CN106353607A - Antenna working parameter test management system and method based on same - Google Patents
Antenna working parameter test management system and method based on same Download PDFInfo
- Publication number
- CN106353607A CN106353607A CN201610785857.8A CN201610785857A CN106353607A CN 106353607 A CN106353607 A CN 106353607A CN 201610785857 A CN201610785857 A CN 201610785857A CN 106353607 A CN106353607 A CN 106353607A
- Authority
- CN
- China
- Prior art keywords
- module
- information
- test
- antenna
- base station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R29/00—Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
- G01R29/08—Measuring electromagnetic field characteristics
- G01R29/10—Radiation diagrams of antennas
Landscapes
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
An antenna working parameter test management system comprises test terminals, an antenna attitude test management platform and a data management system, wherein the antenna attitude test management platform comprises a base station antenna information table module, a base station survey information table module, a wireless parameter module, a one-key test module, a base station survey module, a statistical analysis module and a personnel and equipment module; the base station antenna information table module is used for storing data management system synchronized site information of an existing network; the base station survey information table module is used for storing newly added and data management system synchronized site information; the wireless parameter module is used for managing wireless parameter information of community antennae in the whole network; the one-key test module is used for managing site data information, collected and uploaded by clients, of the existing network; the base station survey module is used for managing newly added site data information collected and uploaded by the test terminals. One efficient antenna working parameter test management system and a method based on the same are provided.
Description
[technical field]
The invention belongs to technical field of information management, specifically refer to a kind of sky lineman ginseng test and management system and its method.
[background technology]
Fast development with wireless communication technology and the construction of base station infrastructure equipment, incident is day by day numerous
The test maintaining of weight and antenna for base station equipment debugging safeguard the work such as work ginseng collection, and operator can only be according to existing for a long time
Manually, the machine tools such as traditional mechanical compass, gradiometer, gps instrument are relied on to gather the main work parameter information of antenna, by collection
Personnel, area associate, county associate, city associate etc. collect from level to level, are finally provided by system manager's typing again
Management system.For substantial amounts of work ginseng data summarization transmit from level to level, can exist unavoidably data fabrication and data accuracy and
The network optimization is caused to disconnect with high-rise optimization in when property;Cause the quality of existing communication net and performance can not reach optimum;Cause
Manager cannot effective real-time awareness tracing management tester, ultimately cause existing work ginseng test collect management each
The disconnection of link.
To in sky lineman ginseng test collection, what operator was not only concerned about is the work ginseng data message of antenna, equally needs
Know the whole process gathering, because traditional antenna work ginseng collecting flowchart has various problems, whole measurement process ring
Section many, low precision, efficiency is low, there is many weak points, as cannot know personnel whether truly reach the spot test, on hand over
Ginseng information whether true and accurate and each step is required for handling through personnel from level to level, incident is manager
To the urgent needss improving traditional antenna work ginseng acquisition scheme, it is desirable to have set testing scheme can effectively manage existing work ginseng
Collecting work flow process, can truly timely and effectively gather work parameter according to, can effectively Monitor examination tester work etc. be just
Face.
[content of the invention]
The technical problem to be solved is to provide a kind of efficient sky lineman ginseng test and management system and its side
Method.
The present invention is achieved in that
Its lineman joins test and management system, including test terminal, antenna attitude test management platform, money guard system;
Described antenna attitude test management platform includes antenna for base station information table module, base station survey information table module, no
Line parameter module, a key test module, base station exploration module, statistical analysis module, personnel equipment's module;
Described antenna for base station information table module, for storing the existing network site information of described money guard system synchronization;
Described base station survey information table module, for storing the newly-increased site information of described money guard system synchronization;
Described wireless parameter module, for managing the whole network antenna in cell wireless parameter information;
A described key test module, gathers for management client and uploads existing network station data information;
Described base station surveys module, uploads newly-increased station data information for managing the collection of described test terminal;
Described statistical analysis module, uploads collection information and user's examination information for analyzing described test terminal;
Described personnel equipment's module, for managing described test terminal, tester.
Join the management method of test and management system based on described sky lineman, comprise the steps:
To client antenna cells collection work ginseng information by way of get, successful then return 1+ character string arrives client
Client carries data base, and failure then directly returns 0;
Client carries data base and by information, data packing is committed to server by tcp/ip agreement, then server
According to timing, by client data database data and the user profile that carries is committed to antenna attitude test management platform and money
Guard system executes;
The analytic function forward end page of statistical analysiss is submitted to and is shown, and to antenna attitude test management platform and money piping
To returning correct and wrong parameter, if correctly, return information passes through 64 bit encryptions to system to system point, and information is passed through by system again
Post mode returns to client;
Resurvey, if mistake then directly returns 0, system is run with this, realizes automatic data collection examination & verification appraisal management work
Make.
It is an advantage of the current invention that: compared with traditional work ginseng test mode, the present invention adopts advanced electronic instrument to substitute
The originally retrospective installation such as uneven mechanization compass, gradiometer, unified testing standard, effectively evade retrospective installation and survey
The problems such as error of examination, demographic data play tricks, and realize closed loop monitoring management with sky lineman ginseng management system, it is to avoid tester
Do not arrive at a station, do not go up the test case such as tower, set up the job rating standard foundation of effective personnel.Secondly join information in collection work
Meanwhile, greatly simplify layer by layer data transfer the drawbacks of, realize one-touch upload synchronization association website, the relevant information such as cell, subtract
The mistake that the numerous intervention of person of low position's power frequency causes.Management and the contrast of benefit aspect: collected layer by layer by original multidisciplinary personnel's staged
Work is joined it is impossible to timely and effectively pinpoint the problems, and only needs now 1 people+1 system can manage the whole network sky lineman's parameter evidence and tester
Examination of member's working condition etc., efficient data transfer mode, the efficient utilization of lifting work parameter evidence, in personnel cost input side
Face is under control, and is that manager brings and easily efficiently manages.
[brief description]
The invention will be further described in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is the system architecture diagram of the present invention.
Fig. 2 is the system block diagram of the antenna attitude test management platform in the present invention.
Fig. 3 is the system data table of the present invention.
[specific embodiment]
As depicted in figs. 1 and 2, sky lineman ginseng test and management system, pats including test terminal, antenna attitude testing tube
Platform, money guard system;
Described antenna attitude test management platform includes antenna for base station information table module, base station survey information table module, no
Line parameter module, a key test module, base station exploration module, statistical analysis module, personnel equipment's module;
Described antenna for base station information table module, for storing the existing network site information of described money guard system synchronization;
Described base station survey information table module, for storing the newly-increased site information of described money guard system synchronization;
Described wireless parameter module, for managing the whole network antenna in cell wireless parameter information;
A described key test module, gathers for management client and uploads existing network station data information;
Described base station surveys module, uploads newly-increased station data information for managing the collection of described test terminal;
Described statistical analysis module, uploads collection information and user's examination information for analyzing described test terminal;
Described personnel equipment's module, for managing described test terminal, tester.
The management system of the present invention is realized to sky lineman ginseng information management examination & verification, tester's work using electronic mode
The function of the aspects such as situation examination, docking third party's data system shared data.Management system receives in the instrument of test terminal
The work ginseng test data passing, according to the examination & verification data standard of manager's setting in advance, automatically to upload antenna longitude and latitude, orientation
Angle, the high important parameter of extension are compared with resource information automatically, if a certain parameter exceedes, automatically reject this station information to finger
Determine test instrumentation, tester reminds tester to need Resurvey information, thus avoiding tester not survey to scene/not upper station
The problems of examination, and tester's outbound situation can be examined by statistical module so that home-confined just can enter to personnel
Row timely and effectively manages.For automatically auditing the data passed through, then the very first time update money pipe/webmaster system resource
Storehouse, ensures that optimization personnel targetedly carry out troubleshooting/optimize and revise according to up-to-date work ginseng information in storehouse in time to existing network network.Separately
External system, herein in connection with management modules such as antenna model, wireless parameter, tester, test equipments, realizes having work to join to antenna more
Information association is managed independently, effectively improves the management of the work of day utilization of lineman's parameter evidence and personnel, is that manager carries
Supply efficient antenna measurement working solution.
System data table is as shown in Figure 3.
System call interfaces:
Interface interchange returns:
Join the management method of test and management system based on above-mentioned sky lineman, comprise the steps:
To client antenna cells collection work ginseng information by way of get, successful then return 1+ character string arrives client
Client carries data base, and failure then directly returns 0;
Client carries data base and by information, data packing is committed to server by tcp/ip agreement, then server
According to timing, by client data database data and the user profile that carries is committed to antenna attitude test management platform and money
Guard system executes;
The analytic function forward end page of statistical analysiss is submitted to and is shown, and to antenna attitude test management platform and money piping
To returning correct and wrong parameter, if correctly, return information passes through 64 bit encryptions to system to system point, and information is passed through by system again
Post mode returns to client;
Resurvey, if mistake then directly returns 0, system is run with this, realizes automatic data collection examination & verification appraisal management work
Make.
The present invention, compared with traditional work ginseng test mode, substitutes originally uneven machinery using advanced electronic instrument
Change compass, the retrospective installation such as gradiometer, unified testing standard, effectively evade error, the demographic data of retrospective installation test
The problems such as play tricks, and realize closed loop monitoring management with sky lineman ginseng management system, it is to avoid tester does not arrive at a station, does not go up the survey such as tower
Examination situation, sets up the job rating standard foundation of effective personnel.Secondly, while gathering work ginseng information, greatly simplify layer by layer
The drawbacks of data transfer, realize the relevant informations such as one-touch upload synchronization association website, cell, reduce manually frequently intervention and cause
Mistake.Management and the contrast of benefit aspect: work ginseng is collected layer by layer it is impossible to timely and effectively by original multidisciplinary personnel's staged
Pinpoint the problems, only need now 1 people+1 system can manage examination of the whole network sky lineman's parameter evidence and tester's working condition etc.,
Efficient data transfer mode, the efficient utilization of lifting work parameter evidence, it is under control in terms of personnel cost input, for management
Person brings and easily efficiently manages.
The foregoing is only the preferable enforcement use-case of the present invention, be not intended to limit protection scope of the present invention.All
Within the spirit and principles in the present invention, any modification, equivalent and improvement of being made etc., should be included in the present invention's
Within protection domain.
Claims (2)
1. day lineman ginseng test and management system it is characterised in that: include test terminal, antenna attitude test management platform, money pipe
System;
Described antenna attitude test management platform includes antenna for base station information table module, base station survey information table module, wireless ginseng
Digital-to-analogue block, a key test module, base station exploration module, statistical analysis module, personnel equipment's module;
Described antenna for base station information table module, for storing the existing network site information of described money guard system synchronization;
Described base station survey information table module, for storing the newly-increased site information of described money guard system synchronization;
Described wireless parameter module, for managing the whole network antenna in cell wireless parameter information;
A described key test module, gathers for management client and uploads existing network station data information;
Described base station surveys module, uploads newly-increased station data information for managing the collection of described test terminal;
Described statistical analysis module, uploads collection information and user's examination information for analyzing described test terminal;
Described personnel equipment's module, for managing described test terminal, tester.
2. based on described in claim 1 sky lineman join test and management system management method it is characterised in that: include as follows
Step:
Client by way of get to client antenna cells collection work ginseng information, successful then return 1+ character string to client
End carries data base, and failure then directly returns 0;
Client carry data base by data packing information is committed to by server by tcp/ip agreement, then server according to
By client data database data and the user profile that carries is committed to antenna attitude test management platform and money piping to timing
System execution;
The analytic function forward end page of statistical analysiss is submitted to and is shown, and divides to antenna attitude test management platform and money guard system
To returning correct and wrong parameter, if correct, return information passes through 64 bit encryptions to system, and information is passed through post by system again
Mode returns to client;
Resurvey, if mistake then directly returns 0, system is run with this, realizes automatic data collection examination & verification appraisal management work.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610785857.8A CN106353607A (en) | 2016-08-31 | 2016-08-31 | Antenna working parameter test management system and method based on same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610785857.8A CN106353607A (en) | 2016-08-31 | 2016-08-31 | Antenna working parameter test management system and method based on same |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106353607A true CN106353607A (en) | 2017-01-25 |
Family
ID=57856271
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610785857.8A Pending CN106353607A (en) | 2016-08-31 | 2016-08-31 | Antenna working parameter test management system and method based on same |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106353607A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2005069664A1 (en) * | 2004-01-16 | 2005-07-28 | Ktfreetel Co., Ltd. | Device and method for remotely measuring and monitoring antenna system using mobile terminal |
CN102905297A (en) * | 2012-09-12 | 2013-01-30 | 中兴通讯股份有限公司 | Base station engineering information acquisition method and system |
CN103116364A (en) * | 2013-01-24 | 2013-05-22 | 珠海市东耀企业有限公司 | Antenna attitude monitoring system supporting electric tuning function |
CN103139811A (en) * | 2013-02-05 | 2013-06-05 | 中兴通讯股份有限公司 | Adjustment method and system of engineering parameter |
-
2016
- 2016-08-31 CN CN201610785857.8A patent/CN106353607A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2005069664A1 (en) * | 2004-01-16 | 2005-07-28 | Ktfreetel Co., Ltd. | Device and method for remotely measuring and monitoring antenna system using mobile terminal |
CN102905297A (en) * | 2012-09-12 | 2013-01-30 | 中兴通讯股份有限公司 | Base station engineering information acquisition method and system |
CN103116364A (en) * | 2013-01-24 | 2013-05-22 | 珠海市东耀企业有限公司 | Antenna attitude monitoring system supporting electric tuning function |
CN103139811A (en) * | 2013-02-05 | 2013-06-05 | 中兴通讯股份有限公司 | Adjustment method and system of engineering parameter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102436249B (en) | Intelligent electric quantity management and control system and method | |
CN100583168C (en) | Channel patrol checking management system | |
CN106295985A (en) | A kind of platform district line loss management system of local electric network and management method | |
CN103929759B (en) | A kind of mobile network network optimized approach and network optimization system based on case history | |
CN106572495A (en) | Network quality monitoring method based on signalling and MR data and coverage assessment method based on signalling and MR data | |
CN101217770A (en) | An automatic evaluating and analyzing device and method for mobile communication network quality | |
CN102456239A (en) | Intelligent Beidou inspection system | |
CN103835764B (en) | Underground works and deep basal pit pre-warning system for monitoring | |
CN103107914A (en) | Detection method and detection system for remote power acquisition terminal | |
CN204731826U (en) | A kind of polling transmission line management system based on GPS technology | |
CN111062504A (en) | AR technology-based intelligent power distribution station operation and maintenance system and method | |
CN103414601A (en) | Method and system for detecting data for communication resource management system | |
CN105681469A (en) | Mobile terminal used for hydropower station, and data management system and method | |
CN105447923A (en) | Electric power circuit routing inspection system | |
CN104283732A (en) | Network testing method, network testing data collection method, network testing device and network testing system | |
CN104597495A (en) | Earthquake data recording and analyzing system based on mobile phone earthquake monitoring network | |
CN111294730A (en) | Method and device for processing network problem complaint information | |
CN105722112A (en) | Communication network test and optimization system based on mobile terminal | |
CN112050092A (en) | Water supply pipe network leakage information management system, building method and application | |
US20180160314A1 (en) | Identification method, device and system for wcdma network cell soft switching band and storage medium | |
CN103824337A (en) | Power transmission intelligent tour-inspection system | |
CN110443711B (en) | Urban equipment management method based on block chain | |
CN104808568A (en) | Underground water remote monitoring system based on GPRS | |
CN103686773A (en) | Automatic optimization control method and system for operator network entire process | |
CN103701851A (en) | Agricultural technology promotion cloud log management publishing system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 350000 east of the five floor of building 4, M9511 Industrial Park, 18 Ma Jiang Road, Mawei District, Fuzhou, Fujian. Applicant after: Fuzhou Fuguang Electronics Co., Ltd. Address before: 350000 No. 8 Xingfa Road, Fuzhou Development Zone, Fuzhou City, Fujian province (FTA) Applicant before: Fuzhou Fuguang Electronics Co., Ltd. |
|
CB02 | Change of applicant information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170125 |
|
RJ01 | Rejection of invention patent application after publication |