CN106351210A - Composite precast pile and pile sinking construction method - Google Patents

Composite precast pile and pile sinking construction method Download PDF

Info

Publication number
CN106351210A
CN106351210A CN201610876097.1A CN201610876097A CN106351210A CN 106351210 A CN106351210 A CN 106351210A CN 201610876097 A CN201610876097 A CN 201610876097A CN 106351210 A CN106351210 A CN 106351210A
Authority
CN
China
Prior art keywords
pile
section
prefabricated pile
mixing
mixing prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610876097.1A
Other languages
Chinese (zh)
Other versions
CN106351210B (en
Inventor
何国富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Engineering Group Co Ltd
Sinopec Shanghai Engineering Co Ltd
Original Assignee
Sinopec Engineering Group Co Ltd
Sinopec Shanghai Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Engineering Group Co Ltd, Sinopec Shanghai Engineering Co Ltd filed Critical Sinopec Engineering Group Co Ltd
Priority to CN201610876097.1A priority Critical patent/CN106351210B/en
Publication of CN106351210A publication Critical patent/CN106351210A/en
Application granted granted Critical
Publication of CN106351210B publication Critical patent/CN106351210B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers

Abstract

The invention discloses a composite precast pile and a pile sinking construction method suitable for the composite precast pile under the situations of a thin overlying quaternary system cover layer and large underlying intensely weathered or intermediary weathered bed rock stratum top surface change. A hollow channel is reserved in the middle of the composite precast pile and includes a section A and a section B, and the section A is located at the upper portion of the section B and is higher than the section B in concrete strength level. The composite precast pile and the pile sinking construction method overcome the technical defect that the top elevation of the precast pile is not in place on an underlying bed rock relief site and reliable rooting cannot be achieved at the pile end, the cost waste of pile head cutting is effectively reduced, and the bearing capability of the pile and the working stability of a pile foundation are remarkably improved.

Description

A kind of mixing prefabricated pile and pile sinking construction method
Technical field
The present invention relates to pile foundation engineering field, more particularly, to a kind of mixing prefabricated pile and pile sinking construction method.
Background technology
In China's wide geographic area, overlying the 4th is cover layer, the lower this stratum condition ratio of severely-weathered or middle weathered rockses that crouches Than all it is.Particularly in short hilly country, this soil layer with binary nature of pixel operation is very common.Because overlaying bedrock face becomes Change larger, using the problem often running into pile-type selection during pile foundation.Generally bored concrete pile is preferred version, can be because stake is long Adjusted at any time during construction pore-creating, but should not control because it has construction quality, sediment borehole cleaning is not in place, steel reinforcement cage Precast length not can determine that, long construction period, relatively costly, and does not recommend the problems such as civilized construction to adopt, prefabricated on the contrary The problem that stake (particularly phc stake) is not in place despite the presence of absolute altitude and will " be beheaded ", but due to being of relatively low cost, constructing The advantages of quality and cycle are controlled and more adopted.
Although but do not stint the cost of " beheading " using prefabricated pile, but still another question occurs.Stake top absolute altitude Not in place, illustrate that stake end may have arrived at bedrock surface it is impossible to make a forcible entry into, otherwise pile crown will be broken again, affect pile body Quality, simultaneously because stake end cannot ensure to enter supporting course (basement rock) certain depth, forms unstable outstanding pile, design is taken Very unfavorable with vertical bearing capacity of single pile, in addition deformation all there is certain hidden danger.This situation is relatively shallower for bedrock surface Place particularly disadvantageous.The searching solution stake top absolute altitude in overlaying bedrock fluctuating place for the prefabricated pile is not in place, stake end cannot be reliable The problem taken root, is extremely paid close attention to by engineers and technicians always, but there is no reliable technological means can implement at present.
Content of the invention
In order to solve the problems referred to above of the prior art, the invention provides a kind of mixing prefabricated post and piling construction side Method, overcomes on overlaying bedrock fluctuating place, and the technology such as prefabricated pile stake top absolute altitude is not in place, cannot reliably take root in stake end lacks Fall into, under conditions of keeping the various technical advantage of prefabricated pile, the cost that can reduce cutting pile crown wastes, and improves holding of stake simultaneously Loading capability, it is ensured that stablizing of pile foundation, has good Practical significance to China's pile foundation engineering.
Present invention one side provides a kind of mixing prefabricated pile, reserved hollow channel in the middle of stake, and described mixing is pre- Stake processed includes a section and b section, and, on the top of described b section, described a section concrete strength grade is higher than b section for described a section.
Preferably, described a section concrete strength grade is not less than c60, and described b section concrete strength grade is not more than c15.
Preferably, described mixing prefabricated pile pile body is shaped as cylindrical or cuboid.
Preferably, the section of described hollow channel is circle, and its a diameter of 100-150mm is big to meet common Grouting Pipe Little it is advisable.
Preferably, the section of described hollow channel is square, and its area is 8000-18000mm2.
Preferably, the described a section closing prefabricated pile and the same section of b section, and the arrangement of reinforcement method phase of described a section and described b section With.
This mixing prefabricated pile overall length is l=la+lb, and l, la and lb can become different length as three parameters, pre-production Prefabricated pile, forms pre-engineered series pile-type, to adapt to different bedrock surface buried depth needs, wherein preferably b segment length≤1m; It is further preferred that b segment length is 0.75m.
Described a section and the mixing prefabricated pile of described b section composition, can be according to strength grade segmentation in a stake mould during production Pour pile.
Another aspect of the invention additionally provide one kind be applied to overlying the 4th be cover layer, lower sleeping severely-weathered or air slaking The pile sinking construction method of the mixing prefabricated pile of bedrock formation, comprises the following steps:
Step 1: preparation is as claimed in claim 1 to mix prefabricated pile;
Step 2: with prepared mixing prefabricated pile in heavy hammer and low strike step 1, after first time occurs jumping hammer, be changed to weight high strike Mixing prefabricated pile, until last ten pile penetrations hit are less than 25-30mm, receive hammer and stops beating;
Step 3: pass through the hollow channel in pile body to bottom stake end, the slip casting at stake end using grouting pipe, form b section pile body Broken concrete, bedrock surface surface air slaking body, the part soil body and stake end bar are in the grouting and reinforcing body of one, after pressure stabilisation Stop slip casting.
Preferably, in described step 2, last ten pile penetrations hit are less than 25mm.
Heavy hammer and low strike is using dropping hammer, any one in steam hammer, diesel hammer or hydraulic hammer, preferably diesel hammer.Low hit When pile monkey fall between about 0.7m-1m, preferably from about 0.8m.
During slip casting in described step 3, pressure is not less than 1.0 mpa, preferably 1.0 mpa.
In described step 2, the material of slip casting is cement based grout material, forms b section pile concrete fragment, bedrock surface surface Air slaking body, the part soil body and stake end bar are in the grouting and reinforcing body of one.
It is cover layer, lower sleeping strong that mixing prefabricated pile provided by the present invention and its pile sinking construction method are applied to overlying the 4th The binary nature of pixel operation soil layer such as air slaking or middle weathered rockses, be particularly suited for overlying the 4th be cover layer relatively thin, lower sleeping severely-weathered or in The situation that weathered rockses stratum top surface changes greatly, has good Practical significance.
Compared with prior art, the method have the advantages that
1) mixing prefabricated pile provided by the present invention and its pile sinking construction method, overcome on overlaying bedrock fluctuating place, in advance Stake stake top absolute altitude processed is not in place, the technological deficiency that cannot reliably take root in stake end;
2) the high low-intensity of hollow provided by the present invention mixes prefabricated pile and can effectively reduce the cost of cutting pile crown and wastes, significantly Improve bearing capacity and the pile foundation job stability of stake.
Brief description
Fig. 1 is the elevation of mixing prefabricated pile of the present invention;In figure: 1- stake top, 2-a section, 3-b section, 4- stake end, h-h For mixing the horizontal cross-section of prefabricated pile.
Fig. 2 respectively illustrates the h-h sectional view of the mixing prefabricated pile of embodiment 1 and embodiment 2;In figure: 1- hollow channel, 2- reinforcing bar.
Fig. 3 is the piling construction schematic diagram of the mixing prefabricated pile of embodiment 1.
Specific embodiment
With reference to specific embodiment, the present invention is further elaborated, but the present invention is not limited to following embodiment party Formula.
Embodiment 1
Present embodiments provide a kind of mixing prefabricated pile, as shown in figure 1, pile-type is the high low-intensity of hollow mixes prefabricated pile, by a and Two sections of compositions of b, a section is the pile for prestressed pipe consistent with common GB specification, and length is la, b section and the same section of a section, and length is lb;Pile body is cylindrical, middle reserved hollow channel;The section of described hollow channel be circle, this circle a diameter of 100mm, pile body h-h sectional view is as shown in Figure 2 a.
Above-mentioned mixing prefabricated pile overall length is l=la+lb, and l, la and lb can become different length as three parameters, pre-production Prefabricated pile, formed pre-engineered series pile-type, to adapt to different bedrock surface buried depth needs;The length of lb is 0.8m.
Wherein, the pile body construction of a section stake, material and all consistent with common GB specification, the concrete strengths such as reinforcing bar configuration Grade is c80;B section stake adopts low-grade concrete intensity, and strength grade is c15, and its arrangement of reinforcement method is identical with a section.
The hollow high low-intensity mixing prefabricated pile of a section and b section composition, can be according to strength grade in a stake mould during production Segmentation pours pile.
Embodiment 2
Present embodiments provide a kind of mixing prefabricated pile, as shown in figure 1, pile-type is the high low-intensity of hollow mixes prefabricated pile, by a and Two sections of compositions of b, a section is the pile for prestressed pipe consistent with common GB specification, and length is la, b section and the same section of a section, and length is lb;Pile body is cuboid, middle reserved hollow channel;The section of described hollow channel is square, this foursquare area For 18000mm2, pile body h-h sectional view is as shown in Figure 2 b.
Above-mentioned mixing prefabricated pile overall length is l=la+lb, and l, la and lb can become different length as three parameters, pre-production Prefabricated pile, formed pre-engineered series pile-type, to adapt to different bedrock surface buried depth needs;The length of lb is 0.8m.
Wherein, the pile body construction of a section stake, material and all consistent with common GB specification, the concrete strengths such as reinforcing bar configuration Grade is c80;B section stake adopts low-grade concrete intensity, and strength grade is c15, and its arrangement of reinforcement method is identical with a section.
The hollow high low-intensity mixing prefabricated pile of a section and b section composition, can be according to strength grade in a stake mould during production Segmentation pours pile.
Embodiment 3
Present embodiments provide a kind of pile sinking construction method of mixing prefabricated pile, piling principle is as shown in figure 3, include following walking Rapid:
Step 1: the mixing prefabricated pile described in preparation embodiment 1;
Step 2: hit initially with diesel hammer is low, the falling away from about 0.8m of each pile monkey, when first time there is jumping hammer, stake end Meet with bedrock surface, then proceed to use diesel hammer high strike, until down degree of last ten hits is less than receipts hammer during 25mm and stops beating;
Step: 3: grouting pipe is inserted into an end by the hollow channel in pile body, carrying out pressure at stake end is 1.5 mpa High-pressure slip-casting, form b section pile concrete fragment, bedrock surface surface air slaking body, the part soil body and stake end bar in one Grouting and reinforcing body, stopping slip casting after pressure stabilisation.Described injecting paste material is mortar.
Mixing prefabricated pile and its pile sinking construction method that the present embodiment provides, overcome on overlaying bedrock fluctuating place, Prefabricated pile stake top absolute altitude is not in place, the technological deficiency that cannot reliably take root in stake end;And can effectively reduce the one-tenth of cutting pile crown This waste, is greatly improved bearing capacity and the pile foundation job stability of stake.
Above the specific embodiment of the present invention is described in detail, but it has been intended only as example, the present invention has not limited It is formed on particular embodiments described above.To those skilled in the art, any equivalent modifications that the present invention is carried out and Substitute also all among scope of the invention.Therefore, the impartial conversion made without departing from the spirit and scope of the invention and Modification, all should cover within the scope of the invention.

Claims (10)

1. it is characterised in that reserving hollow channel in the middle of stake, described mixing prefabricated pile includes a section and b to a kind of mixing prefabricated pile Section, on the top of described b section, described a section concrete strength grade is higher than b section for described a section.
2. mixing prefabricated pile according to claim 1 is it is characterised in that described a section concrete strength grade is not less than C60, described b section concrete strength grade is not more than c15.
3. mixing prefabricated pile according to claim 1 is it is characterised in that described mixing prefabricated pile pile body is shaped as cylinder The bodily form or cuboid.
4., it is characterised in that the section of described hollow channel is circle, it is straight for mixing prefabricated pile according to claim 1 Footpath is 100-150mm.
5. according to claim 1 mixing prefabricated pile it is characterised in that described hollow channel section be square, its Area is 8000-18000mm2.
6. mixing prefabricated pile according to claim 1 is it is characterised in that described a section and the same section of b section, and a section and b The arrangement of reinforcement method of section is identical.
7. mixing prefabricated pile according to claim 1 is it is characterised in that described b segment length≤1m.
8. a kind of be applied to overlying the 4th be cover layer, lower sleeping severely-weathered or air slaking bedrock formation mixing prefabricated pile pile sinking Construction method is it is characterised in that comprise the following steps:
Step 1: preparation is as claimed in claim 1 to mix prefabricated pile;
Step 2: with prepared mixing prefabricated pile in heavy hammer and low strike step 1, after first time occurs jumping hammer, be changed to weight high strike Mixing prefabricated pile, until last ten pile penetrations hit are less than 25-30mm, receive hammer and stops beating;
Step 3: pass through the hollow channel in pile body to bottom stake end, the slip casting at stake end using grouting pipe, form b section pile body Broken concrete, bedrock surface surface air slaking body, the part soil body and stake end bar are in the grouting and reinforcing body of one, after pressure stabilisation Stop slip casting.
9. pile sinking construction method according to claim 8 is it is characterised in that last ten pile penetration hit in described step 2 Less than 25mm.
10. pile sinking construction method according to claim 8 is it is characterised in that pressure during slip casting in described step 3 Power is not less than 1.0 mpa.
CN201610876097.1A 2016-10-08 2016-10-08 A kind of mixing prefabricated pile and pile sinking construction method Active CN106351210B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610876097.1A CN106351210B (en) 2016-10-08 2016-10-08 A kind of mixing prefabricated pile and pile sinking construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610876097.1A CN106351210B (en) 2016-10-08 2016-10-08 A kind of mixing prefabricated pile and pile sinking construction method

Publications (2)

Publication Number Publication Date
CN106351210A true CN106351210A (en) 2017-01-25
CN106351210B CN106351210B (en) 2019-11-29

Family

ID=57866236

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610876097.1A Active CN106351210B (en) 2016-10-08 2016-10-08 A kind of mixing prefabricated pile and pile sinking construction method

Country Status (1)

Country Link
CN (1) CN106351210B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1386936A (en) * 2002-05-28 2002-12-25 立基工程有限公司 Combined rock-embedding pile and its construction method
CN1458346A (en) * 2003-04-30 2003-11-26 立基工程有限公司 Rock engaged combined pile and its construction method
JP2004124452A (en) * 2002-10-01 2004-04-22 Geotop Corp Foundation pile structure in bearing ground and working method of foundation pile
CN1896383A (en) * 2005-07-14 2007-01-17 胡柏英 Steel-pipe concrete assembled pile of predrilled hole rock-embedded and its construction
CN201520973U (en) * 2009-10-20 2010-07-07 上海强劲基础工程有限公司 Precast pile with grouting hole
CN103741683A (en) * 2013-12-23 2014-04-23 浙江天润建设有限公司 Bag bottom expanding rigid-flexible combined pile and construction method thereof
CN102808403B (en) * 2011-05-30 2014-07-02 宝山钢铁股份有限公司 Precast tubular pile and construction method thereof
CN105908773A (en) * 2016-06-12 2016-08-31 上海勘测设计研究院有限公司 Two-stage socketed pile wind turbine foundation for shallow covering stratum foundation of offshore wind plant and construction method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1386936A (en) * 2002-05-28 2002-12-25 立基工程有限公司 Combined rock-embedding pile and its construction method
JP2004124452A (en) * 2002-10-01 2004-04-22 Geotop Corp Foundation pile structure in bearing ground and working method of foundation pile
CN1458346A (en) * 2003-04-30 2003-11-26 立基工程有限公司 Rock engaged combined pile and its construction method
CN1896383A (en) * 2005-07-14 2007-01-17 胡柏英 Steel-pipe concrete assembled pile of predrilled hole rock-embedded and its construction
CN201520973U (en) * 2009-10-20 2010-07-07 上海强劲基础工程有限公司 Precast pile with grouting hole
CN102808403B (en) * 2011-05-30 2014-07-02 宝山钢铁股份有限公司 Precast tubular pile and construction method thereof
CN103741683A (en) * 2013-12-23 2014-04-23 浙江天润建设有限公司 Bag bottom expanding rigid-flexible combined pile and construction method thereof
CN105908773A (en) * 2016-06-12 2016-08-31 上海勘测设计研究院有限公司 Two-stage socketed pile wind turbine foundation for shallow covering stratum foundation of offshore wind plant and construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
藤延京: "《中国建筑学会地基基础分会2008年学术年会论文集》", 30 June 2008, 知识产权出版社 *
鲍国宁: "浅谈TSC桩与PHC桩组合桩在海峡青年交流营地项目中的应用", 《江西建材》 *

Also Published As

Publication number Publication date
CN106351210B (en) 2019-11-29

Similar Documents

Publication Publication Date Title
CN100371537C (en) Novel method for reinforcing deep soft foundition-cencrete core sand stone pile compound foundition method
CN102011399B (en) PHC pile-based multiple high jet pedestal pile construction method
CN105625294A (en) Composite foundation and construction method thereof
CN203924036U (en) A kind of pile for prestressed pipe of outsourcing active material pile body
CN104846841B (en) Anti-floating construction method for basements without uplift piles
CN207109475U (en) It is close to mountain high-filled subgrade stabilization and Deformation control structure
CN103184734A (en) Implanted and grouted compound pile and construction method
CN107503257A (en) One kind is close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
CN206784372U (en) Injection forming club-footed pile
CN101812843A (en) Centre grouted poured post-grouting pile construction methods, and grouter and grout injector used thereby
CN104314078A (en) Concrete pile construction equipment and construction method thereof
CN106522191A (en) Transformer substation foundation treatment method and application thereof
CN104863132A (en) Bougainvillea spectabilis willd-shaped cement-soil mixing pile and shaping method thereof
CN104762956B (en) Method for forming pile based on construction waste recycled aggregate
CN106245643A (en) A kind of compound pile-type structure being applicable to the process of coastal deep reclaimed ground and construction method
CN104631440A (en) Stiffening core lengthening foundation pit support structure for existing large-diameter bored concrete pile and construction method
CN109252433A (en) Method soft soil foundation intensive treatment construction and reinforce soft soil foundation foundation pit
CN202187340U (en) Socketed pile with concrete-filled steel tube core column
CN105484270B (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN209066518U (en) A kind of constructing structure of section of stake forced-landing tilt correcting structure and miniature steel pipe pile
CN206157726U (en) Composite pile type structure suitable for coast deep dredger fill soil foundation handle
CN106245641A (en) PHC pile tube post grouting construction technique and PHC pile tube composite pile
CN205475211U (en) A mix soil extrusion solidification precast pile for soft base is handled
CN205501998U (en) Expand end combination end -bearing pile basis
CN204780975U (en) A four return circuit terminal steel pipe poles are drawn and are dug compound basis of anchor log for medium voltage electric distribution circuit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant