CN106285701A - A kind of tunneler - Google Patents

A kind of tunneler Download PDF

Info

Publication number
CN106285701A
CN106285701A CN201610783770.7A CN201610783770A CN106285701A CN 106285701 A CN106285701 A CN 106285701A CN 201610783770 A CN201610783770 A CN 201610783770A CN 106285701 A CN106285701 A CN 106285701A
Authority
CN
China
Prior art keywords
tunneler
tunnel
support boots
diameter
cutterhead
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610783770.7A
Other languages
Chinese (zh)
Inventor
刘飞香
程永亮
郑大桥
何其平
彭正阳
杨慧星
李深远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Heavy Industry Group Co Ltd
Original Assignee
China Railway Construction Heavy Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Heavy Industry Group Co Ltd filed Critical China Railway Construction Heavy Industry Group Co Ltd
Priority to CN201610783770.7A priority Critical patent/CN106285701A/en
Publication of CN106285701A publication Critical patent/CN106285701A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/08Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0621Shield advancing devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to a kind of tunneler, it is suitable to the tunnel that digging diameter is 6.8m to 7.9m.Tunneler includes: drive the main driving mechanism of cutterhead, main driving mechanism includes multiple drive force source assembly, drive mechanism by multiple drive force source Component drivers, and the cutterhead being connected with drive mechanism, circumferentially being enclosed in the shield around main driving mechanism, the shell of shield adapts to the diameter in tunnel to be excavated and changes size.When wait the tunnel diameter excavated at 6.8m to 7.9m between time, it is only necessary to changing the part-structure of tunneler of the present invention, and change without entirety, this can realize the versatility of main parts size, and highly shortened and manufacture and design cycle and producing cost.

Description

A kind of tunneler
Technical field
The present invention relates to mechanical field, particularly relate to a kind of tunneler.
Background technology
Along with the fast development of national economy, urbanization process is constantly accelerated, and this causes domestic urban subway tunnel, water The Tunnel Engineering such as work tunnel, cross-river tunnel, railway tunnel, vcehicular tunnel, municipal pipeline will need substantial amounts of tunneler.Tunnel Road development machine is a kind of high-intelligentization, integrates mechanical, electrical, the constructing tunnel major technologies and equipment of liquid, light, computer technology. Implement tunneler domestic industry, both can break the situation that foreign enterprise market at home rules all the land, and can promote and drive again The development of the industries such as relevant electromechanics, hydraulic pressure, material, sensor, strengthens equipment manufacture comprehensive strength, improves the great dress of China Standby competitiveness in the international market.
Generally, tunneler is tailor-made according to constructing tunnel object.But, the structure of tunneler is multiple Miscellaneous, parts are various, this cause tunneler manufacture and design cycle length and also producing cost is the highest.In satisfied customization On the premise of the differentiation of product, how to meet realize main parts size versatility, shorten manufacture and design cycle and production expense With being the key subjects faced at present.
Summary of the invention
For the problems referred to above, the present invention proposes a kind of tunneler, and it is suitable to digging diameter is 6.8m to 7.9m's Tunnel.When wait the tunnel diameter excavated at 6.8m to 7.9m between time, it is only necessary to change the part-structure of this tunneler, And change without entirety, this can realize the versatility of main parts size, and highly shortened and manufacture and design cycle and production Expense.
Tunneler according to the present invention includes the main driving mechanism driving cutterhead, and main driving mechanism includes multiple driving Power source component, by the drive mechanism of multiple drive force source Component drivers, and the cutterhead being connected with drive mechanism, circumferentially surround Shield around main driving mechanism, the shell of shield adapts to the diameter in tunnel to be excavated and changes size.
When using the tunneler digging diameter tunnel at 6.8m to 7.9m of the present invention, can be by replacing shield Shell is so that shell after Geng Huaning can be with the contact internal walls in tunnel, but the miscellaneous part relevant to shield shell is then without more Change, thus achieve the versatility of main parts size, and highly shortened and manufacture and design cycle and producing cost.
In one embodiment, multiple drive force source assemblies each include motor and the change speed gear box being connected with motor, transmission Mechanism includes the gear ring driven by multiple change speed gear boxes and the cutterhead bearing part being connected with gear ring.In a preferred embodiment, The quantity of multiple motors is 10, and the power of each motor is 350Kw.In one embodiment, drive mechanism also includes carrying From the base bearing of the thrust of cutterhead, base bearing is arranged between cutterhead bearing part and described change speed gear box.Preferably, base bearing A diameter of 4.6m.It has been found that when the tunnel that digging diameter is 6.8m to 7.9m, the motor of this combination can provide to Cutterhead provides sufficiently large power to creep in stratum.The base bearing of a diameter of 4.6m also be enough to bear the extruding from cutterhead Power, it is ensured that tunnel piercing function successfully tunneling.Thus, when change between the diameter in tunnel is at 6.8m to 7.9m, and Need not change and change motor and base bearing, which strongly simplifies the design of tunneler, and reduce tunnel digging Enter producing cost and the production cycle of machine.
In one embodiment, shell is made up of the multiple housing portions mutually overlapped, and is internally provided with use at shell In the shield oil cylinder driving multiple housing portions.Shield oil cylinder can push out housing portion and lean tunnel wall tightly, real The now preliminary supporting to tunnel wall.
In one embodiment, at least one in multiple housing portions is provided with connecting plate on surface within it, connects Plate has the ligand that arc protrudes, and the end structure of the drive rod of corresponding shield oil cylinder becomes the ligand phase protruded with arc The supporting body of the arc-shaped recess coordinated.It addition, be configured with the through hole run through on ligand, it is configured with on the carrier and through hole Corresponding installing hole, it is interior with installing hole housing portion to be connected with corresponding shield oil cylinder that connecting bolt is arranged on through hole, logical The diameter in hole is less than the diameter of the bolt head of connecting bolt more than the diameter of the shank of bolt of connecting bolt.Owing to the diameter of through hole is more than It it is arc between the diameter of the shank of bolt of connecting bolt, and the supporting body of the drive rod of the ligand of housing portion and shield oil cylinder Face is connected, and therefore relative motion occurs between housing portion to a certain extent.So, outside shield oil cylinder pushes out During shell part, the position of scalable housing portion, this is very important for housing portion supporting tunnel wall.Prior It is that the size of this attachment structure is much smaller than chain connection of the prior art, and this is 6.8m to 7.9m tunnel for digging diameter For the less inner space of the tunneler in road, it is very important.
In a preferred embodiment, ligand is provided with the oil filler point connected with through hole.Can by oil filler point Lubricating oil is injected in through hole.And then, lubricating oil can be flowed between ligand and supporting body, thus at ligand and supporting body Between arc cooperation face on play lubrication.
In one embodiment, compared with the design adaptation tunnel diameter of tunneler, the diameter in tunnel to be excavated When increase amplitude is between 50mm to 500mm, by being fixedly installed new housing department on the outer surface of multiple housing portions respectively Divide and change its size.In a preferred embodiment, between housing portion and new housing portion, there are gap, Multiple ribs it is provided with in gap.Can particularly simple change the size of the shell of shield in this way, particularly diameter, And multiple ribs makes new shell can bear the pressure in tunnel.This greatly reduces the quantity of renewal part, Expense and being time-consumingly also greatly reduced.Additionally, by the gap between regulation housing portion and new housing portion, one can be entered The size of step joint shell, thus expand the tunnel diameter that tunnel piercing function is adaptive.
In one embodiment, cutterhead includes central block and the multiple limits block that can be removably mounted.By changing accelerating of cutterhead, can Change the diameter of cutterhead easily, to adapt to tunnel to be excavated.In a preferred embodiment, the quantity of multiple limits block is Four and shape identical.The shape of limit block is identical, and this is very easy to batch making limit block, and facilitates user more Change sides block.
In one embodiment, tunneler also includes axially arranged girder, and main driving mechanism is arranged on girder Front, the hinged propulsion assembly that is provided with at the middle part of girder, and it is fixedly installed a support component, a support component includes slidingtype The saddletree being connected across on girder, the support boots oil cylinder that suspension type is connected with saddletree, the end of the extension bar of support boots oil cylinder is provided with support Boots, propulsion assembly is hinged with support boots, and support boots adapt to the diameter in tunnel to be excavated and change.A preferred embodiment In, former support boots are fixedly installed variable diameter plate and change to the diameter adapting to described tunnel.In tunneler tunneling process, support Boots are used for propping up tunnel wall.It has been found that only change support boots and do not change support boots oil cylinder and other associated components, Ke Yifang Just adapt to the diameter tunnel at 6.8m to 7.9m, which strongly simplifies design and the manufacture of tunneler.
In one embodiment, the quantity of support boots oil cylinder is two, and the cylinder bottom of two support boots oil cylinders is connected with each other, two supports The extension bar of boots oil cylinder is in same straight line and extends in the opposite direction.So, two support boots oil cylinders individually can be tieed up Protect, and can keep in repair individually or change one of them when necessary, and another is unaffected, it reduces and safeguards into This.
In one embodiment, a support component also includes pin assemblies, and pin assemblies includes the cylinder being arranged on two support boots oil cylinders Horizontal winning in succession, horizontal two ends won in succession saddletrees respectively are connected, and pin assemblies also includes vertically selling, and vertically sells gap vertically at the end Formula extends through the installing hole being arranged on the horizontal middle part won in succession, and vertically the two ends of pin are each via connecting plate and two support boots Oil cylinder is connected.Two support boots oil cylinders are connected into an entirety by vertically pin and the connecting plate of pin assemblies, it is to avoid two support boots oil cylinders Between occur relative motion.Pin assemblies horizontal win in succession and with saddletree, two support boots oil cylinders connected into an entirety, it is to avoid two Support boots oil cylinder and saddletree relative motion in the axial direction.So when propulsion assembly pushes ahead girder, said two support boots oil cylinder Can synchronously travel forward.Further, since vertically pin is matched in clearance with the installing hole on horizontal winning in succession, so can be as requested Realize the upper and lower tuning of tunneler.
In one embodiment, the size at the horizontal middle part won in succession is more than the size of two ends, and from middle part to end Seamlessly transit.Therefore horizontal winning in succession can be configured in the middle part of it by the extruding force from vertically pin at the horizontal installing hole won in succession Size is sized to improve the horizontal intensity won in succession more than two ends.Can avoid additionally, seamlessly transit from middle part to end Horizontal winning in succession occurs that stress is concentrated.
In a preferred embodiment, between the cylinder bottom of two support boots oil cylinders, contiguous block is installed, in contiguous block Reporting to the leadship after accomplishing a task and be configured with transverse holes and longitudinal hole, horizontal win in succession through transverse holes, vertically pin is through longitudinal hole, connecting plate be in contiguous block it Outward.By arranging contiguous block, it is convenient to regulate the distance between two support boots, so that two support boots can better adapt to The diameter in tunnel to be excavated.Win in succession additionally, horizontal and vertically sell the inside being mostly in contiguous block, thus avoiding it and be subject to Injury from external environment condition.Additionally, contiguous block also contributes to connect together two support boots oil cylinders, alleviate connecting plate Stressing conditions.
In one embodiment, on girder, it is disposed adjacently steel arch-shelf installing mechanism at the rear of shield.Steel arch-shelf Installing mechanism includes the rotating ring of internal tooth round, engages the multiple support rollers coordinated with rotating ring, and the plurality of support roller is fixed on girder On.When installing supporting shaped steel, first the multiple supporting shaped steel becoming section are arranged on rotating ring, and is spliced into a circle Arc, is installed in tunnel wall the most again.
In one embodiment, rotating ring is provided with at interval for carrying the multiple hook of supporting shaped steel, hook Including hook body, the first extension of hook body is fixedly linked with rotating ring, and the second extension is used for carrying supporting The weight of shaped steel, is also equipped with auxiliary hook in hook body, and auxiliary hook is parallel with the second extension and its first end It is hinged on the corner of hook body, at the second end, is provided with the tension hook assembly being connected with hook body.According to this Plant structure, after being placed on hook by supporting shaped steel, by rotating auxiliary hook and by tension hook assembly and hook master Body is connected and can be stably maintained on hook by supporting shaped steel.In addition, it is desirable to during release supporting shaped steel, it is only necessary to by tension hook group Part separates with hook body, this facilitate that user operates.
In one embodiment, being additionally provided with jumbolter assembly on girder, jumbolter assembly includes that symmetrical expression sets Put on girder both sides two arc tracks and two brills moved along two arc tracks respectively by annular walking mechanism Machine.Rig is for perforating in tunnel wall and applies the reinforcement materials such as reinforcing bar in tunnel wall, to strengthen the intensity of tunnel wall.Logical Cross and two arc tracks are set, can make the rig can perforating on each position on tunnel wall circumference.
Compared with prior art, it is an advantage of the current invention that: only need to reequip tunneler shield shell, support simply Tunneler complete machine just can be used for the digging diameter any tunnel between 6.8m to 7.9m by boots easily, and without changing The miscellaneous part of dress tunneler, which strongly simplifies design and the manufacture of tunneler.
Accompanying drawing explanation
Hereinafter based on embodiment reference accompanying drawing, the present invention will be described in more detail.Wherein:
Fig. 1 show schematically show the overall structure of the tunneler according to the present invention;
Fig. 2 show schematically show the main driving mechanism of the tunneler according to the present invention;
Fig. 3 show schematically show the structure of the shield of the tunneler according to the present invention;
Fig. 4 show schematically show the structure of the cutterhead of the tunneler according to the present invention;
Fig. 5 show schematically show the structure of the girder of the tunneler according to the present invention;
Fig. 6 is the top view of Fig. 5;
Fig. 7 is the A-A sectional view of Fig. 5;
Fig. 8 show schematically show the steel arch-shelf installing mechanism of the tunneler according to the present invention;
Fig. 9 is the side view of Fig. 8;
Figure 10 show schematically show the jumbolter assembly of the tunneler according to the present invention;
Figure 11 is the C portion zoomed-in view of Fig. 3;
Figure 12 show schematically show the support boots of the tunneler according to the present invention;
Figure 13 show schematically show the variable diameter plate of the tunneler according to the present invention;
Figure 14 show schematically show according to the reducing of the tunneler of the present invention after support boots;
Figure 15 is the B-B sectional view of Fig. 6;
Figure 16 show schematically show propulsion assembly, a support component, saddletree and the assembly relation of pin assemblies with top view;
Figure 17 show schematically show the structure of the hook according to the present invention;
Figure 18 is the side view of Figure 17;
Figure 19 is the longitudinal section of Figure 17.
In the accompanying drawings, identical parts use identical reference.Accompanying drawing is not according to actual ratio.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
As it is shown in figure 1, tunneler 10 includes the cutterhead 1 along axis 11 layout, shield 2, main driving mechanism 3, girder 7 And it is arranged on other structures multiple or the assembly, such as steel arch-shelf installing mechanism 4 and jumbolter assembly 5 of girder 7.
Cutterhead 1 is in the forefront of tunneler 10, and in order to creep in stratum.Main driving mechanism 3 be used for Cutterhead 1 applies driving force.The tunnel wall in the tunnel that shield 2 has just been drilled to for preliminary support.Adjacent with shield 2 and after being arranged on The steel arch-shelf installing mechanism 4 of side is for implementing supporting to tunnel.It is arranged on the jumbolter assembly at steel arch-shelf installing mechanism 4 rear 5 for punching and insert the reinforcements such as reinforcing bar, to strengthen tunnel wall further in tunnel wall.
Multiple ingredients of tunneler 10 are described separately below.
Fig. 4 show schematically show the structure of cutterhead 1.Cutterhead 1 includes central block 41 and four identical limit blocks 42. It should be understood that the quantity of limit block 42 can also be more.Central block 41 is connected to receive power with main driving mechanism 3.Limit block 42 Can change, in order to adapt to digging diameter tunnel between 6.8m to 7.9m.In one embodiment, central block 41 Cross section be rotational symmetric corner cut square shape, the mating shapes of the shape of limit block 42 and central block 41, in order to card Connect location.In another embodiment, the cross section of central block 41 and the ratio of the cross-sectional area of cutterhead 1 are at 3:5.Application Crinis Carbonisatus Existing, when the digging diameter tunnel at 6.8m to 7.9m, the central block 41 of such size can accept enough moments of torsion without Deform.
Fig. 2 show schematically show main driving mechanism 3.As in figure 2 it is shown, what main driving mechanism 3 included arranging in the circumferential Ten motors 21.Motor 21 is chosen as the frequency conversion motor that power is 350Kw.Ten motors 21 respectively with the deceleration in change speed gear box 24 Machine 22, gear 23 are connected.Gear 23 engages with gear ring 25.Gear ring 25 is connected with cutterhead bearing part 27 again.Cutterhead 1 is arranged on cutterhead On bearing part 27.Hereby it is achieved that main driving mechanism 3 drives cutterhead 1.
In order to avoid gear ring 25 and gear 23 bear the thrust from cutterhead 1, at cutterhead bearing part 27 and change speed gear box 24 Base bearing 26 and ball 28 are installed, this thrust to be delivered on change speed gear box 24 between outer wall.Base bearing 26 and ball 28 are used In reducing frictional force.In one embodiment, base bearing 26 is configured to its a diameter of 4.6m.
Fig. 3 show schematically show shield 2.Shield 2 includes shell 31 and is arranged on the inside of shell 31 outside driving The shield oil cylinder 32 of shell 31.Shell 31 is formed by the housing portion 33 of multiple mutual overlap joints, and therefore the quantity of shield oil cylinder 32 is also It is correspondingly multiple, to drive these housing portions 33.
Owing to the diameter of tunneler is less, this causes, and shield 2 is internal only has less space to install these shields Oil cylinder 32.Especially for top shield oil cylinder 321, its installing space is less, creatively improves top shield oil cylinder 321 for this Connected mode with top shell 311.As shown in figure 11, the inner surface of top housing portion 311 is provided with connecting plate 312.Even Fishplate bar 312 has the ligand 313 that arc protrudes, the end structure camber depression of the drive rod 322 of top shield oil cylinder 321 Supporting body 323.Supporting body 323 complements each other to form with ligand 313 and is similar to the attachment structure that ball is connected.At ligand 313 On be configured with the through hole 314 run through, supporting body 323 is configured with the installing hole 324 corresponding with through hole 314.Connecting bolt 325 Extend through through hole 314 and be fixedly linked with installing hole 324, to realize the phase of top housing portion 311 and top shield oil cylinder 321 Even.The diameter of through hole 314 is less than the diameter of the bolt head 327 of connecting bolt more than the diameter of the shank of bolt 326 of connecting bolt 325. When pushing up shield oil cylinder 321 and pushing out top housing portion 311, coordinated by the cambered surface of supporting body 323 with ligand 313 and have There is larger-diameter through hole 314 can regulate the position of top housing portion 311, so that its supporting is in the appropriate location of tunnel wall. What is more important, connecting plate 312 height H only has 85mm, and this is much smaller than hinged height of the prior art (usually 245mm), it is clear that this cambered surface of the present invention coordinates the tunnel that digging diameter is 6.8m to 7.9m of being suitable to being more suitable for the present invention Tunneler 10.
Preferably, ligand 313 is provided with the oil filler point 317 connected with through hole 314.So, oil filler point can be passed through Lubricating oil is injected in through hole 314 by 317.And then, lubricating oil can be flowed between ligand 313 and supporting body 323, thus Lubrication is played on arc cooperation face between ligand 313 and supporting body 323.
Shield 2 (or shell 31) can also be increased by fixedly mounting new housing portion 35 in housing portion 33 Size, so that tunneler 10 is suitable to the digging diameter any tunnel between 6.8m to 7.9m.Preferably, with tunnel digging The design adaptation tunnel diameter entering machine 10 is compared, wait the diameter in the tunnel excavated increase amplitude at 50mm to 500mm between time, logical Cross and on the outer surface of housing portion 33, be fixedly installed new housing portion 35 to change its size.Particularly, for reusing Tunneler for, can extremely convenient tunneler be applicable to new tunnel to be excavated in this way. As it is shown on figure 3, there are gap 36 between housing portion 33 and new housing portion 35, in gap 36, it is provided with multiple support Rib 37.By regulating the size in gap 36, the straight of shell 31 after being provided with new housing portion 35 can be adjusted easily Footpath.
Fig. 5 show schematically show the girder 7 of tunneler 10.The motor 21 of main driving mechanism 3 is arranged on girder 7 On leading section 511.The middle part 512 of girder 7 is provided with propulsion assembly 52 and a support component 753, as shown in Figure 5 and Figure 6.? In one embodiment, propulsion assembly 52 is propelling cylinder.The connecting rod 53 of propelling cylinder 52 is hinged with girder 7, and propelling cylinder 52 is hinged with a support component 753.Preferably, girder 7 lateral symmetry be provided with propelling cylinder 52.By connecting rod 53 from pushing away Retract in the cylinder body of oil-feed cylinder 52 and stretch out, girder 7 can be promoted to advance, and then promoting cutterhead 1 to advance.It should be understood that Fig. 6 with Two propelling cylinders being in different conditions show the course of action of propelling cylinder 52.
Prop up support component 753 and include saddletree 54, the lower section being in girder 7 and and the saddletree that slidingtype is connected across on girder 7 The support boots oil cylinder 71 that 54 suspension types are connected.In the end of the extension bar 72 of support boots oil cylinder 71, support boots 73 are installed.In this situation Under, propelling cylinder 52 is hinged with support boots 73.In the present embodiment, the quantity of support boots oil cylinder 71 is two, and two support boots oil The cylinder bottom of cylinder is connected with each other.So, the extension bar 72 of two support boots oil cylinders 71 is in same straight line and in the opposite direction Extend.Be mounted on supportting boots 73 in the end of each extension bar 72, therefore two support boots 73 are symmetrically in the two of girder 7 Side.Symmetrical support boots 73 are supported in tunnel wall 1004, to ensure that girder 7 is all the time along being correctly oriented advance.Main advancing During beam 7, first two support boots 73 support be connected in tunnel wall 1004, the connecting rod 53 of propelling cylinder 52 stretch out in cylinder body from And promote girder 7 relative to saddletree 54 forward slip.It follows that two support boots 73 separate with tunnel wall 1004, propelling cylinder 52 Connecting rod 53 be retracted in cylinder body thus draw support boots 73 and advance, and then saddletree 54 and support boots oil cylinder 71 also travel forward.So It is achieved that and pushes ahead tunneler 10.
All the time being synchronized with the movement with saddletree 54 in order to ensure two support boots oil cylinders 71, a support component 753 also includes pin assemblies.As Shown in Figure 15 and 16, pin assemblies includes horizontal winning 1601 in succession, and it is arranged between the cylinder bottoms of two support boots oil cylinders 71, and horizontal wins in succession The two ends of 1601 are connected with saddletree 54.Horizontal win in succession 1601 middle part be provided with the installing hole 1603 of vertically extension.Pin assemblies is also Including with matched in clearance extend through the vertical pin 1501 of installing hole 1603.Vertically connecting plate is passed through at the two ends of pin 1501 respectively 1502 are fixedly linked with two support boots oil cylinders 71.So, in horizontal win in succession 1601, vertical pin 1501 and the connection of connecting plate 1502 Under, two support boots oil cylinders 71 form an entirety with saddletree 54.When propelling cylinder 52 is pulled along two support boots 73, it is ensured that two Individual support boots oil cylinder 71 and saddletree 54 synchronously travel forward.
Preferably, horizontal win in succession 1601 the size at middle part (being i.e. provided with the position of installing hole 1603) more than the chi of two ends Very little, and seamlessly transit from middle part to end.On the whole, horizontal winning in succession 1601 in fish tail shape, this can be avoided horizontal winning in succession Produce stress on 1601 to concentrate.
In one embodiment, between the cylinder bottom of two support boots oil cylinders 71, contiguous block 75 is installed.This can increase two Distance between support boots 73, so can adapt to the new diameter treating tunneling further.In this case, at contiguous block 75 Inside report to the leadship after accomplishing a task and be configured with transverse holes 1503 and longitudinal hole 1504.Horizontal winning in succession 1601 through transverse holes 1503, vertical pin 1501 is through vertical To hole 1504, connecting plate 1502 is in outside contiguous block 75.
For reusable tunneler, variable diameter plate 1301 can be fixedly installed on the outer surface of support boots 73 Change its size, thus adapt to the new diameter treating tunneling.As shown in figure 12, support boots 73 include matrix 1201, by propping up The arc 1203 that support member 1202 is connected with matrix 1201.Arc 1203 is used for leaning tunnel wall.Arrange on arc 1203 There is screwed hole 1204, variable diameter plate 1301 is also equipped with the screwed hole 1302 corresponding with screwed hole 1204, so can pass through spiral shell Bolt 1401 is installed variable diameter plate 1301 on arc 1203 and is changed the size of support boots.In one embodiment, variable diameter plate 1301 It is the steel plate of 50mm for thickness.When using the tunneler 10 with support boots 73 to excavate new tunnel, can be easily One or more variable diameter plate 1301 (such as Figure 14) is installed as required on arc 1203, adapts to new tunnel to be excavated Road.
In one embodiment, being provided with two moment of torsion oil cylinders 74 on saddletree 54, two support boots oil cylinders 71 are respectively with two The extension bar of individual moment of torsion oil cylinder 74 is connected, thus realizes supportting boots oil cylinder 71 and be connected with the suspension type of saddletree 54.By regulation moment of torsion The extension elongation of the extension bar of oil cylinder 74, can be conveniently adjusted the height of support boots oil cylinder 71, and then regulation tunneler 10 Upper-lower position.
Fig. 8 and Fig. 9 shows the steel arch-shelf installing mechanism 4 of tunneler 10.Steel arch-shelf installing mechanism 4 is closely arranged At the rear of shield 2, so that the tunnel wall excavated is implemented supporting.As shown in Figure 8, steel arch-shelf installing mechanism 4 includes rotating Ring 81 and the multiple support rollers 82 matched with rotating ring 81, multiple support rollers 82 are arranged on girder 7.Rotating ring 81 is configured to interior table Mask has the gear ring shape of teeth, and support roller 82 also engages with rotating ring 81 for gear.Preferably, rotating ring 81 is pacified at interval Equipped with being used for carrying the multiple hook of supporting shaped steel 1701 (as shown in FIG. 8 and 9).When installing supporting shaped steel, the multiple of section will be become First supporting shaped steel arranged on the hook 1701 of rotating ring 81, and is spliced into a circular arc, the most again by stretching arm 85 It is installed in tunnel wall.
Figure 17,18 and 19 show an exemplary structure of hook 1701.As shown in figure 19, hook 1701 includes hanging Hook main body 1901.Hook body 1901 is substantially l-shaped, and its first extension 1902 is fixedly linked with rotating ring 81, the Two extensions 1903 are for carrying the weight of supporting shaped steel 1904.Hook 1701 also includes auxiliary hook 1702.Preferably, auxiliary The quantity of hook 1702 is two, and is symmetrically arranged on the both sides of hook body 1901, as shown in figure 18.Auxiliary hook 1702 And its first end 1703 parallel with the second extension 1903 is hinged at the turning 1905 of hook body 1901, second The tension hook assembly 1705 being connected it is provided with hook body 1901 at end 1704.In one embodiment, tension hook group Part 1705 includes the drag hook 1707 of the chain 1706 being connected with the second end 1704 and the end that is arranged on chain 1706.? One extension 1902 is provided with tension hole 1708, and drag hook 1707 is engageable interior to realize and hook body to tension hole 1708 1901 are connected.
So, after supporting shaped steel 1904 being placed on hook 1701, by rotating auxiliary hook 1702 and general Drag hook 1707 is connected with hook body 1901 and can be stably maintained at by supporting shaped steel 1904 on hook 1701.In addition, it is desirable to release When putting supporting shaped steel 1904, it is only necessary to separated with hook body 1901 by drag hook 1707, this facilitate that user operates.
Preferably, steel arch-shelf installing mechanism 4 also includes the walking mechanism 91 driving rotating ring 81 axially-movable.Walking mechanism 91 move along girder 7 and carry rotating ring 81 simultaneously moves (i.e. axially-movable) along girder 7, so can be in the axial direction Supporting shaped steel 1904 on tunnel wall 1004 installation site is fine-tuned.
Figure 10 shows the jumbolter assembly 5 of tunneler 10.Jumbolter assembly 5 includes that two are installed symmetrically Arc track 1001 on girder 7 both sides and moved along two arc tracks 1001 by annular walking mechanism 1003 two Rig 1002.By this motion of rig 1002, two rigs 1002 cover each on a circumference of tunnel wall 1004 Position, i.e. can each position perforating on one circumference of tunnel wall apply the reinforcement materials such as reinforcing bar in tunnel wall, with Strengthen the intensity of tunnel wall.
Although by reference to preferred embodiment, invention has been described, but in the situation without departing from the scope of the invention Under, can make improvements and parts therein can be replaced with equivalent.As long as there is not structural hazard, each is implemented The every technical characteristic being previously mentioned in example all can combine in any way.The invention is not limited in the particular implementation in literary composition Example, but include all technical schemes fallen within the scope of the appended claims.

Claims (17)

1. a tunneler, it is suitable to the tunnel that digging diameter is 6.8m to 7.9m, and described tunneler includes:
Driving the main driving mechanism of cutterhead, described main driving mechanism includes multiple drive force source assembly, by the plurality of driving force The drive mechanism that source component drives, and the cutterhead being connected with described drive mechanism,
Circumferentially being enclosed in the shield around described main driving mechanism, the shell of described shield adapts to the straight of tunnel to be excavated Footpath and change size.
Tunneler the most according to claim 1, it is characterised in that the plurality of drive force source assembly each includes electricity Machine and the change speed gear box being connected with motor, described drive mechanism includes the gear ring driven by multiple change speed gear boxes and is connected with described gear ring Cutterhead bearing part.
Tunneler the most according to claim 2, it is characterised in that the quantity of motor is 10, the merit of each motor Rate is 350Kw.
4. according to the tunneler described in Claims 2 or 3, it is characterised in that described drive mechanism also include carry from The base bearing of the thrust of described cutterhead, described base bearing is arranged between described cutterhead bearing part and described change speed gear box.
Tunneler the most according to claim 4, it is characterised in that a diameter of 4.6m of described base bearing.
6. according to the tunneler according to any one of claim 1 to 5, it is characterised in that described shell is by mutually overlapping Multiple housing portions composition, at the shield oil cylinder being internally provided with for driving the plurality of housing portion of described shell.
Tunneler the most according to claim 6, it is characterised in that at least one in the plurality of housing portion exists Being provided with connecting plate on its inner surface, described connecting plate has the ligand that arc protrudes, the drive rod of corresponding shield oil cylinder End structure become the supporting body of arc-shaped recess that the ligand with described arc protrusion matches.
Tunneler the most according to claim 7, it is characterised in that be configured with run through logical on described ligand Hole, is configured with the installing hole corresponding with described through hole on described supporting body,
Connecting bolt is arranged on described through hole and described installing hole is interior with by described housing portion and corresponding shield oil cylinder Being connected, the diameter of described through hole is less than the straight of the bolt head of described connecting bolt more than the diameter of the shank of bolt of described connecting bolt Footpath.
9. according to the tunneler according to any one of claim 6 to 8, it is characterised in that with the design of tunneler Adaptive tunnel diameter is compared, wait the diameter in the tunnel excavated increase amplitude at 50mm to 500mm between time, by the plurality of New housing portion it is fixedly installed respectively to change its size on the outer surface of housing portion.
Tunneler the most according to claim 9, it is characterised in that deposit between housing portion and new housing portion There iing gap, in described gap, be provided with multiple ribs.
11. according to the tunneler according to any one of claim 1 to 10, it is characterised in that described cutterhead includes center Block and the multiple identical limit block that can be removably mounted.
12. according to the tunneler according to any one of claim 1 to 11, it is characterised in that described tunneler is also Including axially arranged girder, described main driving mechanism is arranged on the front of described girder,
The hinged propulsion assembly that is provided with at the middle part of described girder, and it is fixedly installed a support component,
Described support component includes the saddletree that slidingtype is connected across on described girder, the support boots oil that suspension type is connected with described saddletree Cylinder, the end of the extension bar of described support boots oil cylinder is provided with support boots, and described propulsion assembly is hinged with described support boots, described support boots energy Adapt to the diameter in tunnel to be excavated and change.
13. tunnelers according to claim 12, it is characterised in that be fixedly installed change on the outer surface of former support boots Footpath plate changes its size.
14. according to the tunneler described in claim 12 or 13, it is characterised in that the quantity of described support boots oil cylinder is two Individual, the cylinder bottom of two support boots oil cylinders is connected with each other, and the extension bar of two support boots oil cylinders is in same straight line and towards contrary Direction extends.
15. tunnelers according to claim 14, it is characterised in that described support component also includes pin assemblies, institute State pin assemblies and include being arranged on horizontal between the cylinder bottom of said two support boots oil cylinder winning in succession, described horizontal two ends won in succession institutes respectively State saddletree to be connected,
Described pin assemblies also includes vertically selling, and described vertical pin clearance fit type vertically extends through and is arranged on described horizontal win in succession The installing hole at middle part, the two ends of described vertical pin are connected each via connecting plate and two support boots oil cylinders.
16. tunnelers according to claim 15, it is characterised in that the size at the described horizontal middle part won in succession is more than two The size of individual end, and seamlessly transit from middle part to end.
17. according to the tunneler described in claim 15 or 16, it is characterised in that at the cylinder bottom of said two support boots oil cylinder Between contiguous block is installed, report to the leadship after accomplishing a task in described contiguous block and be configured with transverse holes and longitudinal hole, described horizontal win in succession through described horizontal stroke Xiang Kong, described vertical pin is in outside described contiguous block through described longitudinal hole, described connecting plate.
CN201610783770.7A 2016-08-31 2016-08-31 A kind of tunneler Pending CN106285701A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610783770.7A CN106285701A (en) 2016-08-31 2016-08-31 A kind of tunneler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610783770.7A CN106285701A (en) 2016-08-31 2016-08-31 A kind of tunneler

Publications (1)

Publication Number Publication Date
CN106285701A true CN106285701A (en) 2017-01-04

Family

ID=57673187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610783770.7A Pending CN106285701A (en) 2016-08-31 2016-08-31 A kind of tunneler

Country Status (1)

Country Link
CN (1) CN106285701A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593463A (en) * 2017-01-10 2017-04-26 辽宁三三工业有限公司 Hard rock tunnel boring machine (TBM) main beam and saddle frame sliding rail device
CN112983448A (en) * 2021-03-25 2021-06-18 中铁十八局集团有限公司 Novel DSIS TBM

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102691506A (en) * 2012-06-29 2012-09-26 北方重工集团有限公司 Spherical support girder turning mechanism for open-type hard-rock boring machines
CN102704940A (en) * 2012-06-29 2012-10-03 中国铁建重工集团有限公司 Limit protection device for supporting oil cylinder of open type whole-section tunnel rock boring machine
CN202510121U (en) * 2012-03-13 2012-10-31 秦皇岛天业通联重工股份有限公司 Hard rock boring machine
CN104533437A (en) * 2014-12-11 2015-04-22 徐工集团凯宫重工南京有限公司 Cutter head torque input structure for shield tunneling machine
CN104747200A (en) * 2015-03-18 2015-07-01 中铁工程装备集团有限公司 Pipe segment diameter adjustable hard rock tunneling machine adopting double-layer supporting mode and construction method thereof
CN105443135A (en) * 2015-12-29 2016-03-30 上海隧道工程有限公司 Spreading shoe structure of quasi-rectangular shield pushing oil cylinder

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202510121U (en) * 2012-03-13 2012-10-31 秦皇岛天业通联重工股份有限公司 Hard rock boring machine
CN102691506A (en) * 2012-06-29 2012-09-26 北方重工集团有限公司 Spherical support girder turning mechanism for open-type hard-rock boring machines
CN102704940A (en) * 2012-06-29 2012-10-03 中国铁建重工集团有限公司 Limit protection device for supporting oil cylinder of open type whole-section tunnel rock boring machine
CN104533437A (en) * 2014-12-11 2015-04-22 徐工集团凯宫重工南京有限公司 Cutter head torque input structure for shield tunneling machine
CN104747200A (en) * 2015-03-18 2015-07-01 中铁工程装备集团有限公司 Pipe segment diameter adjustable hard rock tunneling machine adopting double-layer supporting mode and construction method thereof
CN105443135A (en) * 2015-12-29 2016-03-30 上海隧道工程有限公司 Spreading shoe structure of quasi-rectangular shield pushing oil cylinder

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593463A (en) * 2017-01-10 2017-04-26 辽宁三三工业有限公司 Hard rock tunnel boring machine (TBM) main beam and saddle frame sliding rail device
CN106593463B (en) * 2017-01-10 2018-03-20 辽宁三三工业有限公司 A kind of hard rock TBM girders and saddletree railroad
CN112983448A (en) * 2021-03-25 2021-06-18 中铁十八局集团有限公司 Novel DSIS TBM

Similar Documents

Publication Publication Date Title
CN106285703A (en) Boots and tunneler are supportted in seriation for tunneler
CN106223970A (en) A kind of tunneler
WO2019085819A1 (en) Process and device for supporting anchor bolt and anchor cable on successive mining working face
CN105626089A (en) Method and device for in-tunnel demounting of master drive of shield tunneling machine
CN107288648A (en) Open-type full-face rock ripper support system and method for protecting support
CN106285702A (en) A kind of tunneler
CN106285701A (en) A kind of tunneler
CN103924985A (en) Cast-in-situ inverted arch lining trolley and concrete curing system in synchronous construction with TBM (tunnel boring machine) tunneling
CN203769787U (en) Mining whole-section rectangular heading machine supporting, propelling and direction adjusting mechanism
CN102383793B (en) Dual function machine for drilling and loading in tunnel
CN203847130U (en) Cast-in-situ inverted arch lining trolley and concrete curing system capable of being synchronously constructed along with boring of TMB (tunnel boring machine)
CN103161187A (en) Bulldozer and earth-loosening device thereof
CN106285705A (en) A kind of tunneler
CN106194197A (en) A kind of tunneler
CN106285706A (en) A kind of tunneler
CN106194194A (en) A kind of method for tunneler seriation
CN105944818B (en) The dual-purpose movement of rail is broken to select platform
CN2589677Y (en) Side arch type all round needle beam loop wheel machine
CN105221166A (en) Upstriker large span contains tunnel outer mould liner platform building cart
CN203805992U (en) Novel mining crawler-type loader-digger
CN107461194A (en) Cantilevered longitudinal axis development machine
CN202768027U (en) Quick heading temporary shoring system matched and used with heading machine
CN104442526A (en) Road anti-collision fence breakdown van
CN104564076A (en) Caterpillar band walking type double-barrel coal cutter for strip mine
CN201614939U (en) Three-dimensional space curved surface steel mould trolley

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170104