CN106337408A - 一种碎石挤密桩复合地基的施工方法 - Google Patents
一种碎石挤密桩复合地基的施工方法 Download PDFInfo
- Publication number
- CN106337408A CN106337408A CN201610720507.3A CN201610720507A CN106337408A CN 106337408 A CN106337408 A CN 106337408A CN 201610720507 A CN201610720507 A CN 201610720507A CN 106337408 A CN106337408 A CN 106337408A
- Authority
- CN
- China
- Prior art keywords
- tube
- broken stone
- composite foundation
- immersed tube
- vibration
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/08—Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本发明公开了一种碎石挤密桩复合地基的施工方法,包括:根据设计图纸,对所有需要施工的碎石挤密桩进行放样,确定碎石桩的桩孔位置;用打桩机进行振动沉管,沉管每下沉0.5m,留振30s,直到沉管达到设计标高为止;沉管达到设计深度后,进行第一次填碎石料,在沉管内注入1/3体积的水,然后进行投填碎石料,直到投满为止,启动拔管后先留振1min,然后进行拔管;拔管在3.5m后边向沉管注水边填碎石料,每提升1m,留振20min,直到沉管拔至孔口处,启动反插,向沉管内注入碎石料。
Description
技术领域
本发明属于地基施工领域,尤其涉及一种碎石挤密桩复合地基的施工方法。
背景技术
传统的振冲碎石桩成孔依赖于高压水的冲排,实质上是用碎石置换相同体积的土,只是在振动器振动时才能达到土体挤密的作用,但一般的振动器不长,横向振动范围并不大,所以挤密效果不强,土体的承载力提高不多,土体密实也提高不大,减少沉降量的能力也大为削弱。
发明内容
本发明实施例的目的在于提供一种碎石挤密桩复合地基的施工方法,旨在解决软土地基的强度、承载能力、降低地基的沉降量以及地基土的抗液化能力低的问题。
本发明是这样实现的,一种碎石挤密桩复合地基的施工方法包括:
步骤一、根据设计图纸,对所有需要施工的碎石挤密桩进行放样,确定碎石桩的桩孔位置;
步骤二、用打桩机进行振动沉管,沉管每下沉0.5m,留振30s,直到沉管达到设计标高为止;
步骤三、沉管达到设计深度后,进行第一次填碎石料,在沉管内注入1/3体积的水,然后进行投填碎石料,直到投满为止,启动拔管后先留振1min,然后进行拔管;
步骤四、拔管在3.5m后边向沉管注水边填碎石料,每提升1m,留振20min,直到沉管拔至孔口处,启动反插,向沉管内注入碎石料。
进一步,按隔行隔列跳跃式施工。
进一步,拔管速度控制在每分钟不超过1m。
本发明提供的碎石挤密桩复合地基的施工方法中碎石桩在成孔过程中,对周围土产生很大的横向挤压力,使桩周围的土重新排列密实,空隙减小,密实度增大,通过挤密作用,提高了土的强度和地基承载力;
碎石桩还有造价较低,砂石资源丰富,可就地取材,节约钢材、水泥等优点,施工工期短、质量容易控制;
本发明提供的碎石挤密桩复合地基的施工方法中碎石挤密桩是通过振动沉管将同体积的土体挤开灌入碎石料,因而挤密效果佳,施工中无需高压水成孔,无土体流失,碎石用量少,施工方便;土体中被强制灌入碎石,使土体密实度和承载力大大提高,有效抑制地基的沉降量。
解决了软土地基的强度、承载能力、降低地基的沉降量以及地基土的抗液化能力低的问题。
本发明的具体的应用案例以及效果:长株潭烟草物流园项目联合工房建安工程项目位于长株潭交界处,基坑属于大型基坑。此项目场地原始微地貌属于湘江冲洪积阶地,且根据地勘察报告,场地内大部分区域埋藏淤泥质土及砾砂层。属于软土地基,其沉降量大,固结时间长,承载力小。此实际工程中采取碎石挤密桩加固措施,共施工碎石桩3116根,桩体承载力为100Kpa,经过碎石桩加固处理后的区域根据重型动力触探试验和静载试验结果可知桩体的密实度和地基承载力得到明显提高。
附图说明
图1是本发明实施例提供的碎石挤密桩复合地基的施工方法流程图;
图2是本发明实施例提供的碎石挤密桩复合地基剖面示意图;
图3是本发明实施例提供的碎石挤密桩复合地基横切面结构示意图。
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
下面结合附图及具体实施例对本发明的应用原理作进一步描述。
请参阅图1:
一种碎石挤密桩复合地基的施工方法,包括:
S101、根据设计图纸,对所有需要施工的碎石挤密桩进行放样,确定碎石桩的桩孔位置;
S102、用打桩机进行振动沉管,沉管每下沉0.5m,留振30s,直到沉管达到设计标高为止,打桩机将桩孔的土向周围挤,使地基的土层更加密实;
S103、沉管达到设计深度后,进行第一次填碎石料,在沉管内注入1/3体积的水,然后进行投填碎石料,直到投满为止,启动拔管后先留振1min,然后进行拔管;
S104、拔管在3.5m后边向沉管注水边填碎石料,每提升1m,留振20min,直到沉管拔至孔口处,启动反插,向沉管内注入碎石料;
进一步,为了避免由于邻桩对于碎石挤密桩的变形影响,施工中应当按隔行隔列跳跃式施工。
进一步,拔管速度控制在每分钟不超过1m。
图2是本发明实施例提供的碎石挤密桩复合地基剖面示意图;
图3是本发明实施例提供的碎石挤密桩复合地基横切面结构示意图。
下面结合原理对本发明进一步说明。
长株潭烟草物流园项目联合工房建安工程项目位于长株潭交界处,,基坑属于大型基坑。此项目场地原始微地貌属于湘江冲洪积阶地,且根据地勘察报告,场地内大部分区域埋藏淤泥质土及砾砂层。属于软土地基,其沉降量大,固结时间长,承载力小。此实际工程中采取碎石挤密桩加固措施,共施工碎石桩3116根,桩体承载力为100Kpa,经过碎石桩加固处理后的区域根据重型动力触探试验和静载试验结果可知桩体的密实度和地基承载力得到明显提高。
本发明提供的碎石挤密桩复合地基的施工方法中碎石桩在成孔过程中,对周围土产生很大的横向挤压力,使桩周围的土重新排列密实,空隙减小,密实度增大,通过挤密作用,提高了土的强度和地基承载力;
碎石桩还有造价较低,砂石资源丰富,可就地取材,节约钢材、水泥等优点,施工工期短、质量容易控制;
本发明提供的碎石挤密桩复合地基的施工方法中碎石挤密桩是通过振动沉管将同体积的土体挤开灌入碎石料,因而挤密效果佳,施工中无需高压水成孔,无土体流失,碎石用量少,施工方便;土体中被强制灌入碎石,使土体密实度和承载力大大提高,有效抑制地基的沉降量。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。
Claims (3)
1.一种碎石挤密桩复合地基的施工方法,其特征在于,所述碎石挤密桩复合地基的施工方法包括:
步骤一、根据设计图纸,对所有需要施工的碎石挤密桩进行放样,确定碎石桩的桩孔位置;
步骤二、用打桩机进行振动沉管,沉管每下沉0.5m,留振30s,直到沉管达到设计标高为止;
步骤三、沉管达到设计深度后,进行第一次填碎石料,在沉管内注入1/3体积的水,然后进行投填碎石料,直到投满为止,启动拔管后先留振1min,然后进行拔管;
步骤四、拔管在3.5m后边向沉管注水边填碎石料,每提升1m,留振20min,直到沉管拔至孔口处,启动反插,向沉管内注入碎石料。
2.如权利要求1所述碎石挤密桩复合地基的施工方法,其特征在于,按隔行隔列跳跃式施工。
3.如权利要求1所述碎石挤密桩复合地基的施工方法,其特征在于,拔管速度控制在每分钟不超过1m。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610720507.3A CN106337408A (zh) | 2016-08-24 | 2016-08-24 | 一种碎石挤密桩复合地基的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610720507.3A CN106337408A (zh) | 2016-08-24 | 2016-08-24 | 一种碎石挤密桩复合地基的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106337408A true CN106337408A (zh) | 2017-01-18 |
Family
ID=57824885
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610720507.3A Pending CN106337408A (zh) | 2016-08-24 | 2016-08-24 | 一种碎石挤密桩复合地基的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106337408A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114150651A (zh) * | 2021-12-03 | 2022-03-08 | 中交第二航务工程勘察设计院有限公司 | 强夯联合沉管挤密砂石桩的复合地基加固方法 |
CN114737554A (zh) * | 2022-03-30 | 2022-07-12 | 中建路桥集团有限公司 | 一种利用碎石挤密桩处理桥头软基的施工方法 |
CN116289861A (zh) * | 2023-01-28 | 2023-06-23 | 中国十七冶集团有限公司 | 一种振冲碎石桩复合地基基层质量控制方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000160546A (ja) * | 1998-12-01 | 2000-06-13 | Geotop Corp | ドレーン材を施工する方法 |
KR20010104773A (ko) * | 2001-10-19 | 2001-11-28 | 김백영 | 연약지반 안정처리를 위한 모래혼합 진동쇄석말뚝 공법 |
CN1424468A (zh) * | 2003-01-21 | 2003-06-18 | 王继忠 | 复合地基的施工方法 |
CN1459533A (zh) * | 2002-05-22 | 2003-12-03 | 王继忠 | 加固地基的施工方法 |
CN101781888A (zh) * | 2010-02-01 | 2010-07-21 | 河海大学 | 一种振动沉管挤密碎石-混凝土组合桩及其施工方法 |
-
2016
- 2016-08-24 CN CN201610720507.3A patent/CN106337408A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000160546A (ja) * | 1998-12-01 | 2000-06-13 | Geotop Corp | ドレーン材を施工する方法 |
KR20010104773A (ko) * | 2001-10-19 | 2001-11-28 | 김백영 | 연약지반 안정처리를 위한 모래혼합 진동쇄석말뚝 공법 |
CN1459533A (zh) * | 2002-05-22 | 2003-12-03 | 王继忠 | 加固地基的施工方法 |
CN1424468A (zh) * | 2003-01-21 | 2003-06-18 | 王继忠 | 复合地基的施工方法 |
CN101781888A (zh) * | 2010-02-01 | 2010-07-21 | 河海大学 | 一种振动沉管挤密碎石-混凝土组合桩及其施工方法 |
Non-Patent Citations (1)
Title |
---|
高俊峰: "振动沉管挤密碎石桩施工技术", 《铁道标准设计》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114150651A (zh) * | 2021-12-03 | 2022-03-08 | 中交第二航务工程勘察设计院有限公司 | 强夯联合沉管挤密砂石桩的复合地基加固方法 |
CN114737554A (zh) * | 2022-03-30 | 2022-07-12 | 中建路桥集团有限公司 | 一种利用碎石挤密桩处理桥头软基的施工方法 |
CN116289861A (zh) * | 2023-01-28 | 2023-06-23 | 中国十七冶集团有限公司 | 一种振冲碎石桩复合地基基层质量控制方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2017133372A1 (zh) | 一种复合地基及其施工方法 | |
CN104131555B (zh) | 一种外包透水性钢筋混凝土管碎石注浆桩及其施工方法 | |
CN104005404B (zh) | 一种外包活性材料桩体的预应力管桩及施工方法 | |
CN112609673B (zh) | 深层共振密实加固杂填土地基的装置及方法 | |
CN203924036U (zh) | 一种外包活性材料桩体的预应力管桩 | |
CN106703004A (zh) | 一种湿陷性黄土地基的处理方法 | |
CN102900079A (zh) | 高频液振水泥土插芯组合桩施工工法 | |
CN105804007B (zh) | 一种基于滩涂软基的加筋土岸墙结构 | |
CN105714773A (zh) | 一种地基处理方法 | |
CN103061328A (zh) | 一种带砂墙翼板的后注浆碎石桩及施工方法 | |
CN105113478A (zh) | 一种地基深层置换强夯处理法 | |
CN106337408A (zh) | 一种碎石挤密桩复合地基的施工方法 | |
CN109680671A (zh) | 一种基于建筑垃圾的液化地基处理方法 | |
CN107012861A (zh) | 一种散体材料芯膨胀混凝土桩及其施工方法 | |
CN203066056U (zh) | 一种带砂墙翼板的后注浆碎石桩及其专用沉管 | |
CN102251514A (zh) | 多段式变截面强夯法 | |
CN102535446B (zh) | 大断面沉管灌注混凝土后压浆空心方桩及其制作方法 | |
CN103966996A (zh) | 一种碎石桩及其制作方法 | |
CN108824412A (zh) | 基于石笼墙加筋土以及强夯联合的软基处理方法 | |
CN205591212U (zh) | 多功能预制管桩 | |
CN110409416A (zh) | 一种湿陷性土或溶陷性土地基的处理方法 | |
CN106869153A (zh) | 一种井点降水快速处理软地基的方法 | |
CN102605775B (zh) | 一种柔性桩与刚性桩上下同体组合桩及成桩方法 | |
CN103981863A (zh) | 一种散体材料桩与混凝土上下同体组合桩及施工方法 | |
CN211200425U (zh) | 一种碎石土高填方边坡复合支护结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170118 |