CN106351669A CN201610905608.8A CN201610905608A CN106351669A CN 106351669 A CN106351669 A CN 106351669A CN 201610905608 A CN201610905608 A CN 201610905608A CN 106351669 A CN106351669 A CN 106351669A
Authority
CN
China
Prior art keywords
tunnel
inverted arch
construction method
loess
tunnel bottom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610905608.8A
Other languages
Chinese (zh)
Inventor
刘文兵
郑志彪
余水明
罗彬�
黄景新
邓稀肥
徐磊
刘扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of CTCE Group
Original Assignee
Fourth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of CTCE Group filed Critical Fourth Engineering Co Ltd of CTCE Group
Priority to CN201610905608.8A priority Critical patent/CN106351669A/en
Publication of CN106351669A publication Critical patent/CN106351669A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention relates to a construction method for inhibiting loess mudstone tunnel bottom plate uplifting and longitudinal cracking. During the digging construction on loess mudstone tunnels with a horseshoe-shaped cross section form and has weak expansibility on surrounding rock, positions above an arching foot are constructed according to design parameters; the width of a tunnel cross section keeps unchanged; the digging depth of the tunnel bottom is increased; meanwhile, the support depth is increased; an anti-cracking steel frame net piece is laid on the top surface of an inverted arch filling layer. The method provided by the invention has the advantages that by using a construction method of deepening the tunnel bottom and installing the anti-crack steel bar net piece on the top surface, the cross section of the whole tunnel support structure is similar to a round shape; the bottom stress arch of an inverted arch can bear greater load and expansion force, so that the surrounding rock pressure born by the surface of the support structure can be more balanced; steel bars in the filling layer can effectively achieve the anti-crack effect; the generation of longitudinal cracks of a tunnel bottom plate can be inhibited; the structure stability and the integrality are ensured; the tunnel durability is improved.

Description

A kind of suppression loess mud stone tunnel floor protuberance and the construction method of longitudinal cracking
Technical field
The present invention relates to technical field of tunnel construction is and in particular to a kind of suppression loess mud stone tunnel floor swells and longitudinal The construction method of cracking.
Background technology
The fast development built with high ferro, need to build tunnel in mountain area and hilly country, in the process of constructing tunnel In, when facing muddy loess rock tunnel, mud stone has certain expansion characteristics, and construction stage mud stone is relatively stable, but After inverted arch closing a period of time, destructiveness gradually appears, and tunnel bed mud rock gradually expands, and when expansive force reaches to a certain degree, passes System horse-shoe tunnel base plate will appear from swelling, plain concrete packed layer top surface longitudinal cracking defect phenomenon, above-mentioned tunnel bottom The scope of the protuberance of plate usually has certain critical field, after exceeding the critical field of protuberance, can make later stage Wu Zha road Bed produces displacement, and rail flexibility index reduces, and seriously jeopardizes operation security.
Content of the invention
It is an object of the invention to provide the construction method of a kind of suppression loess mud stone tunnel floor protuberance and longitudinal cracking, Effectively suppression tunnel floor protuberance is it is ensured that the operation security in tunnel later stage.
For achieving the above object, the technical solution used in the present invention is:
A kind of suppression loess mud stone tunnel floor protuberance and the construction method of longitudinal cracking,
A), the lithology of detection tunnel bed mud rock and material resources mechanical index;
When b), excavating mudstone stratum tunnel bottom, more than skewback excavate radius and constructed by design parameter, tunnel bottom cutting depth Determined by three-dimensional artificial numerical simulation calculation;
C), keep the width of tunnel cross-section constant, increase the depth at tunnel bottom;
D), set profile steel frame in tunnel underframe;
E), in packed layer top surface, anticracking reinforced mesh is installed.
The attachment feature of present method invention also presence is: sets up three-dimensional artificial mould according to the lithology mechanical index of detection Type, calculates approximate formula y=9-1.7x that suppression loess mudstone tunnel tunnel bottom protuberance is deepened with inverted arch,
Y is tunnel bottom protuberance value (cm)
X deepens depth (m) for inverted arch.
After tunnel excavation, profile steel frame and the supporting of tunnel bottom are equally deepened.
The double-deck anticracking reinforced mesh of inverted arch filling top surface laying in tunnel, fill concrete one-time-concreting completes.With now Technology is had to compare, the technique effect that the present invention possesses is: mainly by deepening to the tunnel bottom in tunnel, top surface is arranged the present invention The construction method of top surface reinforcing bar, makes whole tunnel support structure section level off to circle, and stress arch in inverted arch bottom can carry bigger Load and expansive force, so that the pressure from surrounding rock that supporting construction surface is born more is equalized, and fill in reinforcing bar can effectively send out Wave anti-crack function, the generation of suppression tunnel floor longitudinal crack, it is ensured that the stable and globality of structure, improves later stage tunnel The safety running.
Brief description
Fig. 1 is the end view after the tunnel bottom intensification in tunnel;
Fig. 2 is the sectional drawing of the erection profile steel frame after the tunnel bottom intensification in tunnel;
Fig. 3 fills top surface steel bar arrangement figure for after the tunnel bottom intensification in tunnel.
Specific embodiment
In conjunction with Fig. 1 to Fig. 3, the present invention is further described:
A kind of suppression loess mud stone tunnel floor protuberance and the construction method of longitudinal cracking,
A), the tunnel bottom 11 mud stone lithology in detection tunnel 10 and material resources mechanical index.
B), tunnel is carried out with excavation construction, excavates radius and inverted arch outward flange radius is constructed according to design load, tunnel 10 tunnel bottom 11 is mud stone;
C), keep the width of tunnel 10 section constant, increase the depth at the tunnel bottom 11 in tunnel 10;
D), set up profile steel frame 30 at the tunnel bottom 11 in tunnel 10;
E), the top surface in tunnel inverted arch 10 installs anticracking reinforced mesh 20.
The present invention, mainly by deepening to the tunnel bottom 11 in tunnel 10, fills top surface in inverted arch and arranges anticracking reinforcing bar 20 Construction method, makes whole tunnel 10 supporting construction section level off to circle, and stress arch in inverted arch bottom 11 can carry bigger load And expansive force, so that the pressure from surrounding rock that supporting construction surface is born more is equalized, and fill in reinforcing bar 20 can effectively play anti- Split effect, the generation of suppression tunnel 10 base plate longitudinal crack, it is ensured that the stable and globality of structure, improves later stage tunnel 10 The safety running.
In described step a, three-dimensional simulation model is set up according to the lithology mechanical index of detection, calculate suppression loess mud stone Approximate formula y=9-1.7x that tunnel tunnel bottom protuberance is deepened with inverted arch,
Y is tunnel bottom 11 protuberance value (cm)
X deepens depth (m) for inverted arch.
After tunnel excavation, profile steel frame 30 and the supporting of tunnel bottom are equally deepened.
The double-deck anticracking reinforced mesh of inverted arch filling top surface laying in tunnel 10, fill concrete one-time-concreting completes.
Above-mentioned holding former tunnel 10 section width is constant, changes its curvature so as to depth increases by adjusting inverted arch radius.
Deepened on the basis of original design in tunnel 10 midline inverted arch filling thickness by calculating.
The pore water of front ejectment country rock extravasation is excavated at tunnel bottom 10, forbids current to soak tunnel bottom.
Just lined steel frame radius accordingly adjusts inverted arch, arch wall and the smoother connection of inverted arch, just lining, inverted arch thickness, steelframe, reinforcing bar type Number still press original design parameter constant.
Longitudinally bury drainage culvert according to design altitude position in inverted arch filling, drainage culvert lower concrete vibrates close Real.
Lay double layer bar, top layer reinforcing bar net protective layer thickness 50mm in filling top surface 0.35m, transverse steel adopts Diameter 18mm spiral, longitudinal pitch 0.4m, it is connected with lining cutting cage bar inside inverted arch;Longitudinal reinforcement adopts diameter 12mm screw thread Steel, horizontal spacing 0.4m;Vertical stirrup adopts diameter phi 8mm round steel, horizontal, longitudinal pitch 0.4cm, fill concrete one-time-concreting Complete.
Inverted arch fill concrete reach design strength 100% after plant equipment can directly pass through.

Claims (4)

1. a kind of suppression loess mud stone tunnel floor protuberance and longitudinal cracking construction method it is characterised in that:
A), tunnel bottom (11) the mud stone lithology of detection tunnel (10) and material resources mechanical index.
B), tunnel is carried out with excavation construction, excavates radius and inverted arch outward flange radius is constructed according to design load, tunnel (10) Tunnel bottom (11) be mud stone;
C), keep the width of tunnel (10) section constant, increase the depth at the tunnel bottom (11) in tunnel (10);
D), set up profile steel frame (30) at the tunnel bottom (11) of tunnel (10);
E), the top surface in tunnel inverted arch (10) installs anticracking reinforced mesh (20).
2. the construction method of suppression loess mud stone tunnel floor protuberance according to claim 1 and longitudinal cracking, its feature It is: in described step a, three-dimensional simulation model is set up according to the lithology mechanical index of detection, calculate suppression loess mud stone tunnel Approximate formula y=9-1.7x that road tunnel bottom protuberance is deepened with inverted arch,
Y is tunnel bottom (11) protuberance value (cm)
X deepens depth (m) for inverted arch.
3. the construction method of suppression loess mud stone tunnel floor protuberance according to claim 2 and longitudinal cracking, its feature It is: after tunnel excavation, profile steel frame (30) and the supporting of tunnel bottom are equally deepened.
4. the construction method of suppression loess mud stone tunnel floor protuberance according to claim 1 and longitudinal cracking, its feature It is: in the double-deck anticracking reinforced mesh of inverted arch filling top surface laying of tunnel (10), fill concrete one-time-concreting completes.
CN201610905608.8A 2016-10-17 2016-10-17 Construction method for inhibiting loess mudstone tunnel bottom plate uplifting and longitudinal cracking Pending CN106351669A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610905608.8A CN106351669A (en) 2016-10-17 2016-10-17 Construction method for inhibiting loess mudstone tunnel bottom plate uplifting and longitudinal cracking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610905608.8A CN106351669A (en) 2016-10-17 2016-10-17 Construction method for inhibiting loess mudstone tunnel bottom plate uplifting and longitudinal cracking

Publications (1)

Publication Number Publication Date
CN106351669A true CN106351669A (en) 2017-01-25

Family

ID=57866912

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610905608.8A Pending CN106351669A (en) 2016-10-17 2016-10-17 Construction method for inhibiting loess mudstone tunnel bottom plate uplifting and longitudinal cracking

Country Status (1)

Country Link
CN (1) CN106351669A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107401413A (en) * 2017-08-29 2017-11-28 中铁第勘察设计院集团有限公司 Tunnel structure for expansive stratum
CN107476812A (en) * 2017-09-27 2017-12-15 贵州省公路工程集团有限公司 A kind of assembled inverted arch and preparation method thereof
CN107524458A (en) * 2017-08-30 2017-12-29 中铁二院工程集团有限责任公司 A kind of tunnel lining structure with tunnel bottom deformation allowance
CN109057826A (en) * 2018-08-08 2018-12-21 中铁二院工程集团有限责任公司 A kind of truss-like tunnel inverted arch liner structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107401413A (en) * 2017-08-29 2017-11-28 中铁第勘察设计院集团有限公司 Tunnel structure for expansive stratum
CN107524458A (en) * 2017-08-30 2017-12-29 中铁二院工程集团有限责任公司 A kind of tunnel lining structure with tunnel bottom deformation allowance
CN107524458B (en) * 2017-08-30 2023-09-22 中铁二院工程集团有限责任公司 Tunnel lining structure with tunnel bottom reserved deformation
CN107476812A (en) * 2017-09-27 2017-12-15 贵州省公路工程集团有限公司 A kind of assembled inverted arch and preparation method thereof
CN109057826A (en) * 2018-08-08 2018-12-21 中铁二院工程集团有限责任公司 A kind of truss-like tunnel inverted arch liner structure

Similar Documents

Publication Publication Date Title
CN101614125B (en) Construction method of V-level surrounding rock tunnel
WO2020253001A1 (en) Two-step fast closed tunnel support structure having inverted arch and construction method therefor
CN106351669A (en) Construction method for inhibiting loess mudstone tunnel bottom plate uplifting and longitudinal cracking
CN106930321B (en) The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole
CN104564128A (en) Deformation monitoring method for shallow-buried excavation tunnel construction
CN111485901B (en) Method for building side-span non-filling type long and narrow shallow bottom karst cave section tunnel
CN106089244A (en) Frame props up arched tunnel lining structure
CN113503166B (en) Reinforced disposal structure of karst cave at middle and lower parts of tunnel and construction method thereof
CN107503754A (en) A kind of construction method of VI grade of country rock rich water Shallow tunnel with large cross-section
CN102660955B (en) Quick construction method for foundation pit slope support
CN112682048B (en) Replacement reinforcement construction method for small clear distance up-span existing tunnel of newly-built tunnel
CN104674863A (en) Method for reinforcing existing municipal pipe gallery within deep foundation pit excavation range
CN110284885A (en) Shield inspection-pit construction method
CN104631440A (en) Stiffening core lengthening foundation pit support structure for existing large-diameter bored concrete pile and construction method
CN111287794A (en) Karst tunnel underground water open type drainage structure and method
CN107964971B (en) A kind of precipitation method of the subway station using the construction of PBA engineering method
CN109826635B (en) Construction method for reinforcing shield receiving space peripheral soil body constructed by subsurface excavation method
CN114352292A (en) Shallow-buried bias-pressure multi-arch tunnel construction method for weathering phyllite stratum
CN112983467B (en) Treatment method for tunnel gate closing type large collapse
CN110761795B (en) Construction method of shallow tunnel in loess gully
CN204491683U (en) A kind of ruggedized construction to municipal piping lane existing within the scope of deep pit digging
KR100846094B1 (en) Abutment structure and the construction method of this for mountains area installation with slope
CN103741712B (en) Retaining wall construction method
CN206368375U (en) A kind of electric power pylon basis
CN211598669U (en) Tunnel collapse cavity backfill structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170125