CN106368236A - 一种采空区自适应调整基础的装置及方法 - Google Patents

一种采空区自适应调整基础的装置及方法 Download PDF

Info

Publication number
CN106368236A
CN106368236A CN201610896619.4A CN201610896619A CN106368236A CN 106368236 A CN106368236 A CN 106368236A CN 201610896619 A CN201610896619 A CN 201610896619A CN 106368236 A CN106368236 A CN 106368236A
Authority
CN
China
Prior art keywords
self
goaf
layer
tower
fixed plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610896619.4A
Other languages
English (en)
Other versions
CN106368236B (zh
Inventor
宰红斌
陈文刚
吴非宏
秦志沁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jincheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jincheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jincheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610896619.4A priority Critical patent/CN106368236B/zh
Publication of CN106368236A publication Critical patent/CN106368236A/zh
Application granted granted Critical
Publication of CN106368236B publication Critical patent/CN106368236B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations

Abstract

本发明属于采空区自适应调整基础的装置及方法的技术领域,具体涉及一种采空区自适应调整基础的装置及方法;解决的技术问题为:提供一种能够自动调整基础的采空区自适应调整基础的装置及方法;采用的技术方案为:一种采空区自适应调整基础的装置,包括固定板,所述固定板内设置有粗砂层和填充层,所述粗砂层设置在填充层的下方,所述填充层的上方设置有杆塔基础,所述杆塔基础的上方设置有用于固定设备的地脚螺栓,所述填充层包括多层鹅卵石层和多层粗砂层;本发明适用于采空区的技术领域。

Description

一种采空区自适应调整基础的装置及方法
技术领域
本发明属于采空区自适应调整基础的装置及方法的技术领域,具体涉及一种采空区自适应调整基础的装置及方法。
背景技术
煤矿或其他矿产采动时会造成地表的塌陷和地表盆地移动,造成输电线路杆塔倾斜与基础不均匀沉降问题,支撑输电线路导地线的杆塔与地基基础,倾斜与沉降时产生的非荷载应力将极有可能导致杆塔构件破坏、断裂、变形等事故发生,情况严重者将导致倒杆塔断线,对输电线路的安全运行构成严重威胁。
采空区塌陷造成输电杆塔地基基础下沉(倾斜)后,其首要措施一是及时释防导地线张力;二是及时调整倾斜杆塔。调正倾斜杆塔的方法主要有:一是在塔脚板下方加装垫铁;二是更换加长塔脚板;三是调整基础;四是更换杆塔。由于采空区杆塔倾斜变化频繁,如调整不及时,将有可能引起倒塔断线等事故发生,因此调整工作量多而频繁。
当采用在塔脚板下方加装垫铁和更换加长塔脚板不能将杆塔倾斜值调整在规程规定的安全范围内,就需要对铁塔基础进行调整,调整基础属于大型作业,作业现场安全措施多,工作时间长,且必须停电进行调整,根据电网运行方式和现状,线路刚停过电,随即再申请线路停电,从电网方式、可靠性、社会影响及实际情况等方面考虑实施难度大。
发明内容
本发明克服现有技术存在的不足,所要解决的技术问题为:提供一种能够自动调整基础的采空区自适应调整基础的装置及方法。
为了解决上述技术问题,本发明采用的技术方案为:一种采空区自适应调整基础的装置,包括固定板,所述固定板内设置有粗砂层和填充层,所述粗砂层设置在填充层的下方,所述填充层的上方设置有杆塔基础,所述杆塔基础的上方设置有用于固定设备的地脚螺栓,所述填充层包括多层鹅卵石层和多层粗砂层。
所述固定板为上方开口的方形结构。
所述固定板和杆塔基础均为钢筋混凝土结构。
所述杆塔基础至少为两个。
所述杆塔基础为普通台阶基础,或为联合基础。
一种采空区自适应调整基础的方法,包括下列步骤:
步骤S01:确定固定板的结构尺寸;
步骤S02:确定填充层内鹅卵石层和粗砂层的铺设层数和高度;
步骤S03:确定杆塔基础的结构尺寸;
步骤S04:进行固定板基坑的开挖、固定板的浇筑,待固定板上的混凝土凝固后,以粗砂为底层,铺设填充层;
步骤S05:在填充层上方进行杆塔基础的配筋铺设和混凝土浇筑,回填固定板基坑,组立铁塔、放线、紧线、附件等完成全部施工工作。
本发明与现有技术相比具有以下有益效果:
本发明一种采空区自适应调整基础的装置及方法,当采动或采空影响铁塔稳定倾斜时,在导线张力及铁塔自重力的作用下能够进行自适应调整杆塔基础,保证铁塔倾斜值在规程规定的安全运行范围内。本发明可减免频繁调整铁塔基础造成的人力、物力浪费,以及作业带来的停电损失和作业风险,并有效避免了倒塔断线等恶劣事故发生,保证了输电线路安全运行,提高了供电可靠性。
附图说明
下面结合附图对本发明做进一步详细的说明;
图1为本发明的侧视图;
图2为本发明的俯视图;
图中:1为固定板,2为粗砂层,3为填充层,4为杆塔基础,5为地脚螺栓,6为鹅卵石层。
具体实施方式
为使本发明实施例的目的、技术方案和优点更加清楚,下面将对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明的一部分实施例,而不是全部的实施例;基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
如图1、图2所示,一种采空区自适应调整基础的装置,包括固定板1,所述固定板1内设置有粗砂层2和填充层3,所述粗砂层2设置在填充层3的下方,所述填充层3的上方设置有杆塔基础4,所述杆塔基础4的上方设置有用于固定设备的地脚螺栓5,所述填充层3包括多层鹅卵石层6和多层粗砂层2。
所述固定板1为上方开口的方形结构。
所述固定板1和杆塔基础4均为钢筋混凝土结构,设计荷载按照国家和行业标准进行设计。
所述杆塔基础4至少为两个,本申请说明书附图以四个杆塔基础4为例进行说明;所述杆塔基础4为普通台阶基础,或为联合基础。
一种采空区自适应调整基础的方法,包括下列步骤:
步骤S01:确定固定板1的结构尺寸;
步骤S02:确定填充层3内鹅卵石层6和粗砂层2的铺设层数和高度;
步骤S03:确定杆塔基础4的结构尺寸(一般情况下可选用典型基础形式进行设计);
步骤S04:进行固定板1基坑的开挖、固定板1的浇筑,待固定板1上的混凝土凝固后,以粗砂2为底层,铺设填充层3,填充层3的厚度和高度由步骤S02中确定后的鹅卵石层6和粗砂层2的铺设层度决定;
步骤S05:在填充层3上方进行杆塔基础4的配筋铺设和混凝土浇筑,回填固定板1基坑,组立铁塔、放线、紧线、附件等完成全部施工工作。
按照输电线路铁塔设计或加强改造设计的塔位路径,调查清楚输电线路铁塔塔位附近的地质状况,如,输电线路铁塔的塔位处于采空区,按照《采动影响区分级标准与防灾措施》的要求,采用本发明所述的装置进行设计与施工;施工完成后,当采动(采空)影响铁塔稳定倾斜时,在导线张力及铁塔自重力的作用下进行自适应调整(调平)铁塔的杆塔基础4,可始终保证铁塔倾斜值在规程规定的安全运行范围内,安全可靠,经济环保,尤其是采空区输电线路耐张塔,效果更加明显。
本发明能够减免频繁调整铁塔基础造成的人力、物力的浪费,以及作业带来的停电损失和作业风险,并有效避免了倒塔断线等恶劣事故发生,保证了输电线路安全运行,提高了供电可靠性。
最后应说明的是:以上各实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述各实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的范围。

Claims (6)

1.一种采空区自适应调整基础的装置,其特征在于:包括固定板(1),所述固定板(1)内设置有粗砂层(2)和填充层(3),所述粗砂层(2)设置在填充层(3)的下方,所述填充层(3)的上方设置有杆塔基础(4),所述杆塔基础(4)的上方设置有用于固定设备的地脚螺栓(5),所述填充层(3)包括多层鹅卵石层(6)和多层粗砂层(2)。
2.根据权利要求1所述的一种采空区自适应调整基础的装置,其特征在于:所述固定板(1)为上方开口的方形结构。
3.根据权利要求1所述的一种采空区自适应调整基础的装置,其特征在于:所述固定板(1)和杆塔基础(4)均为钢筋混凝土结构。
4.根据权利要求1所述的一种采空区自适应调整基础的装置,其特征在于:所述杆塔基础(4)至少为两个。
5.根据权利要求1所述的一种采空区自适应调整基础的装置,其特征在于:所述杆塔基础(4)为普通台阶基础,或为联合基础。
6.一种采空区自适应调整基础的方法,其特征在于:包括下列步骤:
步骤S01:确定固定板(1)的结构尺寸;
步骤S02:确定填充层(3)内鹅卵石层(6)和粗砂层(2)的铺设层数和高度;
步骤S03:确定杆塔基础(4)的结构尺寸;
步骤S04:进行固定板(1)基坑的开挖、固定板(1)的浇筑,待固定板(1)上的混凝土凝固后,以粗砂(2)为底层,铺设填充层(3);
步骤S05:在填充层(3)上方进行杆塔基础(4)的配筋铺设和混凝土浇筑,回填固定板(1)基坑,组立铁塔、放线、紧线、附件等完成全部施工工作。
CN201610896619.4A 2016-10-14 2016-10-14 一种采空区自适应调整基础的装置及方法 Active CN106368236B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610896619.4A CN106368236B (zh) 2016-10-14 2016-10-14 一种采空区自适应调整基础的装置及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610896619.4A CN106368236B (zh) 2016-10-14 2016-10-14 一种采空区自适应调整基础的装置及方法

Publications (2)

Publication Number Publication Date
CN106368236A true CN106368236A (zh) 2017-02-01
CN106368236B CN106368236B (zh) 2021-01-19

Family

ID=57896219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610896619.4A Active CN106368236B (zh) 2016-10-14 2016-10-14 一种采空区自适应调整基础的装置及方法

Country Status (1)

Country Link
CN (1) CN106368236B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029728A (zh) * 2018-05-22 2019-07-19 北京市建筑工程研究院有限责任公司 一种带架空构造的功能可恢复装配式混凝土框架柱脚节点
CN110904991A (zh) * 2019-12-20 2020-03-24 国网山西省电力公司晋城供电公司 一种杆塔基础和杆塔

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1184875A (zh) * 1996-12-13 1998-06-17 杨彦农 大型抗震建筑物及其设计方法
JP2008231851A (ja) * 2007-03-23 2008-10-02 Nitto Kako Kk 改良地盤およびその施工方法
CN201232194Y (zh) * 2008-06-13 2009-05-06 中国矿业大学 一种抗变形输电杆塔
CN201347560Y (zh) * 2009-01-09 2009-11-18 中国矿业大学 一种煤矿塌陷区输电杆塔复合板基础
KR101042248B1 (ko) * 2011-01-28 2011-06-17 주식회사 한화건설 해상교량의 지진격리기초구조물 및 그 시공방법
CN206090604U (zh) * 2016-10-14 2017-04-12 国网山西省电力公司晋城供电公司 一种采空区自适应调整基础的装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1184875A (zh) * 1996-12-13 1998-06-17 杨彦农 大型抗震建筑物及其设计方法
JP2008231851A (ja) * 2007-03-23 2008-10-02 Nitto Kako Kk 改良地盤およびその施工方法
CN201232194Y (zh) * 2008-06-13 2009-05-06 中国矿业大学 一种抗变形输电杆塔
CN201347560Y (zh) * 2009-01-09 2009-11-18 中国矿业大学 一种煤矿塌陷区输电杆塔复合板基础
KR101042248B1 (ko) * 2011-01-28 2011-06-17 주식회사 한화건설 해상교량의 지진격리기초구조물 및 그 시공방법
CN206090604U (zh) * 2016-10-14 2017-04-12 国网山西省电力公司晋城供电公司 一种采空区自适应调整基础的装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
任庆峰: "论采空区大板基础施工技术", 《科学之友》 *
贾雷亮: "采空区对电力输电线路的影响分析及其综合治理研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑(月刊)》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029728A (zh) * 2018-05-22 2019-07-19 北京市建筑工程研究院有限责任公司 一种带架空构造的功能可恢复装配式混凝土框架柱脚节点
CN110904991A (zh) * 2019-12-20 2020-03-24 国网山西省电力公司晋城供电公司 一种杆塔基础和杆塔

Also Published As

Publication number Publication date
CN106368236B (zh) 2021-01-19

Similar Documents

Publication Publication Date Title
CN101666081B (zh) 深水库区陡坡裸岩钻孔平台及工艺
CN105239586B (zh) 一种采用支撑结构支护基坑的方法
CN102352590A (zh) 采用桩板式挡墙进行高填方路基拼接的方法
CN105256824B (zh) 一种废旧轮胎格宾单元及格宾锚定板挡土墙及施工方法
CN106638663A (zh) 一种沉陷区高压输电铁塔基础加固及整体纠倾平移方法
CN103452147A (zh) 自平衡锚配重断桩迫降纠倾方法
CN105201011A (zh) 一种复合锚定板挡土墙及其施工方法
CN101967786B (zh) 一种箱型隔震基础机场道面结构
CN105544590A (zh) 用于输变电工程杆塔的整体连续可调基础
CN108824476A (zh) 用于山地采空边坡高压输电塔的连续可调抗采空基础
CN106368236A (zh) 一种采空区自适应调整基础的装置及方法
CN108108507B (zh) 一种高强土工布加固铁路岩溶路基的设计方法
CN206635599U (zh) 一种塌方道路的路面抢险支固装置
CN206346216U (zh) 一种输电线路铁塔基础的加固结构
CN201502056U (zh) 深水库区陡坡裸岩钻孔平台
CN108412223B (zh) 一种水平锁固断柱的纠偏结构及水平锁固断柱的纠偏方法
CN104032767A (zh) 一种深基坑内塔吊基础及其施工方法
CN107447731B (zh) 一种混合坝及其施工方法
CN206090604U (zh) 一种采空区自适应调整基础的装置
CN110016919A (zh) 一种旧楼加装电梯微创基坑结构与施工方法
CN106869198B (zh) 一种利用井字梁加固杆塔基础加固松散土质下陷空区方法
CN109706987B (zh) 一种框架结构建筑物内部顶升纠倾方法
CN110397335A (zh) 一种自立式铁塔塔座纠偏方法
CN101956479B (zh) 原基础加装的高压线塔可提升且抗采动变形装置
CN110106905A (zh) 一种联合电塔桩基础

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 048000 No. 1 East st street, Jincheng, Shanxi

Applicant after: JINCHENG POWER SUPPLY COMPANY OF STATE GRID SHANXI ELECTRIC POWER Co.

Applicant after: STATE GRID CORPORATION OF CHINA

Address before: 048000 No. 1 East st street, Jincheng, Shanxi

Applicant before: JINCHENG POWER SUPPLY COMPANY OF STATE GRID SHANXI ELECTRIC POWER Co.

Applicant before: State Grid Corporation of China

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20170201

Assignee: Jincheng Huagang Power Technology Co.,Ltd.

Assignor: JINCHENG ELECTRIC POWER COMPANY OF SHANXI ELECTIRC POWER COPRPRATION OF STATE GRID CORPORATION OF CHINA

Contract record no.: X2021140000007

Denomination of invention: A device and method for adaptive adjustment foundation of goaf

Granted publication date: 20210119

License type: Common License

Record date: 20211215

EE01 Entry into force of recordation of patent licensing contract