CN106337369A - Steel-truss supporting method for construction of cap beam of pier - Google Patents
Steel-truss supporting method for construction of cap beam of pier Download PDFInfo
- Publication number
- CN106337369A CN106337369A CN201610837166.8A CN201610837166A CN106337369A CN 106337369 A CN106337369 A CN 106337369A CN 201610837166 A CN201610837166 A CN 201610837166A CN 106337369 A CN106337369 A CN 106337369A
- Authority
- CN
- China
- Prior art keywords
- steel
- pier
- platform
- cap beam
- iron
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
The invention discloses a steel-truss supporting method for construction of a cap beam of a pier. The steel-truss supporting method comprises the following steps: enabling steel rods to penetrate into reserved holes formed at the upper parts of concrete pier columns; installing steel supports symmetrically at the two ends of the steel rods, and installing platform-lifting adjustment devices symmetrically on the steel supports; arranging a bearing steel-truss platform on the platform-lifting adjustment devices; supporting the bearing steel-truss platform on the platform-lifting adjustment devices of the two adjacent concrete pier columns; arranging cushion blocks on the bearing steel-truss platform, installing sized steel templates on the cushion blocks, and casting concrete to form a concrete cap beam of the pier. The steel-truss supporting method disclosed by the invention has the advantages that the working procedure time of the construction of the cap beam of the pier can be shortened, fast formation of the steel-truss support for construction of the cap beam of the pier is ensured, the construction safety of a supporting system is improved, the stability of the template of the cap beam of the pier is realized, and the technical effect for the quality of the concrete casting compactness of the cap beam is guaranteed; in disassembly, the removal is carried out according to the reverse order of installation, the time for disassembling operation can be greatly shortened, the working procedure time of high-altitude operation is shortened, and the safety of disassembling operation is improved.
Description
Technical field
The present invention relates to a kind of steel truss support method of pier cap beam construction, more particularly, to a kind of pier cap beam construction
Steel truss support method.
Background technology
The steel truss support method of traditional pier cap beam construction, after typically performance of concrete column confined is formed, pre- on pier stud
The hole staying penetrates shaped steel or rod iron forms steel truss support point, directly spreads little steel plate after transverse lap I-steel on its strong point
Jack is installed, is symmetrically installed contact steel truss formation Coping Construction platform;In construction, the rod iron of installation occurs rotation,
It is difficult to keep balance, welding connection need to be carried out to the contact portion of contact I-steel and little steel plate, even to I-steel and steel
Rod carries out welding connection in the lump;When the steel truss operation platform load being formed occurs unbalance change, steel truss is in strong point steel
The unsafe condition of longitudinal and transverse two directions skew is occurred on rod;It is unfavorable for the assembling and disassembling of steel truss, and in work high above the ground
Activity time is longer, and work efficiency is low, is unfavorable for that the Pier Formwork in pier cap beam is installed and concrete formation pouring construction;This master
If the construction technology of steel truss support of pier cap beam construction and method need to improve.Using the pier cap beam construction after improving
Steel truss support construction technology and method, can shorten pier cap beam construction activity time it is ensured that pier cap beam construction steel
The quick formation of truss support, improves the working security of support system, realizes stablizing of pier cap beam template, ensures bent cap concrete
Pour closely knit quality technology effect.
Content of the invention
For deficiency above-mentioned present in prior art, the invention provides a kind of steel truss support of pier cap beam construction
Construction technology it is easy to design and construction pier cap beam construction steel truss support construction technology improved method.
In order to solve above-mentioned technical problem, present invention employs following technical scheme;A kind of steel truss of pier cap beam construction
The construction method that frame supports, comprises the steps:
(1) according to technological requirement, after performance of concrete column confined pours, form preformed hole on performance of concrete column confined top;In reserved in the hole
Penetrate rod iron;
(2) according to technological requirement, it is symmetrically installed bridle iron at rod iron two ends, lifting platform is symmetrically installed on bridle iron and adjusts dress
Put;Lifting platform adjusting means can lift to adjust the height of platform;
(3) according to technological requirement, setting in lifting platform adjusting means carries steel girder platform, carries steel girder platform and supports
In the lifting platform adjusting means of two adjacent performance of concrete column confineds;Cushion block is set on carrying steel girder platform, in cushion block
Upper installation set shaped steel formwork, casting concrete then forms the concrete bent cap of bridge pier.
Further feature is: the bridle iron curved plate medial surface of bridle iron and performance of concrete column confined lateral surface are identical
Arc-shaped curved surface.
Bridle iron is connected on bridle iron sleeve, or arranges bridle iron sleeve on bridle iron, and bridle iron sleeve is enclosed within steel
On rod;Several steel bushing trip bolt holes are disposed radially on bridle iron sleeve, have been screwed into spiral shell in steel bushing trip bolt in the hole
Nail, the front end of screw is tight against on the lateral surface of rod iron.
Compared with prior art, the present invention has the advantage that
1st, the steel truss support construction technology of pier cap beam construction after the present invention improves and method, can shorten pier cap beam construction
Activity time it is ensured that the quick formation of the steel truss support of pier cap beam construction, improve the working security of support system, real
Stablizing of existing pier cap beam template, ensures the closely knit quality technology effect of bent cap concrete placings.
2nd, different shape pier stud condition and the needs of reserved bearing duct form can be met, enrich existing bridge coping and apply
Work scheme engineering legislation.
When the 3rd, dismantling, remove according to the reverse order installed, disassembling section time can be greatly shortened, shorten work high above the ground
Activity time, improve disassembling section safety.
Brief description
Fig. 1 is the supporting construction schematic diagram of method for supporting of the present invention;
Fig. 2 is that bridle iron coordinates mounting structure schematic diagram with rod iron;
Fig. 3 is that bridle iron, rod iron and bridge pier column coordinate mounting structure schematic diagram;
Fig. 4 is that bridle iron, rod iron and bridge pier column coordinate mounting structure sectional view.
In accompanying drawing: 1 bridge pier column, 2 bridle irons, 3 lifting platform adjusting meanss, 4 carry steel truss puts down
Platform, 5 cushion blocks, 6 set shaped steel formworks, 7 pier stud bent cap Cast-in-place concretes, 8 bridle iron sleeves, 9 rod irons, 10 steel bushing fastenings
Screw hole, 11 screws, ribbed panel under 12 bridle iron curved plate 13 steel bushing, 14 bridle iron platform ribbed panels 15
Curved plate ribbed panel.
Specific embodiment
With reference to the accompanying drawings and detailed description the present invention is described in further detail.A kind of pier cap beam construction
Steel truss support method, comprise the steps:
(1) according to technological requirement, after performance of concrete column confined 1 pours, form preformed hole on performance of concrete column confined 1 top;In concrete
The reserved in the hole of pier stud 1 penetrates rod iron 9;
(2) according to technological requirement, it is symmetrically installed bridle iron 2 at rod iron two ends, lifting platform is symmetrically installed on bridle iron 2 and adjusts
Device 3;Bridle iron 2 is the steel structure support that can bear weight, and lifting platform adjusting means 3 can lift, and relies on pneumatic, liquid
Dynamic or machinery is lifted, to adjust the height of platform;
(3) according to technological requirement, setting in lifting platform adjusting means 3 carries steel girder platform 4, carries steel girder platform 4
It is supported in the lifting platform adjusting means 3 of adjacent two performance of concrete column confined 1;Adjust one or more platform liters as needed
Falling tone regulating device 3 is to adjust the height carrying steel girder platform 4 or levelness;On carrying steel girder platform 4, cushion block 5 is set,
Set shaped steel formwork 6 is installed on cushion block 5, casting concrete then forms the concrete lid of bridge pier in the cavity that set shaped steel formwork 6 is formed
Beam 7.Carrying steel girder platform 4 is the steel structure support that can bear weight, and cushion block 5 is evenly arranged in carrying steel girder platform 4
On, set shaped steel formwork 6 is arranged according to the shape (structure) of the concrete bent cap 7 of bridge pier, pours in the cavity that set shaped steel formwork 6 is formed
Concrete, is met the concrete bent cap 7 of technological requirement after being dried.
The concrete bent cap 7 being formed, after concrete strength reaches, when needing to remove, is carried out: first by the following method
First the left and right being symmetrically installed on bridle iron 2 two lifting platform adjusting means 3 is carried out step-down operation, turns down the height of platform,
So that set shaped steel formwork 6 and concrete bent cap 7 is separated from or loosen;Then, remove set shaped steel formwork according to technological requirement or prior art
6;Preferably, according to the reverse order installed, remove cushion block 5 successively, dismounting carries steel girder platform 4, remove bridle iron 2 and reserved
The rod iron 9 of in the hole.
The lower end of bridle iron 2 is supported on rod iron 9, and matched with the lateral surface of performance of concrete column confined 1 in its side, in order to prevent
Bridle iron 2 produces, and the present invention improves as follows further to bridle iron 2: the riser medial surface of bridle iron 2 and performance of concrete column confined
1 lateral surface is the arc-shaped curved surface coincideing, and mating surface between the two is the arc-shaped curved surface design matching, and can prevent bridle iron
2 inclination, and can be close together;In addition, for guaranteeing bridle iron 2 positioning correcting and the install convenient that couple, bridle iron 2 with
Carried using bridle iron sleeve 8 form between rod iron 9 and design and produce, bridle iron 2 is connected on bridle iron sleeve 8, or steel props up
Cover for seat cylinder 8 and bridle iron 2 make into a single integrated structure (arranging bridle iron sleeve 8 on bridle iron 2), and bridle iron sleeve 8 is enclosed within steel
On rod 9, several steel bushing trip bolt holes 10 are radially designed with bridle iron sleeve 8 simultaneously, in steel bushing trip bolt hole
It is screwed into screw 11, the front end of screw 11, just can bridle iron 2 when mounted and rod iron 9 tight against on the lateral surface of rod iron 9 in 10
Between fastening combine, and the overall cambered design due to riser of bridle iron 2 and bridge pier surface fit tightly anti-incline, formed surely
Fixed, complete steel truss support system.
As shown in Figure 2,3, bridle iron 2 is provided with bridle iron curved plate 12, by bridle iron curved plate 12 and coagulation
Knoll post 1 lateral surface matches, and mating surface between the two is identical arc;Bridle iron sleeve 8 adds under setting steel bushing
Floor 13, bridle iron platform ribbed panel 14, to improve the strength and stiffness of bridle iron sleeve 8, can also prop up in the steel of bridle iron 2
Seat curved plate 12 outer surface setting curved plate ribbed panel 15, to improve its strength and stiffness.
Using steel truss support construction technology and the method for the pier cap beam construction after improving, pier cap beam construction can be shortened
Activity time it is ensured that the quick formation of the steel truss support of pier cap beam construction, improve the working security of support system, real
Stablizing of existing pier cap beam template, ensures the closely knit quality technology effect of bent cap concrete placings.Its technological process is as follows:
(1) erection sequence: 1. performance of concrete column confined 1 pour formation → 2. performance of concrete column confined 1 top reserve in the hole penetrate rod iron 9 →
3. it is symmetrically installed bridle iron 2 at rod iron 9 two ends, bridle iron sleeve 8 → be 4. symmetrically installed lifting platform on bridle iron adjusts dress
Put 3 → 5. install in lifting platform adjusting means 3 and carry the equal cloth pad on carrying steel girder platform 4 of steel girder platform 4 → 6.
The casting concrete of block 5 → 7. install on cushion block 5 set shaped steel formwork 6 → 8. then forms the concrete bent cap 7 of bridge pier.
(2) dismounting order: concrete bent cap 7 concrete strength 1. being formed reaches → 2. to being symmetrically installed on bridle iron
Lifting platform adjusting means 3 is turned down height → 3. remove set shaped steel formwork 6 → 4. remove cushion block 5 → 5. remove and is carried steel truss and puts down
The rod iron 9 of platform 4 → 6. remove bridle iron 2 and reserved in the hole.
A kind of described steel truss support construction technology of pier cap beam construction and method, can shorten pier cap beam construction
Activity time, it is ensured that the quick formation of the steel truss support of pier cap beam construction, improves the working security of support system, realizes
Stablizing of pier cap beam template, ensures the closely knit quality technology effect of bent cap concrete placings.Also dependent on meeting different shape pier stud
Condition and the needs of reserved bearing duct form, enrich existing bridge coping arrangement and method for construction engineering legislation.
Above example only in order to technical scheme to be described and unrestricted, although with reference to preferred embodiment to this
Bright be described in detail, it will be understood by those within the art that, technical scheme can be modified
Or equivalent, the objective without deviating from technical solution of the present invention and scope, it all should cover the claim in the present invention
In the middle of scope.
Claims (3)
1. a kind of steel truss support method of pier cap beam construction is it is characterised in that comprise the steps:
(1) according to technological requirement, after performance of concrete column confined pours, form preformed hole on performance of concrete column confined top;In reserved in the hole
Penetrate rod iron;
(2) according to technological requirement, it is symmetrically installed bridle iron at rod iron two ends, lifting platform is symmetrically installed on bridle iron and adjusts dress
Put;Lifting platform adjusting means can lift to adjust the height of platform;
(3) according to technological requirement, setting in lifting platform adjusting means carries steel girder platform, carries steel girder platform and supports
In the lifting platform adjusting means of two adjacent performance of concrete column confineds;Cushion block is set on carrying steel girder platform, in cushion block
Upper installation set shaped steel formwork, in the cavity that set shaped steel formwork is formed, casting concrete then forms the concrete bent cap of bridge pier.
2. according to claim 1 pier cap beam construction steel truss support method it is characterised in that: be provided with bridle iron
Bridle iron curved plate, bridle iron curved plate medial surface and performance of concrete column confined lateral surface are identical arc-shaped curved surface.
3. pier cap beam according to claim 1 and 2 construction steel truss support method it is characterised in that: bridle iron is even
It is connected on bridle iron sleeve, or bridle iron sleeve is arranged on bridle iron, bridle iron sleeve is enclosed within rod iron;In bridle iron sleeve
On be disposed radially several steel bushing trip bolt holes, be screwed into screw in steel bushing trip bolt in the hole, the front end of screw tight against
On the lateral surface of rod iron.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610837166.8A CN106337369B (en) | 2016-09-21 | 2016-09-21 | A kind of steel truss support method of pier cap beam construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610837166.8A CN106337369B (en) | 2016-09-21 | 2016-09-21 | A kind of steel truss support method of pier cap beam construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106337369A true CN106337369A (en) | 2017-01-18 |
CN106337369B CN106337369B (en) | 2018-05-22 |
Family
ID=57839033
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610837166.8A Active CN106337369B (en) | 2016-09-21 | 2016-09-21 | A kind of steel truss support method of pier cap beam construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106337369B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111893897A (en) * | 2020-08-13 | 2020-11-06 | 中国水利水电第八工程局有限公司 | Supporting device for bridge capping beam construction and bridge capping beam construction method |
CN113152283A (en) * | 2019-10-21 | 2021-07-23 | 宁波市政工程建设集团股份有限公司 | Construction method of cantilever or large-crotch-diameter support system of prefabricated small box girder type hidden cover beam of road bridge |
CN113526322A (en) * | 2021-07-01 | 2021-10-22 | 中交四公局第一工程有限公司 | Top tied beam construction hanging bracket constructed after reconstruction and extension project of bridge under construction and construction method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100566665B1 (en) * | 2005-12-08 | 2006-04-03 | 극동엔지니어링(주) | A temporary bearing for jacking up upper structure of bridge |
CN101922143A (en) * | 2010-07-02 | 2010-12-22 | 上海市第二市政工程有限公司 | Construction method of bent cap |
CN202181511U (en) * | 2011-06-21 | 2012-04-04 | 汕头市达濠市政建设有限公司 | Device for adjusting and dismantling pier coping beam template |
CN204510005U (en) * | 2015-01-20 | 2015-07-29 | 中国建筑第七工程局有限公司 | A kind of Coping Construction operating platform |
CN105735149A (en) * | 2016-03-04 | 2016-07-06 | 中交路桥(北京)科技有限公司 | Bridge jacking counter-force device suitable for narrow and small space between beam bottom and cover beam |
-
2016
- 2016-09-21 CN CN201610837166.8A patent/CN106337369B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100566665B1 (en) * | 2005-12-08 | 2006-04-03 | 극동엔지니어링(주) | A temporary bearing for jacking up upper structure of bridge |
CN101922143A (en) * | 2010-07-02 | 2010-12-22 | 上海市第二市政工程有限公司 | Construction method of bent cap |
CN202181511U (en) * | 2011-06-21 | 2012-04-04 | 汕头市达濠市政建设有限公司 | Device for adjusting and dismantling pier coping beam template |
CN204510005U (en) * | 2015-01-20 | 2015-07-29 | 中国建筑第七工程局有限公司 | A kind of Coping Construction operating platform |
CN105735149A (en) * | 2016-03-04 | 2016-07-06 | 中交路桥(北京)科技有限公司 | Bridge jacking counter-force device suitable for narrow and small space between beam bottom and cover beam |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113152283A (en) * | 2019-10-21 | 2021-07-23 | 宁波市政工程建设集团股份有限公司 | Construction method of cantilever or large-crotch-diameter support system of prefabricated small box girder type hidden cover beam of road bridge |
CN113152283B (en) * | 2019-10-21 | 2022-06-10 | 宁波市政工程建设集团股份有限公司 | Construction method of large-crotch-diameter supporting system of small box girder type hidden cover beam prefabricated on road and bridge |
CN111893897A (en) * | 2020-08-13 | 2020-11-06 | 中国水利水电第八工程局有限公司 | Supporting device for bridge capping beam construction and bridge capping beam construction method |
CN111893897B (en) * | 2020-08-13 | 2022-05-24 | 中国水利水电第八工程局有限公司 | Supporting device for bridge capping beam construction and bridge capping beam construction method |
CN113526322A (en) * | 2021-07-01 | 2021-10-22 | 中交四公局第一工程有限公司 | Top tied beam construction hanging bracket constructed after reconstruction and extension project of bridge under construction and construction method |
Also Published As
Publication number | Publication date |
---|---|
CN106337369B (en) | 2018-05-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106192771B (en) | A kind of steel truss support and method for dismounting of pier cap beam construction | |
CN105625186B (en) | A kind of heavy in section concrete Y shape pillar construction method | |
CN102635186B (en) | Double-layer spoke type space string-structure steel roof truss and pre-stressed tension method thereof | |
CN104674945A (en) | Tree-shaped steel pipe column structure and construction method thereof | |
CN106337369A (en) | Steel-truss supporting method for construction of cap beam of pier | |
CN107653781A (en) | Big steel pipe truss and construction method for bent cap cast-in-place construction | |
CN105350454B (en) | Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge | |
CN105714683A (en) | Installation and dismantling method of high bent cast-in-situ aqueduct suspension type bailey frames | |
CN205636474U (en) | Assembled bracket structure | |
CN107190647A (en) | A kind of alignment control apparatus and method suitable for the special-shaped tower of steel construction | |
CN107268455B (en) | Concrete girder gooseneck composite structure beam cradle construction method | |
CN108149643A (en) | RCC double curvature arch dam is two-way adjustable to turn over rising mould plate and construction method | |
CN109629449A (en) | A kind of steel case arch bridge arch springing toughened internal stress installation locating support and alignment method | |
CN105040591A (en) | Positioning device for waveform steel web and positioning method thereof | |
CN111851317B (en) | Method for installing arch ring of arch bridge | |
CN206667042U (en) | Bridge expanssion joint installation and adjustment instrument | |
CN108930224A (en) | Punching stick method bent cap supports regulating system construction method | |
CN102286927A (en) | Integral mounting construction method of bridge pier column bent cap reinforcement cage | |
CN106592446A (en) | Assembling construction method of precast segmental balanced cantilever with side-span wet joints | |
CN206070387U (en) | A kind of steel truss support structure of pier cap beam construction | |
CN106759880A (en) | Prefabricated superposed beam quickly positions adjustment frock and method with prefabricated post junction | |
CN206015523U (en) | The built-in steel anchor beam accurate positioning device of free-standing Sarasota | |
CN216640277U (en) | Radial adjustable supporting force device for close contact of lower chord of beam-arch combined bridge curve | |
CN206219976U (en) | A kind of automatic arc regulation bridle iron suitable for science of bridge building concrete cylinder | |
CN209686875U (en) | A kind of support device of irregular building component model |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |