CN204344144U - The anti-wall caving temporary support device of hacking shed tunnel - Google Patents

The anti-wall caving temporary support device of hacking shed tunnel Download PDF

Info

Publication number
CN204344144U
CN204344144U CN201420687238.1U CN201420687238U CN204344144U CN 204344144 U CN204344144 U CN 204344144U CN 201420687238 U CN201420687238 U CN 201420687238U CN 204344144 U CN204344144 U CN 204344144U
Authority
CN
China
Prior art keywords
wall caving
pipe
shed tunnel
connecting rod
support bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420687238.1U
Other languages
Chinese (zh)
Inventor
邵福兵
沈君
姚丰辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Datun Energy Holding Co Ltd
Original Assignee
Shanghai Datun Energy Holding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Datun Energy Holding Co Ltd filed Critical Shanghai Datun Energy Holding Co Ltd
Priority to CN201420687238.1U priority Critical patent/CN204344144U/en
Application granted granted Critical
Publication of CN204344144U publication Critical patent/CN204344144U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses the anti-wall caving temporary support device of a kind of hacking shed tunnel, relate to laneway temporary support technical field.The utility model is made up of multiple bracing or strutting arrangement, and bracing or strutting arrangement comprises a support bar and connecting rod, the front end of support bar and one end of connecting rod hinged, the other end of connecting rod is hinged with anti-wall caving snag; The front end place of support bar and tail end place all install one for being fixed on the retaining member on back i iron, at the front end place near support bar, screw mandrel is installed, the upper end of leading screw is provided with support platform, lower end is fixed with handle, anti-wall caving snag comprises a pipe, the upper end of pipe and the tail end of connecting rod hinged, the lower end of pipe is set with hammer drill, pipe is provided with the fastener for fastening hammer drill, and the outside of pipe is provided with hook from top to bottom.Advantage: processing is simple, intensity is large, improves the safety factor during operation of anchor rack tunnel.

Description

The anti-wall caving temporary support device of hacking shed tunnel
Technical field
The utility model relates to laneway temporary support technical field, and specifically the anti-wall caving of a kind of hacking shed tunnel is propped up temporarily
Protection unit, is mainly used in colliery hacking shed tunnel temporary lining and uses.
Background technology
Traditional temporary lining volume is large, and heavier, need man-hour many during reach, Ren Yuanduo, labour intensity is large.Temporary support structures is complicated, poor safety performance, wall supporting weak effect.
Summary of the invention
Go up a hill and face upward to solve anchor rack combined supporting tunnel wide-angle the problem that pick easily causes wall caving casualty accident, the utility model provides a kind of hacking shed tunnel anti-wall caving temporary support device, improve safety factor during hacking shed tunnel operation, effectively reduce the casualty accident that driving face causes because of roof collapse and wall caving, for mining area safety creates conditions.
The utility model realizes with following technical scheme: the anti-wall caving temporary support device of a kind of hacking shed tunnel, be made up of multiple bracing or strutting arrangement, described bracing or strutting arrangement comprises a support bar and connecting rod, the front end of support bar and one end of connecting rod hinged, the other end of connecting rod is hinged with anti-wall caving snag; The front end place of support bar and tail end place all install one for being fixed on the retaining member on the frame ceiling plate i iron of tunnel, at the front end place near support bar, screw mandrel is installed, the upper end of leading screw is fixed with the support platform with hacking shed tunnel top plate contact, and the lower end of leading screw is fixed with the handle for rotating threaded shaft; Described anti-wall caving snag comprises a pipe, the upper end of pipe and the tail end of connecting rod hinged, the lower end of pipe is set with hammer drill, and pipe is provided with the fastener for fastening hammer drill, and the outside of pipe is provided with hook from top to bottom, and hook is provided with anti-wall caving protecting wire net.
The beneficial effects of the utility model are: processing is simple, intensity is large, improves the safety factor during operation of anchor rack tunnel, by support bar and anti-wall caving device combined, effectively reduce driving face and cause casualty accident because of roof collapse and wall caving, for mining area safety creates conditions.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation,
Fig. 2 is supporting bar structure schematic diagram,
Fig. 3 is anti-wall caving snag structural representation,
Fig. 4 is screw structure schematic diagram,
Fig. 5 is retaining member structural representation,
Fig. 6 is the right view of Fig. 5.
Detailed description of the invention
As shown in Figure 1, a kind of hacking shed tunnel anti-wall caving temporary support device is made up of multiple bracing or strutting arrangement, described bracing or strutting arrangement comprises a support bar 1 and connecting rod 5, the front end of support bar 1 and one end of connecting rod 5 hinged, the other end of connecting rod 5 is hinged with anti-wall caving snag 4; The front end place of support bar and tail end place all install one for being fixed on the retaining member 2 on hacking shed tunnel top board i iron.At the front end place near support bar, screw mandrel 3 is installed.
As shown in Figure 2, support bar adopts coating steel pipe, and length is between 2.8-3.0m, and the strength of materials is comparatively large, and weight is suitable for, and easily processes.
As shown in Figure 3, anti-wall caving snag 4 comprises a pipe 41, the upper end of pipe 41 and the tail end of connecting rod hinged, the lower end of pipe is set with hammer drill 44, pipe is provided with the fastener 43 for fastening hammer drill, and the outside of pipe is provided with hook 42 from top to bottom, and hook is provided with anti-wall caving protecting wire net.
As shown in Figure 4, the upper end of leading screw is fixed with the support platform 6 with hacking shed tunnel top plate contact, and the lower end of leading screw is fixed with the handle 7 for rotating threaded shaft, and swing handle both rotatable screw mandrels, make it move up and down in use.
As shown in Figure 5 and Figure 6, retaining member comprises one for being set with the detachable suspension ring of steel pipe, and upper articulation one fixed bar of suspension ring, the front end of fixed bar is provided with the bending for being stuck on i iron.
Fastener adopts screw, can fast and easy be fixed hammer drill.
Be provided with near hammer drill tip place the auxiliary block stepped on for pin, described auxiliary block cross section is triangle.
During use, this suspension device is chosen according to field demand.Be stuck on retaining member top on the i iron of hacking shed tunnel top board, coating steel pipe is through the detachable suspension ring below retaining member, and the top braces of screw mandrel is on back, and in anti-wall caving snag, the tip of hammer drill is inserted on the ground.

Claims (6)

1. the anti-wall caving temporary support device of hacking shed tunnel, it is characterized in that: be made up of multiple bracing or strutting arrangement, described bracing or strutting arrangement comprises a support bar and connecting rod, the front end of support bar and one end of connecting rod hinged, the other end of connecting rod is hinged with anti-wall caving snag; The front end place of support bar and tail end place all install one for being fixed on the retaining member on hacking shed tunnel top board i iron, at the front end place near support bar, screw mandrel is installed, the upper end of leading screw is fixed with the support platform with hacking shed tunnel top plate contact, and the lower end of leading screw is fixed with the handle for rotating threaded shaft; Described anti-wall caving snag comprises a pipe, pipe upper end and the tail end of connecting rod hinged, the lower end of pipe is set with hammer drill, and pipe is provided with the fastener for fastening hammer drill, the outside of pipe is provided with hook from top to bottom, and hook is provided with anti-wall caving protecting wire net.
2. the anti-wall caving temporary support device of hacking shed tunnel according to claim 1, is characterized in that: described support bar adopts steel pipe.
3. the anti-wall caving temporary support device of hacking shed tunnel according to claim 2, it is characterized in that: described retaining member comprises one for being set with the suspension ring of steel pipe, upper articulation one fixed bar of suspension ring, the front end of fixed bar is provided with the bending for being stuck on i iron.
4. the anti-wall caving temporary support device of hacking shed tunnel according to claim 1, is characterized in that: described fastener adopts screw.
5. the anti-wall caving temporary support device of hacking shed tunnel according to claim 1, is characterized in that: be provided with near hammer drill tip place the auxiliary block stepped on for pin.
6. the anti-wall caving temporary support device of hacking shed tunnel according to claim 5, is characterized in that: described auxiliary block cross section is triangle.
CN201420687238.1U 2014-11-17 2014-11-17 The anti-wall caving temporary support device of hacking shed tunnel Expired - Fee Related CN204344144U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420687238.1U CN204344144U (en) 2014-11-17 2014-11-17 The anti-wall caving temporary support device of hacking shed tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420687238.1U CN204344144U (en) 2014-11-17 2014-11-17 The anti-wall caving temporary support device of hacking shed tunnel

Publications (1)

Publication Number Publication Date
CN204344144U true CN204344144U (en) 2015-05-20

Family

ID=53227419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420687238.1U Expired - Fee Related CN204344144U (en) 2014-11-17 2014-11-17 The anti-wall caving temporary support device of hacking shed tunnel

Country Status (1)

Country Link
CN (1) CN204344144U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105545331A (en) * 2016-01-29 2016-05-04 中国矿业大学 Large-section coal roadway driving face rib-stripping-preventing stop rod and supporting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105545331A (en) * 2016-01-29 2016-05-04 中国矿业大学 Large-section coal roadway driving face rib-stripping-preventing stop rod and supporting method

Similar Documents

Publication Publication Date Title
CN203022776U (en) Temporary supporting device for heating faces
CN204344144U (en) The anti-wall caving temporary support device of hacking shed tunnel
CN204371384U (en) Anchor Agent boost motor
CN201363144Y (en) Development machine piggyback temporary support
CN201221365Y (en) Front cantilever temporary support
CN106837396B (en) A kind of modular support suitable for lame advanced supporting
CN201265423Y (en) Temporary support
CN208749063U (en) A kind of mobile job platform of underground chamber abutment wall
CN203978470U (en) One is hydraulic support stand device movably
CN205840903U (en) Temporary support device is visited before a kind of overlength
CN204212791U (en) Driving face Novel front canopy hoisting ring device
CN203795824U (en) Suspension type fastener scaffold erecting device
CN204386631U (en) A kind of Portable protective net
CN208310827U (en) Gob side entry forces side column Special anchor rod pallet
CN201851129U (en) Light type shield type temporary support facility for roadway excavation
CN203905949U (en) Working platform for raise boring
CN203296368U (en) Front supporting mechanism for fixing steel wire rope of hanging basket
CN203308477U (en) Yieldable iron support rod for mine
CN208564611U (en) The adjustable air partition of fully-mechanized mining working two ends
CN209444269U (en) A kind of fixed device of drilling machine for high slope anchor hole drilling
CN204344122U (en) A kind of large-scale development machine bolting with wire mesh device
CN2913608Y (en) Articulated roof bar type cantilever timbering
CN204677234U (en) A kind of mine blow dryer erecting by overhang
CN204326486U (en) Outrigger oblique pull wire rope fixing device
CN205673847U (en) One is exclusively used in coal mining hydraulic drilling rig chuck provision for disengagement

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150520

Termination date: 20161117

CF01 Termination of patent right due to non-payment of annual fee