CN106285741A - A kind of front canopy hoisting ring - Google Patents

A kind of front canopy hoisting ring Download PDF

Info

Publication number
CN106285741A
CN106285741A CN201610890721.3A CN201610890721A CN106285741A CN 106285741 A CN106285741 A CN 106285741A CN 201610890721 A CN201610890721 A CN 201610890721A CN 106285741 A CN106285741 A CN 106285741A
Authority
CN
China
Prior art keywords
connecting portion
hanging
fastening bolt
nut
nut matched
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610890721.3A
Other languages
Chinese (zh)
Inventor
杜扬柱
赵伟
王玉林
杜宝峰
赵振伟
田强
赵振源
田涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610890721.3A priority Critical patent/CN106285741A/en
Publication of CN106285741A publication Critical patent/CN106285741A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D17/00Caps for supporting mine roofs
    • E21D17/10Details of mine caps for engaging the tops of pit-props, with or without retaining-plates; Retaining-plates

Abstract

The invention discloses a kind of front canopy hoisting ring, including hanging connecting portion, hanging ring, fastening bolt, described hanging connecting portion side is provided with the anchor nut matched with roofbolt, anchor nut uses with hanging connecting portion and is made of welded connection, described hanging ring one end is provided with and hangs connecting portion and be connected the nut matched, hanging ring one end is provided with the nut matched with fastening bolt, with hanging connecting portion is connected the nut matched and be connected with fastening bolt the nut matched respectively with hanging ring employing be welded to connect.Hanging ring uses specification width to be the steel pipe that 3cm and thickness are not less than 6 cun, is provided with one and may be used for the hole through fastening bolt, be provided with and be connected the nut matched with fastening bolt below hole below steel pipe.This front canopy hoisting ring laterally hangs on the roof timbering anchor pole at rear of meeting head on, it is to avoid move repeatedly forestope because making roofbolt, significantly reduces the labor intensity of worker.

Description

A kind of front canopy hoisting ring
Technical field
The present invention relates to underground coal mine driving supporting field, be specifically related to a kind of front canopy hoisting ring.
Background technology
Underground coal mine boring head gib now uses the mode of front-probe support, and forestope typically uses the side of hanging On the formula hanging roof timbering anchor pole that supporting is intact after meeting head on, but permanent support in the wings directly hung by existing erecting by overhang Anchor pole on, due to former front canopy hoisting ring fixing after, forestope centrage with anchor pole point-blank, move and put in place by forestope After, delay anchor pole of constructing of meeting head on, it is therefore desirable to anchor pole of constructing after intersection reach forestope, the most not only affect labor efficiency, with Time there is also potential safety hazard.
Summary of the invention
It is an object of the invention to provide a kind of front canopy hoisting ring, with the problem solving to propose in above-mentioned background technology.
For achieving the above object, the present invention provides following technical scheme: one hangs connecting portion, hanging ring, fastening bolt, Described hanging connecting portion side is provided with the anchor nut matched with roofbolt, and anchor nut uses with hanging connecting portion and welds Being formed by connecting, described hanging ring one end is provided with and hangs connecting portion and be connected the nut matched, and hanging ring one end is provided with and fastens The nut that bolt matches, is connected the nut matched and is connected the nut matched with fastening bolt respectively with hanging connecting portion Use with hanging ring and be welded to connect.
Preferably, described hanging ring uses specification width to be 3cm, and thickness is not less than, and the steel pipe of 6 cun, below steel pipe It is provided with one and may be used for the hole through fastening bolt, be provided with below hole and be connected the nut matched with fastening bolt.
Preferably, described hanging connecting portion and fastening bolt all use the screw-thread steel of Φ 18mm, and the nut on hanging ring is equal And between the screw-thread steel of Φ 18mm, coupling is connected, and fastening bolt one end is provided with nut, weld between the screw-thread steel of nut and Φ 18mm Connect in succession.
Compared with prior art, the invention has the beneficial effects as follows: this front canopy hoisting ring solves when visiting beam before use, faces Time supporting after affect roofbolt by line construction problem;When gib can solid top board, meet the safety of gib Requirement;Forestope can be made easy to use, reduce labor intensity during librarian use forestope gib;This forestope hangs Hang device simple in construction, be prone to processing, there is higher promotional value.
Accompanying drawing explanation
Fig. 1 is that the present invention assembles front schematic diagram.
Fig. 2 is schematic diagram after the present invention assembles.
In figure: 1-hangs connecting portion, 2-hanging ring, 3-fastening bolt.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not making creative work premise Embodiment, broadly falls into the scope of protection of the invention.
Refer to Fig. 1-2, a kind of embodiment that the present invention provides: a kind of front canopy hoisting ring, including hanging connecting portion 1, hang Link 2, fastening bolt 3, described hanging connecting portion 1 side is provided with the anchor nut matched with roofbolt, anchor nut with Hanging connecting portion 1 uses and is made of welded connection, and described hanging ring 2 one end is provided with and hangs connecting portion 1 and be connected the nut matched, Hanging ring 2 one end is provided with the nut matched with fastening bolt 3, with hanging connecting portion 1 be connected the nut matched and with fastening Bolt 3 connects the nut matched and is welded to connect with hanging ring 2 employing respectively, and hanging ring uses specification width to be 3cm and thickness Degree is not less than the steel pipe of 6 cun, is provided with one and may be used for the hole through fastening bolt, be provided with and fasten spiral shell below hole below steel pipe Tethering and connect the nut matched, hanging connecting portion and fastening bolt all use the screw-thread steel of Φ 18mm, and the nut on hanging ring is equal And between the screw-thread steel of Φ 18mm, coupling is connected, and fastening bolt one end is provided with nut, weld between the screw-thread steel of nut and Φ 18mm Connect in succession.
Specifically used mode: in the present invention, constitutes this device by hanging connecting portion 1, hanging ring 2, fastening bolt 3, Hanging connecting portion 1 is fastened on the outer Rose of rear roof timbering anchor pole of meeting head on by this front canopy hoisting ring when mounted, then will hang Link 2 spiral shell fastens with nut on hanging connecting portion 1 and in lower section, then forestope penetrates hanging ring 2, finally will fasten spiral shell Bolt 3 spiral shell enters in the nut below hanging ring 2 and fastens to hold out against forestope.Every three hanging device for fore poling bars are one group, hang one Root forestope.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of the spirit or essential attributes of the present invention, it is possible to realize the present invention in other specific forms.Therefore, no matter From the point of view of which point, all should regard embodiment as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit requires rather than described above limits, it is intended that all by fall in the implication of equivalency and scope of claim Change is included in the present invention.Should not be considered as limiting involved claim by any reference in claim.
Although moreover, it will be appreciated that this specification is been described by according to embodiment, but the most each embodiment only wraps Containing an independent technical scheme, this narrating mode of description is only that for clarity sake those skilled in the art should Description can also be formed those skilled in the art through appropriately combined as an entirety, the technical scheme in each embodiment May be appreciated other embodiments.

Claims (3)

1. a front canopy hoisting ring, including hanging connecting portion (1), hanging ring (2), fastening bolt (3), it is characterised in that: described Hanging connecting portion (1) side is provided with the anchor nut matched with roofbolt, and anchor nut uses weldering with hanging connecting portion (1) Connecing and be formed by connecting, described hanging ring (2) one end is provided with and hangs connecting portion (1) and be connected the nut matched, hanging ring (2) one end Be provided with the nut matched with fastening bolt (3), be connected with hanging connecting portion (1) nut matched and with fastening bolt (3) Connect the nut matched to be welded to connect with hanging ring (2) employing respectively.
A kind of front canopy hoisting ring the most according to claim 1, it is characterised in that described hanging ring (2) uses specification width For 3cm, and thickness is not less than the steel pipe of 6 cun, is provided with a hole that may be used for through fastening bolt (3), hole below steel pipe Lower section is provided with and is connected, with fastening bolt (3), the nut matched.
A kind of front canopy hoisting ring the most according to claim 1, it is characterised in that described hanging connecting portion (1) and fastening spiral shell Bolt (3) all uses the screw-thread steel of Φ 18mm, and the nut on hanging ring (2) all and mates between the screw-thread steel of Φ 18mm and is connected, tightly Fixing bolt (3) one end is provided with nut, is welded to connect between the screw-thread steel of nut and Φ 18mm.
CN201610890721.3A 2016-10-13 2016-10-13 A kind of front canopy hoisting ring Pending CN106285741A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610890721.3A CN106285741A (en) 2016-10-13 2016-10-13 A kind of front canopy hoisting ring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610890721.3A CN106285741A (en) 2016-10-13 2016-10-13 A kind of front canopy hoisting ring

Publications (1)

Publication Number Publication Date
CN106285741A true CN106285741A (en) 2017-01-04

Family

ID=57718719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610890721.3A Pending CN106285741A (en) 2016-10-13 2016-10-13 A kind of front canopy hoisting ring

Country Status (1)

Country Link
CN (1) CN106285741A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301854A (en) * 2017-12-20 2018-07-20 龙口矿业集团有限公司 Chain type forestope fixed ring

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200955402Y (en) * 2006-09-29 2007-10-03 永城煤电集团有限责任公司 Probing-beam fixing device in front of anchor-net lane temporary support
CN201620898U (en) * 2010-02-10 2010-11-03 孙森 Double-wing lifting type front canopy hoisting ring device
CN201924944U (en) * 2010-11-25 2011-08-10 新泰市汶河矿业有限公司 Stabilizing device for front cantilever
CN202544873U (en) * 2011-07-01 2012-11-21 李立华 Front canopy type temporary supporting suspension device for anchor pole supporting tunnel construction
CN202544759U (en) * 2011-07-01 2012-11-21 李立华 Front canopy type temporary supporting device for anchor pole supporting tunnel construction
CN202596751U (en) * 2012-05-31 2012-12-12 山东科技大学 Front canopy advance support using device
CN203394551U (en) * 2013-07-26 2014-01-15 山东新阳能源有限公司 Adjustable front canopy lifting ring device
CN204212791U (en) * 2014-10-30 2015-03-18 高松 Driving face Novel front canopy hoisting ring device
CN204920998U (en) * 2015-08-19 2015-12-30 永贵能源开发有限责任公司 Adjustable forestope rings
CN206144581U (en) * 2016-10-13 2017-05-03 枣庄矿业集团新安煤业有限公司 Forestope rings

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200955402Y (en) * 2006-09-29 2007-10-03 永城煤电集团有限责任公司 Probing-beam fixing device in front of anchor-net lane temporary support
CN201620898U (en) * 2010-02-10 2010-11-03 孙森 Double-wing lifting type front canopy hoisting ring device
CN201924944U (en) * 2010-11-25 2011-08-10 新泰市汶河矿业有限公司 Stabilizing device for front cantilever
CN202544873U (en) * 2011-07-01 2012-11-21 李立华 Front canopy type temporary supporting suspension device for anchor pole supporting tunnel construction
CN202544759U (en) * 2011-07-01 2012-11-21 李立华 Front canopy type temporary supporting device for anchor pole supporting tunnel construction
CN202596751U (en) * 2012-05-31 2012-12-12 山东科技大学 Front canopy advance support using device
CN203394551U (en) * 2013-07-26 2014-01-15 山东新阳能源有限公司 Adjustable front canopy lifting ring device
CN204212791U (en) * 2014-10-30 2015-03-18 高松 Driving face Novel front canopy hoisting ring device
CN204920998U (en) * 2015-08-19 2015-12-30 永贵能源开发有限责任公司 Adjustable forestope rings
CN206144581U (en) * 2016-10-13 2017-05-03 枣庄矿业集团新安煤业有限公司 Forestope rings

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301854A (en) * 2017-12-20 2018-07-20 龙口矿业集团有限公司 Chain type forestope fixed ring

Similar Documents

Publication Publication Date Title
CN202767254U (en) Angle steel connection type semi-rigid node for square steel tube concrete column and steel beam
CN204960269U (en) Integral pylon
CN204716870U (en) A kind of wire tensioner
CN104358318B (en) A kind of building using concrete steel structural upright
CN106285741A (en) A kind of front canopy hoisting ring
CN206144581U (en) Forestope rings
CN204001665U (en) A kind of scaffold assembling wall-connecting piece
CN205154191U (en) Tunnel preliminary bracing steel pipe concrete steelframe
CN206752460U (en) A kind of pile end board
CN203308109U (en) External carrying net device
CN209429279U (en) A kind of beam-column connection for assembling type steel structure
CN204960293U (en) Scaffold connecting structure
CN105443532A (en) Expansion bolt convenient to use
CN203559432U (en) Underground powerhouse vault
CN204607445U (en) Separation type climbing support protective device
CN205012639U (en) Quick coupling scaffold steel pipe
CN203113823U (en) Butt joint connection part of adjacent edge protecting railing
CN204663493U (en) A kind of shaft mouth operating bench
CN203905517U (en) Quickly assembled or disassembled guard bar with connecting pieces
CN204326501U (en) A kind of monolithic scaffold node
CN204344144U (en) The anti-wall caving temporary support device of hacking shed tunnel
CN203034613U (en) Rotating disk buckle connecting device
CN203821609U (en) Connection structure used for sun room framework
CN204899982U (en) Flame proof water bag and linkage thereof
CN207295992U (en) For steel construction Wall-beam-column connection node mechanism

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170104

WD01 Invention patent application deemed withdrawn after publication