CN106339810A - 标准提资与概预算编制相对应的数学模型 - Google Patents
标准提资与概预算编制相对应的数学模型 Download PDFInfo
- Publication number
- CN106339810A CN106339810A CN201610729897.0A CN201610729897A CN106339810A CN 106339810 A CN106339810 A CN 106339810A CN 201610729897 A CN201610729897 A CN 201610729897A CN 106339810 A CN106339810 A CN 106339810A
- Authority
- CN
- China
- Prior art keywords
- project
- information providing
- design
- standard
- money
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000013461 design Methods 0.000 claims abstract description 21
- 239000000463 material Substances 0.000 claims abstract description 12
- 238000012546 transfer Methods 0.000 claims abstract description 5
- 238000010276 construction Methods 0.000 claims description 11
- 238000011160 research Methods 0.000 claims description 6
- 238000011156 evaluation Methods 0.000 claims description 3
- 230000009466 transformation Effects 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims 1
- 230000001105 regulatory effect Effects 0.000 abstract 1
- 238000000034 method Methods 0.000 description 4
- 230000005611 electricity Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000004069 differentiation Effects 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000010348 incorporation Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- Life Sciences & Earth Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Public Health (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610729897.0A CN106339810A (zh) | 2016-08-26 | 2016-08-26 | 标准提资与概预算编制相对应的数学模型 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610729897.0A CN106339810A (zh) | 2016-08-26 | 2016-08-26 | 标准提资与概预算编制相对应的数学模型 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106339810A true CN106339810A (zh) | 2017-01-18 |
Family
ID=57822185
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610729897.0A Pending CN106339810A (zh) | 2016-08-26 | 2016-08-26 | 标准提资与概预算编制相对应的数学模型 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106339810A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111260413A (zh) * | 2020-01-22 | 2020-06-09 | 国网浙江省电力有限公司经济技术研究院 | 一种基于矢量图形的电力主网工程施工图造价速算方法 |
CN116645057A (zh) * | 2022-07-15 | 2023-08-25 | 国网四川省电力公司经济技术研究院 | 用于输变电工程评审的信息处理方法及评审系统 |
-
2016
- 2016-08-26 CN CN201610729897.0A patent/CN106339810A/zh active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111260413A (zh) * | 2020-01-22 | 2020-06-09 | 国网浙江省电力有限公司经济技术研究院 | 一种基于矢量图形的电力主网工程施工图造价速算方法 |
CN111260413B (zh) * | 2020-01-22 | 2023-09-12 | 国网浙江省电力有限公司经济技术研究院 | 一种基于矢量图形的电力主网工程施工图造价速算方法 |
CN116645057A (zh) * | 2022-07-15 | 2023-08-25 | 国网四川省电力公司经济技术研究院 | 用于输变电工程评审的信息处理方法及评审系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106372781A (zh) | 标准化电网工程提资模板 | |
Wang et al. | Constructing an energy efficiency benchmarking system for coal production | |
Bank et al. | Integrating BIM with system dynamics as a decision-making framework for sustainable building design and operation | |
Wijayakumar et al. | Automation of BIM quantity take-off to suit QS’s requirements | |
CN106097149A (zh) | 基于bim技术的输变电工程造价软件的设计方法 | |
CN105117850A (zh) | 输变电工程设计智能化评审辅助系统 | |
CN104252652A (zh) | 电力系统中空间负荷预测方法 | |
CN102646144A (zh) | 基于ObjectARX的农网工程标准化智能化设计方法 | |
CN103093007A (zh) | 输电铁塔三维虚拟装配方法 | |
Farooq et al. | Applications of Building Information Modeling in Electrical Systems Design. | |
CN103150623A (zh) | 一种基于元模型的云制造能力服务建模方法 | |
CN106339810A (zh) | 标准提资与概预算编制相对应的数学模型 | |
CN108170899A (zh) | 一种土质边坡可靠度分析上限法 | |
CN102982420A (zh) | 基于多目标决策理想点法的资产全寿命周期评估方法 | |
CN106447528A (zh) | 历史电网工程典型资源库的建立 | |
CN115907322A (zh) | 基于全生命周期的住区改造前后碳排放影响核算方法及系统 | |
CN109842121B (zh) | 多级多区域协控减负荷在线仿真建模方法及系统 | |
Liu et al. | Evaluation on regional science and technology resources allocation in China based on the zero sum gains data envelopment analysis | |
CN102651115B (zh) | 并行异步混合算法处理系统和水库或水库群优化调度方法 | |
CN102169343A (zh) | 电网集中监控中心程序化遥控操作系统及其操作方法 | |
Shang et al. | Study on quantitative estimation method of energy saving and emission reduction of renewable energy system based on fuzzy matter-element method | |
Yu et al. | Research on the post occupancy evaluation of green public building environmental performance combined with carbon emissions accounting | |
Tyurin | Methods of computer modeling of cost models for buildings | |
CN113807573A (zh) | 一种基于数据管理和三维搜索的施工预测分析方法及系统 | |
CN112116216A (zh) | 一种基于多对象多维度的新能源消纳评价方法及系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Jinyuan Inventor after: Xu Qiangsheng Inventor after: Xia Jingbo Inventor after: Zhang Ruyu Inventor after: Xiu Ce Inventor after: Li Jianhua Inventor after: Li Ge Inventor after: Wu Xuefeng Inventor after: Gao Xun Inventor after: Li Xianglin Inventor after: Zhang Ou Inventor after: Yu Xingcheng Inventor before: Liu Jinyuan Inventor before: Xu Qiangsheng Inventor before: Zhang Shuangying Inventor before: Zhang Ruyu Inventor before: Xiu Ce Inventor before: Li Jianhua Inventor before: Li Ge Inventor before: Wu Xuefeng Inventor before: Gao Xun Inventor before: Li Xianglin Inventor before: Zhang Ou Inventor before: Yu Xingcheng |
|
COR | Change of bibliographic data | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Jinyuan Inventor after: Xu Qiangsheng Inventor after: Xia Jingbo Inventor after: Zhang Ruyu Inventor after: Liu Ziyuan Inventor after: Zhu Yining Inventor after: Xiu Ce Inventor after: Li Jianhua Inventor after: Li Ge Inventor after: Wu Xuefeng Inventor after: Gao Xun Inventor after: Li Xianglin Inventor after: Zhang Ou Inventor after: Yu Xingcheng Inventor before: Liu Jinyuan Inventor before: Xu Qiangsheng Inventor before: Xia Jingbo Inventor before: Zhang Ruyu Inventor before: Xiu Ce Inventor before: Li Jianhua Inventor before: Li Ge Inventor before: Wu Xuefeng Inventor before: Gao Xun Inventor before: Li Xianglin Inventor before: Zhang Ou Inventor before: Yu Xingcheng |
|
COR | Change of bibliographic data | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170118 |
|
WD01 | Invention patent application deemed withdrawn after publication |