CN106284425B - Basement in high rise building roof deformation stitches water proof structure construction method - Google Patents

Basement in high rise building roof deformation stitches water proof structure construction method Download PDF

Info

Publication number
CN106284425B
CN106284425B CN201610667062.7A CN201610667062A CN106284425B CN 106284425 B CN106284425 B CN 106284425B CN 201610667062 A CN201610667062 A CN 201610667062A CN 106284425 B CN106284425 B CN 106284425B
Authority
CN
China
Prior art keywords
concrete
deformation joint
waterproof
sealing
extruded polystyrene
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610667062.7A
Other languages
Chinese (zh)
Other versions
CN106284425A (en
Inventor
韩春
于宝萍
雷小通
王凤杰
王振品
姚小松
王彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201610667062.7A priority Critical patent/CN106284425B/en
Publication of CN106284425A publication Critical patent/CN106284425A/en
Application granted granted Critical
Publication of CN106284425B publication Critical patent/CN106284425B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

The present invention relates to a kind of basement in high rise building roof deformations to stitch water proof structure construction method, includes the following steps: that steel plate for sealing water is arranged along deformation joint length direction in basement roof deformation joint;Extruded polystyrene board is embedded in the upper and lower deformation joint of steel plate for sealing water;Casting concrete top plate;The upper surface of extruded polystyrene board is closely knit along deformation joint pointing using waterproof sealing cream;Sealing zone face rib is upward;Waterproof roll enhancement layer is set on the outside of rubber fastening band;Waterproof layer is set on the outside of waterproof roll enhancement layer.The present invention has evaded concrete roof and outer patch waterstop is easy deviation when outer patch waterstop is constructed simultaneously, position concrete vibrating leakiness and outer patch waterstop and sealing compound finished product protection are costly and repair difficult problem after destroying on the downside of waterstop; top plate top is made into gradient concrete and returns; be conducive to surface drainage, reduce leakage probability;It avoids concerned process steps cross-operation and influences main structure construction, limited without the construction time, guarantee integral construction quality.

Description

Basement in high rise building roof deformation stitches water proof structure construction method
Technical field
The present invention relates to a kind of construction techniques, in particular to a kind of basement in high rise building roof deformation Stitch water proof structure construction method.
Background technique
The construction method of node selection " underground 10J301 building waterproofing construction " top plate node routine is required according to atlas;The party There are limitations for method: (1) if fixed outer patch waterstop before casting concrete, waterstop lower part concrete is not easy to vibrate Closely knit, quality is difficult to control;Moreover, be easy to causeing waterstop deviation during casting concrete, sealing compound pointing quality is difficult to guarantee; (2), if installing outer patch waterstop after casting concrete, after sealing compound pointing, concrete final setting time is not easy to control, and causes Outer patch sealing belt surface face rib can not be pressed and form entirety in people's concrete, generated gap, be easy to cause by concrete setting hardening Leakage;(3) deformation joint construction finishes cannot carry out waterproof protective layer and backfill construction immediately, and main structure construction is needed to finish change It could construct after shape, other processes construction period easily causes outer patch waterstop to destroy, and waterstop exposure duration is long, at Product protection cost is larger, and since outer patch sealing zone face rib and concrete form entirety, waterstop is difficult to be repaired once destroying It is multiple, and the quality after reparation is difficult to ensure.(4) return, put down if basement roof deformation joint upper surface position concrete is not done Whole degree is not easy to control, is easy to leak probability in the position ponding and increase;The construction of conventional basement roof waterproofing of movement joints construction Defect existing for method becomes those skilled in the art's technical problem anxious to be resolved.
Summary of the invention
In view of the deficiency of the prior art, the present invention provides a kind of raising construction efficiency and guarantees construction quality, drop The basement in high rise building roof deformation of low construction cost stitches water proof structure construction method.
The technical solution used in the present invention is:
A kind of basement in high rise building roof deformation seam water proof structure construction method, includes the following steps:
Steel plate for sealing water is arranged along deformation joint length direction in basement roof deformation joint;
Steel plate for sealing water is fixed on the same horizontal plane;Steel plate for sealing water open end is upward in construction;
Extruded polystyrene board is embedded in the upper and lower deformation joint of steel plate for sealing water respectively according to deformation joint height and width;
The extruded polystyrene board being arranged in upper deformation joint is upper extruded polystyrene board;
The extruded polystyrene board being arranged in lower deformation joint is lower extruded polystyrene board;
Casting concrete top plate, top, which does concrete and returns, looks for slope by 1%;
Extruded polystyrene board surface concrete slurry is cleaned out, the upper surface of upper extruded polystyrene board uses waterproof sealing cream edge Deformation joint pointing is closely knit;
Zinc-plated plugging plate is set on the outside of sealing compound after the lower surface scraper pointing sealing compound of lower extruded polystyrene board;
The thick zinc-plated plugging plate of 1.0mm and concrete roof are fixed and are connected using expansion bolt by the zinc-plated plugging plate in deformation joint two sides It connects;
After the waterproof sealing cream pointing of top, rubber fastening band is pasted on the outside of the waterproof sealing cream of top;And use expansion bolt It is fixed;Sealing zone face rib is upward;
Waterproof roll enhancement layer is set on the outside of rubber fastening band;
Waterproof layer is set on the outside of waterproof roll enhancement layer;
Waterproof protective layer is set on the outside of waterproof layer.
After the concrete initial set for constituting concrete roof, stop vibrating;Levelling after the completion of concrete roof pours, Slope is looked for two sides by 1% gradient when press polish;
After reaching code requirement intensity after concreting, first extruded polystyrene board surface concrete slurry is cleaned out, Lower than concrete surface 1-2cm;It is closely knit along deformation joint pointing using oiliness sealing compound in extruded polystyrene board upper surface, after being spaced 3h Pointing sealing compound again, so repeatedly 2-3 times.
After top seal cream pointing, deformation joint two sides concrete surface is cleaned out, hollow position uses 1:2 cement bonded sand Slurry smoothes out, and top of returning on deformation joint is according to the drawing status requirement bullet line of ink marker;
400mmX8mm thickness outer patch rubber fastening band is pasted forward along one end brush special-purpose water-proof glue, and then in brush coating Paving;
It is uniformly beaten with rubber hammer and guarantees waterstop bonding securely, and expanded at the 50mm of waterstop end with M6 Bolt is along the fixed outer patch waterstop of deformation joint direction interval 300mm, and sealing zone face rib is upward, in waterstop and concrete phase cross-stitch It is closed at gap with polyurethane sealant.
Waterproof roll enhancement layer uses 4mm thickness high polymer SBS modified asphalt waterproof coiled material, using Hot-melt construction, by change Coiled material is cut into 1000mm wide coiled material extra play by shape slit shape, and coiled material is formed by bending baltimore groove at deformation joint medium position, Flexible crook reason is done, slot opening is upward.
Waterproof layer includes two layers;
Waterproof layer first layerUsing 4mmThick high polymer SBS modified asphalt waterproof coiled material;
The waterproof layer second layerUsing 3mmThick high polymer SBS modified asphalt waterproof coiled material;
Waterproof layer use Hot-melt construction, coiled material is formed by bending baltimore groove at deformation joint medium position, do stretch it is curved Processing, slot opening are upward.
Waterproof protective layer uses 70mm thickness C20 commodity pea gravel concreten, before carrying out pouring construction, first uses plastic adhesive tape And the foamed plastic rod of φ 50mm is pasted onto waterproof roll and stretched in curved groove by special glue, rear concrete topping is according to concrete It returns according to 1% levelling, plastering.
Zinc-plated envelope is set on the outside of sealing compound after the lower surface scraper pointing sealing compound of extruded polystyrene board on the downside of deformation joint Closure plate;The thick zinc-plated plugging plate of 1.0mm is fixedly connected by zinc-plated plugging plate using expansion bolt with concrete roof;Zinc-plated plugging plate It is made into bending in the middle part of deformation joint and is made into the curved construction that stretches to prevent plugging plate caused by malformation from destroying.
The present invention compared with the prior art the utility model has the advantages that
Basement in high rise building roof deformation of the present invention stitches water proof structure construction method, has evaded concrete roof and outer patch Outer patch waterstop is easy deviation, waterstop downside position concrete vibrating leakiness, outer patch waterstop when waterstop is constructed simultaneously And sealing compound finished product protection is at high cost, outer patch waterstop and sealing compound repair difficult problem after destroying;Sealing compound pointing has been constructed Bi Hou, then by outer patch waterstop by face rib upward, with after dedicated glue sticking and with expansion bolt fixation, dual guarantee; Sealing compound is blocked with zinc-plated plugging plate on the downside of top plate;Top plate top is made into gradient concrete and returns, and is conducive to surface drainage, subtracts Probability is leaked less;It avoids main structure and the cross-operation of waterproof roofing process and influences main structure construction, without the construction time Limitation;Convenient for finished product protection, if outer patch waterstop reduces once destroy to replace in time, and replacing options are easy, and the period is short Cost, and can guarantee integral construction quality.
Detailed description of the invention
Fig. 1 is the constructing structure schematic diagram of basement in high rise building roof deformation seam water proof structure construction method of the present invention.
Main component symbol description in attached drawing:
In figure:
1, steel plate for sealing water
2, extruded polystyrene board
3, waterproof sealing cream
4, C30 commerical ready-mixed concrete pours
5, zinc-plated plugging plate
6, rubber fastening band
71, lower expansion bolt
72, upper expansion bolt
8. waterproof roll enhancement layer
9. waterproof layer
10, foamed plastic rod
11. waterproof protective layer.
Specific embodiment
Referring to the drawings and embodiment the present invention will be described in detail:
Attached drawing 1 includes the following steps: it is found that a kind of basement in high rise building roof deformation seam water proof structure construction method Steel plate for sealing water is arranged along deformation joint length direction in basement roof deformation joint;
Steel plate for sealing water is fixed on the same horizontal plane;1 open end of steel plate for sealing water is upward in construction;
50mm thickness extruded polystyrene board 2 is embedded in the upper and lower deformation joint of steel plate for sealing water according to deformation joint height and width respectively It is interior;
The extruded polystyrene board 2 being arranged in upper deformation joint is upper extruded polystyrene board 21;
The extruded polystyrene board 2 being arranged in lower deformation joint is lower extruded polystyrene board 22;
Casting concrete top plate;
Concrete roof uses C30 commerical ready-mixed concrete;Special messenger's nurse is arranged in concreting process, it is necessary to from deformation joint Ash is symmetrically slowly put in side, guarantees that deformation joint position concrete vibrating is closely knit;
After the concrete initial set for constituting concrete roof, do not allow to vibrate again;Levelling after the completion of concrete roof pours, Slope is looked for two sides by 1% gradient when press polish;
It prevents later period roof deformation from stitching the long-term polywater in position, reduces leakage probability.
After reaching code requirement intensity after concreting, first 2 surface concrete of extruded polystyrene board slurry is cleaned out, Lower than concrete surface 1-2cm;It is closely knit along deformation joint pointing using oiliness sealing compound in 2 upper surface of extruded polystyrene board, it is spaced 3h Pointing sealing compound again afterwards, so repeatedly 2-3 times;
Guarantee that pointing is uniformly closely knit;Lower part exists deformation joint two sides M6 expansion bolt while using scraper pointing will The thick zinc-plated plugging plate fixation of 1.0mm, prevents sealing compound from dropping under the effect of gravity, zinc-plated plugging plate is done in the middle part of deformation joint The curved construction that stretches is made at bending to prevent plugging plate caused by malformation from destroying.
Extruded polystyrene board surface concrete slurry is cleaned out, the upper surface of upper extruded polystyrene board uses waterproof sealing cream (3) closely knit along deformation joint pointing;
Zinc-plated plugging plate is set on the outside of sealing compound after the lower surface scraper pointing sealing compound of lower extruded polystyrene board;
The zinc-plated plugging plate in deformation joint two sides uses M6 lower expansion bolt 71 by the thick zinc-plated plugging plate 5 of 1.0mm and concrete Top plate is fixedly connected;
