3-4), right support the 3rd column(3-5)Between Form second to mark time chute(3-12);Described right support(3)Insertion left socle(1)Lower portion, by the first bearing pin(2)Point Lian Jie not left socle first pin-and-hole(1-6)With right support first pin-and-hole(3-6)And connect left socle second pin-and-hole(1-7)And the right side Support second pin-and-hole(3-7)So that left socle(1)And right support(3)Realize hinged;Described first marks time(4)Marked time by first Plate(4-1), first mark time gripper shoe(4-2), first mark time right sliding surface(4-3), first mark time left sliding surface(4-4)With first Mark time slide block(4-5)Composition, described first marks time slide block(4-5)First mark time front vertical plate(4-8)Fixed installation in the middle of inner side First is had to mark time key seat(4-6), described first marks time key seat(4-6)On offer first and mark time pin-and-hole(4-7);Described second steps on Step(12)By the second step plate(12-1), second mark time gripper shoe(12-2), second mark time right sliding surface(12-3), second mark time Left sliding surface(12-4)Mark time slide block with second(12-5)Composition, described second marks time slide block(12-5)Second mark time front vertical plate (12-8)It is installed with second in the middle of inner side to mark time key seat(12-6), described second marks time key seat(12-6)On offer second Mark time pin-and-hole(12-7);Described first plunger case(10)By the first plunger cylinder plug(10-2), the first plunger case upper end cover(10- 3), the first plunger case bottom end cover(10-7), the first plunger case cylinder barrel(10-5)Composition, described first plunger cylinder plug(10-2)'s Top carries the first plunger(10-1), the first plunger(10-1)On offer pin-and-hole, the first plunger cylinder plug(10-2)Bottom With the first plunger case stopper head(10-4), described first plunger case bottom end cover(10-7)Bottom carries the second plunger(10-8), Second plunger(10-8)On offer pin-and-hole, the first plunger case bottom end cover(10-7)Right side central offers the first oil through(10- 6), described first plunger case upper end cover(10-3)With the first plunger case bottom end cover(10-7)It is separately mounted to the first plunger case cylinder barrel (10-5)Upper and lower end parts, the first plunger case upper end cover(10-3), the first plunger case bottom end cover(10-7)With the first plunger case cylinder Cylinder(10-5)Between sealing member is installed, described first plunger cylinder plug(10-2)It is arranged on the first plunger case cylinder barrel(10-5)Interior Portion, its top is from the first plunger case upper end cover(10-3)Centre bore pass, the first plunger cylinder plug(10-2)With the first plunger Cylinder upper end cover(10-3)Centre bore between sealing member, guidance tape and dust ring are installed;Described second plunger case(14)By Two plunger cylinder plugs(14-2), the second plunger case upper end cover(14-3), the second plunger case bottom end cover(14-7), the second plunger case cylinder Cylinder(14-5)Composition, described second plunger cylinder plug(14-2)Top carry the 3rd plunger(14-1), the 3rd plunger(14-1) On offer pin-and-hole, the second plunger cylinder plug(14-2)Bottom carry the second plunger case stopper head(14-4), described second post Plug cylinder bottom end cover(14-7)Bottom carries the 4th plunger(14-8), the 4th plunger(14-8)On offer pin-and-hole, the second plunger case Bottom end cover(14-7)Left side central portion offers the second oil through(14-6), described second plunger case upper end cover(14-3)With the second post Plug cylinder bottom end cover(14-7)It is separately mounted to the second plunger case cylinder barrel(14-5)Upper and lower end parts, the second plunger case upper end cover(14- 3), the second plunger case bottom end cover(14-7)With the second plunger case cylinder barrel(14-5)Between sealing member is installed, described second plunger Cylinder plug(14-2)It is arranged on the second plunger case cylinder barrel(14-5)Inside, its top is from the second plunger case upper end cover(14-3)In Heart hole passes, the second plunger cylinder plug(14-2)With the second plunger case upper end cover(14-3)Centre bore between sealing is installed Part, guidance tape and dust ring;Described first marks time(4)It is arranged on right support(3)First mark time chute(3-11)Interior, it first Mark time slide block(4-5)Insertion first is marked time chute(3-11)Interior, first marks time slide block(4-5)The left and right sides press close to first respectively Mark time chute(3-11)Inside left and right, first marks time right sliding surface(4-3), first mark time left sliding surface(4-4)Press close to the right side respectively Support first column(3-3), right support second column(3-4)Upper surface, first marks time(4)In right support(3)First step on Step chute(3-11)Inside it is capable of sliding up and down;Described second marks time(12)It is arranged on right support(3)Second mark time chute (3-12)Interior, second marks time(12)In right support(3)Second mark time chute(3-12)Interior, it second is marked time slide block(12-5)Insert Enter second to mark time chute(3-12)Interior, second marks time slide block(12-5)The left and right sides press close to second respectively and mark time chute(3-12) Inside left and right, second marks time right sliding surface(12-3), second mark time left sliding surface(12-4)Press close to right support second column respectively (3-4), right support the 3rd column(3-5)Upper surface, second marks time(12)In right support(3)Second mark time chute(3-12) Inside it is capable of sliding up and down;Described first plunger case(10)Bottom pass through the second plunger(10-8)On pin-and-hole, the 3rd pin Axle(7), and the first key seat(11)Between form hinged installation, described first plunger case(10)Top pass through the first plunger(10- 1)On pin-and-hole, the second bearing pin(6)Mark time with first(4)On first mark time key seat(4-6)Between form hinged installation;Described Second plunger case(14)Bottom pass through the 4th plunger(14-8)On pin-and-hole, the 5th bearing pin(9), and the second key seat(13)Between Form hinged installation, described second plunger case(14)Top pass through the 3rd plunger(14-1)On pin-and-hole, the 4th bearing pin(8)With Second marks time(12)On second mark time key seat(12-6)Between form hinged installation;Described choke valve(5)Oil-in pass through First pipeline(5-1)With the first plunger case bottom end cover(10-7)First oil through on right side(10-6)It is connected, choke valve(5)'s Oil-out passes through the second pipeline(5-2)With the second plunger case bottom end cover(14-7)Second oil through in left side(14-6)It is connected; Described first plunger case(10), the first oil through(10-6), the first pipeline(5-1), choke valve(5), the second pipeline(5-2), Two oil throughs(14-6), the second plunger case(14)Inside be full of fluid;Described first marks time(4)Mark time with second(12)Install When initial position formed and misplace up and down.
2. a kind of hydraulic resistance mountain-climbing simulating fitness equipment according to claim 1 it is characterised in that:Described hydraulic motor(7) Can be replaced with hydraulic oil pump.
3. a kind of hydraulic resistance mountain-climbing simulating fitness equipment according to claim 1 it is characterised in that:Described left socle(1)With Right support(3)Between be fixedly connected.
CN201611014642.2A 2016-11-17 2016-11-17 A kind of hydraulic resistance mountain-climbing simulating fitness equipment Expired - Fee Related CN106377889B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611014642.2A CN106377889B (en) 2016-11-17 2016-11-17 A kind of hydraulic resistance mountain-climbing simulating fitness equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611014642.2A CN106377889B (en) 2016-11-17 2016-11-17 A kind of hydraulic resistance mountain-climbing simulating fitness equipment

