CN106284959A - A kind of installation method of shaft furnace platform - Google Patents

A kind of installation method of shaft furnace platform Download PDF

Info

Publication number
CN106284959A
CN106284959A CN201610781568.0A CN201610781568A CN106284959A CN 106284959 A CN106284959 A CN 106284959A CN 201610781568 A CN201610781568 A CN 201610781568A CN 106284959 A CN106284959 A CN 106284959A
Authority
CN
China
Prior art keywords
platform
support component
gripper shoe
locating slot
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610781568.0A
Other languages
Chinese (zh)
Other versions
CN106284959B (en
Inventor
宋海玉
孙会佳
郭黎明
李振兴
孟立宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xin'an Shuofeng Stone Co ltd
Original Assignee
SHJIAHZHUANG BOGUANG THERMAL ENERGY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHJIAHZHUANG BOGUANG THERMAL ENERGY TECHNOLOGY Co Ltd filed Critical SHJIAHZHUANG BOGUANG THERMAL ENERGY TECHNOLOGY Co Ltd
Priority to CN201610781568.0A priority Critical patent/CN106284959B/en
Publication of CN106284959A publication Critical patent/CN106284959A/en
Application granted granted Critical
Publication of CN106284959B publication Critical patent/CN106284959B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
    • E04G3/243Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons following the outside contour of a building
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/007Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The present invention relates to the installation method of a kind of shaft furnace platform, its concrete steps include a, prefabricated platform component and platform member Selective assembly are become two symmetrical platform block;Prefabricated isometric and that both ends of the surface are inclined-plane steel structure support plate;By the shape of the circumference of kiln body outer wall and size prefabricated semi-circular shape connector;B, precast support component assembling mould;C, the assembly of a support component;D, complete the installation in kiln body outside wall surface of a support component peace platform block.It is high that method provided by the present invention has installation effectiveness, the advantage that potential safety hazard is little and installation accuracy is high.

Description

A kind of installation method of shaft furnace platform
Technical field
The present invention relates to shaft furnace ladder landing platform technical field, the installation method of a kind of shaft furnace platform.
Background technology
At present, the ladder landing platform structure of shaft furnace mostly is bearing diagonal form, and its structure mainly includes platform member and bearing diagonal Assembly two parts.Bearing diagonal assembly is fixed in outside kiln shell along kiln body periphery according to angle and the spacing of design by some gripper shoes, Gripper shoe be both ends of the surface be the strip plate on inclined-plane, its lower end is fixed in kiln body outside wall surface, goes to the bottom with platform obliquely in upper end Face is affixed with support platform.Platform member is whole platform to be connected under kiln entirety lift to high-altitude again, is fixed on outside kiln shell Week.It is usually during construction and first the lifting of whole platform member is got on and affixed with kiln outer wall, then the upper end of every gripper shoe is first First it is welded in platform bottom surface, then the lower end of gripper shoe is welded in kiln body, after the welding completing each gripper shoe seriatim, Integral installation completes.This construction method there is problems in that on the one hand platform size is big, and weight is big, uses crane lifting difficult Degree is big;On the other hand high-altitude is installed and welding operation is more, there is the biggest potential safety hazard.It addition, this mounting means efficiency Lowly, and installation accuracy and quality can not be effectively ensured.
Summary of the invention
It is an object of the invention to provide the installation method of a kind of shaft furnace platform, to solve the existence of existing stage+module method Efficiency low, potential safety hazard is big and installation quality is difficult to ensure that problem.
The present invention is achieved in that the installation method of a kind of shaft furnace platform, specifically includes following steps:
A, prefabricated platform component and two platform block by platform member Selective assembly one-tenth symmetry;Prefabricated isometric and both ends of the surface are The steel structure support plate on inclined-plane;By the shape of the circumference of kiln body outer wall and size prefabricated semi-circular shape connector.
B, precast support component assembling mould: described assembling mould is half round table-like, described half round table-like fit drawing die tool The locating slot of the strip of some uniform accommodated gripper shoes, the angle of inclination of described locating slot and gripper shoe is had on side Corresponding around kiln body outside wall surface angle obliquely;The both ends open of described locating slot, in two bottom surfaces of half round platform, positions The length of groove is less than the length of gripper shoe so that gripper shoe can stretch out in half round platform bottom surface, the spacing of each locating slot and gripper shoe Identical at the installing space of kiln body outer wall.
C, the assembly of a support component: described half round table-like fit drawing die is had steady forward and is placed in smooth ground or flat board On, each gripper shoe is placed in the locating slot of assembling mould, make the bottom of each gripper shoe on earth, top is concordant and inclined-plane, top system One home position having towards half round table-like fit drawing die, ensures the side of each gripper shoe and the ramped bottom surface laminating of locating slot simultaneously Closely, then the lateral surface of semi-circular shape connector is welded with the side towards the center of circle on gripper shoe top, form two A support component of individual half frustum cone side shape.
D, complete the installation in kiln body outside wall surface of a support component peace platform block.
In described step d, being steadily positioned on ground by the support component assembled, wherein, semi-circular shape connector exists Lower section, the platform block assembled up, is lifted into the relevant position above a support component by the free end of gripper shoe, will support The free end of plate carries out welding assembly with platform component bottom surface and becomes two and half adults, and two and half adults assembled are lifted into kiln The outer relevant position of shell is also welded with kiln shell outer wall.
In step d, the support component assembled accurately is lifted into outside kiln shell installation and puts in place, more first by first piece of platform block Be lifted on corresponding support component, afterwards by first piece of platform block with prop up support component and kiln shell welds, the most again will be with Adjacent second piece platform block be lifted on respective support assembly, operator stand on first piece of platform block to second piece put down Platform block welds, and completes the lifting work of whole platform according to the method.
It is high that installation method provided by the present invention has installation effectiveness, the advantage that potential safety hazard is little and alignment error is little.This Invention avoids and takes the link filling too much temporary operating platform, decrease crane lifting number of times and personnel work high above the ground time Between, save manpower and materials, be a kind of the most quick but also the installation method of safety.The present invention utilizes assembling mould to make a support component Assembled speed and precision be greatly improved, each gripper shoe is not only played and connects and fixing effect, simultaneously by annular connector Being alternatively arranged as the reinforcement of kiln body, additionally, platform block is on ground, welding ensure that welding precision, ensures that safety in production.Can The cumulative errors that original each part welding manner one by one causes are evenly distributed to every piece of platform up, so can ensure that The size of whole platform and bearing capacity.
Accompanying drawing explanation
Fig. 1 is a support component and the structural representation of its corresponding platform block.
Fig. 2 is the bottom surface structure schematic diagram of platform block in Fig. 1.
Fig. 3 is the structural representation of assembling mould.
In figure: 1, platform block, 2, semi-circular shape connector, 3, gripper shoe, 4, assembling mould, 5, locating slot.
Detailed description of the invention
The invention provides the installation method of a kind of shaft furnace platform, as Figure 1-3, the present invention specifically includes following step Rapid:
A, prefabricated platform component and two platform block 1 by platform member Selective assembly one-tenth symmetry, described platform member is composition Each part of whole platform, including every piece of platform pedal and connection securing member;Prefabricated isometric and both ends of the surface are the steel on inclined-plane Structural support plate 3, by the shape of the circumference of kiln body outer wall and size prefabricated semi-circular shape connector 2, gripper shoe 3 and semi-circular shape Connector 2 collectively constitutes a support component;Two identical semi-circular shape connectors 2 collectively constitute an annular connector, annulus The each gripper shoe 3 enclosed around kiln shell one is played and connects and fixing effect by shape connector.
B, precast support component assembling mould 4: assembling mould 4 is in half round table-like or the curved of half round platform sidewall, semicircle The locating slot 5 of the strip of some uniform accommodated gripper shoes 3, inclining of locating slot 5 is had on the side of mesa-shaped assembling mould 4 Rake angle and gripper shoe 3 are corresponding around kiln body outside wall surface angle obliquely;The both ends open of locating slot 5 is in the two of half round platform Individual bottom surface, the length of locating slot 5 is less than the length of gripper shoe so that gripper shoe 3 can stretch out in half round platform bottom surface, it is simple to welding Operation, the spacing of each locating slot 5 is identical at the installing space of kiln body outer wall with gripper shoe 3.Prefabricated is required according to above-mentioned design Support component assembling mould 4.
C, the assembly of a support component: the assembling steady forward of mould 4 that half is round table-like is placed on smooth ground or flat board, Each gripper shoe 3 is placed in the locating slot 5 of assembling mould 4, make the bottom of each gripper shoe 3 on earth, top is concordant and inclined-plane, top The unified home position towards half round table-like fit drawing die tool 4, ensures at the bottom of the side of each gripper shoe 3 and the inclination of locating slot 5 simultaneously The side towards the center of circle of the lateral surface of one semi-circular shape connector 4 with gripper shoe 3 top closely, is then welded by face laminating Connect, form a support component of half frustum cone side shape, finally this support component is pulled out along the notch direction of half frustum cone side.
D, complete the installation in kiln body outside wall surface of a support component peace platform block 1.Prop up support component peace platform block 1 at kiln body outer wall Face two kinds of implementations are installed, first kind of way for will support component and corresponding platform block 1 assemble after together lift, second The mode of kind, for being lifted respectively by a support component peace platform block 1, specifically comprises the following steps that
Mode one: be steadily positioned on ground by the support component assembled, wherein, semi-circular shape connector 2, in lower section, supports The platform block 1 assembled up, is lifted into the relevant position above support component by the free end of plate 3, by gripper shoe 3 from Carried out welding assembly by end with platform component bottom surface and become two and half adults, two and half adults assembled are lifted into kiln shell foreign minister Answer position and weld with kiln shell outer wall, it is ensured that when weldering connects, the platform block 1 of two semi-circular shape connectors 2 and its correspondence is right Connect accurately.
Mode two: the support component assembled accurately is lifted into outside kiln shell installation and puts in place, more first by first piece of platform block Be lifted on corresponding support component, afterwards by first piece of platform block with prop up support component and kiln shell welds, the most again will be with Adjacent second piece platform block be lifted on respective support assembly, operator stand on first piece of platform block to second piece put down Platform block welds, and completes the lifting work of whole platform according to the method.Finally installation achievement is checked, it is ensured that engineering Quality and use safety.

Claims (3)

1. an installation method for shaft furnace platform, is characterized in that, comprises the following steps:
A, prefabricated platform component and two platform block by platform member Selective assembly one-tenth symmetry;Prefabricated isometric and both ends of the surface are The steel structure support plate on inclined-plane;By the shape of the circumference of kiln body outer wall and size prefabricated semi-circular shape connector;
B, precast support component assembling mould: described assembling mould is half round table-like, the side of described half round table-like fit drawing die tool On have a locating slot of strip of some uniform accommodated gripper shoes, the angle of inclination of described locating slot and gripper shoe around Kiln body outside wall surface angle obliquely is corresponding;The both ends open of described locating slot in two bottom surfaces of half round platform, locating slot Length is less than the length of gripper shoe so that gripper shoe can stretch out in half round platform bottom surface, and the spacing of each locating slot and gripper shoe are at kiln The installing space of external wall is identical;
C, the assembly of a support component: described half round table-like fit drawing die is had steady forward and is placed on smooth ground or flat board, will Each gripper shoe is placed in the locating slot of assembling mould, make the bottom of each gripper shoe on earth, top is concordant and court is unified on inclined-plane, top To the home position of half round table-like fit drawing die tool, ensure that the side of each gripper shoe is tight with the ramped bottom surface laminating of locating slot simultaneously Close, then the lateral surface of semi-circular shape connector is welded with the side towards the center of circle on gripper shoe top, form two A support component of half frustum cone side shape;
D, complete the installation in kiln body outside wall surface of a support component peace platform block.
The installation method of shaft furnace platform the most according to claim 1, is characterized in that, in described step d, by propping up of assembling Support component is steadily positioned on ground, and wherein, semi-circular shape connector is in lower section, and the free end of gripper shoe up, will assemble Good platform block is lifted into the relevant position above a support component, is welded with platform component bottom surface by the free end of gripper shoe It is assembled into two and half adults, two and half adults assembled is lifted into the outer relevant position of kiln shell and welds with kiln shell outer wall Connect.
The installation method of shaft furnace platform the most according to claim 1, is characterized in that, in step d, and the support group that will assemble Part is accurately lifted into outside kiln shell installation and puts in place, is more first lifted into by first piece of platform block on corresponding support component, afterwards by the One piece of platform block welds with a support component and kiln shell, and second piece of platform block adjacent thereto is lifted into corresponding the most again On support component, operator stand in and on first piece of platform block weld second piece of platform block, complete whole according to the method The lifting work of platform.
CN201610781568.0A 2016-08-31 2016-08-31 A kind of installation method of shaft furnace platform Expired - Fee Related CN106284959B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610781568.0A CN106284959B (en) 2016-08-31 2016-08-31 A kind of installation method of shaft furnace platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610781568.0A CN106284959B (en) 2016-08-31 2016-08-31 A kind of installation method of shaft furnace platform

Publications (2)

Publication Number Publication Date
CN106284959A true CN106284959A (en) 2017-01-04
CN106284959B CN106284959B (en) 2018-07-03

Family

ID=57672248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610781568.0A Expired - Fee Related CN106284959B (en) 2016-08-31 2016-08-31 A kind of installation method of shaft furnace platform

Country Status (1)

Country Link
CN (1) CN106284959B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070008937A (en) * 2005-07-14 2007-01-18 신용오 Auxiliary workbench withdrawal and rotating device of mobile telephone pole
CN203230166U (en) * 2013-03-18 2013-10-09 湖北省送变电工程公司 Special high-altitude emplacement platform
CN203603436U (en) * 2013-12-03 2014-05-21 兖矿东华建设有限公司 Chimney cylinder wall concrete pouring combined platform
CN203834911U (en) * 2014-03-14 2014-09-17 中石化第十建设有限公司 Inner tank suspension type platform of LNG storage tank
CN203878955U (en) * 2014-05-30 2014-10-15 江苏柏诚工程股份有限公司 Chimney flange operating system
CN104251053A (en) * 2013-06-28 2014-12-31 国家电网公司 Steel tube tower mounting platform
CN104594618A (en) * 2013-10-30 2015-05-06 五冶集团上海有限公司 Hoop type disassembling operating platform of blast furnace granulated slag steam exhausting barrel
CN204435816U (en) * 2014-12-10 2015-07-01 中国建筑第八工程局有限公司 Telescopic steel post operation platform
CN204715717U (en) * 2015-04-10 2015-10-21 中建钢构有限公司 A kind of operating platform
CN205206282U (en) * 2015-10-29 2016-05-04 中建钢构有限公司 Concertina type work platform

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070008937A (en) * 2005-07-14 2007-01-18 신용오 Auxiliary workbench withdrawal and rotating device of mobile telephone pole
CN203230166U (en) * 2013-03-18 2013-10-09 湖北省送变电工程公司 Special high-altitude emplacement platform
CN104251053A (en) * 2013-06-28 2014-12-31 国家电网公司 Steel tube tower mounting platform
CN104594618A (en) * 2013-10-30 2015-05-06 五冶集团上海有限公司 Hoop type disassembling operating platform of blast furnace granulated slag steam exhausting barrel
CN203603436U (en) * 2013-12-03 2014-05-21 兖矿东华建设有限公司 Chimney cylinder wall concrete pouring combined platform
CN203834911U (en) * 2014-03-14 2014-09-17 中石化第十建设有限公司 Inner tank suspension type platform of LNG storage tank
CN203878955U (en) * 2014-05-30 2014-10-15 江苏柏诚工程股份有限公司 Chimney flange operating system
CN204435816U (en) * 2014-12-10 2015-07-01 中国建筑第八工程局有限公司 Telescopic steel post operation platform
CN204715717U (en) * 2015-04-10 2015-10-21 中建钢构有限公司 A kind of operating platform
CN205206282U (en) * 2015-10-29 2016-05-04 中建钢构有限公司 Concertina type work platform

Also Published As

Publication number Publication date
CN106284959B (en) 2018-07-03

Similar Documents

Publication Publication Date Title
CN104018514B (en) Large Towers kind equipment basis pre-embedded anchoring bolts inversion construction method
US20220227609A1 (en) Integral lifting system and lifting method for assembled members
CN109184189B (en) Construction method for conical shell silo top structure of large-diameter silo
CN204327103U (en) A kind of reaction frame started for tunneling shield
CN102102444B (en) Assembling and positioning construction method of large steel casting members
CN104929148B (en) The upside-down mounting hardened system of generation power foundation of wind power ring group plinth and reinforcement means thereof
CN104532829B (en) A kind of pile foundation reinforcement cage preparation method
CN203768942U (en) Positioning device for embedded anchor bolts
CN107939141B (en) Steel structure tower and construction method thereof
CN103046788B (en) Steel funnel of coal blending bin and installation method of traditional steel funnel of coal blending bin
CN106284959A (en) A kind of installation method of shaft furnace platform
CN107013044A (en) The modularization installation method of lighting roof and the lowering or hoisting gear for installing lighting roof
CN107165412B (en) Rotatable attaching device for attaching plate type climbing formwork and construction method
CN107740538B (en) Steel upright post structure and application method thereof
CN113914348B (en) Movable modular assembly type tower crane steel bearing platform and mounting method
CN213774558U (en) Embedded hoist and mount construction subassembly is invertd to steel column
CN210703368U (en) Integral ring assembling tool for segmented steel pipe ring
CN208854578U (en) The installation of steel pipe truss beam and unloading the arc steel pallet of jack
CN109577209B (en) Vertical synchronous relay jacking construction method for large-tonnage combined equipment
CN102900023B (en) A kind of combined type working platform
CN219886576U (en) Curved surface abnormal type inner concrete outer steel main tower decoration structure
CN110725239B (en) Modular bridge pile foundation reinforcing apparatus
CN220033716U (en) Install square tube steel construction additional of elevator
CN216939185U (en) Assembling tool for flanges between steel pipe concrete arch bridge sections
CN204326063U (en) A kind of pile foundation reinforcement cage producing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 050000 319 Xiangjiang Road, Shijiazhuang high tech Zone, Hebei

Applicant after: BOGUANG ENVIRONMENTAL PROTECTION TECHNOLOGY CO.,LTD.

Address before: 050000 319 Xiangjiang Road, Shijiazhuang high tech Zone, Hebei

Applicant before: BO GUANG THERMAL ENERGY Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190620

Address after: 050000 Taihang Jiayuan 5B-1-2302, 181 Xiangjiang Road, Shijiazhuang High-tech Zone, Hebei Province

Patentee after: Shijiazhuang Xiangborui Environmental Protection Co.,Ltd.

Address before: 050000 319 Xiangjiang Road, Shijiazhuang high tech Zone, Hebei

Patentee before: BOGUANG ENVIRONMENTAL PROTECTION TECHNOLOGY CO.,LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210118

Address after: 471800 group 1, Hetaoyuan village, Beiye Township, Xin'an County, Luoyang City, Henan Province

Patentee after: Xin'an Shuofeng Stone Co.,Ltd.

Address before: 050000 Taihang Jiayuan 5B-1-2302, 181 Xiangjiang Road, Shijiazhuang High-tech Zone, Hebei Province

Patentee before: Shijiazhuang Xiangborui Environmental Protection Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180703