CN106284923A - Wall pipeline groover - Google Patents

Wall pipeline groover Download PDF

Info

Publication number
CN106284923A
CN106284923A CN201610810105.2A CN201610810105A CN106284923A CN 106284923 A CN106284923 A CN 106284923A CN 201610810105 A CN201610810105 A CN 201610810105A CN 106284923 A CN106284923 A CN 106284923A
Authority
CN
China
Prior art keywords
crawl frame
steel
post
steel climbing
climbing post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610810105.2A
Other languages
Chinese (zh)
Other versions
CN106284923B (en
Inventor
王天东
王冰飞
杨发兵
刘辉
李军
孟亮
王鹏程
徐小烈
皮佳亮
崔秀生
李猛
杨海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN201610810105.2A priority Critical patent/CN106284923B/en
Publication of CN106284923A publication Critical patent/CN106284923A/en
Application granted granted Critical
Publication of CN106284923B publication Critical patent/CN106284923B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Catching Or Destruction (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

A kind of wall pipeline groover, including moving body, fluting work portion, water-spraying dust removal device;Also include being climbed, by I-steel, the travel mechanism that post, crawl frame, ratchet mechanism, cable wire and fixed pulley collectively form.Fluting work portion is arranged on crawl frame, and crawl frame can be moved up and down by ratchet mechanism and being pulled on I-steel climbing post of cable wire.I-steel climbing post can stretch or fold use.I-steel climbing post is fixed according to room floor height, open the switch on equipment and switch attachment surface plate, while water-spraying dust removal device moistens by body of wall, fluting work portion works, operation ratchet mechanism drives crawl frame to run up along I-steel climbing post, the blade in fluting work portion cuts along body of wall, can carry out the wall fluting operation in the case of non-environmental-pollution.Present configuration is reasonable, overall work is firm, simple to operate, and fluting efficiency is high, the neat specification of grooving, straight attractive in appearance, groove depth is shallow unanimously.The use present invention is time saving and energy saving, and project progress is fast.

Description

Wall pipeline groover
Technical field
The present invention relates to a kind of mechanical slotting equipment, particularly relate to a kind of wall pipeline groover.
Background technology
In prior art, the plant equipment of wall fluting has many kinds.Wherein, Chinese Patent Application No.: " retractable dust-free wall grooving machine " technical scheme that 201110034679.2 are given is: moving body is provided with slideway and water spray Nebulization dust mechanism, slideway is provided with the slide bar elevating mechanism moved along slideway, and slide bar elevating mechanism upper end is provided with fluting The fluting work portion of blade, in this technical scheme, slide bar elevating mechanism structure is complicated, fabrication and processing difficulty, and manufacturing cost is high;Separately It is located at the top of whole grooving apparatus, the arm of force formed between blade application point and the equipment strong point outward due to fluting work portion For the total length of total, during fluting, the couple that wall cross-notching blade counteracting force is formed has been at maximum rating, this Couple can work built on the sand by equipment, makes grooving apparatus tilt even to topple over, so that the chase degree of depth outputed gradually becomes shallower as, Do not reach expected effects.There is Chinese Patent Application No. again: " a kind of Novel wall groover " skill that 201520747594.2 provide Art scheme is: comprise the guide post on the moving body with handlebar and moving body, guide post is pacified by fixing bolt Equipped with groover body (i.e. fluting work portion), groover body is provided with two handles, the guide post knot of this technical scheme Structure, in addition to guide post structure is complex, uses the biggest defect, during fluting, unclamps and fixes on the guide bar Groover body fix bolt, two handles of held by both hands groover body, manpower move up groover this Body is slotted;Using this fluting machinery, workman is the operation of people's power under the high dust state of environmental pollution, and labor intensity is the most also Endanger healthy.
Summary of the invention
The invention aims to be given offer a kind of rational in infrastructure, make easily, low cost, easy and simple to handle, nothing of slotting Dust, free from environmental pollution, fluting operation labor intensity is low, the wall pipeline groover that the fluting depth is consistent, effective.
It is an object of the invention to be capable of.Wall pipeline groover of the present invention include band handlebar moving body, On moving body by the fluting work portion of driven by motor blade cut-off machine structure and water-spraying dust removal device.Wall pipeline of the present invention Groover is characterised by: described moving body front portion is arranged above with an I-steel climbing post, and I-steel climbing post is provided with One crawl frame, crawl frame is installed fluting work portion, and the top of described I-steel climbing post is provided with a fixed pulley, I-steel The each hinged support bar in climbing post both sides at fixed pulley bottom, the lower end of two support bars is connected to rear vehicle Handlebar both sides, are provided with on an equipment and switch attachment surface plate, equipment and switch attachment surface plate between described handlebar is horizontal Being provided with the ratchet mechanism of a band winding drum, ratchet mechanism is provided with hand crank, and the winding drum of ratchet mechanism connects a steel Rope, the other end of cable wire is connected with crawl frame by fixed pulley, described I-steel climb post, crawl frame, ratchet mechanism, cable wire with And fixed pulley collectively forms the travel mechanism in fluting work portion.
Wall pipeline groover of the present invention, wherein said I-steel climbing post is made up of epimere and hypomere, and epimere is fixed on On moving body, hypomere is connected with epimere folding by the folding on I-steel aerofoil, and epimere and hypomere are in folding junction Be respectively equipped with on web intubate and under intubate, above intubate and under intubate one steady pin of common grafting, described crawl frame includes Block structure after one pre-structure block and one, the both sides of described pre-structure block and rear block structure are respectively welded a wallboard, are welded into Overall pre-structure block, rear block structure and one rectangular through slot of two wallboard intermediate formation, described I-steel climbing post Being interspersed in the rectangular through slot of crawl frame and be slidably connected with crawl frame, two wallboard upper surfaces that described pre-structure block is located below are each Welding a support, on each support, each installation sets reeded trundle on its rolling surface, and each trundle is by rolling Groove on dynamic face each rolls with two edges of a wing before I-steel climbing post and is connected, said two wallboard rear end outer upper One motor rack of common welding, motor rack is installed motor, and two wallboard rear end outer lower portion weld a turning rolls jointly, rolling Installing on wheel carrier on its rolling surface and set reeded big roller, big roller is climbed with I-steel by the groove on rolling surface Post two edges of a wing below roll connection jointly, and described pre-structure block is arranged below shaft seat, and shaft seat is installed blade cutting Mechanism, described crawl frame is provided with a draw ring in the upper end of I-steel climbing post front, and draw ring and ratchet mechanism pass through cable wire Connect.
Wall pipeline groover of the present invention, wherein said crawl frame is provided with before pre-structure block double track slot pitch and adjusts Device.
Wall pipeline groover of the present invention, wherein said on intubate and under intubate common grafting steady pin in the case of, I-shaped Steel climbing post epimere is in orthogonal coaxial line state with hypomere, and described crawl frame has one on I-steel climbing post Or the running orbit of upstream or downstream.
Wall pipeline groover difference from prior art of the present invention is that wall pipeline groover of the present invention includes There are the moving body of technical scheme, fluting work portion, water-spraying dust removal device, also include being climbed by I-steel of the technical program The travel mechanism that post, crawl frame, ratchet mechanism, cable wire and fixed pulley collectively form.In this wall pipeline groover, with electricity The fluting work portion of machine and blade cut-off machine structure is arranged on crawl frame, and crawl frame is pulled in work by ratchet mechanism and cable wire Can be in line on word steel climbing post movement up and down, and the I-steel climbing post of wall pipeline groover of the present invention can according to room floor height Stretch or fold use.Workmen, according to room floor height, fixes I-steel climbing post, opens equipment and switch attachment surface Switch on plate, while water-spraying dust removal device moistens by body of wall, fluting work portion works, and operates ratchet mechanism, and ratchet mechanism leads to Crossing cable wire drives crawl frame and fluting work portion to be lifted up along I-steel climbing post, and blade cuts along body of wall, can carry out Without the wall fluting operation in the case of dust, non-environmental-pollution.Present configuration is reasonable, overall work is firm, will not in operation Run-off the straight phenomenon, simple to operate, safety, fluting efficiency is high, the 3m that slots per minute, the neat specification of grooving, straight attractive in appearance, groove The depth is consistent.The use present invention is time saving and energy saving, and job schedule is fast.
Below in conjunction with the accompanying drawings the wall pipeline groover of the present invention is described further.
Accompanying drawing explanation
Fig. 1 is the structure schematic front view of wall pipeline groover of the present invention.
Fig. 2 is the three dimensional structure schematic diagram of wall pipeline groover of the present invention.
Fig. 3 is that I-steel climbing post, crawl frame and fluting work portion structure connect schematic front view.
Fig. 4 is that I-steel climbing post, crawl frame and fluting work portion structure connect schematic three dimensional views.
Detailed description of the invention
As shown in Figure 1, Figure 3, wall pipeline groover of the present invention includes the moving body 1 of band handlebar 4, moving body 1 On the fluting work portion 2 and the water-spraying dust removal device 3 that are driven blade cut-off machine structure 14 by motor 13.On moving body 1 front portion Face is provided with an I-steel climbing post 5, and I-steel climbing post 5 is provided with a crawl frame 6, crawl frame 6 is installed fluting work Portion 2.The top of I-steel climbing post 5 is provided with a fixed pulley 8.I-steel climbing post 5 both sides at fixed pulley 8 bottom are each hinged A piece support bar 9, the lower end of two support bars 9 is connected to handlebar 4 both sides at car body 1 rear portion.Between handlebar 4 is horizontal It is provided with an equipment and switch attachment surface plate 10.Equipment and switch attachment surface plate 10 are provided with the ratchet mechanism of a band winding drum 11, ratchet mechanism 11 is provided with a hand crank 11-1.In the present invention, ratchet mechanism 11 or be electronic or be manual.Ratchet machine Connecting a cable wire 12 on the winding drum of structure 11, the other end of cable wire 12 is connected with crawl frame 6 by fixed pulley 8.I-steel is climbed Climb post 5, crawl frame 6, ratchet mechanism 11, cable wire 12 and fixed pulley 8 and collectively form the travel mechanism in fluting work portion 2.
As shown in Figure 1, Figure 3, I-steel climbing post 5 is made up of epimere 5-1 and hypomere 5-2.Epimere 5-1 is fixed on locomotive On body 1, hypomere 5-2 is connected with epimere 5-1 folding by the folding 15 being on I-steel aerofoil.Epimere 5-1 and hypomere 5-2 in Fold junction web on be respectively equipped with on one intubate 5-3 and under intubate 5-4.On intubate 5-3 and under intubate 5-4 and jointly insert Meet a steady pin 5-5.
As shown in Figure 2, Figure 4 shows, block structure 6-2 after crawl frame 6 includes a pre-structure block 6-1 and.Pre-structure block 6-1 A wallboard 6-3 is respectively welded with the both sides of rear block structure 6-2.Be welded into entirety pre-structure block 6-1, rear block structure 6-2 and One rectangular through slot a of two wallboard 6-3 intermediate formation.I-steel climbing post 5 is interspersed in rectangular through slot a of crawl frame 6 It is slidably connected with crawl frame 6.A support 6-4 is respectively welded in two wallboard 6-3 upper surfaces that pre-structure block 6-1 locates below.Each Reeded trundle 6-5 is set on one its rolling surface of each installation on support 6-4.Each trundle 6-5 is by rolling surface Groove each rolls with two edges of a wing before I-steel climbing post 5 and is connected.Two wallboard 6-3 rear end outer upper are welded jointly One motor rack 6-6, motor rack 6-6 installs motor 13.Two wallboard 6-3 rear end outer lower portion weld a turning rolls jointly 6-7, turning rolls 6-7 installs on its rolling surface and sets reeded big roller 6-8.Big roller 6-8 is by rolling surface Groove jointly rolls with two edges of a wing after I-steel climbing post 5 and is connected.Pre-structure block 6-1 is arranged below shaft seat 6-9, turns Blade cut-off machine structure 14 is installed on axle bed 6-9.Crawl frame 6 is provided with a draw ring 7 in the upper end of I-steel climbing post 5 front, Draw ring 7 is connected by cable wire 12 with ratchet mechanism 11.
As shown in Fig. 1 Fig. 4, crawl frame 6 is provided with before pre-structure block 6-1 double track slot pitch adjustor 16.
In the present invention, above intubate 5-3 and under intubate 5-4 common grafting steady pin 5-5 in the case of, I-steel climbing post 5 on Section 5-1 and hypomere 5-2 is in orthogonal coaxial line state.Described crawl frame 6 I-steel climbing post 5 on have one or The running orbit of upstream or downstream.
The wall pipeline groover of the present invention, fluting work portion 2 is on I-steel climbing post 5, under fluting state, a side The retroaction couple that sidewalls cross-notching work portion 2 is formed is little, and on the other hand the counteracting force of wall is passed to by support bar 9 Car body 1 carries so that wall pipeline groover overall work under fluting state is stable.The wall pipeline groover of the present invention is opened Groove is neat, attractive in appearance, and the depth is consistent, creates advantage for later stage wall plastering.
Embodiment described above is only to be described the preferred embodiment of the present invention, the not model to the present invention Enclose and be defined, on the premise of designing spirit without departing from the present invention, the those of ordinary skill in the art technical side to the present invention Various deformation that case is made and improvement, all should fall in the protection domain that claims of the present invention determines.

Claims (4)

1. a wall pipeline groover, including on the moving body (1) of band handlebar (4), moving body (1) by motor (13) fluting work portion (2) and the water-spraying dust removal device (3) of blade cut-off machine structure (14) are driven, it is characterised in that: described shifting Motor vehicles bodies (1) front portion is arranged above with I-steel climbing post (5), and I-steel climbing post (5) is provided with a crawl frame (6), Upper fluting work portion (2) of installing of crawl frame (6), the top of described I-steel climbing post (5) is provided with a fixed pulley (8), I-shaped The each hinged support bar (9) in steel climbing post (5) both sides at fixed pulley (8) bottom, the lower end of two support bars (9) connects respectively It is connected on handlebar (4) both sides at car body (1) rear portion, between described handlebar (4) is horizontal, is provided with an equipment and switch attachment surface Plate (10), equipment and switch attachment surface plate (10) are provided with the ratchet mechanism (11) of a band winding drum, on ratchet mechanism (11) Being provided with hand crank (11-1), the winding drum of ratchet mechanism (11) connects a cable wire (12), the other end of cable wire (12) passes through Fixed pulley (8) is connected with crawl frame (6), described I-steel climbing post (5), crawl frame (6), ratchet mechanism (11), cable wire (12) And fixed pulley (8) collectively forms the travel mechanism of fluting work portion (2).
Wall pipeline groover the most according to claim 1, it is characterised in that: described I-steel climbing post (5) is by epimere (5-1) forming with hypomere (5-2), epimere (5-1) is fixed on moving body (1), and hypomere (5-2) is by I-steel aerofoil Folding (15) folds with epimere (5-1) and is connected, and epimere (5-1) and hypomere (5-2) are respectively equipped with on the web folding junction On intubate (5-3) and under intubate (5-4), above intubate (5-3) and under intubate (5-4) common one steady pin (5-5) of grafting, described Crawl frame (6) includes block structure (6-2) after a pre-structure block (6-1) and, described pre-structure block (6-1) and rear block structure (6-2) wallboard (6-3) is respectively welded in both sides, is welded into the pre-structure block (6-1) of entirety, rear block structure (6-2) and two Individual wallboard (6-3) four one rectangular through slot (a) of intermediate formation, described I-steel climbing post (5) is interspersed in the square of crawl frame (6) Being slidably connected with crawl frame (6) in shape groove (a), two wallboard (6-3) upper surfaces that described pre-structure block (6-1) is located below are each Weld a support (6-4), upper one its rolling surface of each installation of each support (6-4) sets reeded trundle (6-5), often Individual trundle (6-5) is climbed two edges of a wing before post (5) by the groove on rolling surface and is each rolled and be connected with I-steel, institute State two wallboard (6-3) rear end outer upper and jointly weld a motor rack (6-6), motor rack (6-6) is installed motor (13), Two wallboard (6-3) rear end outer lower portion weld a turning rolls (6-7) jointly, and turning rolls (6-7) is upper installs its rolling Setting reeded big roller (6-8) on face, big roller (6-8) is climbed after post (5) with I-steel by the groove on rolling surface Two edges of a wing jointly roll connection, described pre-structure block (6-1) is arranged below shaft seat (6-9), and shaft seat (6-9) is upper to be installed Blade cut-off machine structure (14), described crawl frame (6) is provided with a draw ring (7) in the upper end of I-steel climbing post (5) front, draws Ring (7) is connected by cable wire (12) with ratchet mechanism (11).
Wall pipeline groover the most according to claim 1 or claim 2, it is characterised in that: in pre-structure block on described crawl frame (6) (6-1) double track slot pitch adjustor (16) it is provided with before.
Wall pipeline groover the most according to claim 2, it is characterised in that: intubate on described (5-3) and under intubate (5- 4), in the case of common grafting steady pin (5-5), I-steel climbing post (5) epimere (5-1) is in orthogonal with hypomere (5-2) Coaxial line state, described crawl frame (6) has the running orbit of or upstream or downstream on I-steel climbing post (5).
CN201610810105.2A 2016-09-08 2016-09-08 Wall pipeline groover Active CN106284923B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610810105.2A CN106284923B (en) 2016-09-08 2016-09-08 Wall pipeline groover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610810105.2A CN106284923B (en) 2016-09-08 2016-09-08 Wall pipeline groover

Publications (2)

Publication Number Publication Date
CN106284923A true CN106284923A (en) 2017-01-04
CN106284923B CN106284923B (en) 2018-09-14

Family

ID=57711030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610810105.2A Active CN106284923B (en) 2016-09-08 2016-09-08 Wall pipeline groover

Country Status (1)

Country Link
CN (1) CN106284923B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107044201A (en) * 2017-03-18 2017-08-15 浙江丽尚建材科技有限公司 Integrated wall multifunctional cutting machine
CN107839076A (en) * 2017-11-28 2018-03-27 广西大学 A kind of interior decoration wall cutter
CN108515622A (en) * 2018-04-16 2018-09-11 杨震伟 A kind of construction grooving machine for walls
CN113510864A (en) * 2021-03-18 2021-10-19 范杰杰 Construction slotting device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01198964A (en) * 1988-02-03 1989-08-10 Noshiro:Kk Removal of asbestos-coated film
CN201588389U (en) * 2009-11-18 2010-09-22 李茂铁 High-efficient dust-free wall grooving machine
CN102174853A (en) * 2011-02-09 2011-09-07 李茂铁 Retractable dust-free wall grooving machine
CN102995885A (en) * 2011-09-09 2013-03-27 启东市东云机电有限公司 Grooving machine
CN203412265U (en) * 2013-08-11 2014-01-29 李宏亮 Spray dust-removing type grooving machine
CN204299124U (en) * 2014-12-12 2015-04-29 曹年军 Metope electric groover
CN105178570A (en) * 2015-07-25 2015-12-23 李波平 Wall space dust-free automatic one-time forming grooving machine
CN204955153U (en) * 2015-09-24 2016-01-13 嘉兴职业技术学院 Novel wall notching machine

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01198964A (en) * 1988-02-03 1989-08-10 Noshiro:Kk Removal of asbestos-coated film
CN201588389U (en) * 2009-11-18 2010-09-22 李茂铁 High-efficient dust-free wall grooving machine
CN102174853A (en) * 2011-02-09 2011-09-07 李茂铁 Retractable dust-free wall grooving machine
CN102995885A (en) * 2011-09-09 2013-03-27 启东市东云机电有限公司 Grooving machine
CN203412265U (en) * 2013-08-11 2014-01-29 李宏亮 Spray dust-removing type grooving machine
CN204299124U (en) * 2014-12-12 2015-04-29 曹年军 Metope electric groover
CN105178570A (en) * 2015-07-25 2015-12-23 李波平 Wall space dust-free automatic one-time forming grooving machine
CN204955153U (en) * 2015-09-24 2016-01-13 嘉兴职业技术学院 Novel wall notching machine

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107044201A (en) * 2017-03-18 2017-08-15 浙江丽尚建材科技有限公司 Integrated wall multifunctional cutting machine
CN107839076A (en) * 2017-11-28 2018-03-27 广西大学 A kind of interior decoration wall cutter
CN108515622A (en) * 2018-04-16 2018-09-11 杨震伟 A kind of construction grooving machine for walls
CN113510864A (en) * 2021-03-18 2021-10-19 范杰杰 Construction slotting device

Also Published As

Publication number Publication date
CN106284923B (en) 2018-09-14

Similar Documents

Publication Publication Date Title
CN106284923A (en) Wall pipeline groover
CN202641535U (en) Drawing type ladder stand for vehicle
CN201610631U (en) Traction and movable type lifting platform for construction
CN107187511B (en) Becoming wheelbase can obstacle detouring industrial robot omnidirectional chassis
CN109025789A (en) A kind of convenient type Multifunction ladder cart suitable for subway work
CN212105028U (en) Safe type scaffold frame for construction
CN203412265U (en) Spray dust-removing type grooving machine
CN211200098U (en) Concrete auxiliary vibrating device
CN211114677U (en) Lifting mechanism for wall sanding machine
CN108798714B (en) Portable moving mold trolley for construction of passage wall body and construction method thereof
CN207863434U (en) A kind of job platform that can certainly walk along H profile steel
CN107175500A (en) A kind of frock for being used to dismount cold shears cutting edge
CN205476346U (en) Wall body grooving machine
CN203654829U (en) Novel non-electric double-layer parking stand
CN205476583U (en) Whole support device that shifts of indoor wall
CN107386138A (en) A kind of installation method of totally-enclosed gobo work car and totally-enclosed gobo
CN208898457U (en) Top of building erecting by overhang
CN209494515U (en) A kind of convenient type Multifunction ladder cart suitable for subway work
CN206448517U (en) Removable Bailey bracket formula floor slab formerecting chassis
CN210888006U (en) Station auxiliary trolley
CN210195204U (en) Building construction safety platform
CN208364035U (en) A kind of electric power overhaul packaged type insulation height adjusting stool
CN208329549U (en) The scaffold used for interior decoration
CN206127685U (en) Suspension type clothes hanger that dries in air with remove function
CN207526077U (en) Portable scaffold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant