CN106287645A - Tower-type furnace buckstay integral installation method - Google Patents

Tower-type furnace buckstay integral installation method Download PDF

Info

Publication number
CN106287645A
CN106287645A CN201610792842.4A CN201610792842A CN106287645A CN 106287645 A CN106287645 A CN 106287645A CN 201610792842 A CN201610792842 A CN 201610792842A CN 106287645 A CN106287645 A CN 106287645A
Authority
CN
China
Prior art keywords
buckstay
vertical section
wall
water
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610792842.4A
Other languages
Chinese (zh)
Inventor
蒋俊
仇小飞
张后春
缪传生
孔德丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ceec Anhui Electric Power Construction First Engineering Co Ltd
Original Assignee
Ceec Anhui Electric Power Construction First Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ceec Anhui Electric Power Construction First Engineering Co Ltd filed Critical Ceec Anhui Electric Power Construction First Engineering Co Ltd
Priority to CN201610792842.4A priority Critical patent/CN106287645A/en
Publication of CN106287645A publication Critical patent/CN106287645A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/24Supporting, suspending, or setting arrangements, e.g. heat shielding

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of tower-type furnace buckstay integral installation method, include the lifting of vertical section water-cooling wall buckstay, the lifting of spiral section buckstay and the installation of buckstay.The mode that the vertical section water-cooling wall buckstay of the present invention and the lifting of spiral section buckstay all use integral hoisting fixing positions, simple to operate, lifting locating speed is fast, and lifting location post-mounting structure is stable, meets the needs of boiler body stability.

Description

Tower-type furnace buckstay integral installation method
Technical field
The present invention relates to the construction field of boiler body, specifically a kind of tower-type furnace buckstay integral installation method.
Background technology
Boiler body is the nucleus equipment in thermal power plant, and whole pressure parts of boiler all use overhung construction, just Often under operating condition, pipe adds the sealing membrane type fireplace thorax that band steel is welded into and is difficult to bear extraneous natural wind, earthquake deadweight and attached The load such as negative pressure, detonation or pulsation and operating each to expansion, especially under the damage of detonation also in loading, stove Can be by higher surge.For ensure pressure parts pipe wall be not destroyed, make boiler expand in order, excellent sealing and load Correct transmission, it is necessary to design complete boiler body framework.Boiler body framework is mainly made up of buckstay system.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of tower-type furnace buckstay integral installation method, uses integral hoisting Method, install quickly, and mounted configuration be stable.
The technical scheme is that
Tower-type furnace buckstay integral installation method, includes the lifting of vertical section water-cooling wall buckstay, the lifting of spiral section buckstay With the installation of buckstay, specifically include following steps:
(1), the lifting of vertical section water-cooling wall buckstay: vertical section buckstay is divided into vertical section buckstay upper element and vertical section Buckstay lower component;
The lifting of vertical section buckstay upper element: employing 50T crawler crane cooperation lifts, 80t tower crane lifts by crane in burner hearth, when hanging down Straight section buckstay upper element lifts after erecting, 50t crawler crane break off relations check confirm vertical section buckstay upper element direction without After Wu, 80t tower crane it is adjusted after being lifted to setting height(from bottom) installing the height between vertical section buckstay upper element and link plate Strength bolt, high-strength bolt completes casting anchor of upper element after installing;
The lifting of vertical section buckstay lower component: vertical section buckstay lower component includes multilamellar, uses hydraulic pressure lift dress Put and successively lift;First in zero meter of burner hearth by firm with the vertical section buckstay lower component the superiors for anchor head under hydraulic lifting apparatus Property beam connect, on the upper strata buckstay of vertical section buckstay lower component is risen to and stops after certain altitude by hydraulic lifting apparatus Rise, next layer of horizontal stiffness beam and perpendicular rigid beam are installed by drawing position, and boatswain chair, group are installed outside buckstay Conjunction promotes after completing again, and method is sling vertical section buckstay lower component successively according to this;Vertical section buckstay lower component group After conjunction, hydraulic lifting apparatus rises and rises to absolute altitude shown in drawing, installs interim suspension rod;
(2), spiral section buckstay lifting: the whole face wall of spiral section buckstay uses hydraulic lifting apparatus to lift, hydraulic pressure lift Device is arranged on temporary support beam, and lower anchor head is directly connected with boiler steel structure crossbeam;Spiral section buckstay uses 50t crawler belt Hydraulic lifting apparatus is coordinated to lift, when the ground floor crossbeam of spiral section buckstay is carried by hydraulic lifting apparatus in being hung in burner hearth Stop when being raised to certain altitude hoisting, with 50T crawler crane in burner hearth by the ground floor of spiral section buckstay and second layer crossbeam Between vertical beam level be lifted into installation site, adjust the bolt between vertical beam and crossbeam with chain block, when one layer of peace After dress, hydraulic lifting apparatus hoists, then installs next layer, and so circulation is until whole face wall installs, and rises to drawing institute Indicating height installs interim suspension rod;
(3), the installation of buckstay: water-cooling wall entirety piece terminates, and after terminating by inspection, installs water-cooling wall buckstay and water-cooling wall Between connector, wouldn't connect with layer reinforcing beam corner part, buckstay connect ironware install after, with the mark on steel frame column The corner attachments of buckstay is installed on the basis of high datum line and burner hearth centrage, then install horizontal stiffness beam expansion dead point and The brace of more flat buckstay.
Described temporary support beam one end is placed on the crossbeam on boiler steel structure top, the other end is welded on water-cooling wall On, the described whole face wall of spiral section buckstay is provided with five parallel temporary support beams, two on the left of difference prop up temporarily Support beam is provided with a hydraulic lifting apparatus, and two the temporary support beams being arranged at right side are provided with another hydraulic pressure lift dress Put.
After the lower anchor head of described hydraulic lifting apparatus is by lifting beam is connected with self-control, then with vertical section buckstay bottom The superiors' buckstay of assembly connects and composes tackling system.
In described vertical section buckstay lower component lifting anabolic process, its perpendicular rigid beam is connected with horizontal stiffness beam Place is fixed with bolts, after water-cooling wall is in place, water-cooling wall be connected with buckstay after again by disassembling bolts.
Described vertical section water-cooling wall buckstay and spiral section buckstay divide equally four sides wall, described spiral section buckstay four The lifting sequence of face wall is followed successively by: left wall spiral section water-cooling wall buckstay, front wall spiral section water-cooling wall buckstay, right wall spiral section Water-cooling wall buckstay and rear wall spiral section water-cooling wall buckstay.
The described determination of the superiors' buckstay absolute altitude and the installation site of boatswain chair are with 1 meter of elevation line of steelframe head tree as base Directrix upwards draws elevation line, as the benchmark of four sides wall top layer buckstay elevation line, marks four sides wall top layer buckstay respectively Center elevation line, and carry out permanent visible marking.
Advantages of the present invention:
The mode that the vertical section water-cooling wall buckstay of the present invention and the lifting of spiral section buckstay all use integral hoisting fixing is carried out Location, simple to operate, lifting locating speed is fast, and lifting location post-mounting structure is stable, meets the need of boiler body stability Want.
Accompanying drawing explanation
Fig. 1 is the mounting structure figure of hydraulic lifting apparatus on spiral section buckstay of the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not making creative work premise Embodiment, broadly falls into the scope of protection of the invention.
Tower-type furnace buckstay integral installation method, includes the lifting of vertical section water-cooling wall buckstay, spiral section buckstay Lifting and the installation of buckstay, specifically included following steps:
(1), the lifting of vertical section water-cooling wall buckstay: vertical section buckstay is divided into vertical section buckstay upper element and vertical section Buckstay lower component;
The lifting of vertical section buckstay upper element: vertical section buckstay divides four sides wall to lift respectively, uses 50T crawler crane Cooperation lifts, 80t tower crane lifts by crane in burner hearth, and after vertical section buckstay upper element lifts and erects, 50t crawler crane breaks off relations and examines Look into confirmation vertical section buckstay upper element direction errorless after, 80t tower crane be adjusted installing vertical after being lifted to setting height(from bottom) High-strength bolt between straight section buckstay upper element and link plate, high-strength bolt completes casting anchor of upper element after installing;
The lifting of vertical section buckstay lower component: vertical section buckstay lower component includes multilamellar, uses hydraulic pressure lift dress Put and successively lift;First in zero meter of burner hearth by firm with the vertical section buckstay lower component the superiors for anchor head under hydraulic lifting apparatus Property beam connect, on the upper strata buckstay of vertical section buckstay lower component is risen to and stops after certain altitude by hydraulic lifting apparatus Rise, next layer of horizontal stiffness beam and perpendicular rigid beam are installed by drawing position, and boatswain chair, group are installed outside buckstay Conjunction promotes after completing again, and method is sling vertical section buckstay lower component successively according to this;Vertical section buckstay lower component group After conjunction, hydraulic lifting apparatus rises and rises to absolute altitude shown in drawing, installs interim suspension rod;
(2), spiral section buckstay lifting: spiral section water-cooling wall buckstay divides four sides wall to lift, and lifting sequence is followed successively by: left Wall spiral section water-cooling wall buckstay → front wall spiral section water-cooling wall buckstay → right wall spiral section water-cooling wall buckstay → rear wall spiral shell Rotation section water-cooling wall buckstay;The whole face wall of spiral section buckstay uses hydraulic lifting apparatus to lift, and hydraulic lifting apparatus is installed On temporary support beam, lower anchor head is directly connected with boiler steel structure crossbeam;See that Fig. 1, temporary support beam 1 one end are placed on boiler On the crossbeam 2 on steel construction top, the other end be welded on water-cooling wall 3, the whole face wall of spiral section buckstay is provided with five parallel Temporary support beam 1, respectively left side two temporary support beams 1 be provided with a hydraulic lifting apparatus 4, be arranged at right side two Individual temporary support beam 1 is provided with another hydraulic lifting apparatus 4, the lower anchor head of hydraulic lifting apparatus 4 by with self-control lifting beam After connection, then connect and compose tackling system with the superiors' buckstay of vertical section buckstay lower component;Spiral section buckstay is adopted Hydraulic lifting apparatus 4 is coordinated to lift in burner hearth with 50t crawler crane 5, when hydraulic lifting apparatus is by spiral section buckstay Stop when ground floor crossbeam rises to certain altitude hoisting, with 50T crawler crane ground floor by spiral section buckstay in burner hearth And the vertical beam level between second layer crossbeam is lifted into installation site, adjust the spiral shell between vertical beam and crossbeam with chain block Bolt, after installing when one layer, hydraulic lifting apparatus hoists, then installs next layer, and so circulation is until whole face wall installs, Rise to absolute altitude shown in drawing and interim suspension rod is installed;In vertical section buckstay lower component lifting anabolic process, its perpendicular rigid Beam is fixed with bolts with horizontal stiffness beam junction, and after water-cooling wall is in place, water-cooling wall will after being connected with buckstay again Disassembling bolts
(3), the installation of buckstay: the determination of the superiors' buckstay absolute altitude and the installation site of boatswain chair are with steelframe head tree 1 meter mark Draw elevation line on the basis of high line on alignment, as the benchmark of four sides wall top layer buckstay elevation line, mark four sides wall top respectively Layer buckstay center elevation line, and carry out permanent visible marking;Water-cooling wall entirety piece terminates, and after terminating by inspection, installs Connector between water-cooling wall buckstay and water-cooling wall, wouldn't connect with layer reinforcing beam corner part, connects ironware peace at buckstay After dress, the corner attachments of buckstay is installed on the basis of absolute altitude datum line on steel frame column and burner hearth centrage, then installs The expansion dead point of horizontal stiffness beam and the brace of more flat buckstay.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, permissible Understand and these embodiments can be carried out multiple change without departing from the principles and spirit of the present invention, revise, replace And modification, the scope of the present invention be defined by the appended.

Claims (6)

1. tower-type furnace buckstay integral installation method, it is characterised in that: include the lifting of vertical section water-cooling wall buckstay, spiral Section buckstay lifting and the installation of buckstay, specifically included following steps:
(1), the lifting of vertical section water-cooling wall buckstay: vertical section buckstay is divided into vertical section buckstay upper element and vertical section Buckstay lower component;
The lifting of vertical section buckstay upper element: employing 50T crawler crane cooperation lifts, 80t tower crane lifts by crane in burner hearth, when hanging down Straight section buckstay upper element lifts after erecting, 50t crawler crane break off relations check confirm vertical section buckstay upper element direction without After Wu, 80t tower crane it is adjusted after being lifted to setting height(from bottom) installing the height between vertical section buckstay upper element and link plate Strength bolt, high-strength bolt completes casting anchor of upper element after installing;
The lifting of vertical section buckstay lower component: vertical section buckstay lower component includes multilamellar, uses hydraulic pressure lift dress Put and successively lift;First in zero meter of burner hearth by firm with the vertical section buckstay lower component the superiors for anchor head under hydraulic lifting apparatus Property beam connect, on the upper strata buckstay of vertical section buckstay lower component is risen to and stops after certain altitude by hydraulic lifting apparatus Rise, next layer of horizontal stiffness beam and perpendicular rigid beam are installed by drawing position, and boatswain chair, group are installed outside buckstay Conjunction promotes after completing again, and method is sling vertical section buckstay lower component successively according to this;Vertical section buckstay lower component group After conjunction, hydraulic lifting apparatus rises and rises to absolute altitude shown in drawing, installs interim suspension rod;
(2), spiral section buckstay lifting: the whole face wall of spiral section buckstay uses hydraulic lifting apparatus to lift, hydraulic pressure lift Device is arranged on temporary support beam, and lower anchor head is directly connected with boiler steel structure crossbeam;Spiral section buckstay uses 50t crawler belt Hydraulic lifting apparatus is coordinated to lift, when the ground floor crossbeam of spiral section buckstay is carried by hydraulic lifting apparatus in being hung in burner hearth Stop when being raised to certain altitude hoisting, with 50T crawler crane in burner hearth by the ground floor of spiral section buckstay and second layer crossbeam Between vertical beam level be lifted into installation site, adjust the bolt between vertical beam and crossbeam with chain block, when one layer of peace After dress, hydraulic lifting apparatus hoists, then installs next layer, and so circulation is until whole face wall installs, and rises to drawing institute Indicating height installs interim suspension rod;
(3), the installation of buckstay: water-cooling wall entirety piece terminates, and after terminating by inspection, installs water-cooling wall buckstay and water-cooling wall Between connector, wouldn't connect with layer reinforcing beam corner part, buckstay connect ironware install after, with the mark on steel frame column The corner attachments of buckstay is installed on the basis of high datum line and burner hearth centrage, then install horizontal stiffness beam expansion dead point and The brace of more flat buckstay.
Tower-type furnace buckstay integral installation method the most according to claim 1, it is characterised in that: described temporary support beam One end is placed on the crossbeam on boiler steel structure top, the other end is welded on water-cooling wall, whole of described spiral section buckstay Being provided with five parallel temporary support beams on wall, two temporary support beams in left side are provided with a hydraulic pressure lift dress respectively Putting, two the temporary support beams being arranged at right side are provided with another hydraulic lifting apparatus.
Tower-type furnace buckstay integral installation method the most according to claim 1, it is characterised in that: described hydraulic pressure lift dress After the lower anchor head put is by being connected with self-control lifting beam, then it is connected structure with the superiors' buckstay of vertical section buckstay lower component Become tackling system.
Tower-type furnace buckstay integral installation method the most according to claim 1, it is characterised in that: described vertical section rigidity In beam lower component lifting anabolic process, its perpendicular rigid beam is fixed with bolts with horizontal stiffness beam junction, treats water After cold wall is in place, water-cooling wall be connected with buckstay after again by disassembling bolts.
Tower-type furnace buckstay integral installation method the most according to claim 1, it is characterised in that: described vertical section water-cooled Wall buckstay and spiral section buckstay divide equally four sides wall, and the lifting sequence of described spiral section buckstay four sides wall is followed successively by: left Wall spiral section water-cooling wall buckstay, front wall spiral section water-cooling wall buckstay, right wall spiral section water-cooling wall buckstay and rear wall spiral Section water-cooling wall buckstay.
Tower-type furnace buckstay integral installation method the most according to claim 1, it is characterised in that: described the superiors' rigidity The determination of beam absolute altitude and the installation site of boatswain chair draw elevation line on the basis of 1 meter of elevation line of steelframe head tree on alignment, as The benchmark of four sides wall top layer buckstay elevation line, marks four sides wall top layer buckstay center elevation line respectively, and carries out permanent Visible marking.
CN201610792842.4A 2016-08-30 2016-08-30 Tower-type furnace buckstay integral installation method Pending CN106287645A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610792842.4A CN106287645A (en) 2016-08-30 2016-08-30 Tower-type furnace buckstay integral installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610792842.4A CN106287645A (en) 2016-08-30 2016-08-30 Tower-type furnace buckstay integral installation method

Publications (1)

Publication Number Publication Date
CN106287645A true CN106287645A (en) 2017-01-04

Family

ID=57673077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610792842.4A Pending CN106287645A (en) 2016-08-30 2016-08-30 Tower-type furnace buckstay integral installation method

Country Status (1)

Country Link
CN (1) CN106287645A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107487713A (en) * 2017-08-01 2017-12-19 中国能源建设集团天津电力建设有限公司 Portion's entire combination waterborne lifts by crane technique in place after a kind of π types boiler
CN107720580A (en) * 2017-10-19 2018-02-23 福建省第电力建设公司 A kind of boiler construction water-cooling wall rapid construction hanging apparatus and its method
CN109000261A (en) * 2018-08-13 2018-12-14 中国电建集团河南工程有限公司 Stoker fired grate formula garbage burning boiler construction method of installation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH086896B2 (en) * 1989-07-24 1996-01-29 日立プラント建設株式会社 Boiler installation work space structure
CN1603680A (en) * 2003-07-31 2005-04-06 阿尔斯托姆动力锅炉有限公司 Steam generator and assembly method
JP3896252B2 (en) * 2001-02-09 2007-03-22 株式会社タクマ Water tube boiler
CN201387000Y (en) * 2008-12-30 2010-01-20 上海锅炉厂有限公司 Connecting structure of vertical rigid beam and horizontal rigid beams in boiler
CN202769632U (en) * 2012-07-16 2013-03-06 上海锅炉厂有限公司 A boiler support structure
CN104296122A (en) * 2014-11-03 2015-01-21 上海锅炉厂有限公司 Boiler wall supporting and hanging system of variable section tower boiler

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH086896B2 (en) * 1989-07-24 1996-01-29 日立プラント建設株式会社 Boiler installation work space structure
JP3896252B2 (en) * 2001-02-09 2007-03-22 株式会社タクマ Water tube boiler
CN1603680A (en) * 2003-07-31 2005-04-06 阿尔斯托姆动力锅炉有限公司 Steam generator and assembly method
CN201387000Y (en) * 2008-12-30 2010-01-20 上海锅炉厂有限公司 Connecting structure of vertical rigid beam and horizontal rigid beams in boiler
CN202769632U (en) * 2012-07-16 2013-03-06 上海锅炉厂有限公司 A boiler support structure
CN104296122A (en) * 2014-11-03 2015-01-21 上海锅炉厂有限公司 Boiler wall supporting and hanging system of variable section tower boiler

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中国电力建设企业协会: "《"中国电力建设工法汇编(2010年度)上册》", 31 March 2011, 中国电力出版社 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107487713A (en) * 2017-08-01 2017-12-19 中国能源建设集团天津电力建设有限公司 Portion's entire combination waterborne lifts by crane technique in place after a kind of π types boiler
CN107720580A (en) * 2017-10-19 2018-02-23 福建省第电力建设公司 A kind of boiler construction water-cooling wall rapid construction hanging apparatus and its method
CN107720580B (en) * 2017-10-19 2023-09-01 中国电建集团福建工程有限公司 Quick construction hoisting device and method for boiler construction water-cooled wall
CN109000261A (en) * 2018-08-13 2018-12-14 中国电建集团河南工程有限公司 Stoker fired grate formula garbage burning boiler construction method of installation

Similar Documents

Publication Publication Date Title
CA2585323C (en) Method of installing furnace walls of a boiler
CN102016202A (en) Erection method for solar receiver and support tower
CN106287645A (en) Tower-type furnace buckstay integral installation method
CN105970819A (en) Installation construction method for steel anchor beams
CN105969922A (en) Blast furnace body preassembly technique
CN109081247A (en) A kind of hanging method of vestibule large-span steel girder
CN109138452A (en) Heavy construction bolt sphere steel pipe rack entirety fast lifting construction technology
CN106276601A (en) A kind of technique in place for fired power generating unit π formula boiler furnace arch, furnace nose integral lifting
CN106544959B (en) The construction method of king-tower lifting segment and bridge main tower saddle containing saddle
CN106121040A (en) A kind of welding lattice column device and welding method
CN109132843B (en) The installation method of super-section metal bellows in a kind of vertical shaft
CN109778885A (en) A kind of double-wall steel cofferdam cross frame hanging device and method
CN205369277U (en) Support whole system of transferring in cofferdam
CN105239804B (en) Assembly and lift-erecting method of indirect air-cooling system stretching platforms
CN104030176B (en) The equalizer bar of hoisting platform truss and hanging method thereof
CN110273039A (en) A kind of blast furnace bustle pipe hoisting structure and its installation method
CN210884873U (en) Installation hanging beam and lifting device of pipeline
CN102383613B (en) Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN107487713B (en) integral combination hoisting and positioning process for upper part of water behind pi-shaped boiler
CN106481967B (en) A kind of installation method of rubber diaphragm gas chamber
CN104032944A (en) Suspension frame construction platform device
CN205709666U (en) A kind of jib fittable slackening device
CN211141292U (en) Special bracket for integral hoisting of air pipe
CN203924659U (en) Hanging frame type construction platform device
CN209512263U (en) A kind of horizontal main pipe modular mounting arrangement of basement air-conditioning

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170104