CN106284411A - 下沉式地铁车站开挖方法 - Google Patents
下沉式地铁车站开挖方法 Download PDFInfo
- Publication number
- CN106284411A CN106284411A CN201610759475.8A CN201610759475A CN106284411A CN 106284411 A CN106284411 A CN 106284411A CN 201610759475 A CN201610759475 A CN 201610759475A CN 106284411 A CN106284411 A CN 106284411A
- Authority
- CN
- China
- Prior art keywords
- main body
- body frame
- excavation
- topmast
- stake
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/04—Making large underground spaces, e.g. for underground plants, e.g. stations of underground railways; Construction or layout thereof
Abstract
本发明公开了一种下沉式地铁车站开挖方法。要解决的技术问题是传统围护结构造成的经济浪费和工期长的技术问题,本发明包括以下步骤:①浇筑稳定桩:根据基坑需要开挖的深度和基坑边界浇筑稳定桩,稳定桩上预留滑槽;②浇筑主体框架和顶支桩:顶支桩设置在主体框架下方,先浇筑顶支桩,再浇筑主体框架的横架,最后浇筑竖架;③开挖基坑:先开挖主体框架之间和主体框架下侧处的土体,准备主体框架下沉;④主体框架下沉:使主体框架沿滑槽平稳下沉至开挖标高;⑤主体框架下沉完成后在主体框架上部施工。采用这样的技术方案后的本发明,保证开挖基坑的安全稳定,提高了施工速度,缩短了工期,而且不需要采用大面积的传统基坑围护。
Description
技术领域
本发明涉及一种施工方法,具体涉及一种地铁车站基坑开挖与支护于一体的下沉式地铁车站开挖方法。
背景技术
传统的地铁车站开挖都是采用围护结构,围护结构本身的结构强度基本可满足基坑稳定性的要求问题,但是这些围护结构,待车站建成后起到的安全作用就减少了,车站的主体结构就可以保证车站的安全稳定,这些围护结构又不能重复利用,这不仅造成经济浪费,而且会延误工期,增加工程的投入成本和工程期限。
发明内容
本发明要解决的是传统围护结构造成的经济浪费和工期长的技术问题,提供一种施工成本低,施工工期短的下沉式地铁车站开挖方法。
为解决上述技术问题,本发明采用下述技术方案:一种下沉式地铁车站开挖方法,包括以下步骤:①浇筑稳定桩:根据基坑需要开挖的深度和基坑边界浇筑稳定桩,稳定桩上预留滑槽;②浇筑主体框架和顶支桩:顶支桩设置在主体框架下方,先浇筑顶支桩,再浇筑主体框架的横架,最后浇筑竖架,横架的两端设置在滑槽内;③ 开挖基坑:先开挖主体框架之间和主体框架下侧处的土体,保留顶支桩下侧处的土体,待主体框架下侧的土体开挖达到设计深度,准备主体框架下沉;④主体框架下沉:主体框架下侧的土体开挖达到设计深度后,再开挖顶支桩下侧的土体,使主体框架沿滑槽平稳下沉至开挖标高;⑤主体框架下沉完成后在主体框架上部施工,上部施工完成后重复上述步骤进入下一层基坑开挖。
所述的步骤④主体框架下沉完成后还设有侧壁处理步骤,侧壁处理是对主体框架上侧的开挖面进行砌补或装配。
每根竖架和横架下方均设有顶支桩,步骤④主体框架下沉时多个顶支桩下侧的土体同时开挖。
步骤⑤所述的主体框架上部施工方式为装配式施工或浇筑施工。
采用上述技术方案的本发明是在进行车站开挖前,针对主体框架区域打入稳定桩,起到主体结构下沉的保护作用,主体框架最先施工的是底板主体,随着开挖下沉,慢慢浇筑或是采用装配式施工,建成上层结构,下沉的主体框架作为下层开挖的支撑和保护结构,可以当作施工平台,进行基坑的开挖和建设。
本发明降低施工成本,缩短施工工期。明挖法是地下工程最优先采用的施工方法,该方法适合中小型规模的车站或基坑开挖;主要应用到土质地层的地铁隧道车站开挖和其他地下基坑工程,实行自上而下开挖,主体施工先底板后顶板的施工顺序,基坑的开挖与支护交叉进行,开挖面停留时间短,开挖一定深度,马上进行主体结构装配组装,保证开挖基坑的安全稳定,提高了施工速度,缩短了工期,而且不需要采用大面积的传统基坑围护。
附图说明
图1是本发明基坑施工平面图;
图2是本发明基坑开挖纵平面图;
图3是本发明施工工序图。
具体实施方式
实施例1
如图1至图3所示,本发明包括以下步骤:①浇筑稳定桩:根据基坑需要开挖的深度和基坑边界7浇筑稳定桩1,稳定桩1上预留滑槽2,;②浇筑主体框架和顶支桩4:顶支桩4设置在浇筑主体框架下方,先顶支桩4,再浇筑主体框架5的横架51,最后浇筑竖架52,横架51的两端设置在滑槽2内;③ 开挖基坑:先开挖主体框架之间61和主体框架下侧62处的土体,保留顶支桩下侧63处的土体,待主体框架下侧62的土体开挖达到设计深度,准备主体框架下沉;④主体框架下沉:主体框架下侧62的土体开挖达到设计深度后,再开挖顶支桩下侧63的土体,使主体框架5沿滑槽2平稳下沉至开挖标高;⑤主体框架下沉完成后在主体框架上部施工,上部施工完成后重复上述步骤进入下一层基坑开挖。所述的稳定桩深度大于开挖深度,稳定桩设置在基坑边界处,竖架52与横架51垂直连接,整体浇筑获拼装。开挖标高取决于施工速度,根据具体的围岩情况,选择设定的标高。准备主体框架下沉时需要进行稳定性监测、安全监测、垂直度检测、围岩变形监测等,保证主体框架下沉不变形,不偏移。顶支桩和主体框架底板为一个整体,顶支桩设置在主体结构下侧,顶支桩用于支持和稳定主体框架,为开挖施工提供作业空间。
本发明下沉地铁车站开挖方法,是一种地铁车站基坑开挖与支护于一体的施工技术。主要先进行主体框架底部结构浇筑,以基坑两侧稳定桩为边界保护支撑点,将浇筑或装配好的主体框架结构为平台,开挖下侧土体,在横梁和主要部分结构下有下沉顶支桩,一方面起到稳定的作用,另一方面起到支持的作用,给下部开挖提供作业面,根据土体的稳定情况,选择顶支桩的长度,也就是施工进度,当开挖到设计深度,再开挖顶支桩下侧土体,让主体框架下沉,主体框架的横梁是插顶在两侧的稳定桩内,确保主体结构不变形,并且保持垂直下沉。
实施例2
与实施例1不同的是本实施例中所述的步骤④主体框架下沉完成后还设有侧壁处理步骤,侧壁处理是对主体框架上侧的开挖面进行砌补或装配。当主体框架下沉后,上侧留出的开挖面,要进行及时的砌补和拼装或是浇筑,砌补位置包括上下层之间的框架,边墙和上一层的主体框架,都需要装配或是浇筑砌补。为了保证工程质量和速度,一般采用装配式施工,先进行上部主要主体的组装施工,确保开挖的基坑及时被保护,循环往复,直至开挖至基坑底部。
实施例3
与实施例1不同的是本实施例中所述的步骤④主体框架下沉完成后还设有侧壁处理步骤,侧壁处理是对主体框架上侧的开挖面进行砌补或装配。与每根竖架52和横架51下方均设有顶支桩,步骤④主体框架下沉时多个顶支桩下侧63的土体同时开挖。步骤⑤所述的主体框架上部施工方式为装配式施工或慢慢浇筑施工。为保证工程质量和速度,可以采用装配式施工。
Claims (4)
1.一种下沉式地铁车站开挖方法,其特征在于:包括以下步骤:①浇筑稳定桩:根据基坑需要开挖的深度和基坑边界(7)浇筑稳定桩(1),稳定桩(1)上预留滑槽(2);②浇筑主体框架和顶支桩(4):顶支桩(4)设置在主体框架(5)下方,先浇筑顶支桩(4),再浇筑主体框架(5)的横架(51),最后浇筑竖架(52),横架(51)的两端设置在滑槽(2)内;③ 开挖基坑:先开挖主体框架之间(61)和主体框架下侧(62)处的土体,保留顶支桩下侧(63)处的土体,待主体框架下侧(62)的土体开挖达到设计深度,准备主体框架下沉;④主体框架下沉:主体框架下侧(62)的土体开挖达到设计深度后,再开挖顶支桩下侧(63)的土体,使主体框架(5)沿滑槽(2)平稳下沉至开挖标高;⑤主体框架下沉完成后在主体框架上部施工,上部施工完成后重复上述步骤进入下一层基坑开挖。
2.根据权利要求1所述的下沉式地铁车站开挖方法,其特征在于:所述的步骤④主体框架下沉完成后还设有侧壁处理步骤,侧壁处理是对主体框架上侧的开挖面进行砌补或装配。
3.根据权利要求1所述的下沉式地铁车站开挖方法,其特征在于:每根竖架(52)和横架(51)下方均设有顶支桩,步骤④主体框架下沉时多个顶支桩下侧(63)的土体同时开挖。
4.根据权利要求1所述的下沉式地铁车站开挖方法,其特征在于:步骤⑤所述的主体框架上部施工方式为装配式施工或浇筑施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610759475.8A CN106284411A (zh) | 2016-08-30 | 2016-08-30 | 下沉式地铁车站开挖方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610759475.8A CN106284411A (zh) | 2016-08-30 | 2016-08-30 | 下沉式地铁车站开挖方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106284411A true CN106284411A (zh) | 2017-01-04 |
Family
ID=57675306
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610759475.8A Pending CN106284411A (zh) | 2016-08-30 | 2016-08-30 | 下沉式地铁车站开挖方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106284411A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110042856A (zh) * | 2019-05-07 | 2019-07-23 | 东华理工大学 | 一种用于堰塞湖泄流槽机械开挖的沉井及开挖方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3716750A1 (de) * | 1987-05-19 | 1988-12-01 | Strabag Bau Ag | Verfahren zum herstellen und niederbringen von gruendungsbauwerken |
CN1193065A (zh) * | 1997-03-07 | 1998-09-16 | 石家庄市建设委员会 | 逆作法施工地下工程“四顶一”、“八顶一”交错掏土法 |
CN1639426A (zh) * | 2002-03-07 | 2005-07-13 | P·布拉热维奇 | 施工方法 |
CN104005419A (zh) * | 2014-06-23 | 2014-08-27 | 洛阳城市建设勘察设计院有限公司 | 下沉法施工的箱涵构造及施工方法 |
CN104675403A (zh) * | 2014-12-18 | 2015-06-03 | 上海建工集团股份有限公司 | 一种地下空间施工方法及支护结构 |
CN104863597A (zh) * | 2015-05-27 | 2015-08-26 | 北京市市政工程设计研究总院有限公司 | 一种浅埋暗挖大型地下空间施工的横向洞盖法 |
CN205063326U (zh) * | 2015-09-30 | 2016-03-02 | 中铁十二局集团有限公司 | 一种地铁明挖车站结构用的钢木组合大模板 |
-
2016
- 2016-08-30 CN CN201610759475.8A patent/CN106284411A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3716750A1 (de) * | 1987-05-19 | 1988-12-01 | Strabag Bau Ag | Verfahren zum herstellen und niederbringen von gruendungsbauwerken |
CN1193065A (zh) * | 1997-03-07 | 1998-09-16 | 石家庄市建设委员会 | 逆作法施工地下工程“四顶一”、“八顶一”交错掏土法 |
CN1639426A (zh) * | 2002-03-07 | 2005-07-13 | P·布拉热维奇 | 施工方法 |
CN104005419A (zh) * | 2014-06-23 | 2014-08-27 | 洛阳城市建设勘察设计院有限公司 | 下沉法施工的箱涵构造及施工方法 |
CN104675403A (zh) * | 2014-12-18 | 2015-06-03 | 上海建工集团股份有限公司 | 一种地下空间施工方法及支护结构 |
CN104863597A (zh) * | 2015-05-27 | 2015-08-26 | 北京市市政工程设计研究总院有限公司 | 一种浅埋暗挖大型地下空间施工的横向洞盖法 |
CN205063326U (zh) * | 2015-09-30 | 2016-03-02 | 中铁十二局集团有限公司 | 一种地铁明挖车站结构用的钢木组合大模板 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110042856A (zh) * | 2019-05-07 | 2019-07-23 | 东华理工大学 | 一种用于堰塞湖泄流槽机械开挖的沉井及开挖方法 |
CN110042856B (zh) * | 2019-05-07 | 2024-01-23 | 东华理工大学 | 一种用于堰塞湖泄流槽机械开挖的沉井及开挖方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105041349B (zh) | 一种在地铁区间盾构隧道基础上扩挖车站的暗挖施工方法 | |
CN102966108B (zh) | 紧临既有建筑物以地下结构为内支撑的深基坑施工方法 | |
CN104652443B (zh) | 深基坑临时水平支撑兼作永久结构梁的施工方法 | |
CN103696784B (zh) | 一种浅埋大跨隧道下穿建构筑物的大直径长管幕施工方法 | |
CN104879144B (zh) | 软土地区以阵列顶管建设地下空间的暗挖施工方法 | |
CN101270579B (zh) | 深基坑向浅基坑的扩展施工的基坑围护方法 | |
CN102392648A (zh) | 大直径盾构隧道扩挖建造地铁车站的方法 | |
CN102758442A (zh) | 一种土方开挖方法及明挖隧道施工方法 | |
CN104632227B (zh) | 单层梁拱结构的地铁车站开挖工艺 | |
CN108252329A (zh) | 围护结构承力的装配式综合管廊及其施工方法 | |
CN108842820A (zh) | 一种地铁车站换乘节点段基坑施工方法 | |
CN102410031B (zh) | 桩墙法建造地下空间结构 | |
CN108867692A (zh) | 城市大断面明挖隧道临近建筑物保护及隧道基坑挖掘方法 | |
CN103806464A (zh) | 大型高铁车站与地铁上下交汇逆作法施工工法 | |
CN110486036A (zh) | 一种扩大拱脚初支拱盖法施工方法 | |
CN109056810A (zh) | 既有建筑下方明挖或盖挖地下主体结构的横向扩挖构造及其施工方法 | |
KR20070076553A (ko) | 충전강관 루프와 콘크리트 벽체를 이용한 지하구조물축조방법 | |
JP2009174178A (ja) | 地下構造物の構築方法 | |
CN204457789U (zh) | 一种用桩拱墙支撑扩挖大直径盾构隧道建造的地铁车站 | |
CN204282399U (zh) | 一种地铁围护结构 | |
CN109056703A (zh) | 一种装配式地下连续墙的施工方法 | |
CN207211158U (zh) | 装配式桩柱板墙基坑支护结构 | |
CN101725147A (zh) | 低净空间下先插后喷型钢旋喷桩围护结构施工工艺 | |
CN106284411A (zh) | 下沉式地铁车站开挖方法 | |
CN208815566U (zh) | 既有建筑下方明挖或盖挖地下主体结构的横向扩挖构造 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170104 |