CN106353607A - Antenna working parameter test management system and method based on same - Google Patents

Antenna working parameter test management system and method based on same Download PDF

Info

Publication number
CN106353607A
CN106353607A CN201610785857.8A CN201610785857A CN106353607A CN 106353607 A CN106353607 A CN 106353607A CN 201610785857 A CN201610785857 A CN 201610785857A CN 106353607 A CN106353607 A CN 106353607A
Authority
CN
China
Prior art keywords
module
information
test
antenna
base station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610785857.8A
Other languages
Chinese (zh)
Inventor
孙毅
林永生
夏文祥
陈鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUZHOU FUGUANG ELECTRONICS Co Ltd
Original Assignee
FUZHOU FUGUANG ELECTRONICS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUZHOU FUGUANG ELECTRONICS Co Ltd filed Critical FUZHOU FUGUANG ELECTRONICS Co Ltd
Priority to CN201610785857.8A priority Critical patent/CN106353607A/en
Publication of CN106353607A publication Critical patent/CN106353607A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R29/00Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
    • G01R29/08Measuring electromagnetic field characteristics
    • G01R29/10Radiation diagrams of antennas

Landscapes

  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

An antenna working parameter test management system comprises test terminals, an antenna attitude test management platform and a data management system, wherein the antenna attitude test management platform comprises a base station antenna information table module, a base station survey information table module, a wireless parameter module, a one-key test module, a base station survey module, a statistical analysis module and a personnel and equipment module; the base station antenna information table module is used for storing data management system synchronized site information of an existing network; the base station survey information table module is used for storing newly added and data management system synchronized site information; the wireless parameter module is used for managing wireless parameter information of community antennae in the whole network; the one-key test module is used for managing site data information, collected and uploaded by clients, of the existing network; the base station survey module is used for managing newly added site data information collected and uploaded by the test terminals. One efficient antenna working parameter test management system and a method based on the same are provided.

Description

Its lineman ginseng test and management system and its method
[technical field]
The invention belongs to technical field of information management, specifically refer to a kind of sky lineman ginseng test and management system and its method.
[background technology]
Fast development with wireless communication technology and the construction of base station infrastructure equipment, incident is day by day numerous The test maintaining of weight and antenna for base station equipment debugging safeguard the work such as work ginseng collection, and operator can only be according to existing for a long time Manually, the machine tools such as traditional mechanical compass, gradiometer, gps instrument are relied on to gather the main work parameter information of antenna, by collection Personnel, area associate, county associate, city associate etc. collect from level to level, are finally provided by system manager's typing again Management system.For substantial amounts of work ginseng data summarization transmit from level to level, can exist unavoidably data fabrication and data accuracy and The network optimization is caused to disconnect with high-rise optimization in when property;Cause the quality of existing communication net and performance can not reach optimum;Cause Manager cannot effective real-time awareness tracing management tester, ultimately cause existing work ginseng test collect management each The disconnection of link.
To in sky lineman ginseng test collection, what operator was not only concerned about is the work ginseng data message of antenna, equally needs Know the whole process gathering, because traditional antenna work ginseng collecting flowchart has various problems, whole measurement process ring Section many, low precision, efficiency is low, there is many weak points, as cannot know personnel whether truly reach the spot test, on hand over Ginseng information whether true and accurate and each step is required for handling through personnel from level to level, incident is manager To the urgent needss improving traditional antenna work ginseng acquisition scheme, it is desirable to have set testing scheme can effectively manage existing work ginseng Collecting work flow process, can truly timely and effectively gather work parameter according to, can effectively Monitor examination tester work etc. be just Face.
[content of the invention]
The technical problem to be solved is to provide a kind of efficient sky lineman ginseng test and management system and its side Method.
The present invention is achieved in that
Its lineman joins test and management system, including test terminal, antenna attitude test management platform, money guard system;
Described antenna attitude test management platform includes antenna for base station information table module, base station survey information table module, no Line parameter module, a key test module, base station exploration module, statistical analysis module, personnel equipment's module;
Described antenna for base station information table module, for storing the existing network site information of described money guard system synchronization;
Described base station survey information table module, for storing the newly-increased site information of described money guard system synchronization;
Described wireless parameter module, for managing the whole network antenna in cell wireless parameter information;
A described key test module, gathers for management client and uploads existing network station data information;
Described base station surveys module, uploads newly-increased station data information for managing the collection of described test terminal;
Described statistical analysis module, uploads collection information and user's examination information for analyzing described test terminal;
Described personnel equipment's module, for managing described test terminal, tester.
Join the management method of test and management system based on described sky lineman, comprise the steps:
To client antenna cells collection work ginseng information by way of get, successful then return 1+ character string arrives client Client carries data base, and failure then directly returns 0;
Client carries data base and by information, data packing is committed to server by tcp/ip agreement, then server According to timing, by client data database data and the user profile that carries is committed to antenna attitude test management platform and money Guard system executes;
The analytic function forward end page of statistical analysiss is submitted to and is shown, and to antenna attitude test management platform and money piping To returning correct and wrong parameter, if correctly, return information passes through 64 bit encryptions to system to system point, and information is passed through by system again Post mode returns to client;
Resurvey, if mistake then directly returns 0, system is run with this, realizes automatic data collection examination & verification appraisal management work Make.
It is an advantage of the current invention that: compared with traditional work ginseng test mode, the present invention adopts advanced electronic instrument to substitute The originally retrospective installation such as uneven mechanization compass, gradiometer, unified testing standard, effectively evade retrospective installation and survey The problems such as error of examination, demographic data play tricks, and realize closed loop monitoring management with sky lineman ginseng management system, it is to avoid tester Do not arrive at a station, do not go up the test case such as tower, set up the job rating standard foundation of effective personnel.Secondly join information in collection work Meanwhile, greatly simplify layer by layer data transfer the drawbacks of, realize one-touch upload synchronization association website, the relevant information such as cell, subtract The mistake that the numerous intervention of person of low position's power frequency causes.Management and the contrast of benefit aspect: collected layer by layer by original multidisciplinary personnel's staged Work is joined it is impossible to timely and effectively pinpoint the problems, and only needs now 1 people+1 system can manage the whole network sky lineman's parameter evidence and tester Examination of member's working condition etc., efficient data transfer mode, the efficient utilization of lifting work parameter evidence, in personnel cost input side Face is under control, and is that manager brings and easily efficiently manages.
[brief description]
The invention will be further described in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is the system architecture diagram of the present invention.
Fig. 2 is the system block diagram of the antenna attitude test management platform in the present invention.
Fig. 3 is the system data table of the present invention.
[specific embodiment]
As depicted in figs. 1 and 2, sky lineman ginseng test and management system, pats including test terminal, antenna attitude testing tube Platform, money guard system;
Described antenna attitude test management platform includes antenna for base station information table module, base station survey information table module, no Line parameter module, a key test module, base station exploration module, statistical analysis module, personnel equipment's module;
Described antenna for base station information table module, for storing the existing network site information of described money guard system synchronization;
Described base station survey information table module, for storing the newly-increased site information of described money guard system synchronization;
Described wireless parameter module, for managing the whole network antenna in cell wireless parameter information;
A described key test module, gathers for management client and uploads existing network station data information;
Described base station surveys module, uploads newly-increased station data information for managing the collection of described test terminal;
Described statistical analysis module, uploads collection information and user's examination information for analyzing described test terminal;
Described personnel equipment's module, for managing described test terminal, tester.
The management system of the present invention is realized to sky lineman ginseng information management examination & verification, tester's work using electronic mode The function of the aspects such as situation examination, docking third party's data system shared data.Management system receives in the instrument of test terminal The work ginseng test data passing, according to the examination & verification data standard of manager's setting in advance, automatically to upload antenna longitude and latitude, orientation Angle, the high important parameter of extension are compared with resource information automatically, if a certain parameter exceedes, automatically reject this station information to finger Determine test instrumentation, tester reminds tester to need Resurvey information, thus avoiding tester not survey to scene/not upper station The problems of examination, and tester's outbound situation can be examined by statistical module so that home-confined just can enter to personnel Row timely and effectively manages.For automatically auditing the data passed through, then the very first time update money pipe/webmaster system resource Storehouse, ensures that optimization personnel targetedly carry out troubleshooting/optimize and revise according to up-to-date work ginseng information in storehouse in time to existing network network.Separately External system, herein in connection with management modules such as antenna model, wireless parameter, tester, test equipments, realizes having work to join to antenna more Information association is managed independently, effectively improves the management of the work of day utilization of lineman's parameter evidence and personnel, is that manager carries Supply efficient antenna measurement working solution.
System data table is as shown in Figure 3.
System call interfaces:
Interface interchange returns:
Join the management method of test and management system based on above-mentioned sky lineman, comprise the steps:
To client antenna cells collection work ginseng information by way of get, successful then return 1+ character string arrives client Client carries data base, and failure then directly returns 0;
Client carries data base and by information, data packing is committed to server by tcp/ip agreement, then server According to timing, by client data database data and the user profile that carries is committed to antenna attitude test management platform and money Guard system executes;
The analytic function forward end page of statistical analysiss is submitted to and is shown, and to antenna attitude test management platform and money piping To returning correct and wrong parameter, if correctly, return information passes through 64 bit encryptions to system to system point, and information is passed through by system again Post mode returns to client;
Resurvey, if mistake then directly returns 0, system is run with this, realizes automatic data collection examination & verification appraisal management work Make.
The present invention, compared with traditional work ginseng test mode, substitutes originally uneven machinery using advanced electronic instrument Change compass, the retrospective installation such as gradiometer, unified testing standard, effectively evade error, the demographic data of retrospective installation test The problems such as play tricks, and realize closed loop monitoring management with sky lineman ginseng management system, it is to avoid tester does not arrive at a station, does not go up the survey such as tower Examination situation, sets up the job rating standard foundation of effective personnel.Secondly, while gathering work ginseng information, greatly simplify layer by layer The drawbacks of data transfer, realize the relevant informations such as one-touch upload synchronization association website, cell, reduce manually frequently intervention and cause Mistake.Management and the contrast of benefit aspect: work ginseng is collected layer by layer it is impossible to timely and effectively by original multidisciplinary personnel's staged Pinpoint the problems, only need now 1 people+1 system can manage examination of the whole network sky lineman's parameter evidence and tester's working condition etc., Efficient data transfer mode, the efficient utilization of lifting work parameter evidence, it is under control in terms of personnel cost input, for management Person brings and easily efficiently manages.
The foregoing is only the preferable enforcement use-case of the present invention, be not intended to limit protection scope of the present invention.All Within the spirit and principles in the present invention, any modification, equivalent and improvement of being made etc., should be included in the present invention's Within protection domain.

Claims (2)

1. day lineman ginseng test and management system it is characterised in that: include test terminal, antenna attitude test management platform, money pipe System;
Described antenna attitude test management platform includes antenna for base station information table module, base station survey information table module, wireless ginseng Digital-to-analogue block, a key test module, base station exploration module, statistical analysis module, personnel equipment's module;
Described antenna for base station information table module, for storing the existing network site information of described money guard system synchronization;
Described base station survey information table module, for storing the newly-increased site information of described money guard system synchronization;
Described wireless parameter module, for managing the whole network antenna in cell wireless parameter information;
A described key test module, gathers for management client and uploads existing network station data information;
Described base station surveys module, uploads newly-increased station data information for managing the collection of described test terminal;
Described statistical analysis module, uploads collection information and user's examination information for analyzing described test terminal;
Described personnel equipment's module, for managing described test terminal, tester.
2. based on described in claim 1 sky lineman join test and management system management method it is characterised in that: include as follows Step:
Client by way of get to client antenna cells collection work ginseng information, successful then return 1+ character string to client End carries data base, and failure then directly returns 0;
Client carry data base by data packing information is committed to by server by tcp/ip agreement, then server according to By client data database data and the user profile that carries is committed to antenna attitude test management platform and money piping to timing System execution;
The analytic function forward end page of statistical analysiss is submitted to and is shown, and divides to antenna attitude test management platform and money guard system To returning correct and wrong parameter, if correct, return information passes through 64 bit encryptions to system, and information is passed through post by system again Mode returns to client;
Resurvey, if mistake then directly returns 0, system is run with this, realizes automatic data collection examination & verification appraisal management work.
CN201610785857.8A 2016-08-31 2016-08-31 Antenna working parameter test management system and method based on same Pending CN106353607A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610785857.8A CN106353607A (en) 2016-08-31 2016-08-31 Antenna working parameter test management system and method based on same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610785857.8A CN106353607A (en) 2016-08-31 2016-08-31 Antenna working parameter test management system and method based on same

Publications (1)

Publication Number Publication Date
CN106353607A true CN106353607A (en) 2017-01-25

Family

ID=57856271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610785857.8A Pending CN106353607A (en) 2016-08-31 2016-08-31 Antenna working parameter test management system and method based on same

Country Status (1)

Country Link
CN (1) CN106353607A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005069664A1 (en) * 2004-01-16 2005-07-28 Ktfreetel Co., Ltd. Device and method for remotely measuring and monitoring antenna system using mobile terminal
CN102905297A (en) * 2012-09-12 2013-01-30 中兴通讯股份有限公司 Base station engineering information acquisition method and system
CN103116364A (en) * 2013-01-24 2013-05-22 珠海市东耀企业有限公司 Antenna attitude monitoring system supporting electric tuning function
CN103139811A (en) * 2013-02-05 2013-06-05 中兴通讯股份有限公司 Adjustment method and system of engineering parameter

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005069664A1 (en) * 2004-01-16 2005-07-28 Ktfreetel Co., Ltd. Device and method for remotely measuring and monitoring antenna system using mobile terminal
CN102905297A (en) * 2012-09-12 2013-01-30 中兴通讯股份有限公司 Base station engineering information acquisition method and system
CN103116364A (en) * 2013-01-24 2013-05-22 珠海市东耀企业有限公司 Antenna attitude monitoring system supporting electric tuning function
CN103139811A (en) * 2013-02-05 2013-06-05 中兴通讯股份有限公司 Adjustment method and system of engineering parameter

Similar Documents

Publication Publication Date Title
CN102436249B (en) Intelligent electric quantity management and control system and method
CN100583168C (en) Channel patrol checking management system
CN106295985A (en) A kind of platform district line loss management system of local electric network and management method
CN103929759B (en) A kind of mobile network network optimized approach and network optimization system based on case history
CN106572495A (en) Network quality monitoring method based on signalling and MR data and coverage assessment method based on signalling and MR data
CN101217770A (en) An automatic evaluating and analyzing device and method for mobile communication network quality
CN102456239A (en) Intelligent Beidou inspection system
CN103835764B (en) Underground works and deep basal pit pre-warning system for monitoring
CN103107914A (en) Detection method and detection system for remote power acquisition terminal
CN204731826U (en) A kind of polling transmission line management system based on GPS technology
CN111062504A (en) AR technology-based intelligent power distribution station operation and maintenance system and method
CN103414601A (en) Method and system for detecting data for communication resource management system
CN105681469A (en) Mobile terminal used for hydropower station, and data management system and method
CN105447923A (en) Electric power circuit routing inspection system
CN104283732A (en) Network testing method, network testing data collection method, network testing device and network testing system
CN104597495A (en) Earthquake data recording and analyzing system based on mobile phone earthquake monitoring network
CN111294730A (en) Method and device for processing network problem complaint information
CN105722112A (en) Communication network test and optimization system based on mobile terminal
CN112050092A (en) Water supply pipe network leakage information management system, building method and application
US20180160314A1 (en) Identification method, device and system for wcdma network cell soft switching band and storage medium
CN103824337A (en) Power transmission intelligent tour-inspection system
CN110443711B (en) Urban equipment management method based on block chain
CN104808568A (en) Underground water remote monitoring system based on GPRS
CN103686773A (en) Automatic optimization control method and system for operator network entire process
CN103701851A (en) Agricultural technology promotion cloud log management publishing system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 350000 east of the five floor of building 4, M9511 Industrial Park, 18 Ma Jiang Road, Mawei District, Fuzhou, Fujian.

Applicant after: Fuzhou Fuguang Electronics Co., Ltd.

Address before: 350000 No. 8 Xingfa Road, Fuzhou Development Zone, Fuzhou City, Fujian province (FTA)

Applicant before: Fuzhou Fuguang Electronics Co., Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20170125

RJ01 Rejection of invention patent application after publication