CN106282459A - A kind of protect ferrum port area bricking beat mud method - Google Patents
A kind of protect ferrum port area bricking beat mud method Download PDFInfo
- Publication number
- CN106282459A CN106282459A CN201610746694.2A CN201610746694A CN106282459A CN 106282459 A CN106282459 A CN 106282459A CN 201610746694 A CN201610746694 A CN 201610746694A CN 106282459 A CN106282459 A CN 106282459A
- Authority
- CN
- China
- Prior art keywords
- mud
- ferrum
- beating
- time
- port area
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B7/00—Blast furnaces
- C21B7/12—Opening or sealing the tap holes
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Containers And Packaging Bodies Having A Special Means To Remove Contents (AREA)
Abstract
The present invention provide a kind of protect ferrum port area bricking beat mud method, when blocking up after being specifically included in the ferrum mouth splash of blast furnace casting later stage, by clay gun, stemming is squeezed into the 80~85 of normal mud amount for the first time, beating the mud time is 12~14s, and beating mud pressure is 10~13MPa;Beating for the first time interval 20s after mud terminates, second time squeezes into remaining 15~20 mud amount in step 1, and beating the mud time is 2s, and beating mud pressure is 12~15MPa, and the maintenance ferrum mouth degree of depth is 2~2.2m.The present invention beats mud method by twice dozen of mud of employing, improve ferrum mouth qualification rate, ferrum mouth qualification rate is promoted to 97.2% after implementing by 80.1% before implementing, the ferrum saliva temperature difference is stable at 1.4~1.5 DEG C, effect is especially pronounced, and the ferrum mouth degree of depth is steadily in the long term more than 2 meters, and taphole mud bag is stable, ferrum port area gas fire is effectively controlled, effectively closure ferrum port area gas passage.
Description
Technical field
The invention belongs to metallurgical technology field, be specifically related to a kind of protect ferrum port area bricking beat mud method.
Background technology
Blast furnace was blocked up and is used stemming disposably to squeeze in ferrum mouth passage by clay gun in the past, formed mud drum to protect ferrum mouth region
The operational approach of territory bricking.This operational approach is stable in the ferrum mouth degree of depth, gas leak amount hour is just able to maintain that in ferrum mouth passage
Normal blast fumance;Once arriving the stove labour later stage, cupola well ferrum port area corrodes serious, and ferrum port area is difficult to row and becomes mud drum, and ferrum mouth is deep
Degree maintenance difficulties is big, affects blast furnace safety simultaneously and produces.
Summary of the invention
The present invention provide a kind of protect ferrum port area bricking beat mud method, to solve in prior art after blast furnace casting
When blocking up after phase ferrum mouth splash, owing to cupola well ferrum port area corrodes serious, ferrum port area is difficult to embark on journey the problem of mud drum.
To this end, the technical solution used in the present invention is: a kind of protect ferrum port area bricking beat mud method, including walking as follows
Rapid:
Step 1: when blocking up after the ferrum mouth splash of blast furnace casting later stage, squeezes into the 80 of normal mud amount by clay gun for the first time by stemming
~85, beating the mud time is 12~14s, and beating mud pressure is 10~13MPa;
Step 2: beat interval 20s after mud terminates for the first time, second time squeezes into remaining 15~20 mud amount in step 1, when beating mud
Between be 2s, beating mud pressure is 12~15MPa, maintain the ferrum mouth degree of depth be 2~2.2m.
Under normal circumstances, when clay gun by stemming after ferrum mouth passage is squeezed in cupola well, its " dead ahead " runs in cupola well burnt
" stop " of charcoal, stemming will spread to surrounding along furnace wall centered by ferrum mouth rapidly, also can advance to " dead ahead " simultaneously, enter
Entering after the stemming of cupola well runs into incandescent coke, " duricrust " can be formed rapidly in its surface, and along with playing the increase of mud amount, " duricrust " can be by
Gradually pushing ahead, the stemming of follow-up entrance will continue to spread to " duricrust " surrounding, promote " duricrust " surface area to be gradually increased.Along with
The increase of " duricrust " surface area, the mud pressure of beating of clay gun also increases, when mud spray gun plugging pressure reaches to a certain degree or beats mud
Amount is when reaching a certain amount of, and mud drum will basically form owing to hot metal ratio is great, beat mud initial stage mud drum first can upwards, increase forward,
When mud drum " duricrust " area reaches to a certain degree, mud spray gun plugging pressure reach a certain amount of after, mud drum just can increase downwards.Namely
Saying, beating mud later stage mud drum and can be pressed into cupola well and increase downwards, only mud drum can increase downwards, and mud drum can be " raw
Root ".
The invention have the benefit that by use twice dozen of mud beat mud method, it is downward that mud drum can be pressed into cupola well
Increasing, mud drum " is taken root ", improves ferrum mouth qualification rate, and ferrum mouth qualification rate is promoted to 97.2% after implementing by 80.1% before implementing,
The ferrum saliva temperature difference is stable at 1.4~1.5 DEG C, and effect is especially pronounced, and the ferrum mouth degree of depth is steadily in the long term more than 2 meters, and taphole mud bag is steady
Fixed, ferrum port area gas fire is effectively controlled, effectively closure ferrum port area gas passage.
Detailed description of the invention
Below in conjunction with embodiment, the present invention is described in further details.
1, the control of mud amount is played
Mud amount is not enough, easily causes the ferrum mouth degree of depth and does not reaches requirement;When mud amount is excessive, mud drum extends longer in stove, by ferrum
After water floating force, front end can upwards " come back ", and when running into this kind of situation, ferrum mouth easily ruptures, and mud drum is the most easily consolidated simultaneously.This
To maintain the rational ferrum mouth degree of depth when being accomplished by according to normal production be 2~2.2m, dress mud quantity 10~12 pieces are made reasonably
Beat the mud time.
2, mud Stress control is beaten
Being interrupted when beating mud, second time is beaten mud pressure outline and is higher than first time and beats mud pressure, but pressure is the highest not can exceed that clay gun sets
The constant-pressure upper limit 10~15MPa, otherwise can cause stemming not enter, and the mud amount deficiency ferrum mouth degree of depth declines, simultaneously also can be to clay gun
Equipment causes damage.
3, determine interval time
Beating mud too short for interval time, it is unhardened for the first time to squeeze into the stemming in stove, and the stemming that second time is squeezed into enters after in stove not
Can effectively spread to surrounding and lower section, not reach the effect of stable mud drum;As interval time is long, squeeze in stove for the first time
After stemming is fully hardened, secondary mud amount can be caused to can not get through, be likely to cause race mud simultaneously, affect the normal work of ferrum mouth
Making, this is accomplished by being determined by experiment suitable interval time according to different types of stemming.
Embodiment 1
A kind of protect ferrum port area bricking beat mud method, comprise the steps:
Step 1: when blocking up after the ferrum mouth splash of blast furnace casting later stage, clay gun dress mud quantity is 10~12 pieces, by clay gun by big gun
Mud squeezes into for the first time the 85 of dress mud amount, and beating the mud time is 14s, and beating mud pressure is 13MPa;
Step 2: beat for the first time interval 20s after mud terminates, squeeze into remaining 15 mud amounts in step 1 for the second time, beating the mud time is 2
S, beating mud pressure is 15MPa, and maintaining the ferrum mouth degree of depth is 2.2m, it is ensured that during beating mud, ferrum mouth passage can enter mud smoothly, it is ensured that enters
Mud amount.
When second time beats mud, the mud drum squeezed into for the first time and " duricrust " entirety formed will be elapsed forward, make
The stemming that second time is squeezed into spreads along furnace wall to surrounding.While improving the ferrum mouth degree of depth, also mud drum can be played consolidation
Effect.It is high that second time beats mud pressure relatively for the first time, it is possible to increase stemming degree of compaction in ferrum mouth passage, effectively to filling mud drum
The crack of middle appearance blocks, and the gas leak in envelope stifled iron notch passage is played well effect, is more beneficial for normal raw
The maintenance of ferrum mouth during product.
Claims (1)
1. one kind protect ferrum port area bricking beat mud method, it is characterised in that comprise the steps:
Step 1: when blocking up after the ferrum mouth splash of blast furnace casting later stage, squeezes into the 80 of normal mud amount by clay gun for the first time by stemming
~85, beating the mud time is 12~14s, and beating mud pressure is 10~13MPa;
Step 2: beat interval 20s after mud terminates for the first time, second time squeezes into remaining 15~20 mud amount in step 1, when beating mud
Between be 2s, beating mud pressure is 12~15MPa, maintain the ferrum mouth degree of depth be 2~2.2m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610746694.2A CN106282459A (en) | 2016-08-29 | 2016-08-29 | A kind of protect ferrum port area bricking beat mud method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610746694.2A CN106282459A (en) | 2016-08-29 | 2016-08-29 | A kind of protect ferrum port area bricking beat mud method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106282459A true CN106282459A (en) | 2017-01-04 |
Family
ID=57677438
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610746694.2A Pending CN106282459A (en) | 2016-08-29 | 2016-08-29 | A kind of protect ferrum port area bricking beat mud method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106282459A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108329042A (en) * | 2018-05-11 | 2018-07-27 | 鞍钢股份有限公司 | A kind of high nitrogen type titaniferous environmental-protection furnace stemming |
CN111057809A (en) * | 2020-01-21 | 2020-04-24 | 鞍钢股份有限公司 | Mud beating method for quickly recovering drop of mud bag at front end of taphole |
CN113122668A (en) * | 2021-04-16 | 2021-07-16 | 广东韶钢松山股份有限公司 | Blast furnace treatment method and blast furnace |
CN115074470A (en) * | 2022-06-30 | 2022-09-20 | 武汉钢铁有限公司 | Method, device and equipment for determining working state of blast furnace taphole |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104313219A (en) * | 2014-10-21 | 2015-01-28 | 山东钢铁股份有限公司 | Method for solidifying wet mud at tapping hole |
-
2016
- 2016-08-29 CN CN201610746694.2A patent/CN106282459A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104313219A (en) * | 2014-10-21 | 2015-01-28 | 山东钢铁股份有限公司 | Method for solidifying wet mud at tapping hole |
Non-Patent Citations (2)
Title |
---|
张寿荣: "《高炉高效冶炼技术》", 30 April 2015, 冶金工业出版社 * |
高远等: "邯钢5号高炉创新铁口维护降成本", 《南方金属》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108329042A (en) * | 2018-05-11 | 2018-07-27 | 鞍钢股份有限公司 | A kind of high nitrogen type titaniferous environmental-protection furnace stemming |
CN111057809A (en) * | 2020-01-21 | 2020-04-24 | 鞍钢股份有限公司 | Mud beating method for quickly recovering drop of mud bag at front end of taphole |
CN111057809B (en) * | 2020-01-21 | 2022-02-18 | 鞍钢股份有限公司 | Mud beating method for quickly recovering drop of mud bag at front end of taphole |
CN113122668A (en) * | 2021-04-16 | 2021-07-16 | 广东韶钢松山股份有限公司 | Blast furnace treatment method and blast furnace |
CN115074470A (en) * | 2022-06-30 | 2022-09-20 | 武汉钢铁有限公司 | Method, device and equipment for determining working state of blast furnace taphole |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106282459A (en) | A kind of protect ferrum port area bricking beat mud method | |
CN102399926B (en) | Furnace halt residue iron outlet method for middle and large-sized blast furnaces | |
CN103103303B (en) | The residual iron disassembling method of large blast furnace | |
CN110484716A (en) | A kind of method and device enhancing heat exchange between air and sinter bed | |
CN107297473A (en) | Vanadium iron ingot mould and its knotting method for tilt bed smelting furnace | |
CN202214328U (en) | Integral poured structure of bracket, circular beam and inner ring of circular air channel for dry quenching furnace | |
CN107312556A (en) | A kind of brick gas passage mud jacking encapsulating method | |
CN105986050A (en) | Method for quickly increasing resting iron notch depth | |
CN203992295U (en) | Big round billet crystallizer plays cast iron cage | |
CN108080589A (en) | For the knotting method of vanadium iron ingot mould structure | |
CN111778375B (en) | Maintenance method for iron notch of Ou metallurgical furnace | |
CN101851692A (en) | Construction method for curing non-aqueous slurry at normal temperature in blast furnace | |
CN104453828A (en) | Staged fracturing gel breaking time control method for horizontal well | |
CN205079609U (en) | Composite refractory brick | |
WO2015086557A3 (en) | Tap-hole refurbishing | |
CN103743235A (en) | Coreless air pressure thermal-insulating pouring furnace | |
CN204198767U (en) | A kind of furnace stokehole equipment mud gun nozzle | |
CN203474836U (en) | RH refining furnace dip pipe for preventing nitrogen from being added into molten steel | |
CN106753296A (en) | A kind of oil-soluble temporary plugging agent for oil-water well refracturing and preparation method thereof | |
CN106968652A (en) | A kind of auxiliary carbon dioxide is handled up new method | |
CN202954053U (en) | Novel clay gun | |
CN104313219B (en) | A kind of consolidation method of ferrum mouth wattenshlick | |
CN104313216B (en) | Stock level lowering method for iron making blast furnace | |
CN207050437U (en) | A kind of Mg alloy smelting furnace | |
CN205368424U (en) | Submerged RH dip pipe structure of lining brick in preventing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170104 |