Publications (2)

Publication Number Publication Date
CN106377889A true CN106377889A (en) 2017-02-08
CN106377889B CN106377889B (en) 2019-05-10

Family

ID=57959141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611014642.2A Expired - Fee Related CN106377889B (en) 2016-11-17 2016-11-17 A kind of hydraulic resistance mountain-climbing simulating fitness equipment

Country Status (1)

Country Link
CN (1) CN106377889B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5169361A (en) * 1992-06-05 1992-12-08 Hsu Hsien Long Hydraulic cylinder assembly for climbing exercisers
US5370592A (en) * 1994-01-10 1994-12-06 Cheng-Shiung Chang Modified mechanism for the adjusting valve on the hydraulic cylinder of a stepper
CN101642614A (en) * 2008-08-07 2010-02-10 陈昱廷 Slant walking rehabilitation device
CN104288981A (en) * 2014-10-10 2015-01-21 青岛润鑫伟业科贸有限公司 Mountain-climbing exercise instrument
US20150087482A1 (en) * 2013-09-24 2015-03-26 Southern Taiwan University Of Science And Technology Water resistance lower body reciprocating exerciser

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5169361A (en) * 1992-06-05 1992-12-08 Hsu Hsien Long Hydraulic cylinder assembly for climbing exercisers
US5370592A (en) * 1994-01-10 1994-12-06 Cheng-Shiung Chang Modified mechanism for the adjusting valve on the hydraulic cylinder of a stepper
CN101642614A (en) * 2008-08-07 2010-02-10 陈昱廷 Slant walking rehabilitation device
US20150087482A1 (en) * 2013-09-24 2015-03-26 Southern Taiwan University Of Science And Technology Water resistance lower body reciprocating exerciser
CN104288981A (en) * 2014-10-10 2015-01-21 青岛润鑫伟业科贸有限公司 Mountain-climbing exercise instrument

Also Published As

Publication number Publication date
CN106377889B (en) 2019-05-10

Similar Documents

Publication Publication Date Title
CN106861181B (en) Detachable platform type bicycle exercise training device
CN106377889A (en) Liquid resistance type mountain climbing simulation body-building device
CN105854223A (en) Pedaled fitness equipment
CN206715240U (en) Damp type skating experiencing machine
CN106377888A (en) Liquid resistance type mountain climbing simulation body-building device
CN106563261A (en) Hydraulic damping mountaineering simulation exerciser
CN106334304A (en) Hydraulic Resistance Mountain-climbing Simulating Fitness Equipment
CN106377890A (en) Liquid resistance type mountain climbing simulation body-building device
CN106474710B (en) A kind of hydraulic resistance mountain-climbing simulating fitness equipment
CN106621253B (en) A kind of hydraulic resistance mountain-climbing simulating fitness equipment
CN114404879B (en) Multi-body feeling fitness system based on virtual reality
CN106334305A (en) Hydraulic Resistance Mountain-climbing Simulating Fitness Equipment
CN106621254A (en) Liquid-obstructing mode mountain-climbing simulation fitness equipment
CN106334306A (en) Hydraulic Resistance Mountain-climbing Simulating Fitness Equipment
CN106669128A (en) Fluid resistance type mountaineering simulation body builder
CN106621252A (en) Liquid-resistance type mountaineering simulating fitness equipment
CN211798550U (en) Juggling exercise bicycle
CN201223669Y (en) Air treading apparatus
CN206660443U (en) Horizontal pedal treadmills
CN218458564U (en) Arm strength body builder
CN110665179B (en) Belladonna exercise bicycle and application method thereof
CN206934673U (en) The special step configuration device of callisthenics
CN213375048U (en) Shot throwing auxiliary training device
CN202983042U (en) Lifting adjusting mechanism of treadmill
CN204745483U (en) Treadmill of adjustable shock attenuation intensity

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190510

Termination date: 20211117

CF01 Termination of patent right due to non-payment of annual fee