CN207211158U - 装配式桩柱板墙基坑支护结构 - Google Patents
装配式桩柱板墙基坑支护结构 Download PDFInfo
- Publication number
- CN207211158U CN207211158U CN201721066513.8U CN201721066513U CN207211158U CN 207211158 U CN207211158 U CN 207211158U CN 201721066513 U CN201721066513 U CN 201721066513U CN 207211158 U CN207211158 U CN 207211158U
- Authority
- CN
- China
- Prior art keywords
- pile
- board
- foundation pit
- supporting construction
- pit supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 24
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 27
- 239000010959 steel Substances 0.000 claims abstract description 27
- 239000011449 brick Substances 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 238000009412 basement excavation Methods 0.000 description 3
- 238000003912 environmental pollution Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 239000011083 cement mortar Substances 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Abstract
本实用新型公开了装配式桩柱板墙基坑支护结构,属于土木工程领域。该装置包括支护桩、型钢柱和板墙,所述支护桩并排设置,所述支护桩上设置有锚杆,所述支护桩的上端设有冠梁,所述型钢柱一端连接在所述支护桩上、另一端穿过所述冠梁并延伸至所述冠梁外部,所述板墙位于所述型钢柱和待支护基坑的侧壁之间。
Description
装配式桩柱板墙基坑支护结构
技术领域
[0001]本实用新型涉及土木工程领域,特别涉及装配式桩柱板墙基坑支护结构。
背景技术
[0002]在建筑基坑开挖过程中,通常采用支挡结构对基坑进行支护,以保证基坑侧壁的 安全。
[0003]目前,在基坑开挖深度较大、周边无放坡条件时,通常采用支护桩加锚索的支护方 式。施工顺序依次为:地面预成孔,孔底清孔,安放钢筋笼,灌注混凝土,基坑分层开挖至桩 顶标高,浇筑冠梁。但是,由于种种原因,支护桩桩顶标高通常不能伸至地面,粧顶标高需要 下压。下压范围一般采用砖砌挡墙支护,此时,存在先开挖后支护的问题,在砖砌挡墙施工 前,边坡容易失稳,造成事故。为避免此种情况发生,一般在灌注桩后侧做一排微型桩,即预 成孔后,插入工字钢,再灌注水泥砂浆,形成超前支护体系,再开挖、施工灌注粧。采用上述 超前支护体系主要存在三个问题:
[0004] 其一是工期较长,多了一道微型桩的施工工期;
[0005] 其二是微型粧设置于支护桩背侧,占据场地空间;
[0006] 其三是不符合绿色环保施工的要求,基坑施工完成后,微型桩滞留在土体内,不能 重复利用,微型桩亦会影响后期的管道开挖敷设。
[0007] 因此,在空间狭小,无放坡条件,而上部土层自立性能差的情况下,如何在确保基 坑安全,缩短工期,降低成本,节约场地、实现绿色环保施工是本技术领域人员亟待解决的 问题。 实用新型内容
[0008] 本实用新型提供装配式粧柱板墙基坑支护结构,以解决背景技术中所指出的问 题。
[0009] 装配式桩柱板墙基坑支护结构,包括支护桩、型钢柱和板墙,所述支护桩并排设 置,所述支护粧上设置有锚杆,所述支护粧的上端设有冠梁,所述型钢柱一端连接在所述支 护粧上、另一端穿过所述冠梁并延伸至所述冠梁外部,所述板墙位于所述型钢柱和待支护 基坑的侧壁之间。
[0010] 更优地,所述支护粧为灌注粧。
[0011] 更优地,所述型钢柱为工字钢。
[0012] 更优地,所述工字钢位于所述灌注桩的中心处。
[0013] 更优地,所述板墙为钢板或预制混凝土板。
[0014] 本实用新型提供装配式桩柱板墙基坑支护结构,该施工工艺施工便利,工期短,施 工效率高,成本低,且对环境污染较小,适用于垂直开挖体系,不需进行放坡,占地较少该支 护结构减少了基坑侧壁裸露时间,大大提高了边坡的安全稳定性,特别是对填土厚度大、周 边环境复杂,具有常规砖砌挡墙或微型桩超前支护无法相比的优势。
附图说明
[0015]图1为本实用新型提供的装配式桩柱板墙基坑支护结构结构示意图;
[0016]图2为图1中A-A剖视图。
[0017]附图标记说明:
[0018]卜支护桩,2-型钢柱,3—板墙,4-冠梁。
具体实施方式
[0019]下面结合附图,对本实用新型的一个具体实施方式进行详细描述,但应当理解本 实用新型的保护范围并不受具体实施方式的限制。
[0020]如图1至图2所示,本实用新型实施例提供的装配式粧柱板墙3基坑支护结构,包括 支护桩1、型钢柱2和板墙3,支护粧1并排设置,支护桩1上设置有锚杆,支护桩1的上端设有 冠梁4,型钢柱2—端连接在支护桩1上、另一端穿过冠梁4并延伸至冠梁4外部,板墙3位于型 钢柱2和待支护基坑的侧壁之间,支护桩1为灌注桩,型钢柱2为工字钢,工字钢位于灌注桩 的中心处,板墙3为钢板或预制混凝土板。
[0021]本实用新型提供装配式桩柱板墙基坑支护结构,该施工工艺施工便利,工期短,施 工效率高,成本低,且对环境污染较小,适用于垂直开挖体系,不需进行放坡,占地较少该支 护结构减少了基坑侧壁裸露时间,大大提高了边坡的安全稳定性,特别是对填土厚度大、周 边环境复杂,具有常规砖砌挡墙或微型粧超前支护无法相比的优势。
[0022]以上公开的仅为本实用新型的几个具体实施例,但是,本实用新型实施例并非局 限于此,任何本领域的技术人员能思之的变化都应落入本实用新型的保护范围。
Claims (5)
1.装配式桩柱板墙基坑支护结构,其特征在于,包括支护桩、型钢柱和板墙,所述支护 桩并排设置,所述支护桩上设置有锚杆,所述支护桩的上端设有冠梁,所述型钢柱一端连接 在所述支护粧上、另一端穿过所述冠梁并延伸至所述冠梁外部,所述板墙位于所述型钢柱 和待支护基坑的侧壁之间。
2.如权利要求1所述的装配式桩柱板墙基坑支护结构,其特征在于,所述支护粧为灌注 粧。
3.如权利要求2所述的装配式桩柱板墙基坑支护结构,其特征在于,所述型钢柱为工字 钢。
4. 如权利要求3所述的装配式桩柱板墙基坑支护结构,其特征在于,所述工字钢位于所 述灌注桩的中心处。
5. 如权利要求1所述的装配式桩柱板墙基坑支护结构,其特征在于,所述板墙为钢板或 预制混凝土板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721066513.8U CN207211158U (zh) | 2017-08-23 | 2017-08-23 | 装配式桩柱板墙基坑支护结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721066513.8U CN207211158U (zh) | 2017-08-23 | 2017-08-23 | 装配式桩柱板墙基坑支护结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207211158U true CN207211158U (zh) | 2018-04-10 |
Family
ID=61816711
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721066513.8U Expired - Fee Related CN207211158U (zh) | 2017-08-23 | 2017-08-23 | 装配式桩柱板墙基坑支护结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207211158U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109706939A (zh) * | 2019-01-14 | 2019-05-03 | 杭州江润科技有限公司 | 深基坑预应力组合钢支撑及施工方法 |
CN111456081A (zh) * | 2020-03-16 | 2020-07-28 | 中国电建集团华东勘测设计研究院有限公司 | 一种桩基挡墙结构及施工方法 |
-
2017
- 2017-08-23 CN CN201721066513.8U patent/CN207211158U/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109706939A (zh) * | 2019-01-14 | 2019-05-03 | 杭州江润科技有限公司 | 深基坑预应力组合钢支撑及施工方法 |
CN109706939B (zh) * | 2019-01-14 | 2020-09-15 | 杭州江润科技有限公司 | 深基坑预应力组合钢支撑及施工方法 |
CN111456081A (zh) * | 2020-03-16 | 2020-07-28 | 中国电建集团华东勘测设计研究院有限公司 | 一种桩基挡墙结构及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20220098817A1 (en) | Method for constructing structure | |
CN207211158U (zh) | 装配式桩柱板墙基坑支护结构 | |
CN102561384A (zh) | 钢抱箍桁架式高桩承台塔吊基础的施工方法及结构 | |
CN106522236A (zh) | 基坑支护的结构及施工方法 | |
CN104532957A (zh) | 原有建筑增设地下室逆作施工方法 | |
CN108797641A (zh) | 一种地铁暗挖车站施工期间全车站止水的结构及其施工方法 | |
CN109025349B (zh) | 砖混结构建筑物纠倾并地下增层的方法 | |
CN109056810A (zh) | 既有建筑下方明挖或盖挖地下主体结构的横向扩挖构造及其施工方法 | |
CN108035360A (zh) | 一种用于基坑支护的方法 | |
JP2002115260A (ja) | 地下階増築方法 | |
CN207469262U (zh) | 一种基坑与边坡相结合的支护结构 | |
JP2003147782A (ja) | 既存地下室上に新規建物を建設する基礎構造及びその築造方法 | |
CN206233244U (zh) | 基坑的支护结构 | |
KR101052363B1 (ko) | 심층굴착용 자립식 흙막이공법 | |
CN104264683A (zh) | 三面环绕文保建筑凹字形超深基坑分区支护方法 | |
RU2281997C2 (ru) | Буроинъекционная свая и подпорная стенка на свайном фундаменте | |
JP2007046343A (ja) | 既存建物の直下地盤の液状化防止工法 | |
CN215211008U (zh) | 一种处理废弃防空洞的桩基施工装置及其桩基 | |
CN210177517U (zh) | 一种近海深基坑桩墙合一围护结构 | |
CN105586973A (zh) | 复合咬接桩挡墙施工方法和复合咬接桩挡墙结构 | |
CN206418506U (zh) | 一种基坑支护结构 | |
CN214832749U (zh) | 一种新型基坑内支撑结构 | |
CN213625605U (zh) | 一种旋挖桩锚与挂网喷射混凝土的深基坑结构 | |
CN210421152U (zh) | 锚拉路肩挡土墙 | |
Dellaria et al. | Combining Multiple Techniques to Complete an Urban Deep Excavation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180410 Termination date: 20180823 |
|
CF01 | Termination of patent right due to non-payment of annual fee |