CN104313216B CN201410606333.9A CN201410606333A CN104313216B CN 104313216 B CN104313216 B CN 104313216B CN 201410606333 A CN201410606333 A CN 201410606333A CN 104313216 B CN104313216 B CN 104313216B
Authority
CN
China
Prior art keywords
stockline
stock level
fall
blast furnace
furnace wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410606333.9A
Other languages
Chinese (zh)
Other versions
CN104313216A (en
Inventor
李纲
李培言
李春路
刘卫国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Iron and Steel Group Co Ltd SISG
Original Assignee
Shandong Iron and Steel Group Co Ltd SISG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Iron and Steel Group Co Ltd SISG filed Critical Shandong Iron and Steel Group Co Ltd SISG
Priority to CN201410606333.9A priority Critical patent/CN104313216B/en
Publication of CN104313216A publication Critical patent/CN104313216A/en
Application granted granted Critical
Publication of CN104313216B publication Critical patent/CN104313216B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B5/00Making pig-iron in the blast furnace
    • C21B5/006Automatically controlling the process
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B5/00Making pig-iron in the blast furnace
    • C21B5/008Composition or distribution of the charge

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Manufacture Of Iron (AREA)

Abstract

The invention discloses a stock level lowering method for an iron making blast furnace. The method comprises the following steps: 1, previous preparation, to be specific, in one week before a stock level is lowered, blowing edge gas flow of coal gas flow in the blast furnace to a furnace wall and flushing to remove iron slag sticking substances unsteadily hung on the furnace wall; and 2, stock level lowering, wherein in the stock level lowering process, the oxygen enrichment use quantity is 2,500 to 3,000m<3>/h, the temperature of hot blast is higher than or equal to 1,050 DEG C, the theoretical combustion temperature in the front of a tuyere is higher than or equal to 2,500 DEG C and stock level lowering is finished when the stock level is lowered to the position of the tuyere. The method not only can flush the iron slag sticking substances hung on the furnace wall in the stock level lowering process, but also is safe and rapid.

Description

A kind of method of blast furnace fall stockline
Technical field
The invention belongs to maintaining blast furnace technical field, relate to the aspect such as medium-capital overhauling blowing out, the furnace wall thick process of knot, specifically Ground, the present invention is the method for a kind of blast furnace fall stockline.
Background technology
Fall stockline operation is a kind of mode of operation that blast furnace processes that furnace wall dross or blowing out overhaul are conventional.At fall material Before line operation, in order to maintain conditions of blast furnace direct motion and sufficient heat, when the amount of coke that past blast furnace adds is normally to produce 2 times the highest.In fall stockline operating process, for preventing the working of a furnace from fluctuation occurring, general use stop adding oxygen-enriched, Reduce hot blast temperature and reduce the theoretical temperature combustion to 2100-2150 DEG C before air port to 800-850 DEG C.This operation The drawback of mode has: 1) during fall stockline, the coal gas relative temperature toward furnace wall directional spreding is low and coal gas amount is few, It is unfavorable for washing away the slag ferrum adhesive hanging knot on furnace wall;2) because of in blast furnace local Gas Flow big and wash away on furnace wall Local slag ferrum adhesive, the slag ferrum adhesive come off pricks bad tuyere small sleeve, sternly because of low can not the fusing in time of temperature Air port can be made during weight to produce blast.
Summary of the invention
It is an object of the invention to, it is provided that the method for a kind of blast furnace fall stockline, the method is not only able at fall material Line process washes away and hangs the slag ferrum adhesive tied on furnace wall, and safely, quickly.
For reaching above-mentioned purpose, the technical solution used in the present invention is as follows:
The method of a kind of blast furnace fall stockline, said method comprising the steps of:
1) early-stage preparations: starting in the last week at fall stockline, in blast furnace, the edge airflow of Gas Flow blows to furnace wall, punching Brush away and tie acarpous slag ferrum adhesive except hanging on furnace wall;
2) fall stockline: during fall stockline, oxygen-enriched consumption is 2500-3000m3/ h, hot blast temperature >=1050 DEG C, Theoretical temperature combustion >=2500 DEG C before air port, are reduced to tuyere position to stockline and terminate to drop stockline.
Preferably, described oxygen-enriched consumption is 2800m3/h。
In the preliminary preparation of the present invention, by parameter adjustment, the mainly adjustment of feeding system, in protection Under conditions of motive stream, greatly develop edge airflow, wash away to hang on furnace wall and tie acarpous slag ferrum adhesive.
The method applied in the present invention, due to the rising of theoretical temperature combustion so that hangs knot slag ferrum on furnace wall and glues Knot thing progressively upwardly extends fusing from region, air port.And owing to theoretical tuyere combustion temperature is high, local shedding on furnace wall Slag ferrum adhesive be melted when reaching region, air port, reduce prick bad tuyere small sleeve risk.
The step do not addressed in the present invention, all can use conventional method.
Comparing with existing technology, the excellent results of the present invention is as follows:
1) due to oxygen-enriched use so that in blast furnace, oxygen concentration raises, and accelerates the burning velocity of coke, shorten Time of fall stockline;
2) theoretical temperature combustion before air port is brought up to more than 2500 DEG C, the high-temperature region in blast furnace is moved, hang knot and exist Slag ferrum adhesive on furnace wall has been melted less than air port after coming off, and improves the safety of fall stockline;
3) in blast furnace, high-temperature coal airflow scouring hangs knot adhesive on furnace wall, along with the reduction of stockline, on furnace wall Adhesive is progressively washed away cleaning by Gas Flow, and after fall stockline, the adhesive on furnace wall is eliminated.
Detailed description of the invention
With detailed description of the invention, the present invention is further detailed explanation below.
Embodiment 1
The Wall of Blast Furnace dross of Shan Gang group Laiwu iron and steel Xinjiang company limited, calculates and learns in blast-furnace shaft middle and lower part By the annular tumor of 0.6 meter of thickness, the fall stockline method of the present invention is used to carry out dropping stockline.
1) early-stage preparations: starting in the last week at fall stockline, in blast furnace, the edge airflow of Gas Flow blows to furnace wall, punching Brush away and tie acarpous slag ferrum adhesive except hanging on furnace wall;
2) fall stockline: during fall stockline, oxygen-enriched consumption is 2800m3/ h, hot blast temperature >=1050 DEG C, before air port Theoretical temperature combustion >=2500 DEG C, to stockline be reduced to tuyere position terminate drop stockline.
After fall stockline terminates, the annular tumor of 0.6 meter of thickness is removed totally substantially, clearance rate 99%.
It should be noted last that, above example is only in order to illustrate technical scheme and unrestricted.Although With reference to embodiment, the present invention is described in detail, it will be apparent to an ordinarily skilled person in the art that the present invention Technical scheme modify or equivalent, without departure from the spirit and scope of technical solution of the present invention, it is equal Should contain in the middle of scope of the presently claimed invention.

Claims (2)

1. a method for blast furnace fall stockline, said method comprising the steps of:
1) early-stage preparations: starting in the last week at fall stockline, in blast furnace, the edge airflow of Gas Flow blows to furnace wall, punching Brush away and tie acarpous slag ferrum adhesive except hanging on furnace wall;
2) fall stockline: during fall stockline, oxygen-enriched consumption is 2500-3000m3/ h, hot blast temperature >=1050 DEG C, Theoretical temperature combustion >=2500 DEG C before air port, are reduced to tuyere position to stockline and terminate to drop stockline.
2. the method for blast furnace fall stockline as claimed in claim 1, it is characterised in that described oxygen-enriched consumption is 2800m3/h。
CN201410606333.9A 2014-10-31 2014-10-31 Stock level lowering method for iron making blast furnace Active CN104313216B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410606333.9A CN104313216B (en) 2014-10-31 2014-10-31 Stock level lowering method for iron making blast furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410606333.9A CN104313216B (en) 2014-10-31 2014-10-31 Stock level lowering method for iron making blast furnace

Publications (2)

Publication Number Publication Date
CN104313216A CN104313216A (en) 2015-01-28
CN104313216B true CN104313216B (en) 2017-01-11

Family

ID=52368524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410606333.9A Active CN104313216B (en) 2014-10-31 2014-10-31 Stock level lowering method for iron making blast furnace

Country Status (1)

Country Link
CN (1) CN104313216B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111020082A (en) * 2019-11-29 2020-04-17 张家港宏昌钢板有限公司 Method for online treatment of blast furnace accretion

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102041332A (en) * 2010-12-31 2011-05-04 攀钢集团钢铁钒钛股份有限公司 Blowing-out descending stockline control method for blast furnace
CN103468839A (en) * 2013-09-06 2013-12-25 武汉钢铁(集团)公司 Method for removing caked slag with thickness not smaller than 500mm from blast furnace body

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102041332A (en) * 2010-12-31 2011-05-04 攀钢集团钢铁钒钛股份有限公司 Blowing-out descending stockline control method for blast furnace
CN103468839A (en) * 2013-09-06 2013-12-25 武汉钢铁(集团)公司 Method for removing caked slag with thickness not smaller than 500mm from blast furnace body

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《邯钢8号高炉快速停炉降料面实践》;李世杰 等;《炼铁》;20120831;第31卷(第4期);48-50 *
《邯钢917m3高炉停炉实践》;徐俊杰 等;《河北冶金》;20091231(第173期);31-33 *

Also Published As

Publication number Publication date
CN104313216A (en) 2015-01-28

Similar Documents

Publication Publication Date Title
JP5553179B2 (en) Reduction method of spitting in converter decarburization refining.
CN105714006A (en) Method for blast furnace stopping for heavy maintenance
CN104313216B (en) Stock level lowering method for iron making blast furnace
CN106493309A (en) A kind of water pump turbine casting and annealing process
CN106282459A (en) A kind of protect ferrum port area bricking beat mud method
CN106755676A (en) A kind of thick sweep-out method of blast-furnace shaft knot
CN108315514B (en) Blast furnace blow-in charging method
JP5862519B2 (en) Blast furnace operation method
CN107243603A (en) A kind of offshore oil and gas drilling and producing platform casing thin-section casting manufacture method
JP2018070952A (en) Method of blast furnace operation and blast furnace apparatus
CN203333685U (en) Small sleeve of smelting blast furnace
CN105714024A (en) Method for removing steel slag in bottom groove of RH vacuum chamber
CN103114168B (en) Method for removing residual steel slag at converter bottom
CN203923247U (en) A kind of device that improves oxygen rifle nitrogen envelope effect
CN205205162U (en) Brick cooling wall is inlayed to blast furnace
CN105478678A (en) Manufacturing method for axle castings of mining machinery
CN106435071B (en) A kind of method that basicity of slag is adjusted during blast furnace regular inspection
CN106048113A (en) Method for treating large slow materials through blast furnace
JP2016138332A (en) Converter throat sealing device and converter gas recovery method
CN108950117A (en) The skimming tool operating method of high-titanium type vanadium titanium ore
CN104674264A (en) Method for washing inside surface of bi-metallic compound seamless steel pipe with acid by utilizing supporting wheel device
CN105238922B (en) A kind of method of vanadium slag potassiumization roasting
CN104745759B (en) A kind of method for preventing dry dust removal equipment venting of dust explosion during less-slag operation
CN107904349A (en) A kind of top and bottom combined blown converter extraction vanadium method
CN206872901U (en) It is a kind of to be used for metallurgical argon protective device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Gang

Inventor after: Li Peiyan

Inventor after: Li Chunlu

Inventor after: Liu Weiguo

Inventor before: Li Gang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LI GANG TO: LI GANG LI PEIYAN LI CHUNLU LIU WEIGUO

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant