CN205476583U - Whole support device that shifts of indoor wall - Google Patents

Whole support device that shifts of indoor wall Download PDF

Info

Publication number
CN205476583U
CN205476583U CN201620027517.4U CN201620027517U CN205476583U CN 205476583 U CN205476583 U CN 205476583U CN 201620027517 U CN201620027517 U CN 201620027517U CN 205476583 U CN205476583 U CN 205476583U
Authority
CN
China
Prior art keywords
wall
assembled
traversing carriage
indoor wall
cutting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620027517.4U
Other languages
Chinese (zh)
Inventor
杨军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620027517.4U priority Critical patent/CN205476583U/en
Application granted granted Critical
Publication of CN205476583U publication Critical patent/CN205476583U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses having changed interior wall repacking mode, disclosing a whole support device that shifts of indoor wall, we fix the aversion support device for the wall body that needs were demolishd, need demolish, cut apart the wall body that cuts down to retrieve and recycle. If the repacking, the cutting back utilizes the whole support that shifts, hand crane to remove required position to the wall body, utilizes the reinforcement to fix the back, has just accomplished the repacking with cement concrete remounting. As required, can assemble into the small handcart, the transport trailer of window wall piece is lifted off to the stirrup of ascending a height that can ascend a height, circuit, the grooved cutting frame of water route wall, and slide, layer board, trailer frame set dress up the support of little crane. Owing to be the cutting and the remounting raw materials of few in addition that shifts, saved the new material of fortune and built the time that the wall was plastered again, do not produce building rubbish, embodied rubbish and recycled, resources are saved and time, reduced construction cost.

Description

Indoor wall integral shift holder device
Technical field
This utility model relates to several small-sized electric of interior decoration industry machinery, specifically a kind of indoor wall integral shift holder device.
Background technology
Interior decoration at present is much both for personalized preference design and construction, is modified indoor body of wall sometimes, executes Work is substantially first by the dismounting of wall damage, by manually transporting building waste, needs again to build when building new wall, in addition it is also necessary to people Power has transported construction new material.The building waste produced is difficult to process, and owner to go out certain expense.Along with society Development, it should change form of construction work, make building waste recycle.
Summary of the invention
In order to reduce building waste and effectively utilize machine tool.Utilize a kind of whole body of wall shifting bracket device and cutting tool, Can be achieved with reducing the purpose of building waste.Shifting bracket is moved supporting leg by pallet and vertical protection traversing carriage forms, we After needing the body of wall removed to protect with vertical protection traversing carriage is fixing, successively the periphery of body of wall is cut according to design, Needing dismounting, we carry out splitting recycling according to the size that can recycle by available carrying trailer, if repacking, After cutting, installation pallet moves supporting leg and body of wall is moved to desired position, mends with cement concrete after utilizing girth member to be fixed Dress just completes repacking, owing to simply cutting and displacement, plus little benefit dress raw material, save fortune virgin material and build what wall was plastered again Time, because not destroying body of wall simply displacement, do not produce building waste, so having fully demonstrated rubbish recycling and having saved Resource, artificial and time, country and individual is made to reduce loss.
According to construction needs, it can be assembled into and can transport assembly own or the utility cart of wall block, the stirrup of ascending a height that can ascend a height, unloads window The carrying trailer of mouth wall block, the cutting frame of circuit, water route wall fluting, by the slideway of cutter sweep, reinforcement, supporting plate group Dress up the crossbeam of telpher, be assembled into the support of telpher by trailer frame.
This utility model body of wall integral shift multiple bay device is realized in;
Our body of wall integral shift support is divided into wall body cutting machine tool and moving fixing support two parts.Cutting mechanics by cutting machine, Saw blade, slideway form, and moving fixing support is made up of pallet traversing carriage and vertical protection traversing carriage two parts.Pallet moves Support is made up of supporting plate and rack leg, and being equipped with drawing strickle guide on the cant beam of rack leg can slide along cant beam, drawing strickle guide bottom equipped with roller, Have strip hole on drawing strickle guide upper box wall, in strip hole can transverse axis, transverse axis is connected on screw, and leading screw is permissible by one end after screw In insertion branch sleeve, the screw mandrel other end can install ratchet spanner after the axis hole of support angle end, and rotating ratchet spanner leading screw makes Transverse axis on screw drives drawing strickle guide to slide along cant beam, controls to adjust the height of pulley.Can pacify respectively at the middle part of supporting plate and both ends Dress rack leg, equipped with positive and negative two kinds of screws on rack leg, connects supporting plate with the rack leg equipped with positive screw and is assembled into positive pallet Traversing carriage, connects supporting plate with the rack leg equipped with anti-screw and is assembled into anti-pallet traversing carriage, be relatively fixed by bolts to body of wall On be formed for pallet traversing carriage.Vertical protection traversing carriage is made up of two utility cart skeletons and sweep.When needing mobile wall, First assemble, with several supporting plates, support and go-cart plate etc., stirrup of ascending a height, a vertical protection traversing carriage be fixed on body of wall, Turn hole needing to install meter on mobile wall, install cast-cutting saw slideway, first body of wall top, the left side first half, the upper half on the right After portion has cut, disintegrate stirrup of ascending a height, and assembles another and vertically protects traversing carriage, is fixed on the wall back side and protects with vertical Protect traversing carriage corresponding.Start, bottom cutting, when cutting to a piece of pallet length be installed, to unload cast-cutting saw slideway wall pair The nut of one bolt in face, installs anti-pallet traversing carriage on bolt and supporting plate is inserted saw kerf, rotates adjustment screw mandrel and makes Roller is to one support force of body of wall, it is ensured that will not clamp saw blade, then installs other one piece of slideway, when cutting machine moves to second During block slideway, unload first piece of slideway, saw kerf is installed positive pallet traversing carriage, make to be arranged on the positive traversing carriage of deck end Lower limb be arranged on supporting plate with opposite in the middle part of backward shift to move rack leg corresponding, cut to reach supporting plate distance and just fix a pair with bolt installation, Finally being assembled into pallet moving fixing support group, the most whole body of wall needing movement is all seated in pallet traversing carriage group, by The shallow wheel of several rollers and vertical protection traversing carriage supports.The left and right limit do not cut is being cut, cleaning Good ground rollers passage, moves to setting position with instruments such as hand lifts body of wall.After moving on to setting position, at the bottom of wall Spread concrete on ground;Adjusting on the wall that screw mandrel faces toward in punching, with adapter sleeve, the adjustment screw mandrel on opposite is being connected, even Connect several ratchet spanneres, adjust in one side and body of wall is fallen.Several ratchet spanneres can also be turned on the two sides of body of wall simultaneously Dynamic, body of wall also can be made to fall.Owing to the height of the shallow wheel on vertical protection traversing carriage is also adjustable, do not interfere with body of wall Fall.After body of wall can be seated on ground cement concrete, it is assembled into ascend a height after unloading bottom plate and pedals, at top, several are installed swollen Firmware, fastens swollen firmware, with cement concrete gap filling-in, by two purposes just having reached body of wall integral shift.
When needs are at wall uplifting window family or dismounting body of wall, it are fixed on the both ends of supporting plate with two rack legs, formed and remove wall Body protection suspension bracket, first cutting need to be removed bottom body of wall, and stent bearing plank is inserted saw kerf, need to remove on wall body hole with bolt is fixing, Connect on the two stands of protection suspension bracket with hand hoist hook in carrying motorcycle, protect location to need to remove by motorcycle frame Body of wall, after other limit has been cut, is hung the body of wall after cutting get off by carrying trailer and hand lift.
When needing the repacking conduit of clipper circuit, upper and lower water, first on carrying motorcycle two column, the reinforcing bar of go-cart is installed, pushes away Sweep, is fixed on reinforcing boom end two cutting machine slideways, installs cutting machine, reequip several small-diameter saws on slideway, Disposably complete the conduit of the repacking in clipper circuit, upper and lower water route.During transverse cuts, slideway can be arranged on ascend a height and pedal.
Not having the floor of elevator, we become the arm of telpher the slideway supporting plate reinforcement by connection of cutting machine, are arranged on and remove On the crossbeam of fortune trailer, fix the angle of arm with the car skeleton of another telpher, after connecting with the reinforcing bar of two chassis, It is connected on the connector of arm inner end, forms fixing column between the vertical roof of arm and ground, arm is installing one Coaster, is controlled coaster, fit on suspender or transformation cutting by hand lift hank knotting and is formed for telpher crane, can be upwards Lower fortune finishing material.
The utility model has the advantage of:
1, utilize this utility model construction to decrease to tear open, transport, build, the operation such as smear, save the engineering time.
2, the body of wall that monoblock is removed is recycling, decreases noise and air pollution, reduces raw-material consumption.Do not produce Raw building waste.
3, relatively new body of wall of heap of stone adds swollen firmware, improves safety coefficient.
4, change form of construction work, become actuator from muscle power work.
Accompanying drawing explanation
Fig. 1 is supporting plate 1 structural representation.
Fig. 2 moves right rack leg 33 structural representation for moving left rack leg 2.
Fig. 3 is utility cart 3 structural representation.
Fig. 4 pedals 5 structural representations for ascending a height.
Fig. 5 is conduit support 7 structural representation.
Fig. 6 is carrying motorcycle 4 structural representation.
Fig. 7 is tray supporter group structural representation.
Fig. 8 is telpher support 8 structural representation.
Wherein: 1, supporting plate, 2, move left rack leg, 3, utility cart, 4 carrying motorcycles, 5, stirrup of ascending a height, 6, vertically protect Protect traversing carriage, 7, conduit cutting support, 8, telpher support, 9, cutting machine slideway, 10, hand lift, 11, Ratchet spanner, 12, screw mandrel, 13, support cant beam, 14, support drawing strickle guide, 15, roller, 16, shallow wheel, 17, wheel leads Frame, 18, bolt, 19, connect sleeve pipe, 20, universal wheel, 21, utility cart skeleton, 22, car floor, 23, sweep, 24, arm, 25, reinforce bar, 26, reinforce bar adapter sleeve, 27, the fast bracket of wall, 28, horizontal supporting plate, 29, support post, 30, connector, 31, cant beam, 32, body of wall, 33, move right rack leg, 34, crane reinforce steel wire.
Detailed description of the invention
First unload sweep (23) car floor (22) and another utility cart (3) of next utility cart (3), move right and prop up Frame lower limb (33) and several supporting plates (1) etc. are assembled into stirrup of ascending a height (5) with screw, with car skeleton (21), sweep (23), Supporting plate (1) is assembled into vertically protects traversing carriage (6), be fixed by bolts to body of wall people to be cut construct this one side, stand in Ascend a height and be drilled in wall with impact on stirrup (5) and install meter boring, at Kong Shangyong bolt, cutting machine slideway (9) is fixed on body of wall On, after respectively needs mobile wall (32) top, the two stile first halves having been cut with cutting machine, disintegrating ascends a height pedals (5) It is assembled into vertical another with utility cart (3), sweep (23) and vertically protects traversing carriage (6), be fastened on bolt and hang down Directly protect traversing carriage (6) on corresponding wall.After completing safeguard protection, starting to cut the low limit of wall, cutting to can When a piece of supporting plate (1) distance is installed, the opposite saw kerf of wall is installed one piece of supporting plate (1) and traversing carriage lower limb (2), turns Dynamic ratchet spanner (11) adjusts screw mandrel (12), makes support drawing strickle guide (14) on stake body (2) along support slideway (13) Slide, make roller (15) to (1) support force of supporting plate.When continuation cutting reaches supporting plate (1) half length, install another Outer one piece of slideway (9), when cutting machine runs to second piece of slideway (9), unloads first piece of slideway (9), in saw kerf again Installing another block supporting plate (1) and move right rack leg (33), make supporting plate (1) end moves left rack leg (2) with right Face supporting plate (1) middle part to move right rack leg (33) corresponding, utilize the porthole bolt installing slideway (9) corresponding Obtain supporting plate (1) to fix;Continue to run with cutting machine, slideway (9), supporting plate (1), mobile of traversing carriage lower limb (2) are installed Frame lower limb (33), makes to be mounted with several supporting plates (1) and traversing carriage lower limb (2) (33) in the saw kerf of two sides, base, just assembles Form pallet traversing carriage group, then cut remaining wall two stile, make the body of wall (32) of whole movement all be rolled by several Take turns (15) four shallow wheels (16) to support.When needing mobile wall (32), at moving direction hand lift (10) It is fixed on the ground that wall body of wall (32) middle part is relative, is even suspended to wall supporting plate (1) with the steel wire rope of hand lift (10) On bolt, having cleared up roller (15) needs the ground of process, and it is mobile that shake crane (10) handle can drag body of wall (32) To desired position.When needing to put down body of wall, adjusting in punching on the wall that screw mandrel (12) is corresponding, with adapter sleeve (19) The adjustment screw mandrel (12) on opposite is connected, rotates ratchet spanner (11) and the leading screw (12) on opposite can be made to rotate together; Vertically protect and on shallow wheel (16) the wheel drawing strickle guide (17) of traversing carriage (6), have bolt (18), pull up location spiral shell Bolt (18), makes shallow wheel (16) be in adjustable state.Rotate several ratchet spanneres (11) in wall (32) one side, Making the upper shifting of roller (15), shallow wheel (16), body of wall (32) falls.
Need wall uplifting window family or remove body of wall time, first several supporting plates (1), utility cart (3), sweep (21), The screw such as stake body (33) and universal wheel (20) is assembled into carrying trailer (4) framework, installs pulley (27) on crossbeam, At sweep (23), hand lift (11) is installed, assembles wall block bracket (27) with two rack legs (2) and supporting plate (1), With the fast bracket of steel wire rope connection wall (27), the supporting plate (1) of fast for wall bracket (27) is inserted the bottom saw kerf after cutting, uses It is bolted to need to remove on wall body hole, carrying trailer (4) and hand lift (10) body of wall after cutting is hung down Come.
When needing the repacking conduit of clipper circuit, upper and lower water, first unload two upper four reinforcing bars (25) of utility cart (3), Be arranged on carrying trailer (4) on two columns, two cutting machine slideways (9) are fixed on four reinforcing bar (25) ends. Just it is assembled into conduit cutting support (7).During transverse cuts, slideway (9) can be transversely mounted on to ascend a height and pedal on (5).
There is no the floor of elevator, caning be assembled into the support (8) of telpher, we the slideway (9) of cutting machine, supporting plate (1), Reinforcement and steel wire rope (34) reinforcement by connection become arm (24), connect with horizontal supporting plate (28) and are arranged on carrying trailer (4) On crossbeam on, fix the angle of arm (24) with the car skeleton (21) of another utility cart (3), with two chassis After reinforcing bar (25), connection sleeve pipe (26) connect, it is connected on the connector (30) of arm (24) inner end, is formed solid Determine the vertical column (29) between roof and ground of arm (24).

Claims (6)

1. an indoor wall integral shift holder device, including several supporting plates (1), several traversing carriage lower limbs (2) and utility cart (3), described traversing carriage lower limb (2) includes cant beam (13), drawing strickle guide (14), roller (15), leading screw (12), connect sleeve pipe (19), described utility cart (3) includes sweep (23), car skeleton (21), car floor (22), reinforce bar (25), it is characterized in that: several supporting plates (1), several traversing carriage lower limbs (2) can be assembled into pallet traversing carriage group, utility cart (3), sweep (23), supporting plate (1) can be assembled into vertically protects traversing carriage.
Indoor wall integral shift holder device the most according to claim 1, it is characterized in that: moving right rack leg (2) can be with changing universal wheel (20), and the roller (15) that rotating ratchet spanner (11) controls on drawing strickle guide (14) slides along cant beam (13).
Indoor wall integral shift holder device the most according to claim 1, it is characterised in that: several supporting plates (1), move right rack leg (33), utility cart (3), car floor (22) available screw are assembled into stirrup of ascending a height (5).
Indoor wall integral shift holder device the most according to claim 1, it is characterised in that: the available screw of several supporting plates (1), utility cart (3), sweep (21), stake body (33) and universal wheel (20) is assembled into carrying trailer (4).
Indoor wall integral shift holder device the most according to claim 1, it is characterized in that: reinforcing bar (25), be arranged on carrying trailer (4) on two columns, two cutting machine slideways are fixed on four reinforcing bar (25) ends and can be assembled into conduit cutting support (7).
Indoor wall integral shift holder device the most according to claim 1, it is characterized in that: the slideway (9) of cutting machine, supporting plate (1), reinforcement and steel wire rope (34) reinforcement by connection become arm (24), connect on the crossbeam being arranged in carrying trailer (4) with horizontal supporting plate (28), car skeleton (22) with another utility cart (3) fixes the angle of arm (24), with the reinforcing bar (25) of two chassis, after connection sleeve pipe (26) connects, it is connected on the connector (30) of arm (24) inner end, form the vertical column (29) between roof and ground of fixing arm (8), it can be assembled into the support (8) of telpher.
CN201620027517.4U 2016-01-03 2016-01-03 Whole support device that shifts of indoor wall Expired - Fee Related CN205476583U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620027517.4U CN205476583U (en) 2016-01-03 2016-01-03 Whole support device that shifts of indoor wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620027517.4U CN205476583U (en) 2016-01-03 2016-01-03 Whole support device that shifts of indoor wall

Publications (1)

Publication Number Publication Date
CN205476583U true CN205476583U (en) 2016-08-17

Family

ID=56667318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620027517.4U Expired - Fee Related CN205476583U (en) 2016-01-03 2016-01-03 Whole support device that shifts of indoor wall

Country Status (1)

Country Link
CN (1) CN205476583U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107119920A (en) * 2017-04-19 2017-09-01 武汉大学 The reverse dismounting device and its application method of a kind of intensive high-rise
CN113279606A (en) * 2021-06-28 2021-08-20 五矿二十三冶建设集团有限公司 Brick-concrete wall packaging and dismantling mechanism and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107119920A (en) * 2017-04-19 2017-09-01 武汉大学 The reverse dismounting device and its application method of a kind of intensive high-rise
CN113279606A (en) * 2021-06-28 2021-08-20 五矿二十三冶建设集团有限公司 Brick-concrete wall packaging and dismantling mechanism and method

Similar Documents

Publication Publication Date Title
CN205476583U (en) Whole support device that shifts of indoor wall
CN201024048Y (en) Automatic material-feeding machine
CN101294443A (en) High altitude platform mounting method
CN2849025Y (en) Hand driven lifting cradle
CN201924282U (en) Construction device of road and bridge crash-proof wall
CN102021888A (en) Equipment for constructing bump walls on roads and bridges
CN204454401U (en) A kind of high-rise material small hoist assembling device
CN209907972U (en) Conversion frame for longitudinal and transverse conversion of precast concrete exterior wall cladding
CN203654705U (en) Slideable hanging basket apparatus for steel skeleton assembling
CN207484989U (en) A kind of screw jacking type wallboard erects trolley
CN201264878Y (en) Easy-to-detach hoisting combined rack
CN205277444U (en) Disconnect -type underground cavern lining cutting platform truck
CN2848802Y (en) Loading device easy for assembling and disassembling
CN211895867U (en) Pipeline lifting machine
CN109624050B (en) Partition plate automatic production line trigger dismounting machine and control method thereof
CN209989034U (en) A hoisting frame for factory building piping erection
CN210764202U (en) Double-lifting working platform vehicle for building
CN108868098B (en) Support frame used outside hoistway and mounting method thereof
CN205638478U (en) Tunnel ditch cable duct maintenance platform truck
CN111115461A (en) Reinforcing steel bar and mould transportation and automatic assembling equipment
CN206128625U (en) Smooth empty reverse mould device
CN106545151A (en) One kind is from elevating construction platform
CN211873751U (en) Scaffold for painting steel structure
CN213569241U (en) Vertical lifting device
CN219826195U (en) Temporary supporting device for beam reinforcement installation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20180103

CF01 Termination of patent right due to non-payment of annual fee