CN103686773A - Automatic optimization control method and system for operator network entire process - Google Patents

Automatic optimization control method and system for operator network entire process Download PDF

Info

Publication number
CN103686773A
CN103686773A CN201310645662.XA CN201310645662A CN103686773A CN 103686773 A CN103686773 A CN 103686773A CN 201310645662 A CN201310645662 A CN 201310645662A CN 103686773 A CN103686773 A CN 103686773A
Authority
CN
China
Prior art keywords
building
test
network
audit
quality
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310645662.XA
Other languages
Chinese (zh)
Inventor
霍向琦
韩炎
聂志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING TESCOMM INFORMATION TECHNOLOGY Co Ltd
Original Assignee
BEIJING TESCOMM INFORMATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING TESCOMM INFORMATION TECHNOLOGY Co Ltd filed Critical BEIJING TESCOMM INFORMATION TECHNOLOGY Co Ltd
Priority to CN201310645662.XA priority Critical patent/CN103686773A/en
Publication of CN103686773A publication Critical patent/CN103686773A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses an automatic optimization control method and system for an operator network entire process, and relates to the field of construction, traffic maintenance and routing inspection of mobile communication networks. First, construction control is conducted, wherein an indoor coverage network access application work order is established when a base station is constructed, building information input and generation of a test task are performed according to building names in the work order, the quality of building networks is tested according to the test task, and a test result is uploaded; after construction control is completed, a building traffic maintenance work order is generated for buildings with access to the networks, and the building networks are maintained according to the building traffic maintenance work order; finally, an inspection plan is made according to the base station and building data, inspection of the quality of the building networks is performed according to the inspection plan, the quality of the buildings is assessed according to an inspection result, and therefore the routing inspection process is completed. According to the automatic optimization control method and system for the operator network entire process, control over the process is performed through comprehensive essential data, so that the entire process is traceable; meanwhile, coordination work between all departments is reinforced through electronic management, so that work efficiency is improved.

Description

The full-range Automatic Optimal management-control method of a kind of carrier network and system
Technical field
The present invention relates to wireless network construction, hand over peacekeeping Daily Round Check business scope, be applicable to the whole-process management of communications industry operation producer, be specifically related to the full-range Automatic Optimal management-control method of a kind of carrier network and system.
Background technology
Procedure management mode comes from BPR, and procedure management mode emphasizes that management object is operation flow, emphasizes take that flow process is as target, and the flow process of take is carried out design software framework as guiding, carries out constantly reproducing and innovating of operation flow simultaneously.Continuous progress along with procedure management, allows it for supervising the network construction, and maintenance platform becomes one must.
Whole process management-control method has high advantage with respect to existing service management, and operator is to existing construction, friendship peacekeeping line service, relatively independent, and the ability of going wrong is not reviewed, and the loss of data of each work is serious.In brand-new whole-process management method, run through and start to build a station logout overall process, the data full dose of every step in this process is preserved, and provide all kinds of statistical functions to carry out showing interface, for cooperation between all departments facilitates, and can locate fast by data analysis after going wrong; The relevant all kinds of foundations of quality in handing over dimension process, have been increased, for construction quality problem provides sound assurance; In regular maintenance, patrolling and examining can be according to the plan of formulating in process, regularly issue work order, reduced human cost, improved operating efficiency, and directly pass test result back server in the process of patrolling and examining, for providing, later stage network evaluation the most really connects, the most real data.
Summary of the invention
For the defect existing in prior art, the object of the present invention is to provide the full-range Automatic Optimal management-control method of a kind of carrier network and system, improve quality and the efficiency of management and control.
For achieving the above object, the technical solution used in the present invention is: the full-range Automatic Optimal management-control method of a kind of carrier network, comprises the following steps:
(1) build management and control flow process: when base station construction, set up chamber and divide the application work order that networks, according to building title typing building information, generation test assignment in work order, according to test assignment, carry out the test of building network quality, determine the building that can network, upload test result;
(2) network to hand over dimension flow process: building after management and control flow process finishes, the building that can network are generated to building and hand over dimension work order, and hand over dimension work order to safeguard building network according to building;
(3) patrol and examine flow process: the building that networked are formulated to patrol plan, according to patrol plan, carry out patrolling and examining of building network quality, and according to patrolling and examining result evaluation building quality.
Further, the full-range Automatic Optimal management-control method of a kind of carrier network as above, in step (1), described building information comprises that base station information that essential information, floor information, the building of building are corresponding and the chamber of building divide cell information.
Further, the full-range Automatic Optimal management-control method of a kind of carrier network as above, in step (1), described building network quality test comprises the test of speech business traversal and the test of data service traversal of building.
Further, the full-range Automatic Optimal management-control method of a kind of carrier network as above, in step (1), for WCDMA network, the ratio TotalEcIo that the mensuration item of described test assignment comprises the received signal code power summation TotalRSCP of all floors of building, the intensity of the transmitting power TxPower of mobile phone, community, floor place received signal and adjacent cell are disturbed, stop covering elevator, FTP downloads power and FTP uploads power; For GSM network, the test item of described test assignment comprises that signal transient field intensity Rxlev Sub, carrier interference ratio C/I and elevator ground that the travelling carriage of building receives stop covering.
Further, the full-range Automatic Optimal management-control method of a kind of carrier network as above, in step (1), the concrete mode of test of carrying out building network quality according to test assignment is as follows:
A. by base station construction producer corresponding to building, according to test assignment, carry out the test of building network quality, and by test result I passback backstage, base station construction producer carries out the audit of building network quality according to described test result I, if audit by; enter step c, if audit not by; enter step b;
B. base station construction producer carries out producer's rectification to building network, returns to step a after rectification;
C.You management company carries out the test of building network quality according to test assignment, and by test result II passback backstage, management company carries out the audit of building network quality according to described test result II, if audit by; enter steps d, if audit not by; return to step b;
D. by net, build portion and according to test assignment, carry out the test of building network quality, and by test result III passback backstage, net is built portion and according to described test result III, is carried out the audit of building network quality, if audit by; enter step e, if audit not by; will return to step b;
E. by network optimization portion, according to test assignment, carried out the test of building network quality, and by test result IV passback backstage, network optimization portion carries out the audit of building network quality according to described test result IV, if audit by; test finish, if audit not by; return to steps d.
Further, the full-range Automatic Optimal management-control method of a kind of carrier network as above, in step a, c and d, if any one grade criterion that in test assignment, the test result of test item meets the outstanding, good of setting or networks in three kinds of grades is judged to examine and passed through.
Further, the full-range Automatic Optimal management-control method of a kind of carrier network as above, in step e, when building are VIP building, if the test result of test item meets the outstanding grade criterion of setting in test assignment, audit is passed through, and building can network; When building are non-VIP building, as long as in test assignment, the test result of test item meets setting enters network level criterion, audit is passed through, and building can network.
Further again, the full-range Automatic Optimal management-control method of a kind of carrier network as above, in step (2), generating building hands over after dimension work order, building are handed over to dimension work order and build the building quality that in management and control flow process, network quality test is passed through and upload, the audit of handing over respectively dimension data by district's O&M and movable maintenance center, district, and the friendship dimension state of building is set to hand over dimension.
Further, the full-range Automatic Optimal management-control method of a kind of carrier network as above, in step (3), formulates patrol plan according to building information to the building that networked, and the concrete mode of patrolling and examining of carrying out building network quality according to patrol plan comprises:
1) determine building to be inspected, according to the base station at building place and building information, formulate patrol plan, according to building Information generation, patrol and examine work order;
2) according to described patrol plan, carry out building and patrol and examine, and will patrol and examine result and pass back to backstage;
3) according to the described result evaluation building quality of patrolling and examining, and building network quality is marked in patrolling and examining work order;
4), according to building network quality evaluation result, carry out the eliminating of building fault, and the building after getting rid of are carried out to quality test again.
The full-range Automatic Optimal managing and control system of carrier network, comprising:
Build management and control module, during for base station construction, the application work order that networks is divided in the chamber of foundation, and typing building information, one-tenth test assignment, carry out the test of building network quality according to test assignment, determine the building that can network, and uploads test result;
Network to hand over dimension module, for building after management and control flow process finishes, the building that can network are generated to building and hand over dimension work order, and hand over dimension work order to safeguard building network according to building;
Polling module, formulates patrol plan for the building to having networked, and carries out patrolling and examining of building network quality, according to patrolling and examining result evaluation building quality according to patrol plan.
Beneficial effect of the present invention is: method and system of the present invention, the logout overall process of initially building a station that runs through wireless network, the data full dose of every step in this process is preserved, and provide all kinds of statistical functions to carry out showing interface, for cooperation between all departments facilitates, and can locate fast by data analysis after going wrong; The relevant all kinds of foundations of quality in handing over dimension process, have been increased, for construction quality problem provides sound assurance; In regular maintenance, patrolling and examining can be according to the plan of formulating in process, regularly issue work order, reduced human cost, improved operating efficiency, and directly pass test result back server in the process of patrolling and examining, for providing, later stage network evaluation the most really connects, the most real data.
Accompanying drawing explanation
Fig. 1 is the structured flowchart of the full-range Automatic Optimal managing and control system of a kind of carrier network in embodiment;
Fig. 2 is the flow chart of the full-range Automatic Optimal management-control method of a kind of carrier network in embodiment;
Fig. 3 builds management and control flow chart in embodiment;
Fig. 4 networks in embodiment to hand over dimension flow chart;
Fig. 5 is Daily Round Check flow chart in embodiment;
Fig. 6 is terminal and platform interaction diagrams.
Embodiment
Below in conjunction with Figure of description and embodiment, the present invention is described in further detail.
Fig. 1 shows the structural framing of the full-range Automatic Optimal managing and control system of a kind of carrier network in the specific embodiment of the invention, and this system comprises builds management and control module 11, networking friendship dimension module 12 and polling module 13, wherein:
Build management and control module 11 for when the base station construction, the application work order that networks is divided in the chamber of foundation, and typing building information generates test assignment, and according to test assignment, carries out the test of building network quality, determines that whether building can network, and test result is uploaded;
Network to hand over dimension module 12 for building after management and control flow process finishes, the building that can network are generated to building and hand over dimension work order, and hand over dimension work order to safeguard the network quality of building according to building;
Polling module 13, for according to building information, the building that networked being formulated to patrol plan, carries out patrolling and examining of building network quality according to patrol plan, and according to patrolling and examining result evaluation building quality.
Fig. 2 shows the flow process of the full-range Automatic Optimal management-control method of a kind of carrier network based on system shown in Fig. 1 in the specific embodiment of the invention, and the method mainly comprises following step:
Step S21: the chamber of foundation is divided the application work order that networks, improves building information, generated test assignment, the test of building network quality;
Build management and control flow process: when base station construction, the application work order that networks is divided in the chamber of foundation, and typing building information generates test assignment, and according to test assignment, carries out the test of building network quality, uploads test result.Wherein, described building information comprises that base station information that essential information, floor essential information, the building of building are corresponding and the chamber of building divide cell information.
Building essential information comprises content: building title, city counties and districts numbering, city numbering, province number, district title, city title, economize name, longitude, latitude, property telephone number, property contact person, infrastructure management company's title, generation dimension contact person, in generation, is tieed up telephone number, building type, building purposes, the building number of plies, building better address, construction producer is divided in chamber, chamber is divided and is safeguarded producer, whether there is WCDMA chamber to divide covering, whether there is GSM chamber to divide covering, design drawing is divided in building chamber, building outside drawing, statement of planned tasks numbering, building state, design producer, remarks etc.
Floor information comprises content: floor name, network type, floor type, building name, district title, city title, economize name, affiliated branch company, No. LAC-community, community Cell numbering, number of carriers, floor plan, for problem definition, the floor of design drawing whether test, whether floor participates in that examination is added up, floor GSM patrols and examines comprehensive marking, floor, WCDMA are patrolled and examined comprehensive marking, must be patrolled and examined floor etc.
The base station information that building are corresponding comprises content: city counties and districts numbering, city numbering, province number, building title, site name, website attribute, website grade, station state, site, information source/donor base station name of station (BBU), information source/donor base station station number (BBU), information source/donor base station cell name, information source/donor base station community, information source/donor base station community BCCH, BSIC, TCH, LAC, longitude, latitude, BSC ownership, RAC, place building type ownership, building purposes is detailed, whether stand altogether with divide/repeater, GSM chamber, attributed region (district), attributed region (town), home service section, ownership branch company, integrated producer, Dai Wei unit, supervisor, the ownership duration, the networking time, transfer the O&M time, building floor is (containing elevator, garages etc.) whether obtaining whole chambers divides, uncovered area, actual coverage area territory is divided in chamber, design overlay area is divided in chamber, overlay area while being completed is divided in chamber, ownership BSC_Name, ownership BSC_ID, source type, information source position, the number of signal sources, information source coverage, whether information source goes up webmaster, information source monitoring number, the configuration of information source/donor base station site type, information source model, information source producer, information source power, BBU installation site, lower extension RRU title, lower extension RRU quantity, RRU type, RRU installation site, RRU coverage, donor antenna type, donor antenna installation site, chamber divide/discharging-directly station antenna quantity, place antenna amount under BBU, whether there is exterior aerial, exterior aerial quantity, exterior aerial installation site, exterior aerial azimuth, exterior aerial mechanical tilt angle, exterior aerial electrical tilt angle, exterior aerial overlay area, whether use dry putting, the dry quantity of putting, Gan Fang producer, the dry model of putting, the dry installation site of putting, the dry coverage of putting, whether dry putting goes up webmaster, the dry monitoring number of putting, transmission plan configuration, base station IUB bandwidth, base station code resource distribution, the up CE configuration in base station, base station down CE configuration, transmission actual disposition, the actual quantity of opening, IP address, whether there is group customer, group customer total number of persons, group customer Business Name, property contact person, property telephone number, property contract number, property expiration time, electricity charge expiration time, fixed assets coding, turn the solid time, remarks, base station IDs (original system station number), base station Old Name, station number, station number 3G, device id, affiliated end office (EO), maintenance mode, Beijing, engineering phase station, examine the time, battery supply 2V, producer's device numbering, asset of equipments numbering, data category etc.
The chamber of building divides cell information to comprise: community ID, information source/donor base station cell name, zone number, city numbering, province number, base station numbering, latitude after adjusting, adjustment is by degree, latitude, longitude, base station title, indoor/outdoor, LAC, information source/donor base station community Cell_ID, community sequence number, information source/donor base station cell scrambling (PSC), antenna azimuth, mechanical tilt angle, electrical tilt angle, antenna type, RNC numbering, RNC title, up frequency point number, downlink frequency period, building title, SAC, RAC, BSC title, source type, GSM adjacent area chained list, WCDMA adjacent area chained list, the carrier frequency number of community etc.
When base station site is built, by the district net portion of the building chamber of foundation, divide the application work order that networks, Bing You designing institute and build the completion that producer completes building information, afterwards by system according to the building Information generation test assignment of typing, and according to test assignment, complete the test of building network quality.The test of building network quality comprises the test of speech business traversal and the test of data service traversal of building.For WCDMA network, the ratio TotalEcIo that the test item of the test assignment of generation comprises the received signal code power summation TotalRSCP of all floors of building, the intensity of the transmitting power TxPower of mobile phone, community, floor place received signal and adjacent cell are disturbed, stop covering elevator, FTP downloads power and FTP uploads power; For GSM network, the test item of described test assignment comprises that signal transient field intensity Rxlev Sub, carrier interference ratio C/I and elevator ground that the travelling carriage of building receives stop covering.
The concrete test mode of carrying out the test of building network quality comprises the steps:
A. by base station construction producer corresponding to building, according to test assignment, carry out the test of building network quality, and by test result I passback backstage, base station construction producer carries out the audit of building network quality according to test result I, if audit by; enter step c, if audit not by; enter step b;
B. base station construction producer carries out producer's rectification to building network, returns to step a after rectification;
C. management company carries out the test of building network quality according to test assignment, and by test result II passback backstage, management company carries out the audit of building network quality according to test result II, if audit by; enter steps d, if audit not by; return to step b;
D. net is built portion and according to test assignment, is carried out the test of building network quality, and by test result III passback backstage, net is built portion and is carried out the audit of building network quality according to test result III, if audit by; enter step e, if audit not by; will return to step b;
E. network optimization portion carries out the test of building network quality according to test assignment, and by test result IV passback backstage, network optimization portion carries out the audit of building network quality according to test result IV, if audit by; test finish, if audit not by; return to steps d.
Backstage in present embodiment comprises management and control server (background server) and the web platform end of system of the present invention, by server, complete the preservation of the information such as related data, test assignment, test result and work order, by web platform end, the data of each stage test result or user's needs can be shown.
Concrete, in above-mentioned steps a, c and d, if any one grade criterion that in test assignment, the test result of test item meets the outstanding, good of setting or networks in three kinds of grades is judged to examine and passed through.In step e, when building are VIP building, if the test result of test item meets the outstanding grade criterion of setting in test assignment,, audit is passed through, and building can network; When building are non-VIP building, as long as in test assignment, the test result of test item meets setting enters network level criterion, audit is passed through, and building can network.In actual test process, after the audit of network optimization portion in step e is passed through, O&M portion can be after test test assignment corresponding to regeneration, tester can utilize terminal software to download test work order, to test site, test, and test result is returned to backstage filing.
In review process, if audit is not is not rectified and improved by needs, while searching building problem floor, can analyze the figure that gets ready of problem floor; Wherein, getting figure ready is in order to show that intuitively test point respectively refers to target value scope.On plane graph, get analysis ready, can, according to specifying the interval color of index different value to mark, can on figure, see intuitively like this value scope of the path of test and each test point test index on figure.
In present embodiment for the test item of building and criterion specifically as shown in Table 1 and Table 2:
Table 1
Figure BDA0000429355030000091
Table 2
Decision procedure explanation:
Chamber is divided to network and is usingd building and judge as unit.
Chamber divides the building result of determination of networking to be divided into four kinds: outstanding, good, networking and poor.
The result of determination of building is determined by the result of determination of every layer of these building.Circular is:
Outstanding: to reach on the basis of networking standard, having 80% floor to reach outstanding standard
Good: to reach on the basis of networking standard, having 80% floor to reach good standard
Network: the result of determination of all floors all reaches and networks and above standard
Poor: to have the result of determination of one deck at least for poor;
The result of determination computational methods of floor are (one of them elevator is as one deck, and switch test result, as one deck, is stopped elevator, switched as independent floor):
Outstanding: the result of determination of all judgement indexs all reaches outstanding standard
Good: the result of determination in all judgement indexs all reaches good or outstanding standard
Network: the result of determination of all judgement indexs all reaches and networks and above standard
Poor: to have a result of determination of judging index at least as poor;
Building type is divided into 2 classes: VIP building and non-VIP building.VIP building must reach outstanding standard and just can network, and non-VIP building reach networking standard and can network.
Above-mentioned building network quality test and judgment mode are prior art.
In present embodiment by build management and control module complete build management and control flow process as shown in Figure 3, specifically can comprise the following steps:
Building management and control module 11 is that a control module of building total quality flow process, menu path: [workflow management]-[construction management and control] are divided in the chamber of containing.Management and control divides building networking quality to liking chamber.
The first step: district's net is built and issued work order; Responsible department: net is built portion; Function: the application work order that networks is divided in the chamber of foundation.
Second step: building Data Enter; Responsible department: designing institute; Function: built the building title in the work order issuing according to district's net by the user of designing institute, the essential information of the corresponding building of completion, floor information and corresponding base station information; Typing content: 17 building Back ground Informations, 5 floor information, 15 cell informations.
The 3rd step: building information completion; Responsible department: build producer; Function: divided and built on the building Information base that the user of producer fills in designing institute by chamber, cell information is divided in the chamber of the corresponding building of completion.
The 4th step: add test subitem; Responsible department: build producer; Function: divide the administrator who builds producer that test assignment is handed down to tester by chamber and test.The project of test according to the building Automatic generation of information of having filled in, does not allow user to change by system.
The 5th step: build producer and test oneself; Responsible department: build producer; Function: tested according to the test assignment receiving by tester, pass test log back backstage after test finishes, and submit to audit to judge.User can click refresh button and refresh the state whether l has log to upload.
The 6th step: producer is from examining; Responsible department: build producer; Function: the building quality that the log 1) according to system, test node being uploaded judges automatically, the result of test is examined.2) if a grade arbitrarily in the building quality that system is automatically judged reaches 3 middle grades outstanding, good, that network, user can judge that audit passes through; Also can manually judge that audit do not pass through, return to test node and rectify and improve repetition measurement.3) if the building quality that system is automatically judged as defective, user can only judge that audit do not pass through.When judging that audit is obstructed out-of-date, work order can only be return the operation user to a upper node, does not need artificial selection order people.4) when judging that audit is passed through, the user that work order can be submitted to next node carries out repetition measurement or reexamination.Examining content: building quality information and floor are got figure ready and checked.Concrete 3 points: 1), according to the whole result of determination of building, floor searches problem; 2), after problem identificatioin floor, choose the corresponding figure that gets ready and carry out labor; 3) getting the parameter track that figure shows ready comprises: RSCP, EC/IO, TxPower, FTP downloading rate, Rxlev Sub, C/I.
The 7th step: Supervision survey; Responsible department: management company; Function: tested according to the test assignment receiving by tester, pass test log back backstage after test finishes, and submit to audit to judge.User can click refresh button and refresh the state that whether has log to upload.After terminal test completes, whole Log are uploaded, can in Log listed files, see whole Log filenames, indicate that whole test files have passed back to system platform, can enter next step operation and submit to platform to judge.
The 8th step: management audit; Responsible department: management company; Function: the building quality that the log 1) according to system, tester being uploaded judges automatically, the result of test is examined.2) if a grade arbitrarily in the building quality that system is automatically judged reaches 3 middle grades outstanding, good, that network, user can judge that audit passes through; 3) if the building quality that system is automatically judged as defective, user can only judge that audit do not pass through.When judging that audit is obstructed out-of-date, work order can only be return the operation user to a upper node, does not need artificial selection order people.4) when judging that audit is passed through, the user that work order can be submitted to next node carries out repetition measurement or reexamination.
The 9th step: district's net is built audit; Responsible department: net is built portion; Function: 1) according to management user, the test result of building is carried out the audit of building network quality; 2) when judging that audit is passed through, the user that work order can be submitted to next node carries out repetition measurement or reexamination.
The tenth step: network optimization test; Responsible department: network optimization portion; Function: tested according to the test assignment receiving by tester, pass test log back backstage after test finishes, and submit to audit to judge.User can click refresh button and refresh the state that whether has log to upload.After terminal test completes, whole Log are uploaded, can in Log listed files, see whole Log filenames, indicate that whole test files have passed back to system platform, can enter next step operation and submit to platform to judge.
The 11 step: network optimization audit (the O&M audit in Fig. 3, network optimization subordinate is in O&M subordinate's department); Responsible department: network optimization portion; Function: the building quality that the log 1) according to system, tester being uploaded judges automatically, the result of test is examined.2) if a grade arbitrarily in the building quality that system is automatically judged reaches 3 middle grades outstanding, good, that network, user can judge that audit passes through; 3) if the building quality that system is automatically judged as defective, user can only judge that audit do not pass through.When judging that audit is obstructed out-of-date, work order can only be return the operation user to a upper node, does not need artificial selection order people.
Step S22: generate building and hand over dimension work order, the friendship dimension state of building is set;
After construction management and control flow process finishes, the building that can network are generated to building and hand over dimension work order.Networking and handing over dimension is the necessary link formally coming into operation after web construction completes.Networking link normally represents that this website can formally come into operation.Handing over dimension link is to be built after portion's construction completes and handed to the link that O&M portion safeguards by net, whole data of the successful website that networks need to be transferred to O&M portion, by O&M portion, carries out daily maintenance work.Networking and handing over the effect of dimension is that website can normally be used.
Network to hand over and tie up flow process: after construction management and control flow process finishes, generate building and hand over dimension work order, and building friendship is tieed up to work order and upload, the friendship dimension state of building is set.After building being handed over dimension work order upload, the audit of handing over respectively dimension data by district's O&M and movable maintenance center, district, and the friendship dimension state of building is set to hand over dimension.
In present embodiment, network to hand over dimension module to complete to network hand over dimension flow process as shown in Figure 4, specifically can comprise the following steps:
Networking and handing over dimension module 12 is that a control module of building total quality flow process is divided, menu path in chamber: [workflow management]-[handing over dimension flow process].Management and control divides building networking quality to liking chamber.
The first step: system generates work order automatically; Responsible department: Qu Wangjian; Function: 1) after building the end of management and control flow process, system generates automatically hands over dimension work order; 2) after friendship dimension work order generates, automatically send to and hand over the affiliated district of dimension building Ju district net to build department owner.
Second step: district's net is built application and handed over dimension; Responsible department: Qu Wangjian; Function: the building quality that while 1) handing over dimension, in subsidiary construction management and control flow process, network optimization test is passed through; 2) with attachment version, upload the dimension data of handing over.
The 3rd step: district's O&M audit; Responsible department: district's O&M; Function: the friendship dimension application that 1) district's O&M Bu Dui district net is built submission is examined; 2) whether the content of audit is for handing over dimension data complete.If hand over dimension data imperfect, need in 15 days, the application of friendship dimension be return to district's net and be built portion's completion; 3) whether chamber divides building proposing to hand over dimension application after latter 15 days, no matter hand over dimension application by audit, and building all transfer the dimension state of having handed over automatically to.
The 4th step: movable maintenance center, district audit; Responsible department: movable maintenance center, district; Function: the friendship dimension application that 1) movable maintenance central user in district's is built user's submission to district's net is examined.2) whether the content of audit is for handing over dimension data complete.If hand over dimension data imperfect, need in 15 days, the application of friendship dimension be return to district's net and be built user's completion.3) after confirming to hand over dimension application audit to pass through in district's movable maintenance, this building state transfers to hands over dimension state, starts to be safeguarded by maintenance department.3) whether chamber divides building proposing to hand over dimension application after latter 15 days, no matter hand over dimension application by audit, and building all transfer the dimension state of having handed over automatically to.
Step S23: formulate patrol plan, according to patrol plan, carry out building network quality and patrol and examine, and according to patrolling and examining result evaluation building quality.
Patrol and examine flow process: according to base station and building data, formulate patrol plan, according to patrol plan, carry out building network quality and patrol and examine, and according to patrolling and examining result evaluation website quality.Patrolling and examining in process of reality, for the evaluation of website quality, mainly comprise two classes, i.e. the evaluation of base station and building.The website performance rating relating in present embodiment is mainly the quality of building.According to building, formulate patrol plan, carry out patrolling and examining of building website, and according to patrolling and examining result evaluation building quality.Concrete mode comprises:
1) determine and patrol and examine building, according to the base station at building place and building information, formulate patrol plan, generate and patrol and examine work order;
2) according to patrol plan, carry out building and patrol and examine, and will patrol and examine result and pass back to server;
3) according to patrolling and examining result evaluation building network quality, and building network quality is marked in work order; In this step, identical with the mode of measuring building network quality in step S21 according to the mode of patrolling and examining result evaluation building network quality, being all relatively to carry out to determine building network quality by patrolling and examining result (being test result in step S21) with the grade criterion of setting, is prior art;
4), according to building network quality evaluation result, carry out the eliminating of building fault, and the building after getting rid of are carried out to quality test again.
In present embodiment, by polling module, complete the flow process of patrolling and examining as shown in Figure 5, specifically can comprise the following steps:
Polling module 13 is control modules of web construction total quality flow process.Menu path: [workflow management]-[Daily Round Check].Management and control is to liking base station and the building that networked.
The first step: determine and patrol and examine building; Responsible department: Dai Wei producer; Function: import base station and building data.Determine that to patrol and examine the basic data of website complete.
Second step: producer formulates patrol plan; Responsible department: Dai Wei producer; Function: according to the patrol frequency of different websites, arrange patrol plan.
The 3rd step: patrol plan audit; Responsible department: O&M portion; Function: the patrol plan that audit Dai Wei producer arranges, whether examination plan is reasonable, if unreasonable, return-to-factory is reformulated.
The 4th step: system is sent list automatically; Function: the patrol plan of passing through according to audit distributes patrols and examines work order.
The 5th step: producer divides job order; Responsible department: Dai Wei producer; Function: the work order that system distributes is automatically in the interface staff of producer, and producer's point man arranges to patrol and examine website as the case may be, utilizes work order forwarding capability, distributes to the concrete people that patrols and examines by patrolling and examining website.
The 6th point: building are patrolled and examined; Responsible department: Dai Wei producer; Function: generation dimension patrol officer utilizes terminal to obtain and patrols and examines work order, patrol and examine work, and the result of patrolling and examining is passed back to server end to patrolling and examining website.
The 7th step: patrol and examine quality judging; Responsible department: Dai Wei producer; Function: the Log file of patrolling and examining passback according to scene carries out correlation analysis, calculates the quality of patrolling and examining website, evaluation website credit rating, and mark in work order.
The 8th step: building troubleshooting; Responsible department: Dai Wei producer; Function: patrol and examine in process and found problem, initiate troubleshooting work order, carry out troubleshooting effort.
The 9th step: building repetition measurement; Responsible department: Dai Wei producer; Function: find while patrolling and examining, after fault, to carry out malfunction elimination work, fault is carried out quality test again after having got rid of.
The tenth step: repetition measurement quality judging; Responsible department: Dai Wei producer; Function: the quality to repetition measurement is judged, evaluation website credit rating.
Method and system of the present invention, run through the building logout overall process that starts to build a station, the data full dose of every step in this process is preserved, and provide all kinds of statistical functions to carry out showing interface, for cooperation between all departments facilitates, and can locate fast by data analysis after going wrong; The relevant all kinds of foundations of quality in handing over dimension process, have been increased, for construction quality problem provides sound assurance; In regular maintenance, patrolling and examining can be according to the plan of formulating in process, regularly issue work order, reduced human cost, improved operating efficiency, and directly pass test result back server in the process of patrolling and examining, for providing, later stage network evaluation the most really connects, the most real data.
The product of management-control method provided by the present invention and system can be used in the software based on Windows PC platform, as shown in Figure 6, by the work order in each stage (chamber is divided the application work order that networks, networked and hand over dimension work order and patrol and examine work order etc.) and work order test result are passed back to backstage analytical system, by backstage analytical system, can be analyzed accordingly according to test data, the region going wrong is judged fast, completed the mutual of foreground and backstage.The method software product is implemented simple, easy to operate.In the pilot of UNICOM is used, the staff that this technical method is relevant departments of UNICOM provides very effective, facilitates solution, and has improved operating efficiency greatly, has improved the cooperation between all departments.
Obviously, those skilled in the art can carry out various changes and modification and not depart from the spirit and scope of the present invention the present invention.Like this, if within of the present invention these are revised and modification belongs to the scope of the claims in the present invention and equivalent technology thereof, the present invention is also intended to comprise these changes and modification interior.

Claims (10)

1. the full-range Automatic Optimal management-control method of carrier network, comprises the following steps:
(1) build management and control flow process: when base station construction, set up chamber and divide the application work order that networks, according to building title typing building information, generation test assignment in work order, according to test assignment, carry out the test of building network quality, determine the building that can network, upload test result;
(2) network to hand over dimension flow process: building after management and control flow process finishes, the building that can network are generated to building and hand over dimension work order, and hand over dimension work order to safeguard building network according to building;
(3) patrol and examine flow process: the building that networked are formulated to patrol plan, according to patrol plan, carry out patrolling and examining of building network quality, and according to patrolling and examining result evaluation building quality.
2. the full-range Automatic Optimal management-control method of a kind of carrier network as claimed in claim 1, it is characterized in that, in step (1), described building information comprises that base station information that essential information, floor information, the building of building are corresponding and the chamber of building divide cell information.
3. the full-range Automatic Optimal management-control method of a kind of carrier network as claimed in claim 1 or 2, is characterized in that, in step (1), described building network quality test comprises the test of speech business traversal and the test of data service traversal of building.
4. the full-range Automatic Optimal management-control method of a kind of carrier network as claimed in claim 3, it is characterized in that, in step (1), for WCDMA network, the ratio TotalEcIo that the mensuration item of described test assignment comprises the received signal code power summation TotalRSCP of all floors of building, the intensity of the transmitting power TxPower of mobile phone, community, floor place received signal and adjacent cell are disturbed, stop covering elevator, FTP downloads power and FTP uploads power; For GSM network, the test item of described test assignment comprises that signal transient field intensity Rxlev Sub, carrier interference ratio C/I and elevator ground that the travelling carriage of building receives stop covering.
5. the full-range Automatic Optimal management-control method of a kind of carrier network as claimed in claim 4, is characterized in that, in step (1), the concrete mode of test of carrying out building network quality according to test assignment is as follows:
A. by base station construction producer corresponding to building, according to test assignment, carry out the test of building network quality, and by test result I passback backstage, base station construction producer carries out the audit of building network quality according to described test result I, if audit by; enter step c, if audit not by; enter step b;
B. base station construction producer carries out producer's rectification to building network, returns to step a after rectification;
C.You management company carries out the test of building network quality according to test assignment, and by test result II passback backstage, management company carries out the audit of building network quality according to described test result II, if audit by; enter steps d, if audit not by; return to step b;
D. by net, build portion and according to test assignment, carry out the test of building network quality, and by test result III passback backstage, net is built portion and according to described test result III, is carried out the audit of building network quality, if audit by; enter step e, if audit not by; will return to step b;
E. by network optimization portion, according to test assignment, carried out the test of building network quality, and by test result IV passback backstage, network optimization portion carries out the audit of building network quality according to described test result IV, if audit by; test finish, if audit not by; return to steps d.
6. the full-range Automatic Optimal management-control method of a kind of carrier network as claimed in claim 5, it is characterized in that, in step a, c and d, if any one grade criterion that in test assignment, the test result of test item meets the outstanding, good of setting or networks in three kinds of grades, judges to examine and passes through.
7. the full-range Automatic Optimal management-control method of a kind of carrier network as claimed in claim 6, is characterized in that, in step e, when building are VIP building, if the test result of test item meets the outstanding grade criterion of setting in test assignment, audit is passed through, and building can network; When building are non-VIP building, as long as in test assignment, the test result of test item meets setting enters network level criterion, audit is passed through, and building can network.
8. the full-range Automatic Optimal management-control method of a kind of carrier network as claimed in claim 1, it is characterized in that, in step (2), generating building hands over after dimension work order, building are handed over to dimension work order and build the building quality that in management and control flow process, network quality test is passed through and upload, the audit of handing over respectively dimension data by district's O&M and movable maintenance center, district, and the friendship dimension state of building is set to hand over dimension.
9. the full-range Automatic Optimal management-control method of a kind of carrier network as claimed in claim 1, it is characterized in that, in step (3), according to building information, the building that networked are formulated to patrol plan, the concrete mode of patrolling and examining of carrying out building network quality according to patrol plan comprises:
1) determine building to be inspected, according to the base station at building place and building information, formulate patrol plan, according to building Information generation, patrol and examine work order;
2) according to described patrol plan, carry out building and patrol and examine, and will patrol and examine result and pass back to backstage;
3) according to the described result evaluation building quality of patrolling and examining, and building network quality is marked in patrolling and examining work order;
4), according to building network quality evaluation result, carry out the eliminating of building fault, and the building after getting rid of are carried out to quality test again.
10. the full-range Automatic Optimal managing and control system of carrier network, comprising:
Build management and control module, during for base station construction, the application work order that networks is divided in the chamber of foundation, and typing building information, one-tenth test assignment, carry out the test of building network quality according to test assignment, determine the building that can network, and uploads test result;
Network to hand over dimension module, for building after management and control flow process finishes, the building that can network are generated to building and hand over dimension work order, and hand over dimension work order to safeguard building network according to building;
Polling module, formulates patrol plan for the building to having networked, and carries out patrolling and examining of building network quality, according to patrolling and examining result evaluation building quality according to patrol plan.
CN201310645662.XA 2013-12-03 2013-12-03 Automatic optimization control method and system for operator network entire process Pending CN103686773A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310645662.XA CN103686773A (en) 2013-12-03 2013-12-03 Automatic optimization control method and system for operator network entire process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310645662.XA CN103686773A (en) 2013-12-03 2013-12-03 Automatic optimization control method and system for operator network entire process

Publications (1)

Publication Number Publication Date
CN103686773A true CN103686773A (en) 2014-03-26

Family

ID=50322768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310645662.XA Pending CN103686773A (en) 2013-12-03 2013-12-03 Automatic optimization control method and system for operator network entire process

Country Status (1)

Country Link
CN (1) CN103686773A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104735687A (en) * 2015-03-12 2015-06-24 北京惠捷朗科技有限公司 Single-station verification service testing method and device
CN105656672A (en) * 2016-01-08 2016-06-08 成都网丁科技有限公司 APP-based fault prejudgment diagnostic tool and method
CN109284967A (en) * 2017-07-19 2019-01-29 河北智宏投资有限公司 The automatic management method and device of base station
CN113950089A (en) * 2021-09-27 2022-01-18 中电科思仪科技(安徽)有限公司 Building mobile cellular network quality real-time monitoring cloud platform

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101706896A (en) * 2009-11-24 2010-05-12 苏州锐创通信有限责任公司 Workflow management method facing mobile communication of third generation
US20130095878A1 (en) * 2008-12-03 2013-04-18 Interdigital Patent Holdings, Inc. Uplink power control for distributed wireless communication

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130095878A1 (en) * 2008-12-03 2013-04-18 Interdigital Patent Holdings, Inc. Uplink power control for distributed wireless communication
CN101706896A (en) * 2009-11-24 2010-05-12 苏州锐创通信有限责任公司 Workflow management method facing mobile communication of third generation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中国移动浙江分公司网络部网优中心: "《中国移动通信 移动信息专家》", 31 August 2010 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104735687A (en) * 2015-03-12 2015-06-24 北京惠捷朗科技有限公司 Single-station verification service testing method and device
CN104735687B (en) * 2015-03-12 2018-08-10 北京惠捷朗科技有限公司 A kind of single verification service test method and device of standing
CN105656672A (en) * 2016-01-08 2016-06-08 成都网丁科技有限公司 APP-based fault prejudgment diagnostic tool and method
CN105656672B (en) * 2016-01-08 2019-09-03 成都网丁科技有限公司 A kind of failure anticipation diagnostic tool and method based on APP
CN109284967A (en) * 2017-07-19 2019-01-29 河北智宏投资有限公司 The automatic management method and device of base station
CN113950089A (en) * 2021-09-27 2022-01-18 中电科思仪科技(安徽)有限公司 Building mobile cellular network quality real-time monitoring cloud platform

Similar Documents

Publication Publication Date Title
CN101217770B (en) An automatic evaluating and analyzing device and method for mobile communication network quality
CN102149103B (en) Network optimizing system and method
CN104319893B (en) Electric transmission line GIS based on AGPS and 4G and implementation method
CN106056272A (en) Power grid programming, management and controlling method and system based on mobile GIS
CN102883348B (en) A kind of system and method that intelligent terminal is tested as wireless network
CN103686773A (en) Automatic optimization control method and system for operator network entire process
CN101521898A (en) Speech quality evaluation system of mobile communication network
CN210444305U (en) Wireless private network system
CN105681469A (en) Mobile terminal used for hydropower station, and data management system and method
CN106908667A (en) Electromagnetic environment mobile monitoring method and system
CN104331766A (en) Automatic health management based integrated service system
WO2023103598A1 (en) Base station activation method and apparatus, electronic device, and computer-readable storage medium
CN102938712A (en) Digital operation field management and control system
CN106872799A (en) Electromagnetic environment mobile monitoring car
CN104768179A (en) Monitoring system and monitoring method of access control device
Chugulu et al. Proposed Practical Communication Architecture for Automatic Fault Detection and Clearance in Secondary Distribution Power Network
CN111353767A (en) Redundant monitoring management system of soil remediation station
CN103188694B (en) A kind of method and system promoting WLAN shunt effect and planning accuracy rate
CN102905220B (en) Test file acquisition methods, device, test terminal and server
CN207473653U (en) The evaluation system of substation's O&M performance
CN213024482U (en) Redundant monitoring management system of soil remediation station
Hou et al. Design of a power transmission line monitoring system based upon edge computing and Zigbee wireless communication
Kazi et al. Infrastructure sharing and remedies in next generation cellular networks
CN110913426B (en) Passenger flow big data signaling acquisition point information automatic detection synchronization method
CN104284353B (en) A kind of wireless local area network service performance test methods and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140326