CN106284074A - 一种多面承压抗拔组合传力主缆锚固结构及其施工方法 - Google Patents
一种多面承压抗拔组合传力主缆锚固结构及其施工方法 Download PDFInfo
- Publication number
- CN106284074A CN106284074A CN201610776348.9A CN201610776348A CN106284074A CN 106284074 A CN106284074 A CN 106284074A CN 201610776348 A CN201610776348 A CN 201610776348A CN 106284074 A CN106284074 A CN 106284074A
- Authority
- CN
- China
- Prior art keywords
- anchor
- anchor beam
- bearing
- power transmission
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/14—Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D11/00—Suspension or cable-stayed bridges
- E01D11/02—Suspension bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明涉及一种多面承压抗拔组合传力主缆锚固结构及其施工方法,后锚梁腹板下料后,在两块后锚梁腹板的外侧上、下缘和中间焊接承压板,承压板与后锚梁腹板垂直,承压板之间焊接加劲板;边缘焊接缀板,组成格构式后锚梁;之间焊接“工”形锚杆水平板,形成钢框架,所述后锚梁垂直于主缆理论中心线布置,锚杆沿主缆索股中心线布置;后锚梁下缘承压板底面焊接圆柱头焊钉;“工”形截面锚杆的上端设置锚具,构成多面承压抗拔组合传力主缆锚固结构。本发明后锚梁与混凝土结合成整体不会形成裂缝;能多途径分散传力,改善应力集中,受力可靠;维护工作量小,有利于结构耐久。本发明已在武汉杨泗港长江大桥上得到应用,取得了良好效果。
Description
技术领域
本发明专利涉及一种用于主缆锚固的多面承压抗拔组合传力主缆锚固结构及其施工方法。
背景技术
在悬索桥设计中,主缆是主要承重构件。传统的主缆锚固系统主要有两种:一种是钢框架后锚梁锚固系统,另一种是预应力锚固系统。所述钢框架后锚梁锚固系统由沿主缆索股方向布置的锚杆和垂直于主缆中心布置的后锚梁焊接而成。锚杆为“工”形截面,后锚梁采用顺锚杆方向为实腹板的格构式结构。锚杆上端与主缆索股连接,下端伸入后锚梁内部与其实腹板焊连。后锚梁实腹板上下边缘设翼板,下缘翼板用于布置连接缀板,上缘翼板既用于布置连接缀板,又用作传力承压板。锚固系统埋置于混凝土锚体中,锚杆与混凝土间设隔离防腐层,主缆索股拉力通过锚杆传至后锚梁,再经后锚梁上缘翼板传至混凝土锚体,进而传给基础。此种钢框架后锚梁锚固系统的缺点是,传力集中在后锚梁上翼板单一承压面上,造成混凝土应力过于集中,混凝土内部有开裂的风险,同时后锚梁下翼板底面与锚体混凝土结合面受拉力,易形成间隙积水,影响锚固系统耐久性。
考虑既要传力合理又要确保结构有足够耐久性,则需要将钢框架后锚梁传力途径分散,以解决传统的钢框架后锚梁锚固系统所带来的上述问题。
发明内容
本发明的目的是针对上述现状,旨在提供一种多途径传力、改善应力集中、维护工作量小、有利于结构耐久的多面承压抗拔组合传力主缆锚固结构及其施工方法。
本发明目的的实现方式为,多面承压抗拔组合传力主缆锚固结构,后锚梁腹板与缀板焊接成格构式后锚梁,后锚梁腹板外侧上、下缘和之间沿长度方向焊接数道承压板,承压板与后锚梁腹板垂直,承压板之间焊接沿腹板高度方向布置的加劲板;焊接与之表面垂直的圆柱头焊钉;格构式后锚梁的两块腹板之间焊接“工”形截面锚杆的水平板形成钢框架;“工”形截面锚杆沿主缆索股中心线布置,锚具设置于“工”形截面锚杆的上端;后锚梁垂直于主缆理论中心线布置。
多面承压抗拔组合传力主缆锚固结构的施工方法,具体步骤如下:
1)在后锚梁腹板下料后,在两块后锚梁腹板的外侧上、下缘和中心处焊接沿后锚梁长度布置的三块承压板;
2)在两块后锚梁腹板边缘焊接缀板,组成格构式后锚梁;
3)在两块后锚梁腹板之间焊接“工”形锚杆水平板,形成钢框架,所述后锚梁垂直于主缆理论中心线布置,“工”形截面锚杆沿主缆索股中心线布置;
4)在后锚梁下缘承压板底面焊接圆柱头焊钉;
5)“工”形截面锚杆的上端设置锚具,构成多面承压抗拔组合传力主缆锚固结构。
本发明解决了原钢框架锚固系统传力集中、后锚梁底面与混凝土分离形成裂缝的问题,后锚梁与混凝土结合成整体不会形成裂缝;能多途径分散传力,改善应力集中,受力可靠;维护工作量小,有利于结构耐久。
本发明已在武汉杨泗港长江大桥上得到应用,取得了良好效果。
附图说明
图1为多面承压抗拔组合传力主缆锚固结构立面结构示意图,
图2为多面承压抗拔组合传力主缆锚固结构平面结构示意图。
具体实施方式
参照图1、2,本发明多面承压抗拔组合传力主缆锚固结构的后锚梁腹板1与缀板3焊接成格构式后锚梁。后锚梁腹板外侧上、下缘和之间沿长度方向焊接数道承压板2,承压板与后锚梁腹板垂直,承压板之间焊接沿腹板高度方向布置的加劲板4。锚梁腹板焊接下缘处承压板的底面圆柱头焊钉5,圆柱头焊钉与下缘处承压板的底面垂直。格构式后锚梁的两块腹板之间焊接“工”形截面锚杆的水平板形成钢框架;“工”形截面锚杆沿主缆索股中心线布置,锚具7设置于“工”形截面锚杆6的上端。后锚梁垂直于主缆理论中心线布置。索股拉力通过锚杆传给后锚梁,再通过后锚梁上的三道承压板和圆柱头焊钉传至混凝土锚体。
后锚梁腹板1外侧上、下缘和中心处沿长度方向焊接三道承压板2,三道承压板2之间焊接沿腹板高度方向布置的加劲板4。腹板下缘处承压板2的底面按一定间隔焊接圆柱头焊钉5。
本发明的施工具体步骤如下:
1)在后锚梁腹板1下料后,在两块后锚梁腹板的外侧上、下缘和中心处焊接沿后锚梁长度布置的三块承压板2;
2)在两块后锚梁腹板边缘焊接缀板3,组成格构式后锚梁;
3)在两块后锚梁腹板之间焊接“工”形锚杆水平板,形成钢框架,“工”形锚杆下端伸入格构式后锚梁两块腹板之间,与之焊接成整体,满足板件结构受力要求。所述后锚梁垂直于主缆理论中心线布置,“工”形锚杆沿主缆索股中心线布置;
4)在后锚梁下缘承压板底面焊接圆柱头焊钉5,圆柱头焊钉提供抗拔力,满足结构受力要求;
5)“工”形截面锚杆的上端设置锚具7,构成多面承压抗拔组合传力主缆锚固结构。索股拉力通过锚杆传给后锚梁,再通过后锚梁上的三道承压板和圆柱头焊钉传至混凝土锚体。
本发明解决了原钢框架锚固系统传力集中、后锚梁底面与混凝土分离形成裂缝的问题,后锚梁与混凝土结合成整体不会形成裂缝;能多途径分散传力,改善应力集中,受力可靠;维护工作量小,有利于结构耐久。
本发明已在武汉杨泗港长江大桥上得到应用,取得了良好效果。
Claims (3)
1.多面承压抗拔组合传力主缆锚固结构,其特征在于:后锚梁腹板与缀板焊接成格构式后锚梁,后锚梁腹板外侧上、下缘和之间沿长度方向焊接数道承压板,承压板与后锚梁腹板垂直,承压板之间焊接加劲板,加劲板沿腹板高度方向布置;后锚梁腹板焊接下缘处承压板的底面圆柱头焊钉,圆柱头焊钉与下缘处承压板的底面垂直;格构式后锚梁的两块腹板之间焊接“工”形截面锚杆的水平板形成钢框架;“工”形截面锚杆沿主缆索股中心线布置,锚具设置于“工”形截面锚杆的上端;后锚梁垂直于主缆理论中心线布置。
2.根据权利要求1所述的多面承压抗拔组合传力主缆锚固结构,其特征在于:后锚梁腹板(1)外侧上、下缘和中心处沿长度方向焊接三道承压板(2)。
3.一种权利要求1所述的多面承压抗拔组合传力主缆锚固结构的施工方法,其特征在于:具体步骤如下:
1)在后锚梁腹板下料后,在两块后锚梁腹板的外侧上、下缘和中心处焊接沿后锚梁长度布置的三块承压板;
2)在两块后锚梁腹板边缘焊接缀板,组成格构式后锚梁;
3)在两块后锚梁腹板之间焊接“工”形锚杆水平板,形成钢框架,所述后锚梁垂直于主缆理论中心线布置,“工”形截面锚杆沿主缆索股中心线布置;
4)在后锚梁下缘承压板底面焊接圆柱头焊钉;
5)“工”形截面锚杆的上端设置锚具,构成多面承压抗拔组合传力主缆锚固结构。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610776348.9A CN106284074B (zh) | 2016-08-30 | 2016-08-30 | 一种多面承压抗拔组合传力主缆锚固结构及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610776348.9A CN106284074B (zh) | 2016-08-30 | 2016-08-30 | 一种多面承压抗拔组合传力主缆锚固结构及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106284074A true CN106284074A (zh) | 2017-01-04 |
CN106284074B CN106284074B (zh) | 2018-03-16 |
Family
ID=57673614
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610776348.9A Active CN106284074B (zh) | 2016-08-30 | 2016-08-30 | 一种多面承压抗拔组合传力主缆锚固结构及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106284074B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107386112A (zh) * | 2017-06-23 | 2017-11-24 | 江苏中铁山桥重工有限公司 | 一种聚焦式超长后锚梁的制作方法 |
CN108342982A (zh) * | 2018-02-06 | 2018-07-31 | 中交二公局第二工程有限公司 | 一种混合组合梁斜拉桥缆索吊机承重索梁端自锚结构 |
CN112609586A (zh) * | 2020-12-18 | 2021-04-06 | 中建三局集团有限公司 | 一种钢箱梁自锚悬索桥塔梁同步施工方法 |
CN113174849A (zh) * | 2021-04-02 | 2021-07-27 | 中铁大桥勘测设计院集团有限公司 | 一种新型主缆锚固系统双束锚杆及其安装方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0896108A2 (de) * | 1997-08-05 | 1999-02-10 | Dyckerhoff & Widmann Aktiengesellschaft | Verfahren zum Einbauen und Spannen eines freigespannten Zugglieds und Vorrichtung zum Durchführen des Verfahrens |
CN102261038A (zh) * | 2011-04-28 | 2011-11-30 | 崔冰 | 一种新型悬索桥主缆锚固系统及其单元件 |
CN104846742A (zh) * | 2015-04-23 | 2015-08-19 | 成都科创佳思科技有限公司 | 锚固结构 |
CN105442447A (zh) * | 2015-11-17 | 2016-03-30 | 江苏中矿大正表面工程技术有限公司 | 一种悬索桥型钢锚固系统隔离防护结构 |
-
2016
- 2016-08-30 CN CN201610776348.9A patent/CN106284074B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0896108A2 (de) * | 1997-08-05 | 1999-02-10 | Dyckerhoff & Widmann Aktiengesellschaft | Verfahren zum Einbauen und Spannen eines freigespannten Zugglieds und Vorrichtung zum Durchführen des Verfahrens |
CN102261038A (zh) * | 2011-04-28 | 2011-11-30 | 崔冰 | 一种新型悬索桥主缆锚固系统及其单元件 |
CN104846742A (zh) * | 2015-04-23 | 2015-08-19 | 成都科创佳思科技有限公司 | 锚固结构 |
CN105442447A (zh) * | 2015-11-17 | 2016-03-30 | 江苏中矿大正表面工程技术有限公司 | 一种悬索桥型钢锚固系统隔离防护结构 |
Non-Patent Citations (1)
Title |
---|
崔冰等: "一种新型悬索桥主缆锚固系统设计概念综述", 《中国工程科学》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107386112A (zh) * | 2017-06-23 | 2017-11-24 | 江苏中铁山桥重工有限公司 | 一种聚焦式超长后锚梁的制作方法 |
CN107386112B (zh) * | 2017-06-23 | 2019-03-19 | 江苏中铁山桥重工有限公司 | 一种聚焦式超长后锚梁的制作方法 |
CN108342982A (zh) * | 2018-02-06 | 2018-07-31 | 中交二公局第二工程有限公司 | 一种混合组合梁斜拉桥缆索吊机承重索梁端自锚结构 |
CN108342982B (zh) * | 2018-02-06 | 2020-01-17 | 中交二公局第二工程有限公司 | 一种混合组合梁斜拉桥缆索吊机承重索梁端自锚结构 |
CN112609586A (zh) * | 2020-12-18 | 2021-04-06 | 中建三局集团有限公司 | 一种钢箱梁自锚悬索桥塔梁同步施工方法 |
CN112609586B (zh) * | 2020-12-18 | 2021-12-14 | 中建三局集团有限公司 | 一种钢箱梁自锚悬索桥塔梁同步施工方法 |
CN113174849A (zh) * | 2021-04-02 | 2021-07-27 | 中铁大桥勘测设计院集团有限公司 | 一种新型主缆锚固系统双束锚杆及其安装方法 |
CN113174849B (zh) * | 2021-04-02 | 2022-05-06 | 中铁大桥勘测设计院集团有限公司 | 一种主缆锚固系统双束锚杆及其安装方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106284074B (zh) | 2018-03-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106284074A (zh) | 一种多面承压抗拔组合传力主缆锚固结构及其施工方法 | |
CN103061261B (zh) | 斜拉桥混凝土主梁用锚拉板组件 | |
WO2019033477A1 (zh) | 一种高抗拉强度抗震连接件及抗震支吊架 | |
CN104233962A (zh) | 一种悬索桥主缆索补强加固方法 | |
CN203593944U (zh) | 一种钢棒吊杆与混凝土的连接结构 | |
JP2019132119A (ja) | 重ね梁の性能を上げる構造 | |
CN105887680A (zh) | 一种混合索梁锚固结构 | |
CN203080411U (zh) | 斜拉桥混凝土主梁用锚拉板组件 | |
CN108104335B (zh) | 一种幕墙的装配式柔性干挂体系 | |
CN202658867U (zh) | 悬挑式建筑平台 | |
CN205421695U (zh) | 一种钢结构板 | |
WO2018196453A1 (zh) | 塔吊爬升框与结构支撑梁合一的机械装置及其使用方法 | |
CN205590111U (zh) | 一种施工电梯附墙结构 | |
CN205590122U (zh) | 施工电梯附墙装置 | |
CN205501800U (zh) | 一种实体吊杆与钢箱叠拱拱肋及系梁的连接结构 | |
CN204662937U (zh) | 一种固定于钢结构梁的夹具 | |
CN112095464B (zh) | 钢-混凝土组合梁预制混凝土桥面板的锚固连接装置 | |
CN208733881U (zh) | 一种设置多道挡风钢桁架的超高层超大跨度单层拉索幕墙 | |
CN207597580U (zh) | 一种钢结构连廊 | |
CN204826220U (zh) | 一种带有u型槽的定位预埋件 | |
CN201990948U (zh) | 一种牵索挂篮弧形首 | |
CN207063676U (zh) | 摇摆式柱脚 | |
CN103884640A (zh) | 一种预应力管道摩阻试验装置及其安装方法 | |
CN203833417U (zh) | 一种高层建筑外用电梯导轨的附着节点 | |
CN203347245U (zh) | 一种内销式钢绞线限位装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |