CN106345211A - Boiler smoke dust filtering system for environmental protection - Google Patents

Boiler smoke dust filtering system for environmental protection Download PDF

Info

Publication number
CN106345211A
CN106345211A CN201610840498.1A CN201610840498A CN106345211A CN 106345211 A CN106345211 A CN 106345211A CN 201610840498 A CN201610840498 A CN 201610840498A CN 106345211 A CN106345211 A CN 106345211A
Authority
CN
China
Prior art keywords
framework
fixedly connected
drainage screen
spring
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610840498.1A
Other languages
Chinese (zh)
Inventor
曹燕红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Ansike Electronic Technology Co Ltd
Original Assignee
Shenzhen Ansike Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Ansike Electronic Technology Co Ltd filed Critical Shenzhen Ansike Electronic Technology Co Ltd
Priority to CN201610840498.1A priority Critical patent/CN106345211A/en
Publication of CN106345211A publication Critical patent/CN106345211A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D50/00Combinations of methods or devices for separating particles from gases or vapours
    • B01D50/60Combinations of devices covered by groups B01D46/00 and B01D47/00
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D46/00Filters or filtering processes specially modified for separating dispersed particles from gases or vapours
    • B01D46/56Filters or filtering processes specially modified for separating dispersed particles from gases or vapours with multiple filtering elements, characterised by their mutual disposition
    • B01D46/62Filters or filtering processes specially modified for separating dispersed particles from gases or vapours with multiple filtering elements, characterised by their mutual disposition connected in series

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Filtration Of Liquid (AREA)

Abstract

The invention provides a boiler smoke dust filtering system for environmental protection. The boiler smoke dust filtering system comprises an exhausting device, a first frame body device, a first filtering device, a second frame body device, a propelling device, a third frame body device, a fixing device, a fourth frame body device and a second filtering device; the exhausting device comprises an exhausting bucket, a first transverse plate, a first filter screen, a retaining ring, a first pipeline, a draught fan, a first fixed rod and a first bracket; the first frame body device comprises a first frame body, a second pipeline, a first valve, a water feeding bucket, a discharging pipe and a second valve; the first filtering device comprises a first inclined plate, a first sponge block, a first spring, a second filter screen, a second sponge block, a third filter screen, a second spring, a fourth filter screen, a third sponge block and a fourth sponge block; the second frame body device comprises a second bracket, a third pipeline, a fourth valve, a second frame body, a third spring, a fifth sponge block, a limiting block and a fourth pipeline. The boiler smoke dust filtering system can be used for effectively absorbing and purifying smoke dust generated by a boiler, and has a remarkable purification effect.

Description

A kind of boiler smoke filtration system for environmental protection
Technical field
The present invention relates to technology of smoke purification field, especially relate to a kind of boiler smoke filtration system for environmental protection.
Background technology
Increasingly in short supply with the disposable energy, biomass boiler gradually increases, because its fuel is common and renewable, Obtain in small-sized civil boiler and widely use, but small-sized civil boiler often ignores the atmospheric pollution that flue dust brings, to flue dust Purification filtering consideration is less, causes very big destruction to ecological environment, some udst separations used in large scale industry boiler , often because of high cost, performance difficulty, practical application is less for technology.
Therefore, it is necessary to provide a kind of new technical scheme to overcome drawbacks described above.
Content of the invention
It is an object of the invention to provide a kind of can effectively solving above-mentioned technical problem the boiler smoke mistake for environmental protection Filter system.
For reaching the purpose of the present invention, adopt the following technical scheme that
A kind of boiler smoke filtration system for environmental protection, the described boiler smoke filtration system for environmental protection includes being evacuated Device, the first frame device on the right side of described air extractor, the first filtration dress being contained in described first frame device Put, be located at described first frame device on the right side of second framework device, the pushing meanss being arranged on described second framework device, Positioned at the 3rd frame device below described second framework device, the fixing device below described 3rd frame device, position In the 4th frame device below described fixing device and be contained in the second defecator in described 4th frame device, described Air extractor includes being evacuated bucket, the first transverse slat being contained in described pumping bucket, the first mistake below described first transverse slat Filter screen, be located at described first drainage screen above baffle ring, be located at described pumping bucket top the first pipeline, be arranged at described first Blower fan on pipeline, the first support being located at the first fix bar on the right side of described blower fan and being located at described pumping bucket right side, described First frame device includes the first framework, the second pipe on the right side of described first framework, is arranged on described second pipe The first valve, be located at described second pipe above entering bucket, be located at described first framework below discharge pipe, be arranged at institute State the second valve on discharge pipe, described first defecator include the first swash plate, be located at described first swash plate above first Sponge block, be located at described first sponge block on the right side of the first spring, be located at described first spring on the right side of the second drainage screen, be located at The second sponge block on the right side of described first swash plate, it is located at the 3rd drainage screen below described second sponge block, is located at the described 3rd Second spring below drainage screen, it is located at the 4th drainage screen below described second spring, is located on the right side of described 4th drainage screen The 3rd sponge block and be located at the 4th sponge block below described 3rd sponge block, described second framework device includes second Frame, be located at described second support below the 3rd pipeline, the 4th valve being arranged on described 3rd pipeline, be located at the described 3rd Second framework on the right side of pipeline, be contained in the 3rd spring below described second framework, be located at below described 3rd spring the Five sponge blocks, it is located at stop block on the right side of described 5th sponge block, is located at the 4th pipeline below described second framework, described pushing away Dynamic device includes the first electric cylinders, the first catch bar on the left of described first electric cylinders, is located at described first catch bar left end First push pedal, it is located at the 3rd support below described first electric cylinders, is located at the 4th support below described 3rd support, described the Three frame devices include the 3rd framework, the 5th drainage screen being contained in described 3rd framework, are located under described 5th drainage screen 6th drainage screen of side, the support block above described 6th drainage screen, the left and right sides below described 6th drainage screen Corner block, be located at described corner block between the 4th spring, be located at described 4th spring between the 5th spring and be located at institute State the 7th drainage screen below the 5th spring, described fixing device includes the 5th pipeline, is located at the described 5th pipeline left and right sides First support bar, be located at described first support bar on the right side of second support bar, be located at described first support bar on the left of the 5th Support, described 4th frame device includes the 4th framework, is located at the 6th pipeline on the left of described 4th framework, is arranged at described the The 3rd valve on six pipelines, the second electric cylinders being contained in described 4th framework, it is located at the upper and lower both sides of described second electric cylinders Second fix bar, the second catch bar on the left of described second electric cylinders, the second push pedal on the left of described second catch bar, Described second defecator includes baffle plate, is located at the 8th drainage screen below described baffle plate, the fixation on the left of described baffle plate Block, the roller on the left of described fixed block, the bristle being arranged on described roller, the 9th filtration on the left of described roller Net, be located at described 9th drainage screen on the left of the 6th spring, be located at described 6th spring on the left of the tenth drainage screen and be located at institute State the 7th spring above the tenth drainage screen.
Compared with prior art, the invention has the following beneficial effects: the boiler smoke that the present invention is used for environmental protection filters system System structure is simple, easy to use, and the flue dust that boiler can be produced effectively is absorbed and purifies, and clean-up effect is notable, and Purification efficiency is higher, can be good at meeting needs used in everyday, and cost is relatively low, and suitable popularization and application are simultaneously permissible Control the efficiency filtering, disclosure satisfy that some special needs.
Brief description
Fig. 1 is used for the structural representation of the boiler smoke filtration system of environmental protection for the present invention.
Specific embodiment
The boiler smoke filtration system being used for environmental protection to the present invention below in conjunction with accompanying drawing makes clearly complete explanation.
As shown in figure 1, the boiler smoke filtration system that the present invention is used for environmental protection includes air extractor 1, is located at described pumping First frame device 2 on device 1 right side, the first defecator 3 being contained in described first frame device 2, it is located at described the The second framework device 4 on one frame device 2 right side, the pushing meanss 5 being arranged on described second framework device 4, be located at described 3rd frame device 6 of second framework device 4 lower section, it is located at the fixing device 7 of described 3rd frame device 6 lower section, is located at institute State the 4th frame device 8 of fixing device 7 lower section and be contained in the second defecator 9 in described 4th frame device 8.
As shown in figure 1, described air extractor 1 include be evacuated bucket 11, be contained in described pumping bucket 11 in the first transverse slat 12, Positioned at the first drainage screen 13 below described first transverse slat 12, the baffle ring 14 above described first drainage screen 13, it is located at institute State the first pipeline 15 above pumping bucket 11, the blower fan 16 being arranged on described first pipeline 15, be located on the right side of described blower fan 16 The first fix bar 17 and be located at described pumping bucket 11 right side first support 18.Described pumping bucket 11 is in hollow round table-like, The upper and lower surface of described pumping bucket 11 communicates.Described first transverse slat 12 is horizontal, the side of described first transverse slat 12 with described The inner surface of pumping bucket 11 is fixedly connected, and the left and right two ends of described first transverse slat 12 are provided with the first groove 121, described first groove 121 upper and lower surfaces running through described first transverse slat 12.Described first drainage screen 13 is horizontal, the side of described first drainage screen 13 Face with described pumping bucket 11 inner surface be fixedly connected, described first drainage screen 13 be provided with run through its upper and lower surface first lead to Hole 131, described first through hole 131 is rounded.Described baffle ring 14 is in the cylinder that cross section is annulus, and described baffle ring 14 is vertically put Put, the lower surface of described baffle ring 14 is fixedly connected with the upper surface of described first drainage screen 13, described baffle ring 14 is located at described the The top of one through hole 131.The lower end of described first pipeline 15 is fixedly connected with the upper surface of described pumping bucket 11, described first pipe The inside in road 15 is communicated with the inside of described pumping bucket 11.Described blower fan 16 is connected with power supply so as to can normally run.Described First fix bar 17 is horizontal, and the left end of described first fix bar 17 is fixedly connected with described blower fan 16.Described first support 18 is in l type, and the lower end of described first support 18 is fixedly connected with the side of described pumping bucket 11, the upper end of described first support 18 In vertical shape.
As shown in figure 1, described first frame device 2 includes the first framework 21, is located at the of described first framework 21 right side Two pipelines 22, the first valve 23 being arranged on described second pipe 22, be located at described second pipe 22 top enter bucket 24, Discharge pipe 25, the second valve 26 being arranged on described discharge pipe 25 positioned at described first framework 21 lower section.Described first frame The cross section of body 21 is in isosceles trapezoid, and described first framework 21 is in hollow shape, and the lower surface of described first framework 21 is oblique, The right-hand member of described first fix bar 17 is fixedly connected with the left surface of described first framework 21, the upper end of described first support 18 with The lower surface of described first framework 21 is fixedly connected, described first framework 21 be provided with first through hole 211 positioned at its left surface, The second through hole 212 positioned at its right surface, third through-hole 213 and the fourth hole 214 being located at its lower surface, described first through hole 211st, the second through hole 212, third through-hole 213 and fourth hole 214 are communicated with the inside of described first framework 21, described first pipe The upper end in road 15 is directed at described first through hole 211 and the left surface with described first framework 21 is fixedly connected, described first pipeline 15 inside is communicated with the inside of described first framework 21.Described second pipe 22 is in l type, the lower end pair of described second pipe 22 The accurate described third through-hole 213 and right surface with described first framework 21 is fixedly connected so that the inside of described second pipe 22 Communicate with the inside of described first framework 21.Described enter bucket 24 be in hollow round table-like, the upper end of described second pipe 22 with Described enter bucket 24 lower surface be fixedly connected, the inside of described second pipe 22 with described enter bucket 24 inside communicate.Institute State the upper end described fourth hole 214 of be aligned of discharge pipe 25 and the lower surface with described first framework 21 is fixedly connected, described row The inside of outlet pipe 25 is communicated with the inside of described first framework 21.
As shown in figure 1, described first defecator 3 includes the first swash plate 31, is located at the of described first swash plate 31 top One sponge block 32, it is located at first spring 33 on described first sponge block 32 right side, is located at the second of described first spring 33 right side Drainage screen 34, it is located at second sponge block 35 on described first swash plate 31 right side, is located at the 3rd of described second sponge block 35 lower section Drainage screen 36, the second spring 37 being located at described 3rd drainage screen 36 lower section, the 4th mistake positioned at described second spring 37 lower section Filter screen 38, the 3rd sponge block 39 positioned at described 4th drainage screen 38 right side and the positioned at described 3rd sponge block 39 lower section the 4th Sponge block 30.Described first swash plate 31 is oblique, the inner surface of the left end of described first swash plate 31 and described first framework 21 It is fixedly connected.The cross section ovalize of described first sponge block 32, the lower end of described first sponge block 32 acts against described On the upper surface of one swash plate 31, the upper end of described first sponge block 32 acts against on the inner surface of described first framework 21.Described Second drainage screen 34 is in vertical shape, and the upper end of described second drainage screen 34 is fixedly connected with the inner surface of described second framework 21, The lower end of described second drainage screen 34 is fixedly connected with the upper end of described first swash plate 31.Described first spring 33 is horizontal, The right-hand member of described first spring 33 is fixedly connected with described second drainage screen 34, the left end and described first of described first spring 33 Sponge block 32 is fixedly connected, thus playing a supporting role to described first sponge block 32.Described second sponge block 35 is in bending, The left end of described second sponge block 35 is fixedly connected with described first swash plate 31, the right-hand member of described second sponge block 35 and described the The inner surface of one framework 21 is fixedly connected.Described 3rd drainage screen 36 is in bending, the left end of described 3rd drainage screen 36 and institute State the first swash plate 31 to be fixedly connected, the right-hand member of described 3rd drainage screen 36 is fixedly connected with the inner surface of described first framework 21, The lower surface of described second sponge block 35 is fixedly connected with the upper surface of described 3rd drainage screen 36.Described second spring 37 is in perpendicular Straight shape, the upper end of described second spring 37 is fixedly connected with described 3rd drainage screen 36, the lower end of described second spring 37 and institute State the 3rd sponge block 39 to be fixedly connected, thus playing a supporting role to described 3rd sponge block 39.Described 4th drainage screen 38 is in Horizontal, the left end of described 4th drainage screen 38 is fixedly connected with the inner surface of described first framework 21, described 4th drainage screen 38 right-hand member is fixedly connected with the left surface of described 3rd sponge block 39.Described 3rd sponge block 39 is oblique, and the described 3rd Sponge block 39 is fixedly connected with the inner surface of described first framework 21.Described 4th sponge block 30 is in vertical shape, the described four seas The lower end of continuous block 30 is fixedly connected with the inner surface of described first framework 21, the upper end and the described 3rd of described 4th sponge block 30 Sponge block 39 is fixedly connected.
As shown in figure 1, described second framework device 4 includes second support 41, is located at the of described second support 41 lower section Three pipelines 42, the 4th valve 43 being arranged on described 3rd pipeline 42, the second framework positioned at described 3rd pipeline 42 right side 44th, the 3rd spring 45 being contained in described second framework 44 lower section, the 5th sponge block 47 being located at described 3rd spring 45 lower section, Stop block 46 positioned at described 5th sponge block 47 right side, the 4th pipeline 48 positioned at described second framework 44 lower section.Described Two supports 41 are in l type, and the upper end of described second support 41 is fixedly connected with the right surface of described first framework 21, described second The lower end of frame 41 is fixedly connected with the upper surface of described second framework 44.Described second framework 44 is in hollow cuboid, described The cross section of second framework 44 is in concave shape, and described second framework 44 is provided with fifth hole 441 and position positioned at its left surface In the clematis stem hole 442 of its lower surface, described fifth hole 441 and clematis stem hole 442 rounded and with described second framework 44 Inside communicate.The left end of described 3rd pipeline 42 is directed at described second through hole 212 and the right surface with described first framework 21 It is fixedly connected, the inside of described 3rd pipeline 42 is communicated with the inside of described first framework 21, the right-hand member of described 3rd pipeline 42 Be directed at described fifth hole 441 and the left surface with described second framework 44 be fixedly connected, the inside of described 3rd pipeline 42 with The inside of described second framework 44 communicates.Described 3rd spring 45 is provided with two, and described 3rd spring 45 is in vertical shape, and described the The upper end of three springs 45 is fixedly connected with the inner surface of described second framework 44, the lower end and the described 5th of described 3rd spring 45 The upper surface of sponge block 47 is fixedly connected, thus playing fixation to described 5th sponge block 47.Described 5th sponge block 47 In cuboid and horizontal positioned, the lower surface of described 5th sponge block 47 is fixedly connected with the inner surface of described second framework 44, Described 5th sponge block 47 is located at the top in described clematis stem hole 442.Described stop block 46 is in cuboid and vertical placement, described The lower surface of stop block 46 is fixedly connected with the inner surface of described second framework 44, the right surface of described 5th sponge block 47 and institute The left surface stating stop block 46 is slidably connected.The upper end of described 4th pipeline 48 is directed at described clematis stem hole 442 and with described the The lower surface of two frameworks 44 is fixedly connected, and the inside of described 4th pipeline 48 is communicated with the inside of described second framework 44.
As shown in figure 1, described pushing meanss 5 include the first electric cylinders 51, push away positioned at the first of described first electric cylinders 51 left side Lever 52, the first push pedal 53 being located at described first catch bar 52 left end, the 3rd support positioned at described first electric cylinders 51 lower section 54th, it is located at the 4th support 55 of described 3rd support 54 lower section.Described first electric cylinders 51 are connected with power supply, are described first electric cylinders 51 pass through electric energy, and described first electric cylinders 51 are located at the right side of described second framework 44.Described first catch bar 52 be in cuboid and Horizontal positioned, the right-hand member of described first catch bar 52 is connected with described first electric cylinders 51 so that described first catch bar 52 is permissible Described first catch bar 52 is driven to move left and right, the left end of described first catch bar 52 is solid with the right surface of described first push pedal 53 Fixed connection.Described first push pedal 53 is in cuboid and vertical placement, the side of described first push pedal 53 and described second framework 44 Inner surface be slidably connected so that described first push pedal 53 can move left and right in described second framework 44.Described 3rd Frame 54 is in concave shape, and one end of described 3rd support 54 is fixedly connected with the lower surface of described first electric cylinders 51, described 3rd The other end of frame 54 is fixedly connected with the lower surface of described second framework 44.Described 4th support 55 is in l type, described 4th support 55 upper end is fixedly connected with described 3rd support 54, and the lower end of described 4th support 55 is horizontal.
As shown in figure 1, described 3rd frame device 6 include the 3rd framework 61, be contained in described 3rd framework 61 Five drainage screens 62, it is located at the 6th drainage screen 63 of described 5th drainage screen 62 lower section, is located at described 6th drainage screen 63 top Support block 64, be located at the described 6th drainage screen 63 lower section left and right sides corner block 65, be located between described corner block 65 the Four springs 66, the 5th spring 67 being located between described 4th spring 66 and the 7th filtration being located at described 5th spring 67 lower section Net 68.Described 3rd framework 61 is in hollow round table-like, and described 3rd framework 61 is provided with the 7th through hole positioned at its upper surface 611 and the 8th through hole 612 that is located at its lower surface, described 7th through hole 611 and the 8th through hole 612 rounded and with the described 3rd The inside of framework 61 communicates, and the lower end of described 4th support 55 is fixedly connected with the side of described 3rd framework 61, and the described 4th 7th through hole 611 described in the lower end aligned of the pipeline 48 and upper surface with described 3rd framework 61 is fixedly connected, described 4th pipe The inside in road 48 is communicated with the inside of described 3rd framework 61.Described 5th drainage screen 62 is in hollow hemispherical, and the described 5th The upper surface of drainage screen 62 is fixedly connected with the inner surface of described 3rd framework 61, places right activity in described 3rd drainage screen 62 Charcoal, described 3rd drainage screen 62 is located at the lower section of described 7th through hole 611.Described 6th drainage screen 63 is horizontal, and described The side of six drainage screens 63 is fixedly connected with the inner surface of described 3rd framework 61.The cross section of described support block 64 is in triangle Shape, the lower surface of described support block 64 is fixedly connected with the upper surface of described 6th drainage screen 63, and described support block 64 acts against On described 5th drainage screen 62, thus playing a supporting role to described 5th drainage screen 62.Described corner block 65 be provided with two and The left and right sides being located in described 3rd framework 61 respectively, the cross section of described corner block 65 is triangular in shape, described corner block 65 It is fixedly connected with the inner surface of described 3rd framework 61, gas can be concentrated on centre by described corner block 65.Described 4th bullet Spring 66 is provided with two, and described 4th spring 66 is in vertical shape, and the upper end of described 4th spring 66 is solid with described 6th drainage screen 63 Fixed connection, the lower end of described 4th spring 66 is fixedly connected with the inner surface of described 3rd framework 61, thus to described 6th mistake Filter screen 63 is played a supporting role.Described 5th spring 67 is in vertical shape, and the upper end of described 5th spring 67 is filtered with the described 6th Net 63 is fixedly connected, and the lower end of described 5th spring 67 is fixedly connected with the upper surface of described 7th drainage screen 68, thus to institute State the 7th drainage screen 68 and play fixation.Described 7th drainage screen 68 is in cuboid and horizontal positioned, described 7th drainage screen 68 lower surface is slidably connected with the inner surface of described 3rd framework 61, and described 7th drainage screen 68 is located at described 8th through hole 612 top.
As shown in figure 1, described fixing device 7 includes the 5th pipeline 73, is located at the of described 5th pipeline 73 left and right sides One support bar 72, it is located at the second support bar 71 on described first support bar 72 right side, is located at described first support bar 72 left side 5th support 74.The upper end of described 5th pipeline 73 is directed at described 8th through hole 612 and the lower surface with described 3rd framework 61 It is fixedly connected, the inside of described 5th pipeline 73 is communicated with the inside of described 3rd framework 61.Described first support bar 72 is provided with Two, described first support bar 72 is in cuboid and vertical placement, the upper end of described first support bar 72 and described 3rd framework 61 lower surface is fixedly connected.Described second support bar 71 is in cuboid and vertical placement, the upper end of described second support bar 71 It is fixedly connected with the lower surface of described 4th support 55.Described 5th support 74 is in l type, the upper end of described 5th support 74 and institute The left surface stating the 3rd framework 61 is fixedly connected.
As shown in figure 1, described 4th frame device 8 includes the 4th framework 81, is located at the of described 4th framework 81 left side Six pipelines 82, the 3rd valve 83 being arranged on described 6th pipeline 82, the second electric cylinders being contained in described 4th framework 81 84th, it is located at the second fix bar 85 of both sides, second promotion positioned at described second electric cylinders 84 left side about 84 of described second electric cylinders Bar 86, the second push pedal 87 positioned at described second catch bar 86 left side.Described 4th framework 81 is in hollow cuboid and level Place, described 4th framework 81 is provided with the 9th through hole 811 and the tenth through hole being located at its left surface positioned at its upper surface 812, the 9th through hole 811 described in lower end aligned of described 5th pipeline 73 and fixing with the upper surface of described 4th framework 81 even Connect, the inside of described 5th pipeline 73 is communicated with the inside of described 4th framework 81, the lower end of described first support bar 72 and institute The upper surface stating the 4th framework 81 is fixedly connected, and the lower end of described second support bar 71 is solid with the upper surface of described 4th framework 81 Fixed connection, the lower end of described 5th support 74 is fixedly connected with the upper surface of described 4th framework 81.Described 6th pipeline 82 Right-hand member is directed at described tenth through hole 812 and the left surface with described 4th framework 81 and is fixedly connected, described 6th pipeline 82 interior The volume of portion and described 4th framework 81 you be not communicated with.Described second electric cylinders 84 are connected with power supply, provide for described second electric cylinders 84 Electric energy, the right surface of described second electric cylinders 84 is fixedly connected with the inner surface of described 4th framework 81.Described second fix bar 85 It is provided with two and is located at the both sides up and down of described second electric cylinders 84 respectively, described second fix bar 85 is in cuboid, described second One end of fix bar 85 is fixedly connected with the inner surface of described 4th framework 81, the other end of described second fix bar 85 with described Second electric cylinders 84 are fixedly connected.Described second catch bar 86 is in cuboid and horizontal positioned, the right-hand member of described second catch bar 86 It is connected so that described second electric cylinders 84 can drive described second catch bar 86 to move left and right with described second electric cylinders 84, described The left end of the second catch bar 86 is fixedly connected with the right surface of described second push pedal 87.Described second push pedal 87 is in cuboid and erects Straight place, the side of described second push pedal 87 and the inner surface of described 4th framework 81 are slidably connected so that described second push pedal 87 can move left and right in described 4th framework 81.
As shown in figure 1, described second defecator 9 includes baffle plate 91, is located at the 8th drainage screen of described baffle plate 91 lower section 92nd, it is located at the fixed block 93 in described baffle plate 91 left side, be located at the roller 94 in described fixed block 93 left side, be arranged at described roller 94 On bristle 99, be located at the 9th drainage screen 95 in described roller 94 left side, be located at the 6th bullet in described 9th drainage screen 95 left side Spring 96, the tenth drainage screen 98 being located at described 6th spring 96 left side and the 7th spring being located at described tenth drainage screen 98 top 97.Described baffle plate 91 be in cuboid and vertical place, the inner surface of the upper end of described baffle plate 91 and described 4th framework 81 is fixed Connect.Described 8th drainage screen 92 is in cuboid and vertical placement, the upper surface of described 8th drainage screen 92 and described baffle plate 91 Lower surface be fixedly connected, the lower surface of described 8th drainage screen 92 is fixedly connected with the inner surface of described 4th framework 81.Institute The cross section stating fixed block 93 is in a rectangular trapezoid, and the inner surface of the upper surface of described fixed block 93 and described 4th framework 81 is fixed Connect, the right surface of described fixed block 93 is fixedly connected with the left surface of described baffle plate 91.Described roller 94 is in cylinder, described Roller 94 is turned with described 4th framework 91 axle and is connected so that described roller 94 can rotate in described 4th framework 81, described Roller 94 and motor connection, drive described roller 94 to rotate.Described bristle 99 is provided with several and is evenly distributed on described roller On 94, described bristle 99 is fixedly connected with described roller 94.Described 9th drainage screen 95 is in bending, described 9th drainage screen 95 It is fixedly connected with the inner surface of described 4th framework 81, described bristle 99 can touch the right table of described 9th drainage screen 95 Face.The cross section of described tenth drainage screen 98 is in l type, and the inner surface of described tenth drainage screen 98 and described 4th framework 81 is fixed Connect, described tenth drainage screen 98 is located at the right side of described tenth through hole 812.Described 6th spring 96 is horizontal, and described The right-hand member of six springs 96 is fixedly connected with described 9th drainage screen 95, the left end of described 6th spring 96 and described tenth drainage screen 98 are fixedly connected.Described 7th spring 97 is in vertical shape, and the upper end of described 7th spring 97 is fixing with described 4th framework 81 even Connect, the lower end of described 7th spring 97 is fixedly connected with described tenth drainage screen 98, thus to described 9th drainage screen 95 and Ten drainage screens 98 play the effect supporting and buffering.
As shown in figure 1, when the described present invention is used for the boiler smoke filtration system use of environmental protection, first pumping bucket 11 is put Put at the gas outlet of boiler smoke, then start blower fan 16, the flue dust of boiler is drawn in described pumping bucket 11, warp first Cross the filtration of the first drainage screen 13, its second part enters in described pumping bucket 11 through first through hole 131, then due to first The setting of transverse slat 12 is so that flue dust enters into the top of described first transverse slat 12, described first drainage screen through the first groove 121 13 can filter out the fraction solids impurity in flue dust, and when blower fan 16 cuts out, enter pumping bucket through first through hole 131 Fraction solids impurity in flue dust in 11 can drop above described first drainage screen 13, due to the setting of baffle ring 14, makes Obtain the top that impurity can focus on described first drainage screen 13, thus convenient reclaim to impurity, prevent it to be spread out over air In.Then flue dust enters in described first pipeline 15, then in described first framework 21.It is then passed through the first sponge Enter into after the filtration of block 32 on the right side of it, described first sponge block 32 can filter out the most solid impurity of in the air, and And solid impurity is focused on the left side of described first swash plate 31 top.Then toward entering in bucket 24 to put into water, open the first valve Door 23 so that the water entering in bucket 24 enters in described second pipe 22, then in described first framework 21, then Soak described second sponge block 35, the 3rd drainage screen 36, the 4th drainage screen 38, the 3rd sponge block 39 and the 4th sponge block 30, with When can soak described second drainage screen 34, then the upper surface of excessively described first swash plate 31 of part neatly focuses on described first The left side of swash plate 31 top, then soaks the solid impurity focusing on described first swash plate 31 upper left, such that it is able to prevent It is dispelled in the first framework 21, the filtration to air for the impact.Soak through the first sponge block 32 filtered air process Second drainage screen 34, the second sponge block 35, the 3rd drainage screen 36, the 4th drainage screen 38 and the 3rd sponge block 39 and the 4th sponge Enter into after the filtration of block 30 in described 3rd pipeline 42, open the 4th valve 43 so that air enters into described second framework In 44.When the water in the first framework 21 is more, open the second valve 26 so that the water in the first framework 21 is through discharge pipe 25 Discharge.When whole air enters in described second framework 44, close the 4th valve 43, start the first electric cylinders 51 so that Described first catch bar 52 is moved to the left, and then described first push pedal 53 is moved to the left, thus by second framework 44 Air compresses, and enters in described 4th pipeline 48, then quickly after the fast filtering being then passed through described 5th sponge block 47 Enter in described 3rd framework 61.Described stop block 46 can prevent described first push pedal 53 to be excessively moved to the left.Then Enter into air in described 3rd framework 61 after the filtration of the 5th drainage screen 62 and the 6th drainage screen 63 and through the 7th Enter into after the filtration of drainage screen 68 in described 5th pipeline 73.Then in described 4th framework 81.Start startup the Two electric cylinders 84 are so that described second catch bar 86 is moved to the left, and then described second push pedal 87 are moved to the left so that described The air in the second push pedal 87 left side is compressed, and then part enters into described 8th filtration after the filtration of the 8th drainage screen 92 The left side of net 92, then partly re-enters in described 5th pipeline 73, then in described 3rd framework 61, thus So that described 7th drainage screen 68 moves up, and air is made to again pass by the 6th drainage screen 63 and the 5th drainage screen 62 Filtration, the impurity being now just blocked on described 7th drainage screen 68, the 6th drainage screen 63 and the 5th drainage screen 62 blows off, There is the filter efficiency it is ensured that to air in prevent clogging.Enter into air and the brush in described 8th drainage screen 92 left side Hair 99 contact, starts the motor being connected with roller 94 so that described roller 94 rotates, and then drives described bristle 99 to revolve therewith Turn, such that it is able to filter to air, after being then passed through the 9th drainage screen 95 and the filtration of the tenth drainage screen 98, enter into institute State in the 6th pipeline 82, opening valve 83 makes it discharge.So far, the present invention used for the boiler smoke filtration system of environmental protection Journey is described.

Claims (10)

1. a kind of boiler smoke filtration system for environmental protection, the described boiler smoke filtration system for environmental protection includes pumping dress Put, be located at described air extractor on the right side of the first frame device, the first defecator being contained in described first frame device, Second framework device on the right side of described first frame device, the pushing meanss being arranged on described second framework device, position In the 3rd frame device below described second framework device, be located at described 3rd frame device below fixing device, be located at The 4th frame device below described fixing device and be contained in the second defecator in described 4th frame device, its feature It is: described air extractor includes being evacuated bucket, the first transverse slat being contained in described pumping bucket, is located at below described first transverse slat The first drainage screen, be located at described first drainage screen above baffle ring, be located at described pumping bucket top the first pipeline, be arranged at Blower fan on described first pipeline, the first fix bar on the right side of described blower fan and first positioned at described pumping bucket right side Frame, described first frame device includes the first framework, the second pipe on the right side of described first framework, is arranged at described second The first valve on pipeline, entering bucket, the discharge pipe below described first framework, setting above described second pipe It is placed in the second valve on described discharge pipe, described first defecator includes the first swash plate, is located above described first swash plate The first sponge block, be located at described first sponge block on the right side of the first spring, be located at described first spring on the right side of second filtration Net, be located at described first swash plate on the right side of the second sponge block, be located at described second sponge block below the 3rd drainage screen, be located at institute State the second spring below the 3rd drainage screen, the 4th drainage screen below described second spring, be located at described 4th filtration 3rd sponge block on net right side and be located at the 4th sponge block below described 3rd sponge block, described second framework device includes the Two supports, be located at described second support below the 3rd pipeline, the 4th valve being arranged on described 3rd pipeline, be located at described Second framework on the right side of 3rd pipeline, it is contained in the 3rd spring below described second framework, is located at below described 3rd spring The 5th sponge block, be located at described 5th sponge block on the right side of stop block, be located at described second framework below the 4th pipeline, institute State pushing meanss to include the first electric cylinders, the first catch bar on the left of described first electric cylinders, be located at a described first catch bar left side First push pedal at end, the 3rd support below described first electric cylinders, the 4th support below described 3rd support, institute State the 3rd frame device to include the 3rd framework, the 5th drainage screen being contained in described 3rd framework, be located at described 5th filtration 6th drainage screen of side off the net, the support block above described 6th drainage screen, left and right below described 6th drainage screen The corner block of both sides, the 4th spring being located between described corner block, the 5th spring being located between described 4th spring and position The 7th drainage screen below described 5th spring, described fixing device includes the 5th pipeline, is located at about described 5th pipeline The first support bar of both sides, be located at described first support bar on the right side of second support bar, be located at described first support bar on the left of 5th support, described 4th frame device includes the 4th framework, the 6th pipeline on the left of described 4th framework, is arranged at institute State the 3rd valve on the 6th pipeline, the second electric cylinders being contained in described 4th framework, be located at described second electric cylinders upper and lower two Second fix bar of side, be located at described second electric cylinders on the left of the second catch bar, be located at described second catch bar on the left of second Push pedal, described second defecator includes baffle plate, the 8th drainage screen below described baffle plate, is located on the left of described baffle plate Fixed block, be located at described fixed block on the left of roller, the bristle being arranged on described roller, be located at described roller on the left of the 9th Drainage screen, the 6th spring on the left of described 9th drainage screen, the tenth drainage screen on the left of described 6th spring and position The 7th spring above described tenth drainage screen.
2. be used for as claimed in claim 1 the boiler smoke filtration system of environmental protection it is characterised in that: described pumping bucket is in hollow Round table-like, described first transverse slat is horizontal, the side of described first transverse slat with described pumping bucket inner surface be fixedly connected, The left and right two ends of described first transverse slat are provided with the first groove, and described first drainage screen is horizontal, the side of described first drainage screen Face is fixedly connected with the inner surface of described pumping bucket, and described first drainage screen is provided with the first through hole running through its upper and lower surface, Described baffle ring is in the cylinder that cross section is annulus, and described baffle ring is vertically placed, and the lower surface of described baffle ring filters with described first The upper surface of net is fixedly connected, and described baffle ring is located at the top of described first through hole, and the lower end of described first pipeline is taken out with described The upper surface of gas bucket is fixedly connected, and described first fix bar is horizontal, and the left end of described first fix bar is solid with described blower fan Fixed connect, described first support is in l type, and the side struggled against with described pumping in the lower end of described first support is fixedly connected, described the The upper end of one support is in vertical shape.
3. be used for as claimed in claim 2 the boiler smoke filtration system of environmental protection it is characterised in that: the horizontal stroke of described first framework Section is in isosceles trapezoid, and the lower surface of described first framework is oblique, the right-hand member of described first fix bar and described first frame The left surface of body is fixedly connected, and the upper end of described first support is fixedly connected with the lower surface of described first framework, and described first Framework is provided with the first through hole positioned at its left surface, the second through hole positioned at its right surface, third through-hole and is located at its following table The fourth hole in face, the upper end of described first pipeline is directed at described first through hole and the left surface with described first framework is fixed even Connect, third through-hole described in the lower end aligned of the described second pipe and right surface with described first framework is fixedly connected, described enter Bucket is in hollow round table-like, the upper end of described second pipe with described enter bucket lower surface be fixedly connected, described discharge pipe Upper end be directed at described fourth hole and the lower surface with described first framework and be fixedly connected.
4. be used for as claimed in claim 3 the boiler smoke filtration system of environmental protection it is characterised in that: described first swash plate is in incline Ramp-like, the left end of described first swash plate is fixedly connected with the inner surface of described first framework, the cross section of described first sponge block Ovalize, the lower end of described first sponge block acts against on the upper surface of described first swash plate, described first sponge block upper End act against on the inner surface of described first framework, described second drainage screen be in vertical shape, the upper end of described second drainage screen with The inner surface of described second framework is fixedly connected, and the lower end of described second drainage screen is fixing with the upper end of described first swash plate even Connect, described first spring is horizontal, the right-hand member of described first spring is fixedly connected with described second drainage screen, described first bullet The left end of spring is fixedly connected with described first sponge block, and described second sponge block is in bending, the left end of described second sponge block It is fixedly connected with described first swash plate, the right-hand member of described second sponge block is fixedly connected with the inner surface of described first framework, institute Stating the 3rd drainage screen is in bending, and the left end of described 3rd drainage screen is fixedly connected with described first swash plate, described 3rd filtration The right-hand member of net is fixedly connected with the inner surface of described first framework, the lower surface of described second sponge block and described 3rd drainage screen Upper surface be fixedly connected, described second spring be in vertical shape, the upper end of described second spring is fixed with described 3rd drainage screen Connect, the lower end of described second spring is fixedly connected with described 3rd sponge block, described 4th drainage screen is horizontal, described the The left end of four drainage screens is fixedly connected with the inner surface of described first framework, and the right-hand member of described 4th drainage screen is extra large with the described 3rd The left surface of continuous block is fixedly connected, and described 3rd sponge block is oblique, and described 3rd sponge block is interior with described first framework Surface is fixedly connected, and described 4th sponge block is in vertical shape, the lower end of described 4th sponge block and the interior table of described first framework Face is fixedly connected, and the upper end of described 4th sponge block is fixedly connected with described 3rd sponge block.
5. be used for as claimed in claim 4 the boiler smoke filtration system of environmental protection it is characterised in that: described second support is in l Type, the upper end of described second support is fixedly connected with the right surface of described first framework, the lower end of described second support with described The upper surface of second framework is fixedly connected, and described second framework is in hollow cuboid, and described second framework is provided with positioned at it The fifth hole of left surface and the clematis stem hole being located at its lower surface, the left end of described 3rd pipeline be aligned described second through hole and It is fixedly connected with the right surface of described first framework, the right-hand member of described 3rd pipeline is directed at described fifth hole and with described second The left surface of framework is fixedly connected, and described 3rd spring is provided with two, and described 3rd spring is in vertical shape, described 3rd spring Upper end is fixedly connected with the inner surface of described second framework, the lower end of described 3rd spring and the upper surface of described 5th sponge block It is fixedly connected, described 5th sponge block is in cuboid and horizontal positioned, the lower surface of described 5th sponge block and described second frame The inner surface of body is fixedly connected, described 5th sponge block be located at described clematis stem hole top, described stop block be in cuboid and Vertically place, the lower surface of described stop block is fixedly connected with the inner surface of described second framework, the right side of described 5th sponge block Surface is slidably connected with the left surface of described stop block, and the upper end of described 4th pipeline is directed at described clematis stem hole and with described the The lower surface of two frameworks is fixedly connected.
6. be used for as claimed in claim 5 the boiler smoke filtration system of environmental protection it is characterised in that: described first catch bar is in Cuboid and horizontal positioned, the right-hand member of described first catch bar is connected with described first electric cylinders, the left end of described first catch bar It is fixedly connected with the right surface of described first push pedal, described first push pedal is in cuboid and vertical placement, described first push pedal Side is slidably connected with the inner surface of described second framework, described 3rd support be in concave shape, one end of described 3rd support with The lower surface of described first electric cylinders is fixedly connected, and the other end of described 3rd support is fixing with the lower surface of described second framework even Connect, described 4th support is in l type, the upper end of described 4th support is fixedly connected with described 3rd support, described 4th support Lower end is horizontal.
7. be used for as claimed in claim 6 the boiler smoke filtration system of environmental protection it is characterised in that: described 3rd framework is in sky The heart round table-like, described 3rd framework be provided with positioned at its upper surface the 7th through hole and be located at its lower surface the 8th through hole, The lower end of described 4th support is fixedly connected with the side of described 3rd framework, the 7th described in the lower end aligned of described 4th pipeline The through hole and upper surface with described 3rd framework is fixedly connected, described 5th drainage screen is in hollow hemispherical, described five faults in diagnosis and treatment The upper surface of filter screen is fixedly connected with the inner surface of described 3rd framework, places right activated carbon in described 3rd drainage screen, described 3rd drainage screen is located at the lower section of described 7th through hole, and described 6th drainage screen is horizontal, the side of described 6th drainage screen It is fixedly connected with the inner surface of described 3rd framework, the cross section of described support block is triangular in shape, the lower surface of described support block It is fixedly connected with the upper surface of described 6th drainage screen, described support block acts against on described 5th drainage screen, described corner block It is provided with two and the left and right sides being located in described 3rd framework respectively, the cross section of described corner block is triangular in shape, described three Hornblock is fixedly connected with the inner surface of described 3rd framework, and described 4th spring is provided with two, and described 4th spring is in vertical shape, The upper end of described 4th spring is fixedly connected with described 6th drainage screen, the lower end of described 4th spring and described 3rd framework Inner surface is fixedly connected, and described 5th spring is in vertical shape, and the upper end of described 5th spring is fixing with described 6th drainage screen even Connect, the lower end of described 5th spring is fixedly connected with the upper surface of described 7th drainage screen, described 7th drainage screen is in cuboid And horizontal positioned, the lower surface of described 7th drainage screen and the inner surface of described 3rd framework be slidably connected, described 7th filtration Net is located at the top of described 8th through hole.
8. be used for as claimed in claim 7 the boiler smoke filtration system of environmental protection it is characterised in that: described 5th pipeline End is directed at described 8th through hole and the lower surface with described 3rd framework is fixedly connected, and described first support bar is provided with two, institute State first support bar be in cuboid and vertical place, the lower surface of the upper end of described first support bar and described 3rd framework is fixed Connect, described second support bar is in cuboid and vertical placement, under the upper end of described second support bar and described 4th support Surface is fixedly connected, and described 5th support is in l type, and the upper end of described 5th support is fixing with the left surface of described 3rd framework even Connect.
9. be used for as claimed in claim 8 the boiler smoke filtration system of environmental protection it is characterised in that: described 4th framework is in sky The cuboid of the heart and horizontal positioned, described 4th framework is provided with positioned at the 9th through hole of its upper surface and positioned at its left surface Tenth through hole, the 9th through hole described in lower end aligned of the described 5th pipeline and upper surface with described 4th framework is fixedly connected, The lower end of described first support bar is fixedly connected with the upper surface of described 4th framework, the lower end of described second support bar with described The upper surface of the 4th framework is fixedly connected, and the lower end of described 5th support is fixedly connected with the upper surface of described 4th framework, institute State right-hand member described tenth through hole of be aligned of the 6th pipeline and the left surface with described 4th framework is fixedly connected, described second electric cylinders Right surface be fixedly connected with the inner surface of described 4th framework, described second fix bar is provided with two and is located at described the respectively The both sides up and down of two electric cylinders, described second fix bar is in cuboid, one end of described second fix bar and described 4th framework Inner surface is fixedly connected, and the other end of described second fix bar is fixedly connected with described second electric cylinders, and described second catch bar is in Cuboid and horizontal positioned, the right-hand member of described second catch bar is connected with described second electric cylinders, the left end of described second catch bar It is fixedly connected with the right surface of described second push pedal, described second push pedal is in cuboid and vertical placement, described second push pedal Side is slidably connected with the inner surface of described 4th framework.
10. be used for as claimed in claim 9 the boiler smoke filtration system of environmental protection it is characterised in that: described baffle plate is in rectangular Body and vertical placement, the upper end of described baffle plate is fixedly connected with the inner surface of described 4th framework, and described 8th drainage screen is in length Cube and vertical placement, the upper surface of described 8th drainage screen is fixedly connected with the lower surface of described baffle plate, described 8th filtration The lower surface of net is fixedly connected with the inner surface of described 4th framework, and the cross section of described fixed block is in a rectangular trapezoid, described solid The upper surface determining block is fixedly connected with the inner surface of described 4th framework, the right surface of described fixed block and the left-handed watch of described baffle plate Face is fixedly connected, and described roller is in cylinder, and described roller is turned with described 4th framework axle and is connected, and described bristle is provided with several And be evenly distributed on described roller, described bristle is fixedly connected with described roller, and described 9th drainage screen is in bending, described 9th drainage screen is fixedly connected with the inner surface of described 4th framework, and the cross section of described tenth drainage screen is in l type, and the described tenth Drainage screen is fixedly connected with the inner surface of described 4th framework, and described tenth drainage screen is located at the right side of described tenth through hole, institute State that the 6th spring is horizontal, the right-hand member of described 6th spring is fixedly connected with described 9th drainage screen, described 6th spring Left end is fixedly connected with described tenth drainage screen, and described 7th spring is in vertical shape, the upper end of described 7th spring and described the Four frameworks are fixedly connected, and the lower end of described 7th spring is fixedly connected with described tenth drainage screen.
CN201610840498.1A 2016-09-21 2016-09-21 Boiler smoke dust filtering system for environmental protection Pending CN106345211A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610840498.1A CN106345211A (en) 2016-09-21 2016-09-21 Boiler smoke dust filtering system for environmental protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610840498.1A CN106345211A (en) 2016-09-21 2016-09-21 Boiler smoke dust filtering system for environmental protection

Publications (1)

Publication Number Publication Date
CN106345211A true CN106345211A (en) 2017-01-25

Family

ID=57858223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610840498.1A Pending CN106345211A (en) 2016-09-21 2016-09-21 Boiler smoke dust filtering system for environmental protection

Country Status (1)

Country Link
CN (1) CN106345211A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106664930A (en) * 2017-02-09 2017-05-17 深圳市玖品空气净化科技有限公司 Environmental-friendly biological fertilizer application equipment
CN107537264A (en) * 2017-09-27 2018-01-05 权伟机械(江苏)有限公司 A kind of air-filtering equipment used for air compressor

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105477944A (en) * 2016-01-21 2016-04-13 金思思 Air purifying device facilitating clearing of dust
CN105749682A (en) * 2016-04-15 2016-07-13 安双志 Environment-friendly efficient dust suction device for textile spinning
CN105833650A (en) * 2016-05-28 2016-08-10 周末 Smoke dust purification equipment
CN105854487A (en) * 2016-05-28 2016-08-17 周末 Chemical plant waste gas purification treatment device
CN105854440A (en) * 2016-06-12 2016-08-17 成都恒力达科技有限公司 Industrial waste gas filtering purifier

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105477944A (en) * 2016-01-21 2016-04-13 金思思 Air purifying device facilitating clearing of dust
CN105749682A (en) * 2016-04-15 2016-07-13 安双志 Environment-friendly efficient dust suction device for textile spinning
CN105833650A (en) * 2016-05-28 2016-08-10 周末 Smoke dust purification equipment
CN105854487A (en) * 2016-05-28 2016-08-17 周末 Chemical plant waste gas purification treatment device
CN105854440A (en) * 2016-06-12 2016-08-17 成都恒力达科技有限公司 Industrial waste gas filtering purifier

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106664930A (en) * 2017-02-09 2017-05-17 深圳市玖品空气净化科技有限公司 Environmental-friendly biological fertilizer application equipment
CN106664930B (en) * 2017-02-09 2019-01-11 宁夏众虎智农实业股份有限公司 A kind of bio-feritlizer fertilizing equipment of environmental protection
CN107537264A (en) * 2017-09-27 2018-01-05 权伟机械(江苏)有限公司 A kind of air-filtering equipment used for air compressor
CN107537264B (en) * 2017-09-27 2022-12-06 权伟机械集团(江苏)有限公司 Air filtering equipment for air compressor

Similar Documents

Publication Publication Date Title
CN105771529A (en) Efficient environment-friendly indoor air purifying device
CN201108793Y (en) Purifying means for unwanted exhaust gas advanced treatment
CN108452618B (en) Cloth drying, exhausting and dedusting system
CN106540500A (en) A kind of boiler waste gas treating device
CN205164427U (en) Formula exhaust -gas treatment equipment is adsorbed in condensation
CN106345211A (en) Boiler smoke dust filtering system for environmental protection
CN204996283U (en) Boiler exhaust -gas treatment apparatus
CN106563322A (en) Boiler water film dust removal device
CN206015855U (en) A kind of rainwater flow-discarding device for sponge urban construction
CN205288057U (en) High -efficient dedusting and desulfurizing integration spraying absorb tower of thermal power plant
CN103643984B (en) Uranium ore air draft well tail gas multi-stage separation composite dedusting purifier
CN202860388U (en) Multi-purpose serial bubble type smoke treating device
CN109576028A (en) A kind of natural gas purification processing tower
CN106362533B (en) A kind of bag filter of delay supercharging
CN208943499U (en) A kind of organic exhaust gas active-carbon fibers adsorption processing unit
CN208448915U (en) A kind of energy-saving dust remover
CN203484011U (en) Washing-type deduster
CN203483913U (en) Power oil absorption tank capable of regenerating absorbent
CN207936336U (en) Air cleaning unit in a kind of architectural environment
CN201625491U (en) Adsorption tower
CN204699551U (en) Boiler combustion air emission abatement device
CN201643937U (en) Portable purifier capable of initiatively adsorbing smoke
CN201676609U (en) Smoke elimination desulfurization dust remover
CN205760595U (en) A kind of heat-engine plant wet flue gas desulfurization absorption plant
CN220246050U (en) Novel filtering and dedusting equipment for biogas

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170125