CN106311795A - 预应力钢棒生产线 - Google Patents
预应力钢棒生产线 Download PDFInfo
- Publication number
- CN106311795A CN106311795A CN201610734927.7A CN201610734927A CN106311795A CN 106311795 A CN106311795 A CN 106311795A CN 201610734927 A CN201610734927 A CN 201610734927A CN 106311795 A CN106311795 A CN 106311795A
- Authority
- CN
- China
- Prior art keywords
- rod iron
- steel bar
- traction
- helicla flute
- dephosphorization
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C37/00—Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
- B21C37/04—Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of bars or wire
- B21C37/045—Manufacture of wire or bars with particular section or properties
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Heat Treatment Of Articles (AREA)
Abstract
本发明提出的是预应力钢棒生产线。依次设有顺直装置,除磷装置,螺旋槽成型装置,矫直装置,牵引装置,中频热处理装置,冷却装置,牵引器,收线装置。将钢棒通过顺直装置调直,而后经过除磷装置除磷,除磷后的钢棒经过螺旋槽成型装置制成螺旋槽,制成螺旋槽后经过矫直装置矫直,矫直后的钢棒经过中频热处理装置进行中频热处理,热处理后对钢棒进行冷却,在预应力钢棒加工过程中,钢棒经由各段装置时,依靠牵引装置和牵引器的拉拔从一端向另一端移动,最后成为成品,通过收线装置盘卷。本发明生产线具有生产连续化,可控化,所制成的预应力钢棒强度高,尤其作为混凝土配筋产生优异的性能。适宜作为钢棒预应力加工的生产线应用。
Description
技术领域
本发明提出的是机械制造领域的预应力钢棒生产线。
背景技术
对于钢棒来说,经过预应力处理,增加拉伸强度,是提高产品质量的关键。现有的钢棒预应力生产装置,各个工序不连贯,因此生产效率低,产品质量不能达到优级水平,所以呈待改进。
发明内容
为了实现钢棒预应力加工的连续性,本发明提出了一种预应力钢棒生产线。该生产线通过顺直装置,除磷装置,螺旋槽成型装置,矫直装置,牵引装置,中频热处理装置,冷却装置,牵引器,收线装置有机结合,实现钢棒预应力加工,解决预应力钢棒连续化生产的技术问题。
本发明解决技术问题所采用的方案是:
生产线构成:依次设有顺直装置,除磷装置,螺旋槽成型装置,矫直装置,牵引装置,中频热处理装置,冷却装置,牵引器,收线装置。
1、顺直装置:顺直装置为锥形筒,在锥形筒一侧设有引导管,引导管中心部位设有钢棒顺直孔,在锥形筒内设有筒腔。
所述顺直装置的锥形筒内设有钢筋骨架。
2、除磷装置:采用除磷化学液槽,钢棒从化学液槽中通过,对钢棒表面除磷。
3、螺旋槽成型装置:在螺旋槽模具孔内设有两道模齿,通过螺旋槽模具与钢棒的旋转运动,在钢棒上形成螺旋槽。
4、矫直装置:矫直装置内设有矫直孔,钢棒通过矫直孔,受力被矫直。
5、牵引装置:牵引装置为行进夹持牵引,使钢棒向单一方向移动。
6、中频热处理装置:采用中频电流加热器对钢棒进行加热,进行热处理,使钢棒消除内应力,产生预应力。
所述中频电流加热器由中频加热线圈经由电源线与中频电流发生器连接。
7、冷却装置:据图5所示,冷却装置设有冷却水槽,在冷却水槽上部设有注水管。
8、牵引器:牵引器设有上下两个牵引轮,其中一个牵引轮上连接有动力装置,依靠动力装置带动牵引轮旋转,对钢棒产生压力,牵引钢棒超收线方向移动,产生拉拔力。
9、收线装置:经过牵引器牵引,加工后的预应力钢棒被收线装置收成圆环状,作为预应力钢棒成品卷材。
加工过程:
将钢棒通过顺直装置调直,而后经过除磷装置除磷,除磷后的钢棒经过螺旋槽成型装置制成螺旋槽,制成螺旋槽后经过矫直装置矫直,矫直后的钢棒经过中频热处理装置进行中频热处理,热处理后对钢棒进行冷却,在预应力钢棒加工过程中,钢棒经由各段装置时,依靠牵引装置和牵引器的拉拔从一端向另一端移动,最后成为成品,通过收线装置盘卷。
积极效果,采用本发明生产线能够实现钢棒预应力加工,具有生产连续化,可控化的优点,所制成的预应力钢棒强度高,尤其作为混凝土配筋产生优异的性能,技术指标超过国家标准。适宜作为钢棒预应力加工的生产线应用。
附图说明
图1为本发明总装部件设置图;
图2为本发明钢棒顺直装置图;
图3为本发明中频加热装置结构图;
图4为本发明螺旋槽模具图;
图5为本发明冷却装置图。
图中,0.钢棒,1.顺直装置,2.除磷装置,3.螺旋槽成型装置,4.矫直装置,5.牵引装置,6.中频热处理装置,7.冷却装置,8.牵引器,9.收线装置,1.0.钢棒顺直孔,1.1.锥形筒,1.2.引导管,1.3.筒腔,3.1.螺旋槽模具,3.2.模齿,6.1.中频电流发生器,6.2.电源线,6.3中频加热线圈,7.1.冷却水槽, 7.2.注水管。
具体实施方式
据图所示:
生产线构成:据图1所示,依次设有顺直装置1,除磷装置2,螺旋槽成型装置3,矫直装置4,牵引装置5,中频热处理装置6,冷却装置7,牵引器8,收线装置9。
1、顺直装置:据图2所示,顺直装置为锥形筒1.1,在锥形筒一侧设有引导管1.2,引导管中心部位设有钢棒顺直孔1.0,在锥形筒内设有筒腔1.3。
所述顺直装置的锥形筒内设有钢筋骨架。
2、除磷装置:采用除磷化学液槽,钢棒从化学液槽中通过,对钢棒表面除磷。
3、螺旋槽成型装置:据图4所示,在螺旋槽模具3.1孔内设有两道模齿3.2,通过螺旋槽模具与钢棒的旋转运动,在钢棒上形成螺旋槽。
4、矫直装置:矫直装置内设有矫直孔,钢棒通过矫直孔,受力被矫直。
5、牵引装置:牵引装置为行进夹持牵引,使钢棒向单一方向移动。
6、中频热处理装置:据图3所示,采用中频电流加热器对钢棒进行加热,进行热处理,使钢棒消除内应力,产生预应力。
所述中频电流加热器由中频加热线圈6.3经由电源线6.2与中频电流发生器6.1连接。
7、冷却装置:据图5所示,冷却装置7设有冷却水槽7.1,在冷却水槽上部设有注水管7.2。
8、牵引器:牵引器设有上下两个牵引轮,其中一个牵引轮上连接有动力装置,依靠动力装置带动牵引轮旋转,对钢棒产生压力,牵引钢棒超收线方向移动,产生拉拔力。
9、收线装置:经过牵引器牵引,加工后的预应力钢棒被收线装置收成圆环状,作为预应力钢棒成品卷材。
所述生产线各个装置以钢棒为中心进行设置。
加工过程:
将钢棒通过顺直装置调直,而后经过除磷装置除磷,除磷后的钢棒经过螺旋槽成型装置制成螺旋槽,制成螺旋槽后经过矫直装置矫直,矫直后的钢棒经过中频热处理装置进行中频热处理,热处理后对钢棒进行冷却,在预应力钢棒加工过程中,钢棒经由各段装置时,依靠牵引装置和牵引器的拉拔从一端向另一端移动,最后成为成品,通过收线装置盘卷。
所加工成的预应力钢棒具有螺旋槽,有利于提高强度和抗拉力,并具有对混凝土的接合力,使得以预应力钢棒加工的混凝土制品强度高,接合度好,使用寿命长,抗拉扯性能有所提高。
Claims (1)
1.预应力钢棒生产线,其特征在于:
生产线构成:依次设有顺直装置(1),除磷装置(2),螺旋槽成型装置(3),矫直装置(4),牵引装置(5),中频热处理装置(6),冷却装置(7),牵引器(8),收线装置(9);
1)、顺直装置:顺直装置为锥形筒(1.1),在锥形筒一侧设有引导管(1.2),引导管中心部位设有钢棒顺直孔(1.0),在锥形筒内设有筒腔(1.3);
所述顺直装置的锥形筒内设有钢筋骨架;
2)、除磷装置:采用除磷化学液槽,钢棒从化学液槽中通过,对钢棒表面除磷;
3)、螺旋槽成型装置:在螺旋槽模具(3.1)孔内设有两道模齿(3.2),通过螺旋槽模具与钢棒的旋转运动,在钢棒上形成螺旋槽;
4)、矫直装置:矫直装置内设有矫直孔,钢棒通过矫直孔,受力被矫直;
5)、牵引装置:牵引装置为行进夹持牵引,使钢棒向单一方向移动;
6)、中频热处理装置:采用中频电流加热器对钢棒进行加热,进行热处理,使钢棒消除内应力,产生预应力;
所述中频电流加热器由中频加热线圈(6.3)经由电源线(6.2)与中频电流发生器(6.1)连接;
7)、冷却装置:冷却装置设有冷却水槽(7.1),在冷却水槽上部设有注水管(7.2);
8)、牵引器:牵引器设有上下两个牵引轮,其中一个牵引轮上连接有动力装置,依靠动力装置带动牵引轮旋转,对钢棒产生压力,牵引钢棒超收线方向移动,产生拉拔力;
9)、收线装置:经过牵引器牵引,加工后的预应力钢棒被收线装置收成圆环状,作为预应力钢棒成品卷材;
所述生产线各个装置以钢棒为中心进行设置;
加工过程:
将钢棒通过顺直装置调直,而后经过除磷装置除磷,除磷后的钢棒经过螺旋槽成型装置制成螺旋槽,制成螺旋槽后经过矫直装置矫直,矫直后的钢棒经过中频热处理装置进行中频热处理,热处理后对钢棒进行冷却,在预应力钢棒加工过程中,钢棒经由各段装置时,依靠牵引装置和牵引器的拉拔从一端向另一端移动,最后成为成品,通过收线装置盘卷。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610734927.7A CN106311795A (zh) | 2016-08-28 | 2016-08-28 | 预应力钢棒生产线 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610734927.7A CN106311795A (zh) | 2016-08-28 | 2016-08-28 | 预应力钢棒生产线 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106311795A true CN106311795A (zh) | 2017-01-11 |
Family
ID=57790715
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610734927.7A Pending CN106311795A (zh) | 2016-08-28 | 2016-08-28 | 预应力钢棒生产线 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106311795A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108165715A (zh) * | 2018-02-13 | 2018-06-15 | 葫芦岛市北方金属制品有限公司 | 一种采用形变热处理生产预应力钢棒的方法 |
CN110524192A (zh) * | 2019-08-21 | 2019-12-03 | 何满潮 | Npr钢筋棒材的加工工艺 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB202130A (en) * | 1922-07-04 | 1923-08-16 | Fretz Moon Tube Company | Process of manufacturing metal tubing and apparatus therefor |
US3896653A (en) * | 1971-09-18 | 1975-07-29 | Nippon Steel Corp | Method for producing differential thickness steel plate |
CN2136729Y (zh) * | 1992-05-28 | 1993-06-23 | 天津市预应力钢丝一厂 | 预应力混凝土管桩用异型钢丝 |
CN1095972A (zh) * | 1994-03-29 | 1994-12-07 | 番禺市桥梁开发建设集团公司 | 凹螺纹高强度预应力钢筋生产方法 |
CN2510200Y (zh) * | 2001-11-09 | 2002-09-11 | 严新义 | 定长断丝机 |
CN2727188Y (zh) * | 2004-02-26 | 2005-09-21 | 天津市金能电力电子有限公司 | 高强度预应力钢棒热处理双线生产设备 |
CN104294162A (zh) * | 2014-11-04 | 2015-01-21 | 武钢集团昆明钢铁股份有限公司 | 一种785MPa级高强度预应力结构用螺纹钢筋及其制备方法 |
-
2016
- 2016-08-28 CN CN201610734927.7A patent/CN106311795A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB202130A (en) * | 1922-07-04 | 1923-08-16 | Fretz Moon Tube Company | Process of manufacturing metal tubing and apparatus therefor |
US3896653A (en) * | 1971-09-18 | 1975-07-29 | Nippon Steel Corp | Method for producing differential thickness steel plate |
CN2136729Y (zh) * | 1992-05-28 | 1993-06-23 | 天津市预应力钢丝一厂 | 预应力混凝土管桩用异型钢丝 |
CN1095972A (zh) * | 1994-03-29 | 1994-12-07 | 番禺市桥梁开发建设集团公司 | 凹螺纹高强度预应力钢筋生产方法 |
CN2510200Y (zh) * | 2001-11-09 | 2002-09-11 | 严新义 | 定长断丝机 |
CN2727188Y (zh) * | 2004-02-26 | 2005-09-21 | 天津市金能电力电子有限公司 | 高强度预应力钢棒热处理双线生产设备 |
CN104294162A (zh) * | 2014-11-04 | 2015-01-21 | 武钢集团昆明钢铁股份有限公司 | 一种785MPa级高强度预应力结构用螺纹钢筋及其制备方法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108165715A (zh) * | 2018-02-13 | 2018-06-15 | 葫芦岛市北方金属制品有限公司 | 一种采用形变热处理生产预应力钢棒的方法 |
CN110524192A (zh) * | 2019-08-21 | 2019-12-03 | 何满潮 | Npr钢筋棒材的加工工艺 |
US11596991B2 (en) | 2019-08-21 | 2023-03-07 | Min Xia | Processing method of NPR steel rebar rod |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106435099B (zh) | 一种钢丝感应加热水浴淬火热处理工艺 | |
CN102644036B (zh) | 一种高强螺旋肋钢筋及其加工方法 | |
JP4817911B2 (ja) | 中空管製品の鍛造成形方法 | |
CN105032926B (zh) | 一种静磁场辅助作用下轧制金属线棒材的方法 | |
CN106311795A (zh) | 预应力钢棒生产线 | |
CN102719643B (zh) | 一种钢丝绳用高碳碳素钢盘条热处理工艺 | |
CN106676437A (zh) | 一种铝合金贮箱瓜瓣凸孔装置及凸孔方法 | |
CN103305678A (zh) | 一种钢管内壁硬化淬火设备及淬火方法 | |
CN204608102U (zh) | 钢丝感应加热装置 | |
CN100363511C (zh) | 一种超高强度抽油杆制造工艺 | |
CN101008044A (zh) | 一种冷轧辊整体感应加热深层淬火用盾牌形感应装置 | |
CN104551545A (zh) | 一种细晶组织轴瓦的应变诱发式半固态成形装置及工艺 | |
CN110076533A (zh) | 一种应用于石油防喷管的tc4台阶轴的制备方法 | |
CN1951627A (zh) | 一种截齿的生产工艺方法 | |
CN109604945A (zh) | 一种干涉配合形状记忆合金紧固件的制备方法 | |
CN106947852B (zh) | 一种提高铸挤复合成形大口径厚壁管性能的方法 | |
KR101035796B1 (ko) | 프레스 경화용 금형장치 및 프레스 경화 부품 제조방법 | |
CN102909298B (zh) | 一种带大扭角法兰和中间法兰的锻件成形方法及成形模具 | |
CN110964894A (zh) | 一种锚杆用外螺纹钢管的制备工艺 | |
CN107858496B (zh) | 钢棒热处理生产线 | |
JP2010265512A (ja) | 直接通電式焼入装置及び直接通電式焼入方法 | |
CN104637572A (zh) | 异型铸造合金铜排生产工艺 | |
CN107739782A (zh) | 一种细长杆螺栓的热处理方法 | |
CN210826263U (zh) | 一种大型钢材用的局部热处理装置 | |
CN209778924U (zh) | 一种铁路车轮感应淬火的装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170111 |