CN106335759B - Assembly line station air feed rapid connection device - Google Patents

Assembly line station air feed rapid connection device Download PDF

Info

Publication number
CN106335759B
CN106335759B CN201610765709.XA CN201610765709A CN106335759B CN 106335759 B CN106335759 B CN 106335759B CN 201610765709 A CN201610765709 A CN 201610765709A CN 106335759 B CN106335759 B CN 106335759B
Authority
CN
China
Prior art keywords
swing arm
supply
gas nozzle
air
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610765709.XA
Other languages
Chinese (zh)
Other versions
CN106335759A (en
Inventor
沈永松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Bochuang Construction Development Group Co ltd
Original Assignee
Wenzhou Polytechnic
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Polytechnic filed Critical Wenzhou Polytechnic
Priority to CN201610765709.XA priority Critical patent/CN106335759B/en
Publication of CN106335759A publication Critical patent/CN106335759A/en
Application granted granted Critical
Publication of CN106335759B publication Critical patent/CN106335759B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G35/00Mechanical conveyors not otherwise provided for

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Automatic Assembly (AREA)

Abstract

The invention relates to a device for quickly connecting air supply of stations of an assembly line. The pneumatic tool mainly solves the problem that a pneumatic tool moving on an automatic assembly line cannot directly adopt a gas transmission line for gas supply. The method is characterized in that: the two sides of the rack (1) are respectively hinged with a first air supply swing arm (3) and a second air supply swing arm (4), and a first air supply connector (9) and a second air supply connector (10) which correspond to and are matched with the first air nozzle (5) and the second air nozzle (6) are arranged on the pneumatic tool (2); the lower extreme of first air feed swing arm (3) and the lower extreme of second air feed swing arm (4) articulate the one end of first connecting rod (11) and second connecting rod (12) respectively, and the other end of first connecting rod (11) and second connecting rod (12) all articulates on the piston rod of cylinder (13). The quick connecting device for air supply of the assembly line station adopts the cylinder for control, and can automatically connect an air source after a pneumatic tool reaches a processing station, thereby meeting the requirement of an automatic assembly line.

Description

A kind of flow line stations supply quick throw-in device
Technical field
The present invention relates to the source of the gas engaging means used on automatic assembly line, and in particular to a kind of flow line stations supply Quick throw-in device.
Background technology
In automatic assembly line production process, common circulation workpiece conveying device conveys workpiece, and workpiece is defeated It send and Pneumatic fixture is provided on device, the technological requirements such as Automatic-clamping, rotation after processing stations are reached to meet workpiece, beneficial to contracting The short process-cycle improves work efficiency.Since Pneumatic fixture companion conveying device moves together, can not directly be used in supply Gas transmission line connects, if gas transmission line can be caused to wind using gas transmission line supply, therefore, being badly in need of one kind being capable of quick-make The device of source of the gas.
The content of the invention
In order to solve the problems, such as that the Pneumatic fixture moved on automatic assembly line can not be supplied directly using gas transmission line, this Invention provides a kind of flow line stations supply quick throw-in device, and flow line stations supply quick throw-in device uses cylinder control System, after Pneumatic fixture reaches processing stations can turn on automatically source of the gas, meet the demand of automatic assembly line.
The technical scheme is that:A kind of flow line stations supply quick throw-in device, including rack and Pneumatic fixture, Pneumatic fixture is installed on a conveyor, and the both sides of the rack are respectively articulated with the first supply swing arm and the second supply swing arm, the The upper end of one supply swing arm is equipped with the first gas nozzle, and the upper end of the second supply swing arm is equipped with the second gas nozzle, the first gas nozzle and the second gas Mouth is corresponding, and the inside of the first supply swing arm and the second supply swing arm is respectively equipped with the first air vent and the second air vent, and first Air vent and the second air vent communicate respectively with the first gas nozzle and the second gas nozzle, the Pneumatic fixture be equipped with the first gas nozzle and The first air connector and the second air connector that second gas nozzle is corresponded to and is adapted respectively;The lower end and second of first supply swing arm The lower end of supply swing arm is respectively articulated with one end of first connecting rod and second connecting rod, and the other end of first connecting rod and second connecting rod is cut with scissors It is connected on the piston rod of cylinder.
First air vent and the second air vent are separately positioned on the first supply swing arm and second and supply being hinged for swing arm The upside of point.
First gas nozzle and the second gas nozzle are cone.
The present invention has the advantages that:Due to taking above-mentioned technical proposal, Pneumatic fixture is moved in company with conveying device, When Pneumatic fixture reaches shelf position, conveying device stops, and the first supply swing arm and the second supply swing arm are closed up, the first gas nozzle It is filled in respectively in the first air connector and the second air connector with the second gas nozzle, Pneumatic fixture connects source of the gas;Work pieces process terminates Afterwards, the first supply swing arm and the second supply swing arm are opened, and the first gas nozzle and the second gas nozzle are respectively from the first air connector and second It is extracted in air connector, conveying device starts, and chain Pneumatic fixture is transported to next station.The present invention solves Pneumatic fixture such as The problem of what is supplied, avoiding can cause gas transmission line to wind using gas transmission line supply, meet the need of automatic assembly line It asks.
Description of the drawings
Attached drawing 1 is the structure diagram of the present invention.
1- racks in figure, 2- Pneumatic fixtures, 3- first supply swing arm, and 4- second supplies swing arm, the first gas nozzles of 5-, 6- second Gas nozzle, the first air vents of 7-, the second air vents of 8-, the first air connectors of 9-, the second air connectors of 10-, 11- first connecting rods, 12- Second connecting rod, 13- cylinders.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings:
As shown in Figure 1, a kind of flow line stations supply quick throw-in device, including rack 1 and Pneumatic fixture 2, pneumatic work Filling 2 installations on a conveyor, the both sides of the rack 1 are respectively articulated with the first supply swing arm 3 and the second supply swing arm 4, and first The upper end for supplying swing arm 3 is equipped with the first gas nozzle 5, and the upper end of the second supply swing arm 4 is equipped with the second gas nozzle 6, the first gas nozzle 5 and second Gas nozzle 6 is corresponding, and the inside that the first supply swing arm 3 and second supplies swing arm 4 is respectively equipped with the first air vent 7 and the second air vent 8, the first air vent 7 and the second air vent 8 communicate respectively with the first gas nozzle 5 and the second gas nozzle 6, and the Pneumatic fixture 2 is equipped with The first air connector 9 and the second air connector 10 corresponding respectively with the first gas nozzle 5 and the second gas nozzle 6 and be adapted;First supplies The lower end of gas swing arm 3 and the lower end of the second supply swing arm 4 are respectively articulated with one end of first connecting rod 11 and second connecting rod 12, and first connects The other end of bar 11 and second connecting rod 12 is hinged on the piston rod of cylinder 13.Due to taking above-mentioned technical proposal, pneumatic work It fills 2 to move in company with conveying devices, when Pneumatic fixture 2 reaches 1 position of rack, conveying device stops, the first supply swing arm 3 and the Two supply swing arms 4 are closed up, and the first gas nozzle 5 and the second gas nozzle 6 are filled in respectively in the first air connector 9 and the second air connector 10, Pneumatic fixture 2 connects source of the gas;After work pieces process, the first supply swing arm 3 and second supplies swing arm 4 and opens, 5 He of the first gas nozzle Second gas nozzle 6 is extracted from the first air connector 9 and the second air connector 10 respectively, and conveying device starts, by chain Pneumatic fixture 2 It is transported to next station.The present invention solves the problems, such as how Pneumatic fixture 2 supplies, and avoiding can be made using gas transmission line supply It is wound into gas transmission line, meets the demand of automatic assembly line.
First air vent, 7 and second air vent 8 is separately positioned on the first supply swing arm 3 and second and supplies swing arm 4 The upside of hinge joint.The length of first air vent 7 and the second air vent 8 is shorter, beneficial to processing.
First gas nozzle, 5 and second gas nozzle 6 is cone.Between first gas nozzle 5 and the first air connector 9 and Have between two gas nozzles 6 and the second air connector 10 preferably to neutrality, cooperation air-tightness is good, sealed reliable.

Claims (3)

1. a kind of flow line stations supply quick throw-in device, including rack (1) and Pneumatic fixture (2), Pneumatic fixture (2) installation On a conveyor, it is characterised in that:The both sides of the rack (1) are respectively articulated with the first supply swing arm (3) and the second supply pendulum Arm (4), the upper end of the first supply swing arm (3) are equipped with the first gas nozzle (5), and the upper end of the second supply swing arm (4) is equipped with the second gas nozzle (6), the first gas nozzle (5) and the second gas nozzle (6) are corresponding, the inside difference of the first supply swing arm (3) and the second supply swing arm (4) Equipped with the first air vent (7) and the second air vent (8), the first air vent (7) and the second air vent (8) respectively with the first gas nozzle (5) communicated with the second gas nozzle (6), the Pneumatic fixture (2) is equipped with corresponding respectively with the first gas nozzle (5) and the second gas nozzle (6) And the first air connector (9) and the second air connector (10) being adapted;The lower end of first supply swing arm (3) and the second supply pendulum The lower end of arm (4) is respectively articulated with one end of first connecting rod (11) and second connecting rod (12), first connecting rod (11) and second connecting rod (12) the other end is hinged on the piston rod of cylinder (13).
2. flow line stations according to claim 1 supply quick throw-in device, it is characterised in that:First air vent (7) and the second air vent (8) be separately positioned on the first supply swing arm (3) and second supply swing arm (4) hinge joint upside.
3. flow line stations according to claim 1 or 2 supply quick throw-in device, it is characterised in that:First gas Mouth (5) and the second gas nozzle (6) are cone.
CN201610765709.XA 2016-08-30 2016-08-30 Assembly line station air feed rapid connection device Active CN106335759B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610765709.XA CN106335759B (en) 2016-08-30 2016-08-30 Assembly line station air feed rapid connection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610765709.XA CN106335759B (en) 2016-08-30 2016-08-30 Assembly line station air feed rapid connection device

Publications (2)

Publication Number Publication Date
CN106335759A CN106335759A (en) 2017-01-18
CN106335759B true CN106335759B (en) 2018-06-01

Family

ID=57822622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610765709.XA Active CN106335759B (en) 2016-08-30 2016-08-30 Assembly line station air feed rapid connection device

Country Status (1)

Country Link
CN (1) CN106335759B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110426993A (en) * 2019-07-30 2019-11-08 中国工程物理研究院材料研究所 Automation gas nozzle docking system and its control method based on Zero-point positioning system

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0151602B1 (en) * 1992-11-13 1998-10-15 마스다 쇼오이치로오 Cleanroom transport system
DE10238411A1 (en) * 2002-08-22 2004-03-04 Albert Bryda Conveyor has rollers with tubular core surrounded by outer sleeve which can be inflated to increase its diameter so that roller rolls and moves articles on conveyor forward, after which it is deflated
CN102514899A (en) * 2011-12-19 2012-06-27 大连奥托股份有限公司 Industrial part conveying device
CN202861734U (en) * 2012-10-23 2013-04-10 上海富亿德塑胶有限公司 Device for automatically assembling joint on flexible pipe
CN204487408U (en) * 2015-01-23 2015-07-22 珠海市英诚电子科技有限公司 The automatic positioning equipment of the automatic process of measurement of three-D
CN105081748A (en) * 2015-08-10 2015-11-25 成都亨通兆业精密机械有限公司 Quick assembly method of sensor external lead hole
CN205352360U (en) * 2015-12-30 2016-06-29 双钱集团(江苏)轮胎有限公司 Confession exhaust apparatus is used to engineering child not roundness detection

Also Published As

Publication number Publication date
CN106335759A (en) 2017-01-18

Similar Documents

Publication Publication Date Title
CN206445815U (en) A kind of multi-function robot
CN106335759B (en) Assembly line station air feed rapid connection device
CN110576234A (en) welding device for capacitor explosion-proof cover
CN105438513A (en) Full-automatic packaging line
CN106194067A (en) Off-line sets up root device
CN211102010U (en) Capacitor lead welding device
CN205764001U (en) Copper core automatic charging drilling equipment
CN209036548U (en) A kind of carton intelligence pickup robot gripper
CN203665085U (en) Mooney hanger vertical tube automatic shrinkage punch press
CN201552432U (en) Collar press-fit device
CN202988260U (en) Automatic bottle discharging device of bottle-making machine
CN204470474U (en) Cold headers clamp structure
CN201080465Y (en) All-glass vacuum sun thermal-collecting tube vestlet and tail tube automatic butting machine
CN103801606A (en) Full-automatic oil pipe joint extrusion device
CN203830496U (en) Full-automatic oil pipe joint extrusion device
CN208377884U (en) A kind of pneumatic type spring conveying device
CN106825173A (en) Multistation pier head machine
CN211590150U (en) Vertical clamping mechanism applied to transfer robot
CN110406159B (en) Multi-station automatic hot press
CN204474203U (en) A kind of transmitting device being applicable to all size gear
CN206644350U (en) A kind of assembling equipment of plastic three-way valve
CN205240049U (en) Full -automatic set of bagging apparatus
CN203281742U (en) Pipe bending system and circular die mechanism thereof
CN204696068U (en) With the cell-shell sealed-off equipment of intermediate holder
CN204524717U (en) Loudspeaker pull out magnetic gauge mechanism automatically

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201112

Address after: 221000 No. 88 Liaohe West Road, Pizhou Economic Development Zone, Xuzhou City, Jiangsu Province

Patentee after: SU Normal University Semiconductor Materials and Equipment Research Institute (Pizhou) Co.,Ltd.

Address before: 325036 Zhejiang, Ouhai, South East Road, No. 38, Wenzhou National University Science Park Incubator

Patentee before: WENZHOU VOCATIONAL & TECHNICAL College

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220518

Address after: 221300 506, block B, electronic industrial park, Pizhou Economic Development Zone, Xuzhou City, Jiangsu Province

Patentee after: Xuzhou Bochuang Construction Development Group Co.,Ltd.

Address before: 221000 No.88, Liaohe West Road, Pizhou Economic Development Zone, Xuzhou City, Jiangsu Province

Patentee before: SU Normal University Semiconductor Materials and Equipment Research Institute (Pizhou) Co.,Ltd.