CN106334306A - Hydraulic Resistance Mountain-climbing Simulating Fitness Equipment - Google Patents
Hydraulic Resistance Mountain-climbing Simulating Fitness Equipment Download PDFInfo
- Publication number
- CN106334306A CN106334306A CN201611014659.8A CN201611014659A CN106334306A CN 106334306 A CN106334306 A CN 106334306A CN 201611014659 A CN201611014659 A CN 201611014659A CN 106334306 A CN106334306 A CN 106334306A
- Authority
- CN
- China
- Prior art keywords
- right support
- time
- mark time
- pin
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63B—APPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
- A63B69/00—Training appliances or apparatus for special sports
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63B—APPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
- A63B21/00—Exercising apparatus for developing or strengthening the muscles or joints of the body by working against a counterforce, with or without measuring devices
- A63B21/008—Exercising apparatus for developing or strengthening the muscles or joints of the body by working against a counterforce, with or without measuring devices using hydraulic or pneumatic force-resisters
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63B—APPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
- A63B71/00—Games or sports accessories not covered in groups A63B1/00 - A63B69/00
- A63B71/06—Indicating or scoring devices for games or players, or for other sports activities
- A63B71/0619—Displays, user interfaces and indicating devices, specially adapted for sport equipment, e.g. display mounted on treadmills
- A63B71/0622—Visual, audio or audio-visual systems for entertaining, instructing or motivating the user
Abstract
The invention discloses a hydraulic resistance mountain-climbing simulating fitness equipment. The hydraulic resistance mountain-climbing simulating fitness equipment comprises a left bracket, a first pin shaft, a right bracket, a first step training mode, a second step training mode, a first one-way throttle valve, a second one-way throttle valve, a hydraulic motor, a crankshaft, a key, a first connecting rod, a second pin shaft, a third pin shaft, a second connecting rod and a micro-computer. According to the hydraulic resistance mountain-climbing simulating fitness equipment provided by the present invention, body builder's mountaineering can be simulated, during alternating upward movement of the feet of a body builder, the body weight is lift, the body energy is consumed, and the purpose of body-building is reached; and meanwhile, in the hydraulic resistance mountain-climbing simulating fitness equipment, according to the principle of hydraulic resistance, the flowing of fluid produces hydraulic damping in front of and behind the choke valve, and the hydraulic damping is acted on the hydraulic motor to produce reaction torque, consume and absorb gravitational potential energy of the body builder. As the opening size of the throttle valve is adjustable, the up and down moving speed of stepping can be changed, so that the amount of exercise of the mounting-climbing simulating body builder can be adjusted. The hydraulic resistance mountain-climbing simulating fitness equipment provided by the invention is simple in structure and convenient in regulation, it is quite suitable for the use of families and body-building venues, and it has a wide market space.
Description
Technical field
The present invention relates to a kind of body-building apparatus are and in particular to climb the mountain simulating fitness equipment to a kind of hydraulic resistance, belong to electrically with
Field of electromechanical technology.
Background technology
With the raising of people's standard of living, healthy requirement is also improved constantly, so, body-building be one very well
Selection, body-building is divided into outdoor body-building and indoor body-building, for indoor body-building, usually relies on body-building apparatus, simulation is outdoor
Motion, reaches the purpose of body-building.Now, the species for the body-building apparatus of indoor body-building is also relatively more, than if any conventional act
Weigh, ride, running and various ball activity.
Content of the invention
The present invention proposes a kind of hydraulic resistance mountain-climbing simulating fitness equipment, simulates body builder's mountaineering, the both feet of body builder exist
Realize alternately up during, lift body wt, consume body energy, reach body-building purpose, meanwhile, hydraulic resistance mountain-climbing simulation
In fitness equipment, principle is hindered according to liquid, the flowing of fluid produces hydraulic damping before and after choke valve, acts on hydraulic motor, produce
The raw moment of reaction, consumes and absorbs the gravitional force of body builder.Adjust the openings of sizes of choke valve, thus it is possible to vary mark time up and down
Translational speed, adjusts the exercise motion amount of mountain-climbing simulation body builder, and micro computer can record and show the body weight of body builder, scrunch
Number of times, body-building intensity, the related data such as consumed energy, at the same time it can also play music, video etc., build good body-building atmosphere
Enclose.Present configuration is simple, easy to adjust, is especially suitable for family and body-building venue uses, have the wide market space.
The technical solution used in the present invention is: a kind of hydraulic resistance is climbed the mountain simulating fitness equipment, including left socle, the first bearing pin,
Right support, first mark time, second mark time, the first one-way throttle valve, the second one-way throttle valve, hydraulic motor, bent axle, key, first
Connecting rod, the second bearing pin, the 3rd bearing pin, second connecting rod and micro computer;Described left socle is by left socle first crossbeam, left socle
Two crossbeams, left socle the 3rd crossbeam and left socle first column, left socle second column form the framework of a closing, left socle
First column, the middle part of left socle second column offer left socle first pin-and-hole and left socle second pin-and-hole respectively;The described right side
Support is by right support first crossbeam, right support second cross beam and right support first column, right support second column, right support the 3rd
Column forms the framework of a closing, and the top of described right support first column has fixedly mounted right support first connecting seat, institute
The front portion stating right support first connecting seat offers right support first pin-and-hole, and rear portion offers crankshaft installed hole, described right support
The top of the 3rd column has fixedly mounted right support second connecting seat, and the front portion of described right support second connecting seat offers right
Frame second pin-and-hole, rear portion offers hydraulic motor installing hole, has fixedly mounted oil outside the middle part of described right support the 3rd column
Case, forms the between described right support first crossbeam, right support second cross beam and right support first column, right support second column
One marks time chute, described right support first crossbeam, right support second cross beam and right support second column, right support the 3rd column it
Between form second and mark time chute;Described first mark time by the first step plate, first mark time gripper shoe, first mark time right sliding surface,
First left sliding surface and first of marking time is marked time slide block composition, and described first anteriomedial marking time slide block is installed with first and steps on
Step key seat, described first marks time offers first on key seat and marks time pin-and-hole;Described second marks time by the second step plate, second marks time
Gripper shoe, the second mark time right sliding surface, the second left sliding surface and second of marking time are marked time slide block composition, and described second marks time slide block
Anteriomedial is installed with second and marks time key seat, and described second marks time offers second on key seat and mark time pin-and-hole;Described bent axle
There is the first crank throw and the second crank throw, described first crank throw carries the first crank shaft, described second crank throw carries second bent
Turn axle, the right-hand member of bent axle offers the endoporus with keyway;The top of described first connecting rod carries the first plunger, and the first plunger is opened
It is provided with pin-and-hole, the bottom of first connecting rod carries the second plunger, the second plunger offers pin-and-hole, the upper bands of described second connecting rod
There is the 3rd plunger, the 3rd plunger offers pin-and-hole, the bottom of second connecting rod carries the 4th plunger, the 4th plunger offers pin
Hole;Described right support inserts the lower portion of left socle, connects left socle first pin-and-hole and right support respectively by the first bearing pin
First pin-and-hole and connect left socle second pin-and-hole and right support second pin-and-hole so that left socle and right support realize hinged;Institute
State hydraulic motor and there is oil-in and oil-out, hydraulic motor is fixedly mounted on right support second connecting seat, and its output shaft is worn
Cross hydraulic motor installing hole, insert the endoporus of bent axle right-hand member together with key, and be connected with bent axle;The left axle end of described bent axle
The crankshaft installed in the hole at insertion right support the first connecting seat rear portion, and formed and be slidably matched;The entering of described first one-way throttle valve
Hydraulic fluid port is connected with fuel tank by the first pipeline, and the oil-out of the first one-way throttle valve passes through entering of the second pipeline and hydraulic motor
Hydraulic fluid port is connected;The oil-in of described second one-way throttle valve is connected with fuel tank by the 3rd pipeline, the second one-way throttle valve
Oil-out be connected with the oil-out of hydraulic motor by the 4th pipeline;Described first marks time is arranged on the first of right support and steps on
In step chute, its first slide block insertion of marking time first is marked time in chute, and first left and right sides marking time slide block presses close to first respectively
Mark time inner side about chute, first mark time right sliding surface, first mark time left sliding surface press close to respectively right support first column, right
The upper surface of frame second column, first marks time marks time the first of right support and is capable of sliding up and down in chute;Described second
Mark time and be arranged on the second of right support and mark time in chute, equally, second marks time marks time in chute the second of right support, and it second
Slide block of marking time insertion second is marked time in chute, second left and right sides marking time slide block press close to respectively second mark time interior about chute
Side, second mark time right sliding surface, second mark time left sliding surface press close to respectively right support second column, right support the 3rd column upper
Surface, second marks time marks time the second of right support and is capable of sliding up and down in chute;The upper end of described first connecting rod is passed through
First plunger, the first crank shaft and the first crank throw formed hinged, the lower end of first connecting rod pass through the second plunger, the second bearing pin, the
One mark time pin-and-hole and first mark time key seat formed hinged, and final mark time with first formed hinged;The upper end of described second connecting rod
Formed hinged by the 3rd plunger, the second crank shaft and the second crank throw, the 4th plunger, the 3rd pin are passed through in the lower end of second connecting rod
Axle, second mark time pin-and-hole and second mark time key seat formed hinged, and final mark time with second formed hinged;Described first mark time and
Second initial position marked time when installing necessarily be formed and misplaces up and down, and such as, the first initial position marked time is in lowest order, the
Two initial positions marked time are in highest order;Described micro computer is arranged on left socle first crossbeam, and micro computer can be by setting
Put the weight sensor (mark) on first marks time or second marks time and enumerator (mark) records and shows body builder
Body weight, scrunch number of times, body-building intensity, the related data such as consumed energy, at the same time it can also play music, video etc., build good
Good body-building atmosphere.
When needing to carry out mountain-climbing simulation body-building, a kind of hydraulic resistance mountain-climbing simulating fitness equipment is started working, due to hydraulic resistance
Mountain-climbing simulating fitness equipment in, first mark time and second mark time install when initial position exist misplace up and down, such as, first marks time
Initial position be in lowest order, the second initial position marked time is in highest order, and one first foot of body builder is climbed up first and stepped on
Step, when body builder's another foot is climbed up second and marked time, just produces an action of ascending a height, body builder needs to overcome the weight of itself
Power, plays consumption physical ability, reaches the purpose of body-building, and due to the effect of human bady gravitational, second marks time can produce a sliding force, this
Individual sliding force by second marks time second mark time key seat, the 4th plunger, second connecting rod, the 3rd plunger, second crank shaft transmission
To the second crank throw, form driving moment, and drive hydraulic motor to rotate it is assumed that hydraulic motor is according to clockwise by bent axle, key
Direction rotates, and the fluid in fuel tank is by the check valve in the first pipeline, the first one-way throttle valve, the second pipeline, hydraulic motor
Oil-in, enter hydraulic motor in, simultaneously the fluid in hydraulic motor again by the oil-out of hydraulic motor, the 4th pipeline,
Choke valve in second one-way throttle valve, the 3rd pipeline return to fuel tank, because, in fluid flow process, meeting is in the second one-way throttle
Hydraulic damping, the moment of reaction producing on hydraulic motor, balanced human's gravity are formed on the choke valve in valve, consumes human body
Gravitional force, second marks time slow slide downward, and meanwhile, the clockwise rotation of bent axle and the first crank throw, by first
Crank shaft, the first plunger, first connecting rod, the second plunger, the second bearing pin, the first key seat of marking time drive first to mark time upper shifting, finally,
First marks time is in extreme higher position, and second marks time is in extreme lower position;If next, body builder climbs up first marking time, first
Mark time and can produce a sliding force, this sliding force by first marks time first mark time key seat, the second bearing pin, the second plunger,
First connecting rod, the first plunger, the first crank shaft pass to the first crank throw, form driving moment, and pass through bent axle, key band hydrodynamic pressure
Revolution, realizes the rotate in an anti-clockwise direction of hydraulic motor, and the fluid in fuel tank passes through the 3rd pipeline, the second one-way throttle valve
In check valve, the 4th pipeline, hydraulic motor oil-out enter hydraulic motor in, the fluid in hydraulic motor passes through again simultaneously
Choke valve in the oil-in of hydraulic motor, the second pipeline, the first one-way throttle valve, the first pipeline return to fuel tank, due to fluid
In flow process, hydraulic damping, the anti-work producing on hydraulic motor can be formed on the choke valve in the first one-way throttle valve
With moment, balanced human's gravity, consume gravitational potential energy of human body, first marks time slow slide downward, meanwhile, bent axle and the second crank throw
Anticlockwise rotation, by the second crank shaft, the 3rd plunger, second connecting rod, the 4th plunger, the 3rd bearing pin, second step on
Step key seat drives second to mark time upper shifting, and finally, second marks time is in extreme higher position, and first marks time is in extreme lower position, and formation follows
Ring.By adjusting the openings of sizes of the choke valve in choke valve and the second one-way throttle valve in the first one-way throttle valve, permissible
Realize first to mark time and second mark time and move up and down the speed of speed, adjust the exercise motion amount of mountain-climbing simulation body builder, micro- electricity
Brain can be marked time by being arranged on first or second mark time on weight sensor (mark) and enumerator (mark) record
And show the body weight of body builder, scrunch number of times, body-building intensity, the related data such as consumed energy, at the same time it can also play music,
Video etc., builds good body-building atmosphere.
Described hydraulic motor is it is also possible to be replaced with hydraulic oil pump.
It is also possible to achieve a fixed connection between described left socle and right support.
The invention has the beneficial effects as follows:
Hydraulic resistance mountain-climbing simulating fitness equipment proposed by the present invention, can simulate body builder's mountaineering, the both feet of body builder are in reality
Now replace up during, lift body wt, consume body energy, reach body-building purpose, meanwhile, hydraulic resistance mountain-climbing simulation is strong
In body device, principle is hindered according to liquid, the flowing of fluid produces hydraulic damping before and after choke valve, acts on hydraulic motor, produce
The moment of reaction, consumes and absorbs the gravitional force of body builder.
Adjust the openings of sizes of choke valve, thus it is possible to vary mark time and move up and down speed, adjust the forging of mountain-climbing simulation body builder
Refining quantity of motion, micro computer can record and show the body weight of body builder, scrunch number of times, body-building intensity, the dependency number such as consumed energy
According at the same time it can also play music, video etc., the good body-building atmosphere of construction.Present configuration is simple, easy to adjust, very
Suitable family and body-building venue use, and have the wide market space.
Brief description
The embodiment being given below in conjunction with the accompanying drawings is described in more detail to the present invention.
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the partial enlarged drawing of a in Fig. 2;
Fig. 4 is the structural representation of left socle;
Fig. 5 is the structural representation of right support;
Fig. 6 is the left view of Fig. 5;
Fig. 7 is the right view of Fig. 5;
Fig. 8 is the first structural representation marked time;
Fig. 9 is the b of Fig. 8 to schematic diagram;
Figure 10 is the second structural representation marked time;
Figure 11 is the c of Figure 10 to schematic diagram.
Specific embodiment
As Fig. 1 -- shown in 11, a kind of hydraulic resistance is climbed the mountain simulating fitness equipment, including left socle 1, the first bearing pin 2, right support 3,
First marks time 4, second marks time the 12, first one-way throttle valve 5, the second one-way throttle valve 6, hydraulic motor 7, bent axle 8, key 9, first
Connecting rod 10, the second bearing pin 11, the 3rd bearing pin 13, second connecting rod 14 and micro computer 15;Left socle 1 is by left socle first crossbeam 1-
1st, left socle second cross beam 1-2, left socle the 3rd crossbeam 1-3 and left socle the first column 1-4, left socle the second column 1-5 group
Become the framework of a closing, left socle the first column 1-4, the middle part of left socle the second column 1-5 offer left socle the respectively
One pin-and-hole 1-6 and left socle the second pin-and-hole 1-7;Right support 3 is by right support first crossbeam 3-1, right support second cross beam 3-2 and the right side
Support the first column 3-3, right support the second column 3-4, right support the 3rd column 3-5 form the framework of a closing, right support
The top of the first column 3-3 has fixedly mounted right support the first connecting seat 3-9, and the front portion of right support the first connecting seat 3-9 opens up
There is right support the first pin-and-hole 3-11, rear portion offers crankshaft installed hole 3-6, the top fixed installation of right support the 3rd column 3-5
Right support the second connecting seat 3-10, the front portion of right support the second connecting seat 3-10 offers right support the second pin-and-hole 3-12, after
Portion offers hydraulic motor installing hole 3-8, has fixedly mounted fuel tank 3-7, right support outside the middle part of right support the 3rd column 3-5
Form the between first crossbeam 3-1, right support second cross beam 3-2 and right support the first column 3-3, right support the second column 3-4
One marks time chute 3-15, right support first crossbeam 3-1, right support second cross beam 3-2 and right support the second column 3-4, right support
Form second between 3rd column 3-5 to mark time chute 3-16;First marks time 4 by the first step plate 4-1, first marks time gripper shoe 4-
2nd, the first mark time right sliding surface 4-3, first left sliding surface 4-4 and first that marks time marks time slide block 4-5 composition, and first marks time slide block 4-
5 anteriomedial is installed with first and marks time key seat 4-6, and first marks time offers first on key seat 4-6 and mark time pin-and-hole 4-7;
Second mark time 12 by the second step plate 12-1, second mark time gripper shoe 12-2, second mark time right sliding surface 12-3, second mark time a left side
Sliding surface 12-4 and second marks time slide block 12-5 composition, and the second anteriomedial marking time slide block 12-5 is installed with second and marks time
Key seat 12-6, second marks time offers second on key seat 12-6 and marks time pin-and-hole 12-7;Bent axle 8 has the first crank throw 8-1 and second
Crank throw 8-2, the first crank throw 8-1 carries the first crank shaft 8-4, and the second crank throw 8-2 carries the second crank shaft 8-5, bent axle 8
Right-hand member offers the endoporus 8-3 with keyway;The top of first connecting rod 10 carries the first plunger 10-1, and the first plunger 10-1 opens up
There is pin-and-hole, the bottom of first connecting rod 10 carries the second plunger 10-2, the second plunger 10-2 offers pin-and-hole, second connecting rod 14
Top carries the 3rd plunger 14-1, and the 3rd plunger 14-1 offers pin-and-hole, and the bottom of second connecting rod 14 carries the 4th plunger 14-
2, the 4th plunger 14-2 offers pin-and-hole;Right support 3 inserts the lower portion of left socle 1, is connected respectively by the first bearing pin 2
Left socle the first pin-and-hole 1-6 and right support the first pin-and-hole 3-11 and connection left socle the second pin-and-hole 1-7 and right support second are sold
Hole 3-12 so that left socle 1 and right support 3 realize hinged;Hydraulic motor 7 has oil-in 7-1 and oil-out 7-2, hydraulic pressure horse
Reach 7 to be fixedly mounted on right support the second connecting seat 3-10, its output shaft passes through hydraulic motor installing hole 3-8, together with key 9
The endoporus 8-3 of insertion bent axle 8 right-hand member, and be connected with bent axle 8;After left axle end insertion right support the first connecting seat 3-9 of bent axle 8
In the crankshaft installed hole 3-6 in portion, and formed and be slidably matched;The oil-in of the first one-way throttle valve 5 passes through the first pipeline 5-1 and oil
Case 3-7 is connected, and the oil-out of the first one-way throttle valve 5 is connected with the oil-in 7-1 of hydraulic motor 7 by the second pipeline 5-2
Logical;The oil-in of the second one-way throttle valve 6 is connected with fuel tank 3-7 by the 3rd pipeline 6-1, the going out of the second one-way throttle valve 6
Hydraulic fluid port is connected with the oil-out 7-2 of hydraulic motor 7 by the 4th pipeline 6-2;First marks time 4 is arranged on the first of right support 3
Mark time in chute 3-15, its first slide block 4-5 insertion of marking time first is marked time in chute 3-15, the first left and right marking time slide block 4-5
Both sides press close to respectively first mark time chute 3-15 about inner side, first mark time right sliding surface 4-3, first mark time left sliding surface 4-4
Press close to right support the first column 3-3, the upper surface of right support the second column 3-4 respectively, first marks time 4 the first of right support 3
Mark time and be capable of sliding up and down in chute 3-15;Second marks time 12 is arranged on the second of right support 3 and marks time in chute 3-16, with
Sample, second marks time 12 marks time in chute 3-16 the second of right support 3, and its second slide block 12-5 insertion second of marking time is marked time chute
In 3-16, second left and right sides marking time slide block 12-5 press close to respectively second mark time chute 3-16 about inner side, second marks time the right side
Sliding surface 12-3, the second left sliding surface 12-4 that marks time press close to right support the second column 3-4, right support the 3rd column 3-5 respectively
Upper surface, second marks time 12 marks time the second of right support 3 and is capable of sliding up and down in chute 3-16;First connecting rod 10 upper
End forms hinged by the first plunger 10-1, the first crank shaft 8-4 and the first crank throw 8-1, and the lower end of first connecting rod 10 is by the
Two plungers 10-2, the second bearing pin 11, the first pin-and-hole 4-7 and first key seat 4-6 that marks time that marks time form hinged, and finally step on first
Step 4 forms hinged;The upper end of second connecting rod 14 is passed through the 3rd plunger 14-1, the second crank shaft 8-5 and the second crank throw 8-2 and is formed hinge
Connect, the 4th plunger 14-2 is passed through in the lower end of second connecting rod 14, the 3rd bearing pin 13, the second pin-and-hole 12-7 and second that marks time mark time key seat
12-6 forms hinged and final hinged with the second 12 formation of marking time;First mark time 4 and second mark time 12 installation when initial position
Necessarily be formed and misplace up and down, such as, the first mark time 4 initial position is in lowest order, the second mark time 12 initial position is in
Highest order.Micro computer 15 is arranged on left socle first crossbeam 1-1, and micro computer 15 can mark time 4 or by being arranged on first
Two weight sensors marked time on 12 do not mark with enumerator non-mark records and show the body weight of body builder, scrunch number of times, are good for
Stiffness of the body degree, the related data such as consumed energy, at the same time it can also play music, video etc., build good body-building atmosphere.
When needing to carry out mountain-climbing simulation body-building, a kind of hydraulic resistance mountain-climbing simulating fitness equipment is started working, due to hydraulic resistance
Mountain-climbing simulating fitness equipment in, first mark time 4 and second mark time 12 installation when initial position exist misplace up and down, such as, first
4 initial position of marking time is in lowest order, and the second mark time 12 initial position is in highest order, and one first foot of body builder is climbed up
First marks time 4, when body builder's another foot climb up second mark time 12 when, just produce an action of ascending a height, body builder needs to overcome
The gravity of itself, plays consumption physical ability, reaches the purpose of body-building, and due to the effect of human bady gravitational, second marks time 12 can produce one
Individual sliding force, this sliding force by second mark time 12 second mark time key seat 12-6, the 3rd bearing pin 13, the 4th plunger 14-2,
Second connecting rod 14, the 3rd plunger 14-1, the second crank shaft 8-5 pass to the second crank throw 8-2, form driving moment, and by song
Axle 8, key 9 drive hydraulic motor 7 to rotate it is assumed that hydraulic motor 7 is according to rotationally clockwise, and the fluid in fuel tank 3-7 passes through
Check valve in first pipeline 5-1, the first one-way throttle valve 5, the second pipeline 5-2, the oil-in 7-1 of hydraulic motor 7, enter liquid
In pressure motor 7, the fluid in hydraulic motor 7 is again by the oil-out 7-2 of hydraulic motor 7, the 4th pipeline 6-2, the second list simultaneously
Return to fuel tank 3-7 to the choke valve in choke valve 6, the 3rd pipeline 6-1, because, in fluid flow process, meeting is in the second unidirectional section
Form hydraulic damping on choke valve in stream valve 6, the moment of reaction producing on hydraulic motor 7, balanced human's gravity, consume
Gravitational potential energy of human body, second marks time 12 slow slide downward, meanwhile, clockwise turn of bent axle 8 and the first crank throw 8-1
Dynamic, by the first crank shaft 8-4, the first plunger 10-1, first connecting rod 10, the second plunger 10-2, the second bearing pin 11, first mark time
Key seat 4-6 drives first to mark time and moves on 4, and finally, first marks time 4 is in extreme higher position, and second marks time 12 is in extreme lower position;As
Fruit marks time 4 next, body builder climbs up first, and first marks time 4 can produce a sliding force, and this sliding force is marked time by first
The first of 4 is marked time key seat 4-6, the second bearing pin 11, the second plunger 10-2, first connecting rod 10, the first plunger 10-1, the first crank shaft
8-4 passes to the first crank throw 8-1, forms driving moment, and drives hydraulic motor 7 to rotate by bent axle 8, key 9, realizes hydraulic pressure horse
Reach 7 rotate in an anti-clockwise direction, the fluid in fuel tank 3-7 pass through the 3rd pipeline 6-1, the check valve in the second one-way throttle valve 6,
4th pipeline 6-2, the oil-out 7-2 of hydraulic motor 7 enter in hydraulic motor 7, and the fluid in hydraulic motor 7 passes through liquid more simultaneously
Choke valve in the oil-in 7-1 of pressure motor 7, the second pipeline 5-2, the first one-way throttle valve 5, the first pipeline 5-1 return to fuel tank
3-7, due to, in fluid flow process, can form hydraulic damping, in hydraulic motor on the choke valve in the first one-way throttle valve 5
The moment of reaction producing on 7, balanced human's gravity, consume gravitational potential energy of human body, first marks time 4 slow slide downward, meanwhile,
Bent axle 8 and the anticlockwise rotation of the second crank throw 8-2, by the second crank shaft 8-5, the 3rd plunger 14-1, second connecting rod
14th, the 4th plunger 14-2, the 3rd bearing pin 13, the second key seat 12-6 that marks time drive second to mark time to move on 12, and finally, second marks time 12
It is in extreme higher position, first marks time 4 is in extreme lower position, forms circulation.By adjusting the choke valve in the first one-way throttle valve 5
Openings of sizes with the choke valve in the second one-way throttle valve 6, it is possible to achieve first marks time 4 and second marks time and 12 move up and down speed
The speed of degree, adjusts the exercise motion amount of mountain-climbing simulation body builder.Micro computer 15 can mark time 4 or second by being arranged on first
The weight sensor on 12 of marking time does not mark with enumerator non-mark records and shows the body weight of body builder, scrunches number of times, body-building
Intensity, the related data such as consumed energy, at the same time it can also play music, video etc., build good body-building atmosphere.
In the present invention, hydraulic motor 7 is it is also possible to be replaced with hydraulic oil pump.
It is also possible to achieve a fixed connection between left socle 1 and right support 3 in the present invention.
Hydraulic resistance mountain-climbing simulating fitness equipment proposed by the present invention, can simulate body builder's mountaineering, the both feet of body builder
During realization is alternately up, lifts body wt, consume body energy, reach body-building purpose, meanwhile, hydraulic resistance mountain-climbing mould
Intend, in fitness equipment, hindering principle according to liquid, the flowing of fluid produces hydraulic damping before and after choke valve, acts on hydraulic motor,
Produce the moment of reaction, consume and absorb the gravitional force of body builder.
Adjust the openings of sizes of choke valve, thus it is possible to vary mark time and move up and down speed, adjust the forging of mountain-climbing simulation body builder
Refining quantity of motion, micro computer 15 can record and show the body weight of body builder, scrunch number of times, body-building intensity, the correlation such as consumed energy
Data, at the same time it can also play music, video etc., builds good body-building atmosphere.Present configuration is simple, easy to adjust, non-
Often it is suitable for family and body-building venue uses, there is the wide market space.
The above be only the preferred embodiment of the present invention it should be pointed out that: for the ordinary skill people of the art
For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should
It is considered as protection scope of the present invention.
