一种淤泥动压冲击固结法 Download PDFInfo
- Publication number
- CN106284289A CN106284289A CN201510253632.3A CN201510253632A CN106284289A CN 106284289 A CN106284289 A CN 106284289A CN 201510253632 A CN201510253632 A CN 201510253632A CN 106284289 A CN106284289 A CN 106284289A
- Authority
- CN
- China
- Prior art keywords
- dynamic pressure
- mud
- impact
- dynamic
- pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本发明公开了一种淤泥动压冲击固结法,其步骤是:常规真空预压或堆载预压施工-打设动压体-管道连接-压力罐安装连接-动压体形状测量-动压冲击-空隙水压力测量-高程测量-出水量测量-动压循环作业。本技术可以用于市政、交通、水利、围垦、港口工程中的软基加固工程。本发明方法可以节省工期,节省费用,实现了动载加固粘性土软基的突破,其固结速度快,效果好,可实现环保经济和再生能源的持续发展。
Description
技术领域
本发明涉及淤泥软基加固工程中的一种新型动载固结淤泥新技术,特征是在常规真空预压或堆载预压的基础上,施加动水压力和水锤冲击作用,打破淤泥的部分骨架,改善淤泥的排水通道,并大大提高其排水梯度,促进淤泥的排水和沉降。本技术具有速度快、能耗低、承载力高的优点。本技术可应用于沿海港口工程、填海工程或沿海滩涂建设工程中的淤泥地基改良加固项目。
背景技术
在我国沿海淤泥地基上的工程建设中,关键技术之一是淤泥的改良、加固和利用,软基加固是工程质量、工期和造价的主要影响因素之一,直接影响工后的使用效果。连云港的淤泥颗粒细、含水量高,物理力学指标差,港口建设中,必须对淤泥进行处理,将淤泥挖除或排水固结后作为地基使用。常用的淤泥加固技术和工艺有:
一、抛石置换:采用机械挖泥将淤泥挖除后抛石,形成抛填地基,或采用爆破挤淤专利技术,将淤泥置换,形成建筑物的稳定基础。优点是:地基承载力高,沉降小。缺点是:需要大量的抛填石料,造成自然资源的浪费;机械挖除的淤泥和爆破挤淤挤出的淤泥造成二次搬运和污染;不能充分有效的利用淤泥资源。
二、真空预压:港口工程中的淤泥软基多用真空预压技术进行加固,优点是:实现淤泥的原位加固,可以加固吹填淤泥和原状淤泥,实现了淤泥的废物利用。但新吹填淤泥的含水量很高,表层达到300%。吹填结束后,需要排水、晾晒、自重固结。连云港软基加固中,达到规范停泵要求的抽真空时间需要6~10个月,而且加固后的淤泥承载力较低,含水量仍然很高,后期使用效果不佳。
三、堆载预压:采用超载的办法进行淤泥的排水固结,优点是:加大堆载量并延长压载时间,可以达到较高的淤泥强度。缺点是:同真空预压一样,需要更长的排水固结时间,加固后的强度不高,但造价高。
四、淤泥搅拌:采用水泥、石灰或其它新型外加剂进行淤泥的现场搅拌加固,吸收淤泥中的水分,并产生化学反应,把淤泥变硬,形成外加剂和淤泥的硬性骨架。优点是:淤泥固结快,3个月的强度基本接近最大值。缺点是:外加剂掺加量大,材料费用和施工费用都很高,且对于高含水量的极稀淤泥效果很差,其仅应用于工程的重点部位,工程质量不易保证,很多地区已经取消该工艺。
淤泥软基加固工程的宗旨是:提高排水速度,增加固结度和加固后的强度,减少工后沉降,缩短工期,降低工程造价。采用动载加固淤泥,在我国已有很多尝试,但尚未形成成熟有效的施工技术。
发明内容
本发明要解决的技术问题是针对现有技术的不足,提出一种速度快、效果好、强度高、节能环保的吹填淤泥和原状淤泥软基的快速固结方法。
本发明要解决的技术问题是通过以下技术方案来实现的:一种淤泥动压冲击固结法,其特征在于:包括以下步骤:
(1)施工方案设计:根据地质资料和设计要求确定本工程的施工方案,试算最大最小动压值,确定预期沉降和竣工标准;
(2)动压体及埋设:动压体采用消防水袋等具有一定强度的软体材料,密封上下端口;动压管为直径8毫米的硬质塑料管,端部设U形头,从动压体顶部插入密封,在打设塑料排水板的过程中,在四根排水板的中间打设分层动压体;
(3)动压设备及管道连接:动压设备包括2方压力罐、水泵、空压机、闸阀(或电磁阀)及管道等,动压管支管为8毫米硬质塑料管,主管材料为4~6分硬质塑料管,长管时增加伸缩节;支管与主管相连,主管与闸阀和压力罐连接;
(4)最大、最小动压正值检测:通过进出动压体的水量和动压体形状变化的检测,确定最小、最大动压正值,最小动压正值为动压体底部挤开土体时的水压值,最大动压正值为动压体顶部爆裂时的水压,开始施工时和施工工程中,均需要对动压体的变形和最大最小动压正值进行检测;
(5)动压冲击施工程序:压力罐内注水至上溢流阀--压力罐内注气加压至设计压力--向动压体内注气少许--向动压体内注水至设计时间--打开泄压阀(或接入负压管道)至设计时间--高程测量--循环动压至设计次数--空隙水压力测量--出水速度测量--下一个循环;
(6)工后土力学指标检测:动压结束后一个月进行土力学指标检测;
(7)交工验收。
以上所述的淤泥的动压冲击固结法技术方案中:所有闸阀的开关速度是关键,要求快开快关。
以上所述的淤泥动压冲击固结法技术方案中:动压值的大小、间隔时间是关键,需要根据不同的土质和工程要求进行优化。
本发明是在原有工程设计的堆载压力或真空压力作用下,附加动水压力,在静水压力和动水压力产生的水锤及其应力波作用下,淤泥固结被打开,产生较高的空隙水压力梯度,加速排水。
本发明方法的机理是:
1、动压扰动:常规软基加固方法,如:真空预压、堆载预压、真空联合堆载预压等,均属于一定荷载作用下的静力排水固结。随自由水的排出,超静孔隙水压力转化为土体的有效应力,降低了排水梯度,排水减缓或停止。动压冲击产生的应力波和土体变形,打破了淤泥的部分骨架,重新增加了孔隙水压力及其排水梯度,加快排水。
2、静压排水:施加动水压力、土体变形后增加了局部土体的静压,加快排水。
3、粘聚力排水:淤泥扰动、骨架被打破后,在粘聚力作用下,淤泥颗粒相互吸引,形成排水。
与已有技术相比,本发明的优点和技术效果为:
1、在常规静压排水固结的基础上增加了动压荷载,实现了动载加固软土地基的突破。
2、本发明技术具有操作简单、排水速度快、工期短,节能、质量好、承载力高等优点,继续总结优化后可以作为本行业的施工优势。
3、本发明方法实现了淤泥的废物利用。采用本发明技术后,可以充分利用吹填淤泥,形成码头堆场的基层和填筑层。因此可以更多的利用码头港池和航道挖泥的淤泥废物。
4、本发明方法可以有效降低固化土工程的施工费用,并大大节省砂石料等自然资源的使用量。
具体实施方式
以下进一步描述本发明的具体技术方案,以便于本领域的技术人员进一步地理解本发明,而不构成对其权利的限制。
一种新型淤泥动压固结技术实例,其方案及步骤如下:
(1)工程概况:室内实验,钢管直径273毫米,装淤泥高度3米,吹填淤泥,含水量98.3%。动压体为两个250毫升的塑料瓶,排水体为5×7厘米的塑料排水板,排水体间距0.5米。
(2)实施步骤:关闭出水阀门--动压--高程测量--打开出水阀门--出水速度测量--下一循环。
(3)参数:按从小到大的原则实施动压,最大动压为-100~+65千帕,压载1.16吨/平米,动压时间1.5个月。
(4)效果:沉降16.5%,含水量55.3~62.8%,承载力9.52吨/平米。
Claims (3)
1.一种淤泥动压冲击固结法,其特征在于,步骤如下:
(1)常规真空预压或堆载预压工程施工:包括土力学指标检测、场地整平、铺设竹笆、砂垫层、工作垫层、打设塑料排水板、铺设真空膜、抽真空、膜上保护、堆载、施工监测、加固后土力学指标检测等;
(2)埋设动压体并附设管道:打设塑料排水板后进行分层动压体的埋设并附设、连接动压管;
(3)最大动压和最小动压检测:在动压施工前及施工工程中按一定时间间隔检测动压体的体积变化,以确定最大、最小动压值;
(4)安装动压设备:包括管道、闸阀、水泵、压力罐、空压机等;
(5)动压冲击、排水:真空预压压载或堆载预压压载后,按设计压力值和程序进行动压冲击施工,并进行典型排水板的出水量检测;
(6)竣工及效果分析。
2.根据权利要求1所述的一种淤泥动压冲击固结法,其特征在于,采用动水压力和水锤冲击作用,打破了淤泥骨架,大大地提高了淤泥排水的超静孔隙水压力梯度,数十倍的提高了排水速度,加速沉降;动压结束一定时间后的土体强度大大提高。
3.根据权利要求1或2所述的一种淤泥动压冲击固结法,其特征在于:淤泥排水时间缩短30~80%,地基承载力提高10~50%,节能0~60%。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510253632.3A CN106284289A (zh) | 2015-05-19 | 2015-05-19 | 一种淤泥动压冲击固结法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510253632.3A CN106284289A (zh) | 2015-05-19 | 2015-05-19 | 一种淤泥动压冲击固结法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106284289A true CN106284289A (zh) | 2017-01-04 |
Family
ID=57633004
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510253632.3A Pending CN106284289A (zh) | 2015-05-19 | 2015-05-19 | 一种淤泥动压冲击固结法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106284289A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107338783A (zh) * | 2017-08-24 | 2017-11-10 | 武汉大学 | 降低粘性土料场土料含水量的方法 |
CN107965349A (zh) * | 2017-11-23 | 2018-04-27 | 长沙矿山研究院有限责任公司 | 水固混合料浆加载预压脱水固结方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS56159414A (en) * | 1980-05-14 | 1981-12-08 | Chiyoda Chem Eng & Constr Co Ltd | Treatment of poor sticky subsoil by dynamic load |
CN101016740A (zh) * | 2007-03-05 | 2007-08-15 | 武亚军 | 多重增压快速固结密实软土地基处理方法 |
CN101041960A (zh) * | 2006-03-23 | 2007-09-26 | 周健 | 软土地基高侧压快速排水固结方法 |
CN101581092A (zh) * | 2009-06-09 | 2009-11-18 | 陈杰德 | 快速增压预压法软地基处理方法 |
-
2015
- 2015-05-19 CN CN201510253632.3A patent/CN106284289A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS56159414A (en) * | 1980-05-14 | 1981-12-08 | Chiyoda Chem Eng & Constr Co Ltd | Treatment of poor sticky subsoil by dynamic load |
CN101041960A (zh) * | 2006-03-23 | 2007-09-26 | 周健 | 软土地基高侧压快速排水固结方法 |
CN101016740A (zh) * | 2007-03-05 | 2007-08-15 | 武亚军 | 多重增压快速固结密实软土地基处理方法 |
CN101581092A (zh) * | 2009-06-09 | 2009-11-18 | 陈杰德 | 快速增压预压法软地基处理方法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107338783A (zh) * | 2017-08-24 | 2017-11-10 | 武汉大学 | 降低粘性土料场土料含水量的方法 |
CN107965349A (zh) * | 2017-11-23 | 2018-04-27 | 长沙矿山研究院有限责任公司 | 水固混合料浆加载预压脱水固结方法 |
CN107965349B (zh) * | 2017-11-23 | 2019-05-31 | 长沙矿山研究院有限责任公司 | 水固混合料浆加载预压脱水固结方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100412275C (zh) | 基坑内降水井的防水与封堵施工方法 | |
CN104711994A (zh) | 基坑深井降水及封堵施工方法 | |
CN103953008B (zh) | 一种适用于尾矿库的改进型混合坝 | |
CN104131575A (zh) | 一种岩溶高度发育地层坝基的堵漏排水方法 | |
CN106759297A (zh) | 一种支护桩与三管高压旋喷桩深基坑的施工方法 | |
CN102011391A (zh) | 一种软弱地基的加固处理方法 | |
CN101864779A (zh) | 建(构)筑物深部掏土纠倾的方法 | |
CN103696416A (zh) | 一种地基处理新方法 | |
CN107268688A (zh) | 地下连续墙工字钢接头加固止水的施工方法 | |
CN104264653A (zh) | 超高能级强夯与置换兼容施工工艺 | |
CN113373962B (zh) | 一种深基坑组合堵漏施工方法 | |
Liu et al. | Ground improvement of dredged fills with two improved vacuum preloading methods: Case study | |
CN107190709B (zh) | 新近疏浚土吹填成陆围区内建设河道的方法 | |
CN106284289A (zh) | 一种淤泥动压冲击固结法 | |
CN101481913A (zh) | 嵌岩地下连续墙冲孔槽段施工方法 | |
CN101187209A (zh) | 废弃管道无害化填充技术 | |
CN211948590U (zh) | 一种地下室底板抗浮泄压装置 | |
CN103556641A (zh) | 一种既有地下室坑内地下连续墙成槽辅助方法 | |
CN102635107B (zh) | 吹填淤泥软基的表层快速固结法 | |
CN210975737U (zh) | 一种水库坝身涵管改造结构 | |
CN204435321U (zh) | 一种火力发电厂取水明渠 | |
CN203475467U (zh) | 一种底板砼封底结构 | |
CN207331698U (zh) | 一种淤泥深基坑管道沟结构 | |
CN111719575A (zh) | 一种基坑防沉降排水方法 | |
CN210622801U (zh) | 沉井封底止水装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |