CN106284696A - 一种预加工钢板止水带的施工方法 - Google Patents

一种预加工钢板止水带的施工方法 Download PDF

Info

Publication number
CN106284696A
CN106284696A CN201610790749.XA CN201610790749A CN106284696A CN 106284696 A CN106284696 A CN 106284696A CN 201610790749 A CN201610790749 A CN 201610790749A CN 106284696 A CN106284696 A CN 106284696A
Authority
CN
China
Prior art keywords
steel plate
sealing water
water
prefabricated components
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610790749.XA
Other languages
English (en)
Inventor
陈芝轩
向万军
田昌凤
李健鹏
祁锐
杨德嵩
夏友辉
朱玉龙
熊雪琴
子丽天
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction and Investment Holding Group Co Ltd
Original Assignee
Yunnan Construction and Investment Holding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction and Investment Holding Group Co Ltd filed Critical Yunnan Construction and Investment Holding Group Co Ltd
Priority to CN201610790749.XA priority Critical patent/CN106284696A/zh
Publication of CN106284696A publication Critical patent/CN106284696A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6806Waterstops

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

一种预加工钢板止水带的施工方法,是预先制做止水钢板预制构件,所述预制构件是在一块平板止水钢板(1)上焊接有一组穿过止水钢板的钢筋(2),或者是在L型的直角转角止水钢板(3)的两个面上分别焊接有一组穿过止水钢板的钢筋,然后将止水钢板预制构件安装在钢筋混凝土结构后浇带和/或施工缝部位,与止水钢板要穿过的柱或梁(4)上预先打断的钢筋笼箍筋(5)采用焊接或搭接方式相互连接,通过钢筋实现箍筋的续接,将预制构件的止水钢板与止水带止水钢板(6)密闭围焊,构成钢板止水带。本发明可保证止水钢板经过柱、梁后与箍筋的连续,有效避免因焊接质量、对位偏差等造成的质量缺陷。

Description

一种预加工钢板止水带的施工方法
技术领域
本发明涉及预加工钢板止水带施工技术领域,尤其适用于地下室外墙所用的钢板止水带。
背景技术
建筑施工中,地下室等迎水钢筋混凝土结构的后浇带、施工缝等处多采用设置钢板止水带的措施,用以增强该部位的防水、止水效果,止水钢板通过暗柱、梁等构件时须切断柱或梁的钢筋笼箍筋,通常采用将箍筋补焊在止水钢板上的方式予以补强,实际施工中由于焊接质量、对位偏差等原因,常常造成箍筋连接的质量缺陷,很难达到设计要求。
发明内容
本发明的目的是解决现有技术的不足,提供一种可避免钢板止水带施工中出现的箍筋连接质量问题的预加工钢板止水带的施工方法。
本发明的目的通过如下技术方案实现:
一种预加工钢板止水带的施工方法,方法如下:
a.预先制做止水钢板预制构件,所述预制构件是在一块平板止水钢板上焊接有一组穿过止水钢板的钢筋,或者是在L型的直角转角止水钢板的两个面上分别焊接有一组穿过止水钢板的钢筋;所述钢筋焊接于可与止水钢板要穿过的柱或梁上钢筋笼的箍筋对接的位置;
b.将止水钢板预制构件安装在钢筋混凝土结构后浇带和/或施工缝部位,与止水钢板要穿过的柱或梁上预先打断的钢筋笼箍筋采用焊接或搭接方式相互连接,通过钢筋实现箍筋的续接,将预制构件的止水钢板与止水带止水钢板密闭围焊,构成钢板止水带。
本发明所述钢筋与止水钢板要穿过的柱或梁上钢筋笼的箍筋规格相同。
本发明方法还在围合后的钢板止水带底部间隔焊接一组支撑钢筋,防止钢板止水带下沉。
本发明预先制做止水钢板预制构件,将预制构件的钢筋与柱或梁中预先切断的钢筋笼箍筋搭接或焊接连接,保证止水钢板经过柱、梁后与箍筋的连续,有效避免了现有技术因焊接质量、对位偏差等造成的质量缺陷。钢板止水带一次性固定,构成整体构件,可增加其结构稳定性。止水钢板预制构件预先做好,不受天气和施焊条件的限制,可减小现场施工作业量,提高施工效率。
附图说明
图1是本发明在施工现场的钢板止水带接长位置示意图;
图2a和图2b分别为平板止水钢板预制构件和直角转角止水钢板预制构件的示意图。
具体实施方式
本发明所述预加工钢板止水带的施工方法如下:
a.确定钢板止水带的水平标高后,根据建筑物的标高控制点拉线,以保持钢板止水带上口平直;
b.预先制做止水钢板预制构件。所述预制构件基本为两种结构形式,一种是如图2a所示的平板止水钢板预制构件,是在一块平板止水钢板1上焊接有一组穿过止水钢板的钢筋2;另一种是如图2b所示的直角转角止水钢板预制构件,是在L型的直角转角止水钢板3的两个面上分别焊接有一组穿过止水钢板的钢筋2.所述L型的直角转角止水钢板3可以用两块钢板焊接而成,也可以用一块钢板弯折而成。每块止水钢板上焊接的钢筋2的数量及位置根据止水钢板要穿过的地下室柱或梁4上钢筋笼的箍筋5数量及位置而定,钢筋2要可与箍筋5对接。为确保焊接质量和结构强度以及满足工艺要求,钢筋2与箍筋5的规格应相同;
c.将止水钢板预制构件安装在钢筋混凝土结构后浇带和/或施工缝部位。如图1所示,平面的位置用平板止水钢板预制构件,转角的位置用直角转角止水钢板预制构件。将预制构件上的钢筋2与止水钢板要穿过的柱或梁4上预先打断的钢筋笼箍筋5采用焊接或搭接方式相互连接,通过钢筋实现箍筋的续接,在A部位将预制构件的止水钢板1或3与止水带止水钢板6密闭围焊,构成钢板止水带,达到止水与保证箍筋连续的设计要求。施工中加强跟踪检查以防焊穿钢板,施工完毕后及时清理焊渣;
d.在围合后的钢板止水带底部间隔焊接一组钢筋,起支撑作用,以防止钢板止水带下沉,钢筋的长度以混凝土板墙钢筋网片厚度为准,不能过长以防沿钢筋形成渗水通道,钢筋中心位置应焊止水环,以阻断渗水路线。钢筋间距每800mm左右设置1个,使其大至符合住宅楼开间尺寸。间距不宜过小,否则会增加成本和工作量,间距过大则钢板止水带易弯曲,特别是浇注混凝土受到振动时,易产生变形。

Claims (3)

1.一种预加工钢板止水带的施工方法,其特征是,方法如下:
a.预先制做止水钢板预制构件,所述预制构件是在一块平板止水钢板(1)上焊接有一组穿过止水钢板的钢筋(2),或者是在L型的直角转角止水钢板(3)的两个面上分别焊接有一组穿过止水钢板的钢筋(2);所述钢筋(2)焊接于可与止水钢板要穿过的柱或梁(4)上钢筋笼的箍筋(5)对接的位置;
b.将止水钢板预制构件安装在钢筋混凝土结构后浇带和/或施工缝部位,与止水钢板要穿过的柱或梁(4)上预先打断的钢筋笼箍筋(5)采用焊接或搭接方式相互连接,通过钢筋实现箍筋的续接,将预制构件的止水钢板与止水带止水钢板(6)密闭围焊,构成钢板止水带。
2.根据权利要求1所述的一种预加工钢板止水带的施工方法,其特征是,所述钢筋(2)与止水钢板要穿过的柱或梁(4)上钢筋笼的箍筋(5)规格相同。
3.根据权利要求1或2所述的一种预加工钢板止水带的施工方法,其特征是,在围合后的钢板止水带底部间隔焊接一组支撑钢筋,防止钢板止水带下沉。
CN201610790749.XA 2016-08-31 2016-08-31 一种预加工钢板止水带的施工方法 Pending CN106284696A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610790749.XA CN106284696A (zh) 2016-08-31 2016-08-31 一种预加工钢板止水带的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610790749.XA CN106284696A (zh) 2016-08-31 2016-08-31 一种预加工钢板止水带的施工方法

Publications (1)

Publication Number Publication Date
CN106284696A true CN106284696A (zh) 2017-01-04

Family

ID=57673791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610790749.XA Pending CN106284696A (zh) 2016-08-31 2016-08-31 一种预加工钢板止水带的施工方法

Country Status (1)

Country Link
CN (1) CN106284696A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108130956A (zh) * 2017-12-22 2018-06-08 上海紫宝住宅工业有限公司 一种地下预制叠合墙板转角墙防水节点结构及施工方法
CN109667287A (zh) * 2017-10-17 2019-04-23 中国二十冶集团有限公司 地下室外墙止水钢板过结构柱处箍筋的处理方法
CN111335364A (zh) * 2020-03-06 2020-06-26 河北建设集团股份有限公司 一种钢板止水带遇混凝土外墙柱处钢筋构造的施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29812480U1 (de) * 1998-07-16 1998-11-05 Doellen Heinz Von Element für den wasserdichten Anschluß eines nacheilend zu betonierenden Wandabschnitts an einen vorweg betonierten Wandabschnitt
CN201588402U (zh) * 2009-12-30 2010-09-22 中国京冶工程技术有限公司厦门分公司 用于形成施工缝或后浇带的侧模
CN202007422U (zh) * 2011-04-07 2011-10-12 中国建筑材料科学研究总院 一种地下工程后浇带超前止水钢板构造
CN202247961U (zh) * 2011-08-12 2012-05-30 武汉建工股份有限公司 一种地下室后浇带装配式侧模装置
CN203923846U (zh) * 2014-05-21 2014-11-05 中铁十五局集团有限公司 一种钢筋混凝土底板变形缝结构
CN204199330U (zh) * 2014-10-08 2015-03-11 中国十七冶集团有限公司 一种后浇带整体止水钢板

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29812480U1 (de) * 1998-07-16 1998-11-05 Doellen Heinz Von Element für den wasserdichten Anschluß eines nacheilend zu betonierenden Wandabschnitts an einen vorweg betonierten Wandabschnitt
CN201588402U (zh) * 2009-12-30 2010-09-22 中国京冶工程技术有限公司厦门分公司 用于形成施工缝或后浇带的侧模
CN202007422U (zh) * 2011-04-07 2011-10-12 中国建筑材料科学研究总院 一种地下工程后浇带超前止水钢板构造
CN202247961U (zh) * 2011-08-12 2012-05-30 武汉建工股份有限公司 一种地下室后浇带装配式侧模装置
CN203923846U (zh) * 2014-05-21 2014-11-05 中铁十五局集团有限公司 一种钢筋混凝土底板变形缝结构
CN204199330U (zh) * 2014-10-08 2015-03-11 中国十七冶集团有限公司 一种后浇带整体止水钢板

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
河北建设集团有限公司建筑安装分公司等: "柱箍筋遇止水钢板的质量控制(新)", 《百度文库》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109667287A (zh) * 2017-10-17 2019-04-23 中国二十冶集团有限公司 地下室外墙止水钢板过结构柱处箍筋的处理方法
CN108130956A (zh) * 2017-12-22 2018-06-08 上海紫宝住宅工业有限公司 一种地下预制叠合墙板转角墙防水节点结构及施工方法
CN111335364A (zh) * 2020-03-06 2020-06-26 河北建设集团股份有限公司 一种钢板止水带遇混凝土外墙柱处钢筋构造的施工方法
CN111335364B (zh) * 2020-03-06 2022-07-26 河北建设集团股份有限公司 一种钢板止水带遇混凝土外墙柱处钢筋构造的施工方法

Similar Documents

Publication Publication Date Title
CN107299683B (zh) 复式钢管混凝土柱装配式对接节点及连接方法
CN105756244A (zh) 一种双钢板剪力墙组合结构
CN101265724B (zh) 贯通钢板式方钢管混凝土柱与工字钢梁节点
CN101839074B (zh) 钢框架加固柱及其加固方法
CN102493603A (zh) 预留暗柱孔道预制柱及暗柱式全装配抗震建筑物和工法
CN106284696A (zh) 一种预加工钢板止水带的施工方法
CN206053030U (zh) 一种上承重旋转式预制混凝土外墙与钢梁的连接节点
CN110284587A (zh) 一种错层预制飘窗与钢结构连接节点及施工方法
CN107503473A (zh) 一种工具式矩形柱钢筋定位卡具
CN104294920B (zh) 一种u形钢混凝土组合梁与异形钢管混凝土柱的节点组件及制备方法
CN110761322A (zh) 一种现浇管廊侧墙水平施工缝处加固结构及其施工方法
CN207314670U (zh) 一种工具式矩形柱钢筋定位卡具
CN109680832A (zh) 预制剪力墙单元、承插式剪力墙和建筑物
CN107143076A (zh) 一种用于降板区域的带侧翻边的预制叠合楼板及其施工方法
CN203947498U (zh) 地下室外墙后浇带墙端模板
CN203514542U (zh) 一种工业化装配式钢结构板块接缝连接装置
CN101839030A (zh) 新型建筑组装合成墙体及施工方法
CN106284749B (zh) 一种上承重预制混凝土外墙与钢梁的连接节点
CN209260922U (zh) 带桁架筋叠合楼板先张法连接节点结构
CN104314105A (zh) 地下室外墙板与现浇扶壁柱的连接竖向拼缝结构及施工方法
CN107893478A (zh) 叠合墙与水平构件连接节点及其施工方法
CN108104281A (zh) 一种用于装配式结构外墙无企口叠合梁的侧模做法
CN209456992U (zh) 排桩支护体系下的低损伤单侧支模结构
CN209082793U (zh) 装配式钢结构预制叠合板同钢梁的连接结构
EP3947840A1 (en) Rupture element in concrete structures

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170104

WD01 Invention patent application deemed withdrawn after publication