After 3 pointing of top waterproof sealing cream, rubber fastening band 6 is pasted on the outside of top waterproof sealing cream 3;Use expansion bolt It is fixed;Sealing zone face rib is upward;
After top seal cream pointing, deformation joint two sides concrete surface is cleaned out, hollow position uses 1:2 cement bonded sand Slurry smoothes out, and top of returning on deformation joint is according to the drawing status requirement bullet line of ink marker;
400mmX8mm thickness outer patch rubber fastening band 6 is pasted forward along one end brush special-purpose water-proof glue, and then in brush coating Paving;
It is uniformly beaten with rubber hammer and guarantees waterstop bonding securely, and using the top M6 at the 50mm of waterstop end Expansion bolt 72 is along the fixed outer patch rubber fastening band 6 of deformation joint direction interval 300mm, and 6 face rib of rubber fastening band is upward, in sealing Band intersects with concrete at gap to be closed with polyurethane sealant.
Waterproof roll enhancement layer 8 is set on the outside of rubber fastening band 6;
Waterproof roll enhancement layer 8 uses 4mm thickness high polymer SBS modified asphalt waterproof coiled material, using Hot-melt construction, by change Coiled material is cut into 1000mm wide coiled material extra play by shape slit shape, and coiled material is formed by bending baltimore groove at deformation joint medium position, Flexible crook reason is done, slot opening is upward.
Waterproof layer 9 is set on the outside of waterproof roll enhancement layer 8;
Waterproof layer 9 includes two layers;
9 first layer of waterproof layerUsing 4mmThick high polymer SBS modified asphalt waterproof coiled material;
9 second layer of waterproof layerUsing 3mmThick high polymer SBS modified asphalt waterproof coiled material;
Waterproof layer 9 use Hot-melt construction, coiled material is formed by bending baltimore groove at deformation joint medium position, do stretch it is curved Processing, slot opening are upward.
Waterproof roll enhancement layer: conscientiously checking whether outer patch waterstop has disrepair phenomenon before construction, by damaged waterstop It is replaced at position;Then base cleaning is clean, guarantee that base is dry, with long handle round brush by base treatment agent brushing in base Surface will brush uniformly, must not leak brush or show-through.
Degree of drying, which must be reached, by 6h or more after base treatment agent brushing can implement Hot-melt construction.Method is Coiled material is first cut into 1000mm wide coiled material extra play by deformation joint shape, 400mm wide is respectively spread on two side plane of deformation joint, depending on ruler It after very little, shape is suitable, then by the bottom surface (one side for having hot melt adhesive) of coiled material, is toasted with hand-held benzine blow lamp, to its bottom surface in molten Melt state, can be pasted onto immediately in the base for having brushed 1 sealing material, and be compacted paving jail, in deformation joint position Portion is made into stretch and curved prevents from settling caused destruction.
Construction of waterproof layer: in processed good and dry substrate surface after waterproof reinforced layer acceptance(check), according to selected volume The width of material reserves overlapping the slot size, and the reference line bullet of paving coiled material is good, to carry out installation of membrane construction by this reference line. Entire volume coiled material is placed in paving starting point, is directed in base the good chalk line of bullet, rolling is opened a book material about 1m, by 1 people station coiled material just This 1m coiled material pull-up, another 1 people station are held liquefied gas flame gun coiled material bottom surface (having hot melt adhesive), flame are made to be directed at coiled material by face Coiled material bottom surface and base face are heated simultaneously with basal plane junction, viscous paving are carried out in molten to coiled material bottom surface glue, then by a people Compacting is exhausted to the coiled material of paving with hand-held pressure roller, when being taped against the remaining about 30cm of coil end in this way, coil end is turned over It is molten roasting to be placed on thermal insulation board row again, end coiled material is finally spread into jail compacting, it is important to note that in first and second time waterproof layer paving construction In, coiled material is formed by bending baltimore groove at deformation joint medium position, flexible crook reason is done, uses plastic adhesive tape by φ 50mm afterwards Sticking plaster be pasted onto waterproof roll groove, slot opening must be upward, when carrying out waterproof protective layer construction by sticking plaster In casting concrete, prevent later period malformation from causing waterproof damage layer.
Waterproof protective layer 11 is set on the outside of waterproof layer 9;
Waterproof protective layer 11 uses 70mm thickness C20 commodity pea gravel concreten, before carrying out pouring construction, first uses plastic cement The foamed plastic rod 10 of φ 50mm is pasted onto waterproof roll and stretched in curved groove by band and special glue, and rear concrete topping is according to mixed Solidifying soil is returned according to 1% levelling, plastering.
Water-storing test: going through whether waterproof layer surface has disrepair phenomenon after construction, after perception acceptance(check) The position carries out water-storing test, and water storage height exceeds highest point 50mm, and water storage duration 24 hours, absolutely without can after leak source Carry out the next step implementation.
The above described is only a preferred embodiment of the present invention, not making in any form to structure of the invention Limitation.Any simple modification, equivalent change and modification to the above embodiments according to the technical essence of the invention, Belong within the scope of technical solution of the present invention.

Claims (6)

1. a kind of basement in high rise building roof deformation stitches water proof structure construction method, which comprises the steps of:
Steel plate for sealing water is arranged along deformation joint length direction in basement roof deformation joint;
Steel plate for sealing water is fixed on the same horizontal plane;Steel plate for sealing water open end is upward in construction;
Extruded polystyrene board is embedded in the upper and lower deformation joint of steel plate for sealing water respectively according to deformation joint height and width;
The extruded polystyrene board being arranged in upper deformation joint is upper extruded polystyrene board;
The extruded polystyrene board being arranged in lower deformation joint is lower extruded polystyrene board;
Casting concrete top plate, top, which does concrete and returns, looks for slope by 1%;
Extruded polystyrene board surface concrete slurry is cleaned out, the upper surface of upper extruded polystyrene board is using waterproof sealing cream along deformation It is closely knit to stitch pointing;
Zinc-plated plugging plate is set on the outside of sealing compound after the lower surface scraper pointing sealing compound of lower extruded polystyrene board;
The thick zinc-plated plugging plate of 1.0mm is fixedly connected by the zinc-plated plugging plate in deformation joint two sides using expansion bolt with concrete roof;
After the waterproof sealing cream pointing of top, rubber fastening band is pasted on the outside of the waterproof sealing cream of top, and fixed with expansion bolt; Sealing zone face rib is upward;
Waterproof roll enhancement layer is set on the outside of rubber fastening band;
Waterproof layer is set on the outside of waterproof roll enhancement layer;
Waterproof protective layer is set on the outside of waterproof layer;
After the concrete initial set for constituting concrete roof, stop vibrating;When levelling after the completion of concrete roof pours, press polish by 1% gradient looks for slope to two sides;
After reaching code requirement intensity after concreting, first extruded polystyrene board surface concrete slurry is cleaned out, is lower than Concrete surface 1-2cm;It is closely knit along deformation joint pointing using oiliness sealing compound in extruded polystyrene board upper surface, it is spaced after 3h again Pointing sealing compound, so repeatedly 2-3 times.
2. basement in high rise building roof deformation stitches water proof structure construction method according to claim 1, it is characterised in that: on After portion's sealing compound pointing, deformation joint two sides concrete surface to be cleaned out, hollow position is smoothed out using 1:2 cement mortar, Top is returned on deformation joint according to the drawing status requirement bullet line of ink marker;
400mmX8mm thickness outer patch rubber fastening band is pasted forward along one end brush special-purpose water-proof glue, the and then paving in brush coating;
It is uniformly beaten with rubber hammer and guarantees waterstop bonding securely, and using M6 expansion bolt at the 50mm of waterstop end Along the fixed outer patch waterstop of deformation joint direction interval 300mm, sealing zone face rib is upward, at waterstop intersects gap with concrete It is closed with polyurethane sealant.
3. basement in high rise building roof deformation stitches water proof structure construction method according to claim 1, it is characterised in that: anti- Water coiled material enhancement layer uses 4mm thickness high polymer SBS modified asphalt waterproof coiled material, will by deformation joint shape using Hot-melt construction Coiled material is cut into 1000mm wide coiled material extra play, and coiled material is formed by bending baltimore groove at deformation joint medium position, does flexible crook Reason, slot opening are upward.
4. basement in high rise building roof deformation stitches water proof structure construction method according to claim 1, it is characterised in that: anti- Water layer includes two layers;
Waterproof layer first layer uses 4mm thickness high polymer SBS modified asphalt waterproof coiled material;
The waterproof layer second layer uses 3mm thickness high polymer SBS modified asphalt waterproof coiled material;
Waterproof layer uses Hot-melt construction, and coiled material is formed by bending baltimore groove at deformation joint medium position, does flexible crook reason, Slot opening is upward.
5. basement in high rise building roof deformation stitches water proof structure construction method according to claim 1, it is characterised in that: anti- Water conservation layer uses 70mm thickness C20 commodity pea gravel concreten, first will using plastic adhesive tape and special glue before carrying out pouring construction The foamed plastic rod of φ 50mm is pasted onto waterproof roll and stretches in curved groove, rear concrete topping according to concrete return according to 1% levelling, plastering.
6. basement in high rise building roof deformation stitches water proof structure construction method according to claim 1, it is characterised in that: become Zinc-plated plugging plate is set on the outside of sealing compound after the lower surface scraper pointing sealing compound of shape seam downside extruded polystyrene board;Zinc-plated envelope The thick zinc-plated plugging plate of 1.0mm is fixedly connected by closure plate using expansion bolt with concrete roof;Zinc-plated plugging plate is in deformation joint Portion is made into bending and is made into the curved construction that stretches to prevent plugging plate caused by malformation from destroying.
CN201610667062.7A 2016-08-15 2016-08-15 Basement in high rise building roof deformation stitches water proof structure construction method Active CN106284425B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610667062.7A CN106284425B (en) 2016-08-15 2016-08-15 Basement in high rise building roof deformation stitches water proof structure construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610667062.7A CN106284425B (en) 2016-08-15 2016-08-15 Basement in high rise building roof deformation stitches water proof structure construction method

Publications (2)

Publication Number Publication Date
CN106284425A CN106284425A (en) 2017-01-04
CN106284425B true CN106284425B (en) 2019-02-22

Family

ID=57671032

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610667062.7A Active CN106284425B (en) 2016-08-15 2016-08-15 Basement in high rise building roof deformation stitches water proof structure construction method

Country Status (1)

Country Link
CN (1) CN106284425B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108642996A (en) * 2018-04-28 2018-10-12 中国中元国际工程有限公司 A kind of first floor or basement roof and road/square deformation joint and its construction method
CN110258826A (en) * 2019-06-18 2019-09-20 中国三冶集团有限公司 A kind of waterproof construction of basement steel construction exterior wall and concrete ground plate node
CN111636273A (en) * 2020-06-09 2020-09-08 中国建筑第八工程局有限公司 Horizontal waterproof deformation joint structure and construction method thereof

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759525A (en) * 2017-03-15 2017-05-31 中铁十局集团第二工程有限公司 Rich water sand-pebble layer underground engineering deformation joint structure and its construction method
CN106930331A (en) * 2017-04-19 2017-07-07 中建局集团第二建筑有限公司 Waterproof structure system of underground pipe gallery expansion joint and construction method thereof
CN107514016A (en) * 2017-09-01 2017-12-26 广州番禺职业技术学院 A kind of concavo-convex folded plate biting connecions deformation joint structure
CN108978900B (en) * 2018-07-16 2020-08-25 中国核工业华兴建设有限公司 Construction method of large-seam-width caulking system
CN110130508A (en) * 2019-05-28 2019-08-16 五冶集团上海有限公司 A kind of waterproof method of expansion joint of pool
CN111395067A (en) * 2020-04-30 2020-07-10 中铁二院工程集团有限责任公司 Waterproof structure for pile plate structure and construction method thereof
CN111676908A (en) * 2020-06-18 2020-09-18 中国水利水电科学研究院 Concrete panel tensile joint and peripheral joint surface water stop structure and construction method thereof
CN114673469A (en) * 2022-03-06 2022-06-28 辽宁兰特科技发展有限公司 Semi-overlapping sleeve bag type gas drilling and sealing device
CN115182389B (en) * 2022-07-20 2024-02-09 华北水利水电大学 Water seepage prevention structure at junction of new and old concrete structures of subway engineering and construction process
CN115324118B (en) * 2022-08-30 2023-07-25 海通建设集团有限公司 Basement post-pouring belt leakage plugging structure and construction method
CN115387396B (en) * 2022-09-03 2023-10-27 福建金鼎建筑发展有限公司 Construction method of underground waterproof engineering structure
CN116695642B (en) * 2023-08-07 2023-10-20 四川水发勘测设计研究有限公司 Gate dam bottom plate split head crack treatment method and structure suitable for high water head

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100994145B1 (en) * 2010-06-30 2010-11-12 (주)우암건설 Expansion joint for underground road way
CN201649133U (en) * 2009-12-28 2010-11-24 江苏江中集团有限公司 Basement soleplate deformation joint waterproof device
CN203247778U (en) * 2013-05-15 2013-10-23 深圳市市政设计研究院有限公司 Novel high roof seam water resisting structure
CN203383243U (en) * 2013-05-03 2014-01-08 孔志坚 Basement settlement joint water-proof structure
CN203583525U (en) * 2013-11-28 2014-05-07 中铁二十局集团第五工程有限公司 Waterproof structure for movement joints of peat soft soil stratum subway station
CN203847133U (en) * 2014-06-03 2014-09-24 中铁二十四局集团安徽工程有限公司 Water stop structure for tunnel lining deformation joint
CN204530780U (en) * 2015-01-20 2015-08-05 中铁二院工程集团有限责任公司 The water proof structure of underground-structure deformation joint

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201649133U (en) * 2009-12-28 2010-11-24 江苏江中集团有限公司 Basement soleplate deformation joint waterproof device
KR100994145B1 (en) * 2010-06-30 2010-11-12 (주)우암건설 Expansion joint for underground road way
CN203383243U (en) * 2013-05-03 2014-01-08 孔志坚 Basement settlement joint water-proof structure
CN203247778U (en) * 2013-05-15 2013-10-23 深圳市市政设计研究院有限公司 Novel high roof seam water resisting structure
CN203583525U (en) * 2013-11-28 2014-05-07 中铁二十局集团第五工程有限公司 Waterproof structure for movement joints of peat soft soil stratum subway station
CN203847133U (en) * 2014-06-03 2014-09-24 中铁二十四局集团安徽工程有限公司 Water stop structure for tunnel lining deformation joint
CN204530780U (en) * 2015-01-20 2015-08-05 中铁二院工程集团有限责任公司 The water proof structure of underground-structure deformation joint

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108642996A (en) * 2018-04-28 2018-10-12 中国中元国际工程有限公司 A kind of first floor or basement roof and road/square deformation joint and its construction method
CN108642996B (en) * 2018-04-28 2021-02-09 中国中元国际工程有限公司 Deformation joint for first floor or basement roof and road square and construction method thereof
CN110258826A (en) * 2019-06-18 2019-09-20 中国三冶集团有限公司 A kind of waterproof construction of basement steel construction exterior wall and concrete ground plate node
CN111636273A (en) * 2020-06-09 2020-09-08 中国建筑第八工程局有限公司 Horizontal waterproof deformation joint structure and construction method thereof

Also Published As

Publication number Publication date
CN106284425A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN106284425B (en) Basement in high rise building roof deformation stitches water proof structure construction method
CN110607809B (en) Waterproof construction method for basement of building engineering
CN106120873B (en) A kind of construction method of pile-raft foundation pre-installed and inverted adhered composite high-molecular waterproof roll
CN112081146A (en) Construction method of polymer self-adhesive film waterproof coiled material capable of being constructed in rainy season
CN105201025B (en) Basement waterproofing construction and its construction method
CN110528789A (en) A kind of roof waterproof engineering construction method
CN107012992B (en) A kind of construction method of the waterproof integrated system of foam concrete roof heat insulation
CN109372026A (en) A kind of the combination waterproof layer structure and its construction method of greenbelt underground engineering top plate
CN110778062A (en) Facing paving structure of floor heating area and construction method thereof
CN105239729B (en) It has constructed the construction method of poling reparation of punching after roofing
CN106121061A (en) The waterproof construction of outer wall of basement and construction method thereof
CN204252414U (en) Roof covering water-proof structure
CN212001695U (en) Outer wall waterproof construction
CN209722876U (en) A kind of structure of interior canal storing facilities of water waterproof layer
CN208056489U (en) A kind of parapet percolating water repairerment system
CN204531198U (en) A kind of compound water-proof thermal-insulation integral system
CN109736360A (en) Tunnel open excavation section waterproof construction method
CN114382287A (en) Basement roof waterproof construction method
CN212671027U (en) Leakage-proof structure for terrace roof
CN114809474A (en) Waterproof construction method for slope roof
CN211037568U (en) Plant vegetation roof waterproof construction
CN207959290U (en) A kind of leakage maintaining structure for basement construction seam position
CN213653529U (en) Waterproof structure for building enclosure
CN110924360A (en) Method for repairing settlement joint of concrete structure
CN109339363A (en) Roofing built-in fitting Waterproof Construction Technique out

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant