CN106368310B - Detachable green balcony for multi-storey building building and preparation method thereof - Google Patents
Detachable green balcony for multi-storey building building and preparation method thereof Download PDFInfo
- Publication number
- CN106368310B CN106368310B CN201610914344.2A CN201610914344A CN106368310B CN 106368310 B CN106368310 B CN 106368310B CN 201610914344 A CN201610914344 A CN 201610914344A CN 106368310 B CN106368310 B CN 106368310B
- Authority
- CN
- China
- Prior art keywords
- cable wire
- platform framework
- tube head
- pull rod
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/003—Balconies; Decks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
- E04B1/34315—Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Steps, Ramps, And Handrails (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a kind of for detachable green balcony of multi-storey building building and preparation method thereof, including multiple balconies, balcony includes platform framework, platform framework is welded by type steel skeleton, platform framework is connected by the beam column built from concrete in articulated mounting and house, the platform framework includes garden areas and aisle, the both sides of platform framework are equipped with guardrail grafting pedestal, guardrail is mounted on guardrail grafting pedestal, the both sides of platform framework are respectively provided at least three and fix auxiliary cable wire tube head, cable wire pull rod is assisted to pass through every layer of corresponding fixed auxiliary cable wire tube head, the both ends of auxiliary cable wire pull rod are fixed on top and the bottom on the fixed auxiliary cable wire tube head of roof panel frame, the guardrail is 1 1.5 meters high.The exterior design of the present invention is beautiful, dismounts and mounts flexibly and easily, and security performance is reliable, and the dismountable rear strange land of balcony, pull rod, pond, leisure platform, guardrail is reused.
Description
Technical field
The present invention relates to a kind of for detachable green balcony of multi-storey building building and preparation method thereof.
Background technology
With the continuous improvement of living standards of the people, urbanization process is accelerated, and skyscraper, intensive transportation network are continuous
Ground corrodes the limited green space in city, and it is so to lack that at this moment we, which just really experience life Green,.In order to improve
This undesirable development model, allowing city, people start to spatial development full of green, from plot planning, layout design when just
Start to imagine and a super large green yard is supplied to each household resident, ancient Chinese style garden love knot is allowed to be obtained in high residential building
With extension.
Country's residential quarters greening at present, flowers and plants, landscape, trees are generally each provided at the public-land in cell courtyard
On, also have situation garden being built on roofing.Community resident can only go to one layer of ground or roofing watches, and can not participate in planting
The overall processes such as training, watering, trimming, nursing, it is even more impossible to meet the exclusive privacy of individual character hobby and private savings of the occupant to flowers and plants
It is required that.The particularly residential architecture of early stage can only put several flowerpots on balcony, although balcony area very little, the work(of carrying
Can be again especially more, common balcony be both enjoy the cool, the institute of view and laundry, the place for shining clothing, storing sundries.With inhabitation product
The continuous improvement of matter and the increase of living space, the present invention are exactly to provide one for resident to meet colourful leisure at home
Living space, the living space of this super large can not only cultivate the flowers and plants worm for fishing of personal like, but also as view, body-building, read
It reads, receive a visitor, playing chess is used.This courtyard-style greening balcony or the ground of landscape generation, using it as the indoor sky of core structure
Between, indoor and outdoor is mutually blended, flowing and it is changeable.
In terms of greening cell environment, change cityscape, act in accordance at once for trend, change that thousand city one in the past
The design pattern in face, sets about from the designing scheme in Unit Residential building, and the optimizing design scheme traditional design theory old with change is
Society provides more green buildings and graceful ecological environment is extremely urgent.
Assembled afforests balcony, and exterior design is beautiful, dismounts and mounts flexible and convenient, and security performance is reliable, balcony, pull rod, pond,
It reuses in the dismountable rear strange land of leisure platform, guardrail.
Invention content
In view of the above existing problems in the prior art, the present invention provides a kind of detachable greens for multi-storey building building
Balcony belongs to assembled greening balcony, and exterior design is beautiful, dismounts and mounts flexibly and easily, security performance is reliable, balcony, pull rod, water
It reuses in the dismountable rear strange land of pond, leisure platform, guardrail.
To achieve these goals, the technical solution adopted by the present invention is:A kind of detachable green for possessing garden carrier
Balcony, a kind of detachable green balcony for possessing garden carrier, including multiple balconies, balcony includes platform framework, platform framework
It is welded by type steel skeleton, platform framework is connected by the beam column built from concrete in articulated mounting and house, the platform framework
Including garden areas and aisle, the both sides of platform framework are equipped with guardrail grafting pedestal, and guardrail is mounted on guardrail grafting pedestal, is put down
The both sides of table frame are respectively provided at least three and fix auxiliary cable wire tube head, and auxiliary cable wire pull rod passes through every layer of corresponding fixed auxiliary
Cable wire tube head, the both ends of auxiliary cable wire pull rod are separately fixed at the fixed auxiliary cable wire of the platform framework of top and the bottom
On tube head, the guardrail is 1-1.5 meters high.
The articulated mounting is u-shaped anchor and axial pin type connector, and axial pin type connector is mounted on the interior of u-shaped anchor
Portion is fixed by pivot pin so that u-shaped anchor and axial pin type connector are hinged, and the axial pin type connector is fixed on
One end of platform framework, the u-shaped anchor are fixed on the beam column built from concrete in house, and u-shaped anchor exposes outside hinge bar.
The both sides of platform framework are mounted on several updip formula cable wires and hang nose, and corresponding beam column built from concrete is equipped with dipping type
Anchor, dipping type anchor have rectangular anchor slab, and rectangular anchor slab is fixed on inside beam column built from concrete, and updip formula cable wire hangs nose and has a down dip
Formula anchor is fixedly connected by cap cable pull rod.
There are two the installed in front of the platform framework moves tube head,
Cable wire pull rod passes through corresponding removable tube head, and one end of cable wire pull rod is fixed on Cantilever Beams, and the other end is fixed
On the fixture of bottom, the removable tube head includes sliding shoe and the tube head on the outside of sliding shoe, platform framework
Front side be equipped with sliding slot, sliding shoe can move along sliding slot, and evenly distributed mounting hole is additionally provided on front side of platform framework, Gu
Determine hole and be parallel to sliding slot, be hingedly equipped with card hole bar on sliding shoe, card hole bar can be put in mounting hole.
The Cantilever Beams are arranged on the top of floor.
A kind of production method of detachable green balcony for multi-storey building building:Include the following steps:
(1)Cantilever Beams are set:Cantilever Beams are set on the top of floor, if house is newly constructed house, Cantilever Beams can be with room
House owner's body makes reinforced beam, if aging blocks room, can be used steelwork, is reliably connected with room object top layer;
(2)In the installation metope pre-embedded u-shaped anchor of floor of balcony and dipping type anchor, each floor, dipping type anchor
The position height of part is more than the position height of u-shaped anchor;
(3)(3)Suitable platform framework is selected, and is welded with axial pin type close to the both sides of metope one end in platform framework and connects
Fitting is symmetrically installed at least one set of updip formula cable wire on the body of rod of two sides of platform framework and hangs nose, before platform framework
There are two side installations moves tube head,
The both sides of platform framework are equipped with guardrail grafting pedestal, and 3 fixed auxiliary cable wire tube heads are mounted on per side,
And pass through the floor that hanging device is placed on installation, two axial pin type connectors and the metope pre-embedded u of platform framework
Type anchor is hinged by pivot pin,
Then the updip formula cable wire on the body of rod of two sides of platform framework is hung into nose and dipping type with cap cable pull rod
Anchor connects;
(4)Selection floor continues to install balcony, repeats step(2)And step(3), until floor in need platform frame
Frame is respectively mounted completion, then passes through the corresponding fixed auxiliary cable wire tube head of all platform framework avris with auxiliary cable wire pull rod, will
All platform framework connections are integral, and auxiliary cable wire pull rod passes through every layer of corresponding fixed auxiliary cable wire tube head, assists steel
The both ends of rope pull rod are fixed on top and the bottom on the fixed auxiliary cable wire tube head of roof panel frame, being fixed from top
Cantilever Beams on draw two cable wire pull rods, each cable wire pull rod pass through the corresponding removable tube head of each platform framework, directly
The corresponding removable tube head of all platform frameworks is passed through to cable wire pull rod, finally determines the position of the cable wire pull rod other end, it is described
Position on the fixture on ground so that cable wire pull rod is tight securely, after two cable wire pull rods are all fixed, two cable wires
The angle that pull rod is formed finally fixes the removable tube head on each platform framework so that so that removable between 30-90 °
Dynamic tube head, which is fixed on platform framework, to be moved.
Step(4)In, it, will with two cable wire clamps after cable wire pull rod passes through the corresponding removable tube head of all platform frameworks
Mobile connection tube head is fixed on cable wire pull rod.
The present invention has the following advantages that overhanging type green balcony is will to be made of four adjustable steel ropes in processing factory
The assembled steel balcony oblique pull of completion is horizontally suspended on the outside of building.Because balcony is in processing factory's scale production, process velocity
Soon, precision is high, high-quality.When transporting in-site installation, noiseless and environment influence condition is small, and security performance is reliable.The greening
It can simultaneously design with house, construct simultaneously, be delivered for use simultaneously in balcony.Can be directed to again existing building by direction to house,
After the comprehensive analysis such as body coefficient, daylighting requirement, carry out special design and produce and customize.The present invention passes through Cantilever Beams, a plurality of steel
Multiple balconies are fixed as an entirety by rope pull rod and removable tube head, and structure is firm, due to mobile tube head energy before fixation
It is enough flexible mobile, so the fixed installation of the balcony and floor of various height can be suitble to.
Description of the drawings
Attached drawing 1 is floor map of the present invention;
Attached drawing 2 installs lateral side view for greening balcony;
Attached drawing 3 is the side view of steel platform;
Attached drawing 4 enters concrete node drawing for dipping type anchor and rectangular anchor slab;
Attached drawing 5 mounts node drawing for platform and wall level.
Fig. 6 is the cable wire pull rod connection diagram of multiple balconies.
Fig. 7 is movable pipe header structure figure.
1st, platform framework;2nd, lie fallow platform;3rd, garden;4th, aisle;5 axial pin type connectors;6th, updip formula cable wire hangs nose;7、
U-shaped anchor;8th, beam column built from concrete;9th, pivot pin;10th, guardrail grafting pedestal;11st, cap cable pull rod;12nd, dipping type anchor;13rd, side
Shape anchor slab;14th, Cantilever Beams;15th, cable wire pull rod;16th, fixed auxiliary cable wire pull rod tube head, 17, fixture, 18, removable tube head,
19 auxiliary cable wire pull rods, 20, removable tube head, 101, sliding slot, 102, mounting hole, 201, sliding block, 202, tube head, 203, card hole
Bar.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings.
A kind of detachable green balcony for multi-storey building building, including platform framework 1, the platform framework 1 by
Type steel skeleton is welded, and platform framework is connected by the beam column built from concrete 8 in articulated mounting and house, the platform framework packet
Include garden 3 and aisle 4, leisure platform 2.
The articulated mounting is u-shaped anchor 7 and axial pin type connector 5, and axial pin type connector is mounted on u-shaped anchor
Inside is fixed by pivot pin 9 so that u-shaped anchor and axial pin type connector are hinged, and the axial pin type connector is consolidated
One end of platform framework is scheduled on, the u-shaped anchor is fixed on the beam column built from concrete in house, and u-shaped anchor exposes outside hinge bar.
The both sides of platform framework 1 are mounted on several updip formula cable wires and hang nose 6, and corresponding beam column built from concrete 8 is equipped with down
Formula of inclining anchor 12, dipping type anchor 12 have rectangular anchor slab 13, and rectangular anchor slab 13 is fixed on inside beam column built from concrete 8, updip formula
Cable wire hangs nose 6 and is fixedly connected with dipping type anchor 12 by cap cable pull rod 11.
The both sides of platform framework 1 are equipped with guardrail grafting pedestal 10 and fixed auxiliary cable wire pull rod tube head 16, have 3 per side
Fixed auxiliary cable wire pull rod tube head 16, guardrail grafting pedestal 10 is equipped with guardrail, and guardrail is 1-1.5 meters high.
Cable wire pull rod 19 is assisted to pass through every layer of corresponding fixed auxiliary cable wire tube head 16, the both ends of auxiliary cable wire pull rod 19 are consolidated
It is scheduled on the fixed auxiliary cable wire tube head 16 of the platform framework of top and the bottom,
The installed in front of the platform framework is there are two removable tube head, as shown in fig. 7, specific structure is removable
Tube head includes sliding shoe 201 and the tube head 202 on the outside of sliding shoe, and the front side of platform framework is equipped with sliding slot 101, sliding
Motion block can be moved along sliding slot, evenly distributed mounting hole 102 is additionally provided on front side of platform framework, mounting hole is parallel to cunning
Slot is hingedly equipped with card hole bar 203 on sliding shoe, and card hole bar can be put in mounting hole, and the mobile fixation of sliding block has been achieved,
When shelves need sliding block fixation at the desired position, it is only necessary to before sliding block is moved to the mounting hole for changing position, card hole bar 203 be stretched
Fixation is realized into mounting hole is changed, and in order to preferably fix, card hole rod end head is provided with lockhole, and card hole bar 203, which is put in, changes mounting hole
Afterwards, then with lock by lockhole it locks, reaches better fixed effect.
Cable wire pull rod passes through corresponding removable tube head, and one end of cable wire pull rod is fixed on Cantilever Beams, and the other end is fixed
On bottom fixture 17.
The Cantilever Beams are arranged on the top of floor.
A kind of production method for the detachable green balcony for possessing garden carrier:Include the following steps:
(1)Cantilever Beams are set:Cantilever Beams are set on the top of floor, if house is newly constructed house, Cantilever Beams can be with room
House owner's body makes reinforced beam, if aging blocks room, can be used steelwork, is reliably connected with room object top layer;
(2)In the installation metope pre-embedded u-shaped anchor of floor of balcony and dipping type anchor, each floor, dipping type anchor
The position height of part is more than the position height of u-shaped anchor;
(3)Suitable platform framework is selected, and axial pin type connection is welded with close to the both sides of metope one end in platform framework
Part is symmetrically installed at least one set of updip formula cable wire on the body of rod of two sides of platform framework and hangs nose, the front side of platform framework
There are two installations moves tube head,
The both sides of platform framework are equipped with guardrail grafting pedestal, and 3 fixed auxiliary cable wire tube heads are mounted on per side,
And pass through the floor that hanging device is placed on installation, two axial pin type connectors and the metope pre-embedded u of platform framework
Type anchor is hinged by pivot pin,
Then the updip formula cable wire on the body of rod of two sides of platform framework is hung into nose and dipping type with cap cable pull rod
Anchor connects;
(4)Selection floor continues to install balcony, repeats step(2)And step(3), until floor in need platform frame
Frame is respectively mounted completion, then passes through the corresponding fixed auxiliary cable wire tube head of all platform framework avris with auxiliary cable wire pull rod, will
All platform framework connections are integral, and auxiliary cable wire pull rod passes through every layer of corresponding fixed auxiliary cable wire tube head, assists steel
The both ends of rope pull rod are fixed on top and the bottom and the fixed of roof panel frame are assisted on cable wire tube head,
Two cable wire pull rods are drawn from the outside of the fixed Cantilever Beams in top, each cable wire pull rod passes through each platform
The corresponding removable tube head of frame, until cable wire pull rod pass through the corresponding removable tube head of all platform frameworks, finally determine steel
The position of the rope pull rod other end, since removable tube head can be slided freely, this design is so that determine the cable wire pull rod other end
Position when it is more easy, it is only necessary to determine on the fixture on ground, then by the cable wire pull rod other end directly pull come
Straight line can be formed, and two cable wire pull rods can be drawn from the same place of Cantilever Beams, such Cantilever Beams can not
Too big width is needed, without big as the area of balcony, it is only necessary to its extension elongation and the extension elongation of platform framework one
Cause, with regard to good fixed effect can be reached.
So that cable wire pull rod is tightened securely, after two cable wire pull rods all tighten fixation, two cable wire pull rods are formed
Angle between 30-90 °, the structure of triangle is more firm, finally fixes the removable tube head on each platform framework,
So that removable tube head is fixed on platform framework and can not move, then mobile connection tube head is fixed on two cable wire clamps
On cable wire pull rod,
Removable tube head in this way after several platforms, two cable wire pull rods, fixation is just fixed as an entirety, forms
One firm structure, and this removable tube head facilitates adjusting, be suitble to different height, length domestic floor, such as Fig. 6
It is shown.
Claims (2)
1. a kind of detachable green balcony for multi-storey building building, which is characterized in that including multiple balconies, balcony includes flat
Table frame, platform framework are welded by type steel skeleton, and platform framework is connected by the beam column built from concrete in articulated mounting and house,
The platform framework includes garden areas and aisle, and the both sides of platform framework are equipped with guardrail grafting pedestal, and guardrail is mounted on shield
On column grafting pedestal, the both sides of platform framework are respectively provided at least three and fix auxiliary cable wire tube head, and auxiliary cable wire pull rod passes through every layer
Corresponding fixed auxiliary cable wire tube head, the both ends of auxiliary cable wire pull rod are separately fixed at top and the corresponding platform of the bottom
On the fixed auxiliary cable wire tube head of frame, the guardrail is 1-1.5 meters high;The articulated mounting is u-shaped anchor and pivot pin
Formula connector, the inside that axial pin type connector is mounted on u-shaped anchor are fixed by pivot pin so that u-shaped anchor and axial pin type connect
Fitting is hinged, and the axial pin type connector is fixed on one end of platform framework, and the u-shaped anchor is fixed on house
Beam column built from concrete on, u-shaped anchor exposes outside hinge bar;The both sides of platform framework are mounted on several updip formula cable wires and hang nose,
Corresponding beam column built from concrete is equipped with dipping type anchor, and dipping type anchor has rectangular anchor slab, and rectangular anchor slab is fixed on concrete
Inside beam column, updip formula cable wire hangs nose and is fixedly connected with dipping type anchor by cap cable pull rod;Before the platform framework
There are two side installations moves tube head,
Cable wire pull rod passes through corresponding removable tube head, and one end of cable wire pull rod is fixed on Cantilever Beams, and the other end is fixed on bottom
On portion's fixture, the removable tube head includes sliding shoe and the tube head on the outside of sliding shoe, before platform framework
Side is equipped with sliding slot, and sliding shoe can be moved along sliding slot, and evenly distributed mounting hole, mounting hole are additionally provided on front side of platform framework
Sliding slot is parallel to, is hingedly equipped with card hole bar on sliding shoe, card hole bar can be put in mounting hole;The Cantilever Beams are arranged on building
The top of layer.
2. a kind of production method of detachable green balcony for multi-storey building building:It is characterized by comprising the following steps:
(1)Cantilever Beams are set:Cantilever Beams are set on the top of floor, if house is newly constructed house, Cantilever Beams can be with house master
Body makes reinforced beam, if aging blocks room, can be used steelwork, is reliably connected with room object top layer;
(2)In the installation metope pre-embedded u-shaped anchor of floor of balcony and dipping type anchor, each floor, dipping type anchor
Position height is more than the position height of u-shaped anchor;
(3)Suitable platform framework is selected, and axial pin type connector is welded with close to the both sides of metope one end in platform framework, is put down
At least one set of updip formula cable wire is symmetrically installed on the body of rod of two sides of table frame and hangs nose, the installed in front of platform framework has
Two removable tube heads,
The both sides of platform framework are equipped with guardrail grafting pedestal, and 3 fixed auxiliary cable wire tube heads are mounted on per side,
And pass through the floor that hanging device is placed on installation, two axial pin type connectors and the metope pre-embedded u-shaped anchor of platform framework
Part is hinged by pivot pin,
Then the updip formula cable wire on the body of rod of two sides of platform framework is hung into nose and dipping type anchor with cap cable pull rod
Connection;
(4)Selection floor continues to install balcony, repeats step(2)And step(3), until floor in need platform framework it is equal
Installation is complete, then passes through the corresponding fixed auxiliary cable wire tube head of all platform framework avris with auxiliary cable wire pull rod, will be all
Platform framework connection be integral, auxiliary cable wire pull rod passes through every layer of corresponding fixed auxiliary cable wire tube head, and auxiliary cable wire is drawn
The both ends of bar are fixed on top and the bottom is corresponded on the fixed auxiliary cable wire tube head of platform framework, fixed outstanding from top
Two cable wire pull rods are drawn on outrigger, each cable wire pull rod passes through the corresponding removable tube head of each platform framework, Zhi Daogang
Rope pull rod passes through the corresponding removable tube head of all platform frameworks, finally determines the position of the cable wire pull rod other end, described another
The position at end is on the fixture on ground so that and cable wire pull rod is tight securely, after two cable wire pull rods are all fixed, two bar steels
The angle that rope pull rod is formed finally fixes the removable tube head on each platform framework so that removable between 30-90 °
Tube head, which is fixed on platform framework, to be moved.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810393132.3A CN108532741B (en) | 2016-10-20 | 2016-10-20 | Detachable green terrace for building |
CN201610914344.2A CN106368310B (en) | 2016-10-20 | 2016-10-20 | Detachable green balcony for multi-storey building building and preparation method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610914344.2A CN106368310B (en) | 2016-10-20 | 2016-10-20 | Detachable green balcony for multi-storey building building and preparation method thereof |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810393132.3A Division CN108532741B (en) | 2016-10-20 | 2016-10-20 | Detachable green terrace for building |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106368310A CN106368310A (en) | 2017-02-01 |
CN106368310B true CN106368310B (en) | 2018-07-03 |
Family
ID=57894830
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610914344.2A Active CN106368310B (en) | 2016-10-20 | 2016-10-20 | Detachable green balcony for multi-storey building building and preparation method thereof |
CN201810393132.3A Active CN108532741B (en) | 2016-10-20 | 2016-10-20 | Detachable green terrace for building |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810393132.3A Active CN108532741B (en) | 2016-10-20 | 2016-10-20 | Detachable green terrace for building |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN106368310B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111519754A (en) * | 2020-05-08 | 2020-08-11 | 黄炳江 | Detachable green terrace for multi-storey building and manufacturing method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU757666A1 (en) * | 1978-05-15 | 1980-08-23 | Kh Gorodskoe Zhilishchnoe Upra | Apparatus for insuring balconys |
CN1936205A (en) * | 2006-10-18 | 2007-03-28 | 李建明 | Extending suspension platform reinforced by multiple skew cables |
CN201801953U (en) * | 2010-08-17 | 2011-04-20 | 俞天阳 | Aerated balcony |
CN103174303A (en) * | 2011-12-23 | 2013-06-26 | 五冶集团上海有限公司 | Movable overhung unloading platform and manufacture and installation method thereof |
CN203429783U (en) * | 2013-07-25 | 2014-02-12 | 中国建筑第八工程局有限公司 | Tower crane driver high-altitude walking passageway |
CN203499258U (en) * | 2013-08-19 | 2014-03-26 | 中国建筑第八工程局有限公司 | Prefabricated overhanging type discharging platform |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202990098U (en) * | 2012-11-25 | 2013-06-12 | 陈科 | Terrace capable of moving automatically |
CN203320689U (en) * | 2013-07-12 | 2013-12-04 | 鲍红琴 | Building landscape balcony |
CN204385883U (en) * | 2014-11-25 | 2015-06-10 | 张跃 | A kind of Fabricated balcony |
CN105233433B (en) * | 2015-11-02 | 2018-10-23 | 袁锡良 | The emergent saving oneself activity balcony of building |
-
2016
- 2016-10-20 CN CN201610914344.2A patent/CN106368310B/en active Active
- 2016-10-20 CN CN201810393132.3A patent/CN108532741B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU757666A1 (en) * | 1978-05-15 | 1980-08-23 | Kh Gorodskoe Zhilishchnoe Upra | Apparatus for insuring balconys |
CN1936205A (en) * | 2006-10-18 | 2007-03-28 | 李建明 | Extending suspension platform reinforced by multiple skew cables |
CN201801953U (en) * | 2010-08-17 | 2011-04-20 | 俞天阳 | Aerated balcony |
CN103174303A (en) * | 2011-12-23 | 2013-06-26 | 五冶集团上海有限公司 | Movable overhung unloading platform and manufacture and installation method thereof |
CN203429783U (en) * | 2013-07-25 | 2014-02-12 | 中国建筑第八工程局有限公司 | Tower crane driver high-altitude walking passageway |
CN203499258U (en) * | 2013-08-19 | 2014-03-26 | 中国建筑第八工程局有限公司 | Prefabricated overhanging type discharging platform |
Also Published As
Publication number | Publication date |
---|---|
CN108532741A (en) | 2018-09-14 |
CN106368310A (en) | 2017-02-01 |
CN108532741B (en) | 2020-05-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205777664U (en) | Urban forests high level villa | |
CN107288370A (en) | Urban forests high level villa | |
CN106368310B (en) | Detachable green balcony for multi-storey building building and preparation method thereof | |
CN106638933A (en) | Detachable green terrace with garden carrier and manufacturing method of terrace | |
CN110485254B (en) | Pedestrian landscape cable-stayed bridge based on sightseeing tower bridge tower structure | |
CN106436891B (en) | Detachable balcony of multi-storey building and preparation method thereof | |
CN106638934B (en) | A kind of green balcony and preparation method thereof for multi-storey building | |
CN210856905U (en) | Pedestrian landscape cable-stayed bridge based on bridge tower structure of sightseeing tower | |
CN209145351U (en) | A kind of case type sports training type heat preservation energy-saving house | |
CN221203482U (en) | Landscape garden plant climbing rack | |
CN113026932A (en) | A balcony structure for full aluminium building of green assembled | |
CN103015696A (en) | Hanging basket outer protective layer for super high-rise building | |
CN216123580U (en) | Low water tank drainage type multi-span split plastic greenhouse | |
CN112064891A (en) | Beam structure with planting function | |
CN104405037A (en) | Metal beam column keel frame produced through calcining compression ball | |
CN205511147U (en) | Automatic three -dimensional flower culture device that surplus water of water spray was collected | |
CN211646699U (en) | Three-dimensional balcony garden | |
CN109348926A (en) | A kind of three-dimensional more floor greenhouse methods of construction of Tulou formula | |
CN206070729U (en) | A kind of overhanging type green balcony | |
CN204826756U (en) | Entry formula corridor frame | |
CN220088052U (en) | Greening landscape building | |
CN214531083U (en) | Multi-functional gardens corridor frame | |
CN219344233U (en) | Bath tent | |
CN212130120U (en) | Assembled yurt structure | |
CN211257933U (en) | Building with trapezoidal step-shaped roof and quadrangle composed of building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Jiang Feng Inventor before: Sun Yue |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180524 Address after: 518000 13, B4 unit, Kexing Science Park, 15 Keyuan Road, Nanshan District, Shenzhen, Guangdong. Applicant after: Shenzhen Jieen creative Tsukito design Inc Address before: 221000 No. 23 Qianjiang Road, Second Industrial Park, Xuzhou hi tech Industrial Development Zone, Xuzhou, Jiangsu Applicant before: Xuzhou joy Electromechanical Technology Co., Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |