CN106284959B - A kind of installation method of shaft furnace platform - Google Patents

A kind of installation method of shaft furnace platform Download PDF

Info

Publication number
CN106284959B
CN106284959B CN201610781568.0A CN201610781568A CN106284959B CN 106284959 B CN106284959 B CN 106284959B CN 201610781568 A CN201610781568 A CN 201610781568A CN 106284959 B CN106284959 B CN 106284959B
Authority
CN
China
Prior art keywords
platform
support plate
support component
kiln body
locating slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610781568.0A
Other languages
Chinese (zh)
Other versions
CN106284959A (en
Inventor
宋海玉
孙会佳
郭黎明
李振兴
孟立宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xin'an Shuofeng Stone Co ltd
Original Assignee
Bo Wide Environmental Technology Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bo Wide Environmental Technology Ltd By Share Ltd filed Critical Bo Wide Environmental Technology Ltd By Share Ltd
Priority to CN201610781568.0A priority Critical patent/CN106284959B/en
Publication of CN106284959A publication Critical patent/CN106284959A/en
Application granted granted Critical
Publication of CN106284959B publication Critical patent/CN106284959B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
    • E04G3/243Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons following the outside contour of a building
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/007Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The present invention relates to a kind of installation method of shaft furnace platform, specific steps include a, prefabricated platform component and by platform member Selective assembly into symmetrical two platform blocks;Prefabricated isometric and both ends of the surface are the steel structure support plate on inclined-plane;By the shape of the circumference of kiln body outer wall and the prefabricated semi-circular shape connector of size;B, precast support component assembling mould;C, the assembly of support component;D, the installation of support component and platform block in kiln body outside wall surface is completed.Method provided by the present invention has the advantages of installation effectiveness is high, and security risk is small and installation accuracy is high.

Description

A kind of installation method of shaft furnace platform
Technical field
The present invention relates to shaft furnace ladder landing platform technical field, specifically a kind of installation method of shaft furnace platform.
Background technology
At present, the ladder landing platform structure of shaft furnace is mostly bearing diagonal form, and structure mainly includes platform member and bearing diagonal Component two parts.Bearing diagonal component is fixed in along kiln body periphery outside kiln shell by several support plates according to the angle and spacing of design, Support plate is the strip plate that both ends of the surface are inclined-plane, and lower end is fixed in kiln body outside wall surface, and upper end is gone to the bottom obliquely with platform Face is affixed with support platform.Platform member is that entire platform is connected into entirety to be lifted again to high-altitude under kiln, is fixed on outside kiln shell Week.It is usually first that the lifting of entire platform member is up and affixed with kiln outer wall then the upper end of every support plate is first during construction Platform bottom surface is first welded in, the lower end of support plate is then welded in kiln body, after the welding for seriatim completing each support plate, Integral installation is completed.This construction method has the following problems:One side platform size is big, and weight is big, uses crane lifting hardly possible Degree is big;Another aspect high-altitude is installed and welding operation is more, there is very big security risk.In addition, this mounting means efficiency Lowly, and installation accuracy and quality cannot be effectively ensured.
Invention content
It is an object of the invention to provide a kind of installation methods of shaft furnace platform, exist to solve existing stage+module method Efficiency it is low, the problem of security risk is big and installation quality is difficult to ensure that.
The invention is realized in this way:A kind of installation method of shaft furnace platform, specifically includes following steps:
A, prefabricated platform component and by platform member Selective assembly into symmetrical two platform blocks;Prefabricated isometric and both ends Face is the steel structure support plate on inclined-plane;By the shape of the circumference of kiln body outer wall and the prefabricated semi-circular shape connector of size.
B, precast support component assembling mould:The assembling mold is round table-like for half, the half round table-like fit drawing die tool The locating slot of several uniformly distributed strips for accommodating support plate, the angle of inclination of the locating slot and support plate are provided on side It is corresponding around the angle of kiln body outside wall surface obliquely;The both ends open of the locating slot is in two bottom surfaces of half round platform, positioning The length of slot is less than the length of support plate so that support plate can stretch out in half round platform bottom surface, the spacing and support plate of each locating slot Kiln body outer wall clipping room away from identical.
C, the assembly of support component:Described half round table-like fit drawing die is had into steady forward direction and is placed in smooth ground or tablet On, each support plate is placed in the locating slot of assembling mold, make the bottom end of each support plate on earth, top is concordant and top inclined-plane is united One center location having towards half round table-like fit drawing die, while ensure that the side of each support plate is bonded with the ramped bottom surface of locating slot Closely, then the lateral surface of semi-circular shape connector and the side towards the center of circle on support plate top are welded, forms two The support component of a half frustum cone side shape.
D, the installation of support component and platform block in kiln body outside wall surface is completed.
In the step d, assembled support component is steadily positioned on ground, wherein, semi-circular shape connector exists Lower section, the free end of support plate are lifted into the corresponding position above support component above, by assembled platform block, will support The free end of plate carries out welding assembly into two and half adults with platform component bottom surface, and assembled two and half adult is lifted into kiln It is simultaneously welded with kiln shell outer wall the outer corresponding position of shell.
In step d, assembled support component is accurately lifted into outside kiln shell and is installed in place, then first by first piece of platform block It is lifted into corresponding support component, later welds first piece of platform block with support component and kiln shell, it then again will be with Adjacent second piece platform block be lifted on respective support component, operating personnel station is flat to second piece on first piece of platform block Platform block is welded, and the lifting work of entire platform is completed according to the method.
Installation method provided by the present invention has the advantages of installation effectiveness is high, and security risk is small and installation error is small.This Invention avoids the link taking and fill excessive temporary operating platform, reduce crane lifting number and personnel working at height when Between, manpower and materials are saved, are a kind of not only quick but also safe installation methods.Present invention utilization assembles mold and causes support component Assembled speed and precision greatly improve, circular ring shape connector not only to each support plate play the role of connection and it is fixed, simultaneously The reinforcing rib of kiln body is alternatively arranged as, in addition, platform block ensures welding precision in ground welding, ensures that safety in production.It can By original each part, cumulative errors caused by welding manner are evenly distributed to every piece of platform up one by one, can ensure in this way The size and bearing capacity of entire platform.
Description of the drawings
Fig. 1 is support component and it corresponds to the structure diagram of platform block.
Fig. 2 is the bottom surface structure schematic diagram of platform block in Fig. 1.
Fig. 3 is the structure diagram for assembling mold.
In figure:1st, platform block, 2, semi-circular shape connector, 3, support plate, 4, assembling mold, 5, locating slot.
Specific embodiment
The present invention provides a kind of installation methods of shaft furnace platform, and as shown in Figs. 1-3, the present invention specifically includes following step Suddenly:
A, prefabricated platform component and by platform member Selective assembly into symmetrical two platform blocks 1, the platform member is Each part of entire platform is formed, including every piece of platform pedal and securing member;Prefabricated isometric and both ends of the surface are inclined-plane Steel structure support plate 3, by shape and the prefabricated semi-circular shape connector 2 of size, support plate 3 and the semicircle of the circumference of kiln body outer wall Circular connector 2 collectively constitutes support component;Two identical semi-circular shape connectors 2 collectively constitute a circular ring shape connector, Circular ring shape connector to surround kiln shell one circle each support plate 3 play the role of connection and it is fixed.
B, precast support component assembling mould 4:Mold 4 is assembled in half round table-like or half round platform side wall curved, semicircle The locating slot 5 of several uniformly distributed strips for accommodating support plate 3 is provided on the side of mesa-shaped assembling mold 4, locating slot 5 inclines Rake angle is corresponding around the angle of kiln body outside wall surface obliquely with support plate 3;The both ends open of locating slot 5 is in the two of half round platform A bottom surface, the length of locating slot 5 is less than the length of support plate so that support plate 3 can stretch out in half round platform bottom surface, convenient for welding Operation, the spacing of each locating slot 5 and support plate 3 kiln body outer wall clipping room away from identical.According to the prefabricated branch of above-mentioned design requirement Support component assembles mold 4.
C, the assembly of support component:Half round table-like 4 steady forward direction of assembling mold is placed on smooth ground or tablet, Each support plate 3 is placed in the locating slot 5 of assembling mold 4, make the bottom end of each support plate 3 on earth, top is concordant and top inclined-plane The unified center location towards half round table-like fit drawing die tool 4, while ensure the side of each support plate 3 and the inclination bottom of locating slot 5 Face paste is closed closely, then welds the lateral surface of a semi-circular shape connector 4 and the side towards the center of circle on 3 top of support plate It connects, forms the support component of half frustum cone side shape, finally pull out the support component along the notch direction of half frustum cone side.
D, the installation of support component and platform block 1 in kiln body outside wall surface is completed.Support component and platform block 1 are in kiln body outer wall The installation in face there are two types of realization method, first way be support component and corresponding platform block 1 are assembled it is latter with lifting, second Kind mode is as follows for support component and platform block 1 are lifted respectively:
Mode one:Assembled support component is steadily positioned on ground, wherein, semi-circular shape connector 2 in lower section, The free end of support plate 3 is lifted into the corresponding position above support component above, by assembled platform block 1, by support plate 3 Free end and platform component bottom surface carry out welding assembly into two and half adults, assembled two and half adult is lifted into kiln shell It is simultaneously welded with kiln shell outer wall outer corresponding position, it is ensured that two semi-circular shape connectors 2 and its corresponding platform when weldering connects Block 1 docks accurately.
Mode two:Assembled support component is accurately lifted into outside kiln shell and is installed in place, then first by first piece of platform block It is lifted into corresponding support component, later welds first piece of platform block with support component and kiln shell, it then again will be with Adjacent second piece platform block be lifted on respective support component, operating personnel station is flat to second piece on first piece of platform block Platform block is welded, and the lifting work of entire platform is completed according to the method.Finally installation achievement is checked, it is ensured that engineering Quality and safe to use.

Claims (3)

1. a kind of installation method of shaft furnace platform, it is characterized in that, include the following steps:
A, prefabricated platform component and by platform member Selective assembly into symmetrical two platform blocks;Prefabricated isometric and both ends of the surface are The steel structure support plate on inclined-plane;By the shape of the circumference of kiln body outer wall and the prefabricated semi-circular shape connector of size;
B, precast support component assembling mould:The assembling mold is round table-like for half, the side of the half round table-like fit drawing die tool On be provided with the locating slots of several uniformly distributed strips for accommodating support plate, angle of inclination and the support plate of the locating slot surround The angle of kiln body outside wall surface obliquely is corresponding;The both ends open of the locating slot in two bottom surfaces of half round platform, locating slot Length is less than the length of support plate so that support plate can stretch out in half round platform bottom surface, and the spacing and support plate of each locating slot are in kiln The clipping room of external wall is away from identical;
C, the assembly of support component:Described half round table-like fit drawing die is had steady forward direction to be placed on smooth ground or tablet, it will Each support plate is placed in the locating slot of assembling mold, make the bottom end of each support plate on earth, top is concordant and court is unified on top inclined-plane To the center location of half round table-like fit drawing die tool, while ensure that the side of each support plate is bonded tightly with the ramped bottom surface of locating slot It is close, then the lateral surface of semi-circular shape connector and the side towards the center of circle on support plate top are welded, form two The support component of half frustum cone side shape;
D, the installation of support component and platform block in kiln body outside wall surface is completed.
2. the installation method of shaft furnace platform according to claim 1, it is characterized in that, in the step d, by assembled branch Support component is steadily positioned on ground, wherein, semi-circular shape connector above, will be assembled in lower section, the free end of support plate Good platform block is lifted into the corresponding position above support component, and the free end of support plate and platform member bottom surface are welded Two and half adults are assembled into, assembled two and half adult is lifted into kiln body outer wall corresponding position and are welded with kiln body outer wall It connects.
3. the installation method of shaft furnace platform according to claim 1, it is characterized in that, in step d, by assembled support group Part is accurately lifted into kiln body outer wall and is installed in place, then first first piece of platform block is lifted into corresponding support component, later will First piece of platform block is welded with support component and kiln body outer wall, is then again lifted into second piece of platform block adjacent thereto On respective support component, operating personnel weld second piece of platform block on first piece of platform block at station, complete according to the method Into the lifting work of entire platform.
CN201610781568.0A 2016-08-31 2016-08-31 A kind of installation method of shaft furnace platform Expired - Fee Related CN106284959B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610781568.0A CN106284959B (en) 2016-08-31 2016-08-31 A kind of installation method of shaft furnace platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610781568.0A CN106284959B (en) 2016-08-31 2016-08-31 A kind of installation method of shaft furnace platform

Publications (2)

Publication Number Publication Date
CN106284959A CN106284959A (en) 2017-01-04
CN106284959B true CN106284959B (en) 2018-07-03

Family

ID=57672248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610781568.0A Expired - Fee Related CN106284959B (en) 2016-08-31 2016-08-31 A kind of installation method of shaft furnace platform

Country Status (1)

Country Link
CN (1) CN106284959B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070008937A (en) * 2005-07-14 2007-01-18 신용오 Auxiliary workbench withdrawal and rotating device of mobile telephone pole
CN203230166U (en) * 2013-03-18 2013-10-09 湖北省送变电工程公司 Special high-altitude emplacement platform
CN203603436U (en) * 2013-12-03 2014-05-21 兖矿东华建设有限公司 Chimney cylinder wall concrete pouring combined platform
CN203834911U (en) * 2014-03-14 2014-09-17 中石化第十建设有限公司 Inner tank suspension type platform of LNG storage tank
CN203878955U (en) * 2014-05-30 2014-10-15 江苏柏诚工程股份有限公司 Chimney flange operating system
CN104251053A (en) * 2013-06-28 2014-12-31 国家电网公司 Steel tube tower mounting platform
CN104594618A (en) * 2013-10-30 2015-05-06 五冶集团上海有限公司 Hoop type disassembling operating platform of blast furnace granulated slag steam exhausting barrel
CN204435816U (en) * 2014-12-10 2015-07-01 中国建筑第八工程局有限公司 Telescopic steel post operation platform
CN204715717U (en) * 2015-04-10 2015-10-21 中建钢构有限公司 A kind of operating platform
CN205206282U (en) * 2015-10-29 2016-05-04 中建钢构有限公司 Concertina type work platform

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070008937A (en) * 2005-07-14 2007-01-18 신용오 Auxiliary workbench withdrawal and rotating device of mobile telephone pole
CN203230166U (en) * 2013-03-18 2013-10-09 湖北省送变电工程公司 Special high-altitude emplacement platform
CN104251053A (en) * 2013-06-28 2014-12-31 国家电网公司 Steel tube tower mounting platform
CN104594618A (en) * 2013-10-30 2015-05-06 五冶集团上海有限公司 Hoop type disassembling operating platform of blast furnace granulated slag steam exhausting barrel
CN203603436U (en) * 2013-12-03 2014-05-21 兖矿东华建设有限公司 Chimney cylinder wall concrete pouring combined platform
CN203834911U (en) * 2014-03-14 2014-09-17 中石化第十建设有限公司 Inner tank suspension type platform of LNG storage tank
CN203878955U (en) * 2014-05-30 2014-10-15 江苏柏诚工程股份有限公司 Chimney flange operating system
CN204435816U (en) * 2014-12-10 2015-07-01 中国建筑第八工程局有限公司 Telescopic steel post operation platform
CN204715717U (en) * 2015-04-10 2015-10-21 中建钢构有限公司 A kind of operating platform
CN205206282U (en) * 2015-10-29 2016-05-04 中建钢构有限公司 Concertina type work platform

Also Published As

Publication number Publication date
CN106284959A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
EP2816224B1 (en) Assembly method for a main rotor shaft and an installation tool thereto
CN104018514B (en) Large Towers kind equipment basis pre-embedded anchoring bolts inversion construction method
CN106284959B (en) A kind of installation method of shaft furnace platform
CN104532829A (en) Pile foundation steel bar cage manufacturing method
KR102176840B1 (en) Module Erection Method For Inner Flue Chimney
CN106836261B (en) Rock foundation structure suitable for power transmission line construction and construction method thereof
CN203664972U (en) Wind power tower and flange installation platform
CN214531995U (en) Net rack for hoisting steel lining module with bottom plate
CN113878280B (en) Welding deformation preventing device for large megawatt rotor cone
CN205967970U (en) Multistation welding equipment of shifting
CN112605547B (en) Method for mounting flange plate of lifting support of tire crane saddle beam
CN201304552Y (en) Wind-power tower horizontal assembling device
CN108049634A (en) The construction method of steel construction indirect cool tower cone segments
CN210703368U (en) Integral ring assembling tool for segmented steel pipe ring
CN203526841U (en) Assembling fixture for shell component
CN206464761U (en) Assembly jig frame for foundation ring of wind power tower cylinder
CN219886576U (en) Curved surface abnormal type inner concrete outer steel main tower decoration structure
CN106826176B (en) A kind of support platform well drilling module guide-localization installation method
CN205823351U (en) Turbine blade trial assembly adapted bogey
CN105317054A (en) Draught fan foundation structure with single pile of transition sections and construction method
CN214560481U (en) Novel gearbox tray bearing structure
CN205057875U (en) Location installation frock of compound flange stay tube of super -huge stacker -reclaimer gate seat
CN204999324U (en) Dumping plough receives material arm simply to support car
CN108735315B (en) VVER spent fuel assembly storage cell and manufacturing method
CN203875540U (en) Locating tool for lower support of tower crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 050000 319 Xiangjiang Road, Shijiazhuang high tech Zone, Hebei

Applicant after: BOGUANG ENVIRONMENTAL PROTECTION TECHNOLOGY CO.,LTD.

Address before: 050000 319 Xiangjiang Road, Shijiazhuang high tech Zone, Hebei

Applicant before: BO GUANG THERMAL ENERGY Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190620

Address after: 050000 Taihang Jiayuan 5B-1-2302, 181 Xiangjiang Road, Shijiazhuang High-tech Zone, Hebei Province

Patentee after: Shijiazhuang Xiangborui Environmental Protection Co.,Ltd.

Address before: 050000 319 Xiangjiang Road, Shijiazhuang high tech Zone, Hebei

Patentee before: BOGUANG ENVIRONMENTAL PROTECTION TECHNOLOGY CO.,LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210118

Address after: 471800 group 1, Hetaoyuan village, Beiye Township, Xin'an County, Luoyang City, Henan Province

Patentee after: Xin'an Shuofeng Stone Co.,Ltd.

Address before: 050000 Taihang Jiayuan 5B-1-2302, 181 Xiangjiang Road, Shijiazhuang High-tech Zone, Hebei Province

Patentee before: Shijiazhuang Xiangborui Environmental Protection Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180703

CF01 Termination of patent right due to non-payment of annual fee