Claims (3)
1. a kind of hydraulic resistance mountain-climbing simulating fitness equipment it is characterised in that: include left socle (1), the first bearing pin (2), right support
(3), first mark time (4), second mark time (12), the first one-way throttle valve (5), the second one-way throttle valve (6), hydraulic motor (7),
Bent axle (8), key (9), first connecting rod (10), the second bearing pin (11), the 3rd bearing pin (13), second connecting rod (14) and micro computer
(15);Described left socle (1) is by left socle first crossbeam (1-1), left socle second cross beam (1-2), left socle the 3rd crossbeam (1-
3) and left socle first column (1-4), left socle second column (1-5) form one closing framework, left socle first column
(1-4), the middle part of left socle second column (1-5) offers left socle first pin-and-hole (1-6) and left socle second pin-and-hole respectively
(1-7);Described right support (3) is by right support first crossbeam (3-1), right support second cross beam (3-2) and right support first column
(3-3), right support second column (3-4), right support the 3rd column (3-5) form the framework of a closing, described right support the
The top of one column (3-3) has fixedly mounted right support first connecting seat (3-9), described right support first connecting seat (3-9)
Front portion offers right support first pin-and-hole (3-11), and rear portion offers crankshaft installed hole (3-6), described right support the 3rd column
(3-5) top has fixedly mounted right support second connecting seat (3-10), the front portion of described right support second connecting seat (3-10)
Offer right support second pin-and-hole (3-12), rear portion offers hydraulic motor installing hole (3-8), described right support the 3rd column
(3-5) fuel tank (3-7), described right support first crossbeam (3-1), right support second cross beam (3- have been fixedly mounted outside middle part
2) form first and right support first column (3-3), right support second column (3-4) between to mark time chute (3-15), the described right side
Support first crossbeam (3-1), right support second cross beam (3-2) and right support second column (3-4), right support the 3rd column (3-
5) form second between to mark time chute (3-16);Described first mark time (4) by the first step plate (4-1), first mark time gripper shoe
(4-2), first mark time right sliding surface (4-3), first mark time left sliding surface (4-4) and first mark time slide block (4-5) composition, described
First anteriomedial marking time slide block (4-5) is installed with first and marks time key seat (4-6), and described first marks time key seat (4-6)
On offer first and mark time pin-and-hole (4-7);Described second mark time (12) by the second step plate (12-1), second mark time gripper shoe
(12-2), second mark time right sliding surface (12-3), second mark time left sliding surface (12-4) and second mark time slide block (12-5) composition,
Described second anteriomedial marking time slide block (12-5) is installed with second and marks time key seat (12-6), and described second marks time key seat
(12-6) offer second on to mark time pin-and-hole (12-7);Described bent axle (8) has the first crank throw (8-1) and the second crank throw (8-2),
Described first crank throw (8-1) is upper to carry the first crank shaft (8-4), and described second crank throw (8-2) is upper to carry the second crank shaft (8-
5), the right-hand member of bent axle (8) offers the endoporus with keyway (8-3);The top of described first connecting rod (10) carries the first plunger
(10-1), the first plunger (10-1) offers pin-and-hole, the bottom of first connecting rod (10) carries the second plunger (10-2), the second pin
Pin-and-hole is offered on head (10-2), the top of described second connecting rod (14) carries the 3rd plunger (14-1), the 3rd plunger (14-1)
On offer pin-and-hole, the bottom of second connecting rod (14) carries the 4th plunger (14-2), and the 4th plunger (14-2) offers pin-and-hole;
Described right support (3) inserts the lower portion of left socle (1), connects left socle the first pin-and-hole (1- respectively by the first bearing pin (2)
6) and right support first pin-and-hole (3-11) and connect left socle second pin-and-hole (1-7) and right support second pin-and-hole (3-12), make
Left socle (1) and right support (3) realize hinged;Described hydraulic motor (7) has oil-in (7-1) and oil-out (7-2), liquid
Pressure motor (7) is fixedly mounted on right support second connecting seat (3-10), and its output shaft passes through hydraulic motor installing hole (3-8),
Insert the endoporus (8-3) of bent axle (8) right-hand member together with key (9), and be connected with bent axle (8);The left axle end of described bent axle (8)
In the crankshaft installed hole (3-6) at insertion right support first connecting seat (3-9) rear portion, and formed and be slidably matched;Described first is unidirectional
The oil-in of choke valve (5) is connected with fuel tank (3-7) by the first pipeline (5-1), the oil-out of the first one-way throttle valve (5)
It is connected with the oil-in (7-1) of hydraulic motor (7) by the second pipeline (5-2);The oil-feed of described second one-way throttle valve (6)
Mouth is connected with fuel tank (3-7) by the 3rd pipeline (6-1), and the oil-out of the second one-way throttle valve (6) passes through the 4th pipeline (6-
2) it is connected with the oil-out (7-2) of hydraulic motor (7);Described first mark time (4) be arranged on the first of right support (3) and mark time cunning
In groove (3-15), its first slide block (4-5) insertion first of marking time is marked time in chute (3-15), first left side marking time slide block (4-5)
Right both sides are pressed close to first respectively and are marked time inner side about chute (3-15), first mark time right sliding surface (4-3), first mark time left slip
Face (4-4) presses close to right support first column (3-3), the upper surface of right support second column (3-4) respectively, first mark time (4) exist
The first of right support (3) is marked time and is capable of sliding up and down in chute (3-15);Described second mark time (12) be arranged on right support
(3) second is marked time in chute (3-16), equally, second mark time (12) mark time in chute (3-16) the second of right support (3),
Its second slide block (12-5) insertion second of marking time is marked time in chute (3-16), second mark time slide block (12-5) the left and right sides respectively
Press close to second to mark time inner side about chute (3-16), second mark time right sliding surface (12-3), second mark time left sliding surface (12-4)
Press close to right support second column (3-4), the upper surface of right support the 3rd column (3-5) respectively, second marks time (12) in right support
(3) second is marked time and is capable of sliding up and down in chute (3-16);The first plunger is passed through in the upper end of described first connecting rod (10)
(10-1), the first crank shaft (8-4) and the first crank throw (8-1) form hinged, and the second plunger is passed through in the lower end of first connecting rod (10)
(10-2), the second bearing pin (11), first mark time pin-and-hole (4-7) and first mark time key seat (4-6) formed hinged, and final with first
(4) formation of marking time is hinged;The 3rd plunger (14-1), the second crank shaft (8-5) and the are passed through in the upper end of described second connecting rod (14)
Two crank throws (8-2) form hinged, and the lower end of second connecting rod (14) is passed through the 4th plunger (14-2), the 3rd bearing pin (13), second stepped on
Step pin-and-hole (12-7) and second mark time key seat (12-6) formed hinged and final hinged with second (12) formation of marking time;Described
One marks time (4) and second (12) initial position when installing of marking time forms and misplaces up and down;Described micro computer (15) is arranged on left
On frame first crossbeam (1-1), micro computer (15) can be marked time (4) by being arranged on first or the second weight marking time on (12) passes
Sensor and counter records simultaneously show the body weight of body builder, scrunch number of times, body-building intensity, catabiotic related data.
2. a kind of hydraulic resistance mountain-climbing simulating fitness equipment according to claim 1 it is characterised in that: described hydraulic motor (7)
Can be replaced with hydraulic oil pump.
3. a kind of hydraulic resistance mountain-climbing simulating fitness equipment according to claim 1 it is characterised in that: described left socle (1) and
Right support is fixedly connected between (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611014659.8A CN106334306B (en) | 2016-11-17 | 2016-11-17 | A kind of hydraulic resistance mountain-climbing simulating fitness equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611014659.8A CN106334306B (en) | 2016-11-17 | 2016-11-17 | A kind of hydraulic resistance mountain-climbing simulating fitness equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106334306A true CN106334306A (en) | 2017-01-18 |
CN106334306B CN106334306B (en) | 2018-12-18 |
Family
ID=57841412
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611014659.8A Expired - Fee Related CN106334306B (en) | 2016-11-17 | 2016-11-17 | A kind of hydraulic resistance mountain-climbing simulating fitness equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106334306B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3970302A (en) * | 1974-06-27 | 1976-07-20 | Mcfee Richard | Exercise stair device |
US5169361A (en) * | 1992-06-05 | 1992-12-08 | Hsu Hsien Long | Hydraulic cylinder assembly for climbing exercisers |
CN201510687U (en) * | 2009-09-22 | 2010-06-23 | 厦门宙隆运动器材有限公司 | Stepper simulating climbing action |
CN204469118U (en) * | 2015-03-31 | 2015-07-15 | 河北大学 | A kind of body-building stepping machine |
-
2016
- 2016-11-17 CN CN201611014659.8A patent/CN106334306B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3970302A (en) * | 1974-06-27 | 1976-07-20 | Mcfee Richard | Exercise stair device |
US5169361A (en) * | 1992-06-05 | 1992-12-08 | Hsu Hsien Long | Hydraulic cylinder assembly for climbing exercisers |
CN201510687U (en) * | 2009-09-22 | 2010-06-23 | 厦门宙隆运动器材有限公司 | Stepper simulating climbing action |
CN204469118U (en) * | 2015-03-31 | 2015-07-15 | 河北大学 | A kind of body-building stepping machine |
Also Published As
Publication number | Publication date |
---|---|
CN106334306B (en) | 2018-12-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106861181B (en) | Detachable platform type bicycle exercise training device | |
CN102357284B (en) | Intelligent running machine | |
US7727125B2 (en) | Exercise machine and method for use in training selected muscle groups | |
US9017233B2 (en) | Water resistance lower body reciprocating exerciser | |
CN106563261B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN106334306A (en) | Hydraulic Resistance Mountain-climbing Simulating Fitness Equipment | |
CN106621253B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN106334305A (en) | Hydraulic Resistance Mountain-climbing Simulating Fitness Equipment | |
CN106621252B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN106377890B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN205412059U (en) | Water resistance spinning | |
CN106474710B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN106669128B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN106621254B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN106377888B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN106377889B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN2705198Y (en) | Tread mill with series oil cylinder | |
CN206167734U (en) | Skiing machine | |
CN106334304B (en) | A kind of hydraulic resistance mountain-climbing simulating fitness equipment | |
CN205872348U (en) | Scooter with drive device | |
CN203736775U (en) | Hydrauliccounterweight device for fitness equipment | |
CN200954340Y (en) | Mountain-climbing sport machine | |
CN201223669Y (en) | Air treading apparatus | |
CN208176807U (en) | A kind of interior leg exercises device | |
CN106621343A (en) | Wearable uphill and downhill simulation device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181218 Termination date: 20211117 |
|
CF01 | Termination of patent right due to non-payment of annual fee |