CN106368610A - Pile drilling machine drill bit - Google Patents
Pile drilling machine drill bit Download PDFInfo
- Publication number
- CN106368610A CN106368610A CN201610974958.XA CN201610974958A CN106368610A CN 106368610 A CN106368610 A CN 106368610A CN 201610974958 A CN201610974958 A CN 201610974958A CN 106368610 A CN106368610 A CN 106368610A
- Authority
- CN
- China
- Prior art keywords
- drill bit
- drill
- support
- movable carriage
- drilling rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 31
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 10
- 241001074085 Scophthalmus aquosus Species 0.000 claims description 7
- 230000015572 biosynthetic process Effects 0.000 abstract description 9
- 239000004576 sand Substances 0.000 abstract description 9
- 238000010276 construction Methods 0.000 abstract description 6
- 230000000694 effects Effects 0.000 description 4
- 239000011435 rock Substances 0.000 description 3
- 230000004888 barrier function Effects 0.000 description 2
- 230000001351 cycling effect Effects 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 210000000988 bone and bone Anatomy 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B10/00—Drill bits
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B10/00—Drill bits
- E21B10/42—Rotary drag type drill bits with teeth, blades or like cutting elements, e.g. fork-type bits, fish tail bits
- E21B10/43—Rotary drag type drill bits with teeth, blades or like cutting elements, e.g. fork-type bits, fish tail bits characterised by the arrangement of teeth or other cutting elements
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
A pile drilling machine drill bit comprises a drill bit seat and a drill rod, wherein through holes are formed in the center of the drill bit seat and the center of the drill rod, water is injected into the top end of the drill rod and can flow into the bottom of the drill bit after the drill rod and the drill bit seat are connected, the drill bit seat is connected to an annular support through a supporting rod, a fixed tool rest is arranged on the annular support and the drill bit seat and is a drill bit rack consisting of multiple frameworks at a certain taper, the tail ends of the frameworks of the fixed tool rest are connected with a movable tool rest through connectors, and drilling tools are arranged on the fixed tool rest and the movable tool rest. The pile drilling machine drill bit adopts the mode that the movable tool rest and the fixed tool rest are combined, the drill bit can be taken out under the situation that a drill hole is provide with a hole protecting pipe, and the pile drilling machine drill bit can also perform construction in an underground drift sand formation under the matching of the hole protecting pipe, and is high in working efficiency and simple, convenient and flexible to operate.
Description
Technical field
The present invention relates to a kind of construction, with boring stake machine, especially relates to a kind of drill bit boring stake machine.
Background technology
Construction pile foundation plinth is very crucial, and pile foundation includes prefabricated pile and bored concrete pile two class, the construction party of bored concrete pile
Method divides immersed tube bored and two kinds of drill-pouring.Cast-in-situ bored pile is to go out to meet the hole of design code with boring stake machine drill, is then boring
In hole, insertion steel reinforcement cage concrete perfusion forms.Existing brill stake machine, include drill bit, drilling rod, drilling cramp, Slarry cycling apptss and move
Power apparatus.Drill bit is connected on drilling rod, drilling rod connecting power device, and drilling rod is hollow, and power set drive bit bore
Meanwhile, from the water filling of drilling rod top, the soil that drill bit gets out is stirred into mud by the water constantly flowing into from drilling rod to Slarry cycling apptss
Flow out boring outer.The existing drill bit boring stake machine is to be divided into all size by diameter difference, selects the drill bit of dimension during boring
Construction, drill-shape is relatively fixed, and runs into drift sand formation or small-sized solution cavity just cannot be carried out in work progress.
Content of the invention
In order to solve in prior art, bore the problem that drill bit of pile machine cannot be constructed in underground drift sand formation, the invention provides
A kind of brill drill bit of pile machine, this brill drill bit of pile machine can solve the problem that the problem of underground drift sand formation drilling construction under the cooperation of guard aperture pipe.
The present invention solves technical problem and be the technical scheme is that a kind of brill drill bit of pile machine, including drill headstock and drilling rod,
Described drill headstock and described drilling rod be provided centrally with through hole, described drilling rod and described drill headstock connect after from described drilling rod top
Water filling can flow into drill bit bottom, and described drill headstock connects on a toroidal support by support bar, in described ring support, described
On drill headstock, immovable support is set, the drill bit frame that described immovable support is made up of with certain taper a plurality of skeleton, described
Every skeleton tail end of immovable support connects movable carriage by connector, and described immovable support and described movable carriage are arranged
Drill.
Wherein, described immovable support be integrally fixed on described drill headstock and described ring support for installing described drill
Umbrella skeleton;Described movable carriage be can on described immovable support upset activity the bone for installing described drill
Frame.Described drill headstock and described drilling rod when power set drive rotation, the brill on described immovable support and described movable carriage
Knife pierces stratum, and native rock ballast is stirred into mud by the water of inflow in described drilling rod and flows out outside boring.When drill bit enters underground drift sand formation
When, the boring above drill bit is inserted the guard aperture pipe consistent with bore diameter, by the hole wall of guard aperture protection of pipe drift sand formation boring
Do not subside.When taking out drill bit after the completion of boring, the described movable carriage on drill bit folds under described guard aperture pipe barrier effect,
Drill bit takes out from described guard aperture pipe.
As further technical scheme, described ring support arranges draw-in groove, described company at corresponding described movable carriage
Fitting is articulated elements, and described movable carriage is hinged on described immovable support and can launch and fold, and described movable carriage launches
When be stuck in described draw-in groove and be stretched over outside the circle of described ring support, described movable carriage departs from described draw-in groove simultaneously when folding
Go back in the circle of described ring support.
The invention has the beneficial effects as follows: a kind of drill bit of pile machine of boring due to the present invention employs movable carriage and immovable support
In conjunction with mode, drill bit can be taken out in the case of being provided with guard aperture pipe in the borehole, this brill drill bit of pile machine in guard aperture pipe
Under cooperation, underground drift sand formation also can be constructed, high working efficiency and convenient and flexible operation.
Brief description
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is a kind of view of the present invention.
Fig. 2 is another kind of view of the present invention.
Fig. 3 is the right view of Fig. 1.
The implication of each reference of in figure is: 1. movable carriage;2. connector;3. immovable support;4. drill;5. ring
Shape support;6. drill headstock;7. drilling rod;8. draw-in groove;9. support bar.
Specific embodiment
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of bore drill bit of pile machine, including drill headstock 6 and drilling rod 7, described drill headstock 6 and described
Drilling rod 7 be provided centrally with through hole, described drilling rod 7 and described drill headstock 6 can flow into from the top water filling of described drilling rod 7 after connecting
Drill bit bottom, described drill headstock 6 is connected on ring support 5 by support bar 9, is being connected with described in described ring support 5
Setting immovable support 3 on drill headstock 6, the drill bit frame that described immovable support 3 is made up of with certain taper a plurality of skeleton, described
Immovable support 3 is the umbrella skeleton for installing drill 4, passes through connector 2 even in every skeleton tail end of described immovable support 3
Take over a job movable knife rack 1, described movable carriage 1 be can on described immovable support 3 upset activity for installing described drill 4
Skeleton, is fixedly installed described drill 4 on described immovable support 3 and described movable carriage 1.Corresponding described on described ring support 5
Draw-in groove 8 is set at movable carriage 1, and described connector 2 is articulated elements, described movable carriage 1 is hinged on energy on described immovable support 3
Enough launch and fold, described movable carriage 1 is stuck in described draw-in groove 8 and is stretched over outside the circle of described ring support 5 when launching,
Described movable carriage 1 departs from described draw-in groove 8 and goes back in the circle of described ring support 5 when folding.
During work, described drill headstock 6 and described drilling rod 7 when power set drive rotation, described immovable support 3 and described
Drill 4 on movable carriage 1 pierces stratum, and native rock ballast is stirred into mud by the flowing water of injection in described drilling rod 7, like this constantly from
During described drilling rod 7 top injection flowing water, it is outer that native rock ballast will be taken out of boring by flowing water mud.When drill bit enters underground drift sand formation
When, the boring above drill bit is inserted the guard aperture pipe consistent with bore diameter, by the hole wall of guard aperture protection of pipe drift sand formation boring
Do not subside, when taking out drill bit after the completion of boring, the described movable carriage 1 on drill bit is rolled under described guard aperture pipe barrier effect
Receive, drill bit can pass through guard aperture pipe and be removed.
Claims (2)
1. a kind of brill drill bit of pile machine, including drill headstock (6) and drilling rod (7), the center of described drill headstock (6) and described drilling rod (7)
It is provided with through hole, after described drilling rod (7) and described drill headstock (6) connection, drill bit can be flowed into from described drilling rod (7) top water filling
Bottom it is characterised in that: described drill headstock (6) is upper to connect ring support (5) by support bar (9), in described ring support (5)
Upper setting immovable support (3), the drill bit frame that described immovable support (3) is made up of with certain taper a plurality of skeleton, described
Every skeleton tail end of immovable support (3) connects movable carriage (1), described immovable support (3) and described work by connector (2)
Movable knife rack (1) is upper to arrange drill (4).
2. according to claim 1 a kind of bore drill bit of pile machine it is characterised in that: described ring support (5) is upper corresponding described
Movable carriage (1) place setting draw-in groove (8), described connector (2) is articulated elements, and described movable carriage (1) is hinged on described fixation
Can launch on knife rest (3) and fold, described movable carriage (1) is stuck in described draw-in groove (8) and is stretched over described ring when launching
Outside the circle of shape support (5), described movable carriage (1) departs from described draw-in groove (8) and is recovered to described ring support (5) when folding
Circle in.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610974958.XA CN106368610A (en) | 2016-11-07 | 2016-11-07 | Pile drilling machine drill bit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610974958.XA CN106368610A (en) | 2016-11-07 | 2016-11-07 | Pile drilling machine drill bit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106368610A true CN106368610A (en) | 2017-02-01 |
Family
ID=57894705
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610974958.XA Pending CN106368610A (en) | 2016-11-07 | 2016-11-07 | Pile drilling machine drill bit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106368610A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110206028A (en) * | 2019-06-18 | 2019-09-06 | 蒿振侠 | Level left and right is double to stir drill bit mechanism |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004346586A (en) * | 2003-05-22 | 2004-12-09 | Geotop Corp | Excavating apparatus with expansion blade |
CN201635662U (en) * | 2010-04-14 | 2010-11-17 | 方远建设集团股份有限公司 | Combined drill bit used for cast-in place pile |
JP2011099316A (en) * | 2010-12-21 | 2011-05-19 | Japan Pile Corp | Expansive head opening and closing device for excavator |
CN102767335A (en) * | 2012-07-10 | 2012-11-07 | 苏州市能工基础工程有限责任公司 | Improved-type multifunctional combined drill bit |
CN202578513U (en) * | 2012-05-02 | 2012-12-05 | 上海智平基础工程有限公司 | Filling pile aiguille |
CN203145836U (en) * | 2013-03-07 | 2013-08-21 | 上海山顺土木工程技术有限公司 | Forced cutting drill bit for soft foundation cast-in-situ pile |
CN103774997A (en) * | 2014-02-28 | 2014-05-07 | 赵小勇 | Automatic reducing pore-forming device mounted on drilling machine |
CN204627417U (en) * | 2015-05-14 | 2015-09-09 | 河北万宇建筑工程有限公司 | A kind of for the spiral arm diameter-enlarging drill bit in Grouting Pile Engineering of Drilling Hole |
CN105317381A (en) * | 2015-11-06 | 2016-02-10 | 宁波易通建设有限公司 | Drill bit for constructing cast-in-situ bored pile and hole forming method using same |
CN205154031U (en) * | 2015-11-06 | 2016-04-13 | 宁波易通建设有限公司 | A drill bit for constructing concrete drilling bored concrete pile |
-
2016
- 2016-11-07 CN CN201610974958.XA patent/CN106368610A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004346586A (en) * | 2003-05-22 | 2004-12-09 | Geotop Corp | Excavating apparatus with expansion blade |
CN201635662U (en) * | 2010-04-14 | 2010-11-17 | 方远建设集团股份有限公司 | Combined drill bit used for cast-in place pile |
JP2011099316A (en) * | 2010-12-21 | 2011-05-19 | Japan Pile Corp | Expansive head opening and closing device for excavator |
CN202578513U (en) * | 2012-05-02 | 2012-12-05 | 上海智平基础工程有限公司 | Filling pile aiguille |
CN102767335A (en) * | 2012-07-10 | 2012-11-07 | 苏州市能工基础工程有限责任公司 | Improved-type multifunctional combined drill bit |
CN203145836U (en) * | 2013-03-07 | 2013-08-21 | 上海山顺土木工程技术有限公司 | Forced cutting drill bit for soft foundation cast-in-situ pile |
CN103774997A (en) * | 2014-02-28 | 2014-05-07 | 赵小勇 | Automatic reducing pore-forming device mounted on drilling machine |
CN204627417U (en) * | 2015-05-14 | 2015-09-09 | 河北万宇建筑工程有限公司 | A kind of for the spiral arm diameter-enlarging drill bit in Grouting Pile Engineering of Drilling Hole |
CN105317381A (en) * | 2015-11-06 | 2016-02-10 | 宁波易通建设有限公司 | Drill bit for constructing cast-in-situ bored pile and hole forming method using same |
CN205154031U (en) * | 2015-11-06 | 2016-04-13 | 宁波易通建设有限公司 | A drill bit for constructing concrete drilling bored concrete pile |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110206028A (en) * | 2019-06-18 | 2019-09-06 | 蒿振侠 | Level left and right is double to stir drill bit mechanism |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103726869B (en) | Soft and broken seam gas pumping hole pipe-following drilling method | |
CN105735251B (en) | Cutting type full-casing follow-up pile-forming construction method and system of bridge pile foundation rotary drilling rig | |
CN104832208B (en) | Anti-collapse method for long-distance horizontal hole drilling in soft coal seam of underground coal mine | |
CN100513745C (en) | Construction method for mechanical hole reaming of anchor rod | |
CN202031482U (en) | Square piston type anchoring and chambering drilling rig | |
CN203669921U (en) | Soft and broken coal seam gas extraction hole drilling with casing device | |
CN104929517B (en) | Full-hydraulic drill type pressure relieving equipment with double drill bits and pressure relieving method | |
CN104832082A (en) | Pneumatic DTH hammer reverse circulation slagging construction process for rotary drilling rig | |
EP2914781B1 (en) | Soil grouting | |
CN201635657U (en) | Downhole drilling tool for intelligent downhole multi-branch horizontal drilling completion system | |
CN203066913U (en) | Hole drilling construction equipment of reverse circulation drill | |
CN110529047A (en) | A kind of self-advancing type pipe canopy drilling tool excavated for tunnel soft rock | |
CN106368610A (en) | Pile drilling machine drill bit | |
CN108301769B (en) | A kind of RW type horizontal well construction method and its drilling tool used | |
CN106639876B (en) | Radiating aperture guide digging equipment and technique | |
CN206309279U (en) | Radiating aperture guide digging equipment | |
CN202117567U (en) | Self-cleaning reaming device while drilling | |
RU156918U1 (en) | DRILLING RIG | |
CN205618162U (en) | Shaft sinking machine and tool bit subassembly thereof | |
CN109137919B (en) | Bottom grouting system and grouting method suitable for deep well grounding electrode steel sleeve | |
CN110273413A (en) | A kind of efficient construction method of prefabricated pile | |
CN205713982U (en) | A kind of pile foundation construction drilling equipment being applicable to karst area | |
CN105275389A (en) | Double-rod well drilling machine | |
CN206246061U (en) | Deep level, high-ground stress exposed coal drilling construction device | |
CN101818619A (en) | Well cementation and completion structure and process for cased branch well with temporarily-sealed opening |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170201 |
|
RJ01 | Rejection of invention patent application after publication |