CN106273155A - Thermal insulation board processing integrated mechanism - Google Patents

Thermal insulation board processing integrated mechanism Download PDF

Info

Publication number
CN106273155A
CN106273155A CN201610760197.8A CN201610760197A CN106273155A CN 106273155 A CN106273155 A CN 106273155A CN 201610760197 A CN201610760197 A CN 201610760197A CN 106273155 A CN106273155 A CN 106273155A
Authority
CN
China
Prior art keywords
conveyer belt
thermal insulation
insulation board
double
grinding machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610760197.8A
Other languages
Chinese (zh)
Other versions
CN106273155B (en
Inventor
涂国荣
徐飞
林锋
周玉明
涂鑫豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dingzhou Peng Peng Auto decoration parts manufacturing Co., Ltd.
Original Assignee
Chongqing Kailong Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Kailong Technology Co Ltd filed Critical Chongqing Kailong Technology Co Ltd
Priority to CN201610760197.8A priority Critical patent/CN106273155B/en
Publication of CN106273155A publication Critical patent/CN106273155A/en
Application granted granted Critical
Publication of CN106273155B publication Critical patent/CN106273155B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/02Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor of articles of definite length, i.e. discrete articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C37/00Component parts, details, accessories or auxiliary operations, not covered by group B29C33/00 or B29C35/00
    • B29C37/02Deburring or deflashing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/32Component parts, details or accessories; Auxiliary operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29LINDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
    • B29L2007/00Flat articles, e.g. films or sheets
    • B29L2007/002Panels; Plates; Sheets

Abstract

The invention belongs to field of plastics processing, a kind of thermal insulation board processing integrated mechanism is provided, including plasticator, device for deburring, roughing device, double-ended grinding machine, the first conveyer belt, the second conveyer belt, the 3rd conveyer belt, planetary gear, purge chamber, hothouse and product box, plasticator is the automatic compression molding machine of the disposable multiple part of compression moulding of energy, plasticator includes mechanical hand, 3rd conveyer belt one end is positioned at below mechanical hand, the other end is positioned at above device for deburring, 3rd conveyer belt is provided with cut section, and device for deburring is positioned at roughing device side;First conveyer belt one end is positioned at roughing device side, and the other end offsets with the outlet of double-ended grinding machine, and second conveyer belt one end offsets with the outlet of double-ended grinding machine, and the other end is positioned at the top of product box, and the second conveyer belt sequentially passes through purge chamber and hothouse.Achieve the automatization of thermal insulation board processing, improve production efficiency, reduce production cost.

Description

Thermal insulation board processing integrated mechanism
Technical field
The invention belongs to field of plastics processing, relate to a kind of thermal insulation board processing integrated mechanism.
Background technology
Thermal insulation board is the common part in automobile, plays the most heat insulation effect, prevents the heat that parts produce Amount affect normally working of miscellaneous part, is the properly functioning guarantee of automobile.Thermal insulation board is applied very universal at present, market to every The demand of hot plate is the biggest.
Thermal insulation board just can need to process through operations such as overmolding, burr removing, flat surface grinding degree and cleanings.Molding generally uses Plasticator, the multiple part of the disposable compression moulding of compression moulding function, but each operation is the most separately carried out at present, between the most adjacent operation Distance the most distant, and all pass through artificial, production efficiency is low.As a example by flatness is processed, thermal insulation board needs double Polishing on face grinding machine, planetary gear is placed on grinding machine by current processing mode for manual, then thermal insulation board blank is put into planet In the hole of wheel, manually boot double-ended grinding machine, after completing grinding more manual by thermal insulation board taking-up, and be manually carried out With dry.Also there is no the production line of molding, for improving the production efficiency of thermal insulation board, improve automaticity.
Summary of the invention
The invention is intended to provide a kind of thermal insulation board processing integrated mechanism, to realize the automatization of thermal insulation board processing, improve Production efficiency, reduces production cost.
In order to achieve the above object, the base case of the present invention is as follows: thermal insulation board processing integrated mechanism include plasticator, Device for deburring, roughing device, double-ended grinding machine, the first conveyer belt, the second conveyer belt, the 3rd conveyer belt, planetary gear, cleaning Room, hothouse and product box, described plasticator is the automatic compression molding machine of the disposable multiple part of compression moulding of energy, and described plasticator includes Mechanical hand, described 3rd conveyer belt one end is positioned at below mechanical hand, and the other end is positioned at above device for deburring, on the 3rd conveyer belt Being provided with cut section, device for deburring is positioned at roughing device side;Described first conveyer belt one end is positioned at roughing device side, The other end offsets with the outlet of double-ended grinding machine, and described second conveyer belt one end offsets with the outlet of double-ended grinding machine, the other end Being positioned at the top of product box, the second conveyer belt sequentially passes through purge chamber and hothouse, described planetary gear be positioned at the first conveyer belt, On two conveyer belts and double-ended grinding machine, planetary gear is provided with and the hole of thermal insulation board outline.
Rationale here is that of this programme, plasticator compression moulding goes out multiple thermal insulation board blank, and mechanical hand is many by connecting together Individual thermal insulation board blank presss from both sides out and is dropped on the 3rd conveyer belt, and the cut section of the 3rd conveyer belt, can for being separated by multiple thermal insulation boards Use artificial or special purpose machinery mode to be isolated, and tractable burr are removed.After 3rd conveyer belt will process Thermal insulation board blank is transported to above device for deburring, and thermal insulation board drops in device for deburring under gravity.Burr removing Device constantly rolls, and utilizes to clash into and is removed by the burr being difficult to remove.Workman will go the thermal insulation board of Burr removal in roughing Device is processed, herein for milling, it is also possible to the processing mode after improving with some.Thermal insulation board after roughing is put into by workman In the hole of the planetary gear on the first conveyer belt, the first conveyer belt will be equipped with the planetary gear of thermal insulation board and is transported into double-ended grinding machine and puts down Face degree processing, after flatness machines, the second conveyer belt will be equipped with the planetary gear of thermal insulation board and transports purge chamber to, in this process In, planetary gear is taken out by workman, and thermal insulation board is still on the second conveyer belt.Thermal insulation board passes sequentially through cleaning along with the second conveyer belt Room and hothouse, complete to clean and be dried, drop into product box the most under gravity, in order to carry out packing or entering it The operation that he is necessary.
The advantage of this programme is, drastically increases the automaticity of thermal insulation board processing, improves working (machining) efficiency, fall Low processing cost.Consider each process characteristics in production process, it is provided that a kind of simple and effective integrated mechanism.
Preferred version one: based on scheme preferred, also include can being alternately placed in two immediately below the 3rd conveyer belt Guide plate, two guide plates are connected with two device for deburrings respectively.
The advantage of this programme is, thermal insulation board can enter different device for deburrings, when one of them by guide plate After device for deburring is filled, change another guide plate, thermal insulation board can be made to enter another device for deburring, the burr removing filled Device is started working, it is achieved that Continuous maching, will not delay manufacturing schedule because device for deburring fills.
Preferred version two: based on scheme preferred, described double-ended grinding machine includes grinding face, lower grinding face, OK Star axle and back-up ring, upper grinding face is oppositely arranged with lower grinding face, and planet axis rotates the center being arranged on lower grinding face, back-up ring cincture Lower grinding face, back-up ring is provided with the outlet for loading and unloading, and the first conveyer belt goes out dorsad to Way out transmission, the second conveyer belt Mouth direction is transmitted;Described double-ended grinding machine is provided with some wheels that transmits, and the described wheel that transmits is positioned at the underface of planetary gear.
The principle of this programme is, the first conveyer belt transports planetary gear by exporting the lower grinding face of entrance, planet axis rotational band Dynamic planetary gear revolution, makes another planetary gear can continue by outlet and enters lower grinding face.Meanwhile, transmit wheel rotation to make to be placed with The planetary gear processing part moves, outlet enter the second conveyer belt.Lower grinding face due to the outer beneath portions of planetary gear Part can't be touched, arrange in this position to transmit and take turns the processing that can't affect part.The design transmitting wheel solves row Star-wheel can not enter the problem of the second conveyer belt automatically from double-ended grinding machine, improves the automaticity of mechanism.
Preferred version three: preferably two preferred, described transmission slipping is arranged on double-ended grinding machine, transmit Wheel and upper grinding face connect, and described double-ended grinding machine is provided with the transmission switch triggered by upper grinding face, and described exit is provided with Connect the clutch transmitting wheel with the second conveyer belt,.
The principle of this programme is, after transmitting wheel and the connection of upper grinding face, along with sliding in upper grinding face.Add man-hour, upper mill Bevel slide downward, transmits wheel and moves down therewith, transmits wheel and is less than lower grinding face, now transmits wheel and do not interfere with grinding completely Processing.After machining, upper grinding face moves upward, and transmits wheel and moves upward to equal with surface, lower grinding face the most therewith, this Time trigger and transmit switch, transmit wheel, the first conveyer belt and the second conveyer belt all setting in motions.The purpose of clutch is, exit Transmission wheel near the second conveyer belt is linked by clutch and the second conveyer belt, reaches to transmit the purpose of planetary gear, then goes Star axle rotates and drives planetary gear to move, and this transmits wheel and the second conveyer belt no longer links, and next planetary gear moves to outlet and leans on At nearly second conveyer belt, and linked by clutch and the second conveyer belt, circulate with this.In this programme, transmit wheel, the first transmission The all just motions needs move when of band and the second conveyer belt, save the energy.
Preferred version four: preferably three preferred, described transmit wheel be provided with skid resistant course, described second conveyer belt Being provided with some electric magnet, input and the outfan of each electric magnet are fixed with sheet metal, and the second conveyer belt is near going out One end of mouth arranges two groups of clamping cleats of metals having voltage when the second conveyer belt.
The principle of this programme is, planetary gear is steel material, transmits wheel and planetary gear removal mainly be make use of frictional force, Skid resistant course can guarantee that planetary gear can be smoothly moved out, when needing to remove planetary gear, and the electric magnet energising on the second conveyer belt, make row Star-wheel is attracted on the second conveyer belt, makes this motion more smooth.Clamping cleats of metal is accessed circuit and and transmits switch electrical connection Clamping cleats of metal can be realized and have voltage when the second conveyer belt, trigger after transmitting switch, produce between two groups of clamping cleats of metals Voltage, the second conveyer belt setting in motion, the sheet metal on the electric magnet of outlet is connected with clamping cleats of metal, and electric magnