CN106447528A - 历史电网工程典型资源库的建立 - Google Patents
历史电网工程典型资源库的建立 Download PDFInfo
- Publication number
- CN106447528A CN106447528A CN201610729896.6A CN201610729896A CN106447528A CN 106447528 A CN106447528 A CN 106447528A CN 201610729896 A CN201610729896 A CN 201610729896A CN 106447528 A CN106447528 A CN 106447528A
- Authority
- CN
- China
- Prior art keywords
- engineering
- data
- engineering cost
- history
- cost
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004458 analytical method Methods 0.000 claims abstract description 17
- 238000010276 construction Methods 0.000 claims description 13
- 230000005611 electricity Effects 0.000 claims description 11
- 238000013461 design Methods 0.000 claims description 8
- 238000000034 method Methods 0.000 claims description 7
- 238000007405 data analysis Methods 0.000 claims description 3
- 238000011156 evaluation Methods 0.000 claims description 3
- 238000005096 rolling process Methods 0.000 claims description 3
- 238000007726 management method Methods 0.000 abstract description 8
- 238000005516 engineering process Methods 0.000 abstract description 3
- 238000007418 data mining Methods 0.000 abstract description 2
- 238000011161 development Methods 0.000 abstract description 2
- 230000000052 comparative effect Effects 0.000 abstract 1
- 238000007728 cost analysis Methods 0.000 abstract 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000004069 differentiation Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/21—Design, administration or maintenance of databases
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610729896.6A CN106447528A (zh) | 2016-08-26 | 2016-08-26 | 历史电网工程典型资源库的建立 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610729896.6A CN106447528A (zh) | 2016-08-26 | 2016-08-26 | 历史电网工程典型资源库的建立 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106447528A true CN106447528A (zh) | 2017-02-22 |
Family
ID=58181971
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610729896.6A Pending CN106447528A (zh) | 2016-08-26 | 2016-08-26 | 历史电网工程典型资源库的建立 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106447528A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107391110A (zh) * | 2017-06-22 | 2017-11-24 | 国家电网公司 | 配电网工程设计技经一体化软件设计方法 |
CN107944731A (zh) * | 2017-12-04 | 2018-04-20 | 国网河北省电力公司经济技术研究院 | 典型工程造价模板的建立方法及装置 |
CN110503873A (zh) * | 2019-08-28 | 2019-11-26 | 河南质量工程职业学院 | 一种建筑工程造价教学演示方法 |
CN112016755A (zh) * | 2020-08-31 | 2020-12-01 | 国网甘肃省电力公司建设分公司 | 输变电工程施工图通用设计造价标准化技术模块构建方法 |
-
2016
- 2016-08-26 CN CN201610729896.6A patent/CN106447528A/zh active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107391110A (zh) * | 2017-06-22 | 2017-11-24 | 国家电网公司 | 配电网工程设计技经一体化软件设计方法 |
CN107944731A (zh) * | 2017-12-04 | 2018-04-20 | 国网河北省电力公司经济技术研究院 | 典型工程造价模板的建立方法及装置 |
CN110503873A (zh) * | 2019-08-28 | 2019-11-26 | 河南质量工程职业学院 | 一种建筑工程造价教学演示方法 |
CN112016755A (zh) * | 2020-08-31 | 2020-12-01 | 国网甘肃省电力公司建设分公司 | 输变电工程施工图通用设计造价标准化技术模块构建方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106447528A (zh) | 历史电网工程典型资源库的建立 | |
CN106372781A (zh) | 标准化电网工程提资模板 | |
Nowak et al. | Decision making with use of building information modeling | |
Kádár et al. | Enhanced control of complex production structures by tight coupling of the digital and the physical worlds | |
CN104252652A (zh) | 电力系统中空间负荷预测方法 | |
CN109766605A (zh) | 实物与价值联动的配电网全信息数字模型的建立方法 | |
Dmitriev et al. | Approaches to Classifying Building Innovations while Implementing Information Modeling and Project Management. | |
Farooq et al. | Applications of Building Information Modeling in Electrical Systems Design. | |
Hamidavi et al. | OSD: A framework for the early stage parametric optimisation of the structural design in BIM-based platform | |
Davé et al. | Factory eco-efficiency modelling: framework application and analysis | |
CN103530820A (zh) | 一种智能电网技术评价的建模方法 | |
Mailyan et al. | Optimal order of construction of facilities in complex development with minimal additional costs | |
CN106339810A (zh) | 标准提资与概预算编制相对应的数学模型 | |
Bernardon et al. | Automatic reconfiguration of distribution networks using Smart Grid concepts | |
Bapat et al. | Selection of sustainable materials for energy savings of infrastructure-transportation project in Ahmedabad, India using BIM and FCM | |
Tyurin | Methods of computer modeling of cost models for buildings | |
Huang | Research on computer assisted intelligent emission system of high-rise building based on BIM technology and wireless automatic monitoring | |
Trtílek et al. | Measuring the performance of construction contracts with regard to the environment | |
Agrawal et al. | Layout optimization of machining process of the side frame of cotton ginning M/C using FLP | |
Gavrilova et al. | Management of Energy Supply of Production as a Factor of Sustainable Development of Machine-building Enterprises | |
Bil | A simulation-based approach to decision support for lean practitioners | |
CN104268641A (zh) | 一种考虑三级行业划分的电量预测方法 | |
CN109753717A (zh) | 一种配电网构件数字模型的构建方法及应用 | |
Saldanha et al. | Energy efficiency frameworks: A literature overview | |
Jung et al. | Analysis of the possibility of required resources estimation for nuclear power plant decommissioning applying BIM |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Ruyu Inventor after: Lin Jianfeng Inventor after: Zhang Shuangying Inventor after: Liu Jinyuan Inventor after: Liu Ziyuan Inventor after: Zhu Yining Inventor after: Xia Jingbo Inventor after: Xu Qiangsheng Inventor after: Yu Xingcheng Inventor after: Zhang Ou Inventor after: Ma Qiang Inventor after: Yan Chuang Inventor after: Wu Xuefeng Inventor after: Xiao Xue Inventor before: Zhang Ruyu Inventor before: Lin Jianfeng Inventor before: Zhang Shuangying Inventor before: Liu Jinyuan Inventor before: Xia Jingbo Inventor before: Xu Qiangsheng Inventor before: Yu Xingcheng Inventor before: Zhang Ou Inventor before: Ma Qiang Inventor before: Yan Chuang Inventor before: Wu Xuefeng Inventor before: Xiao Xue |
|
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170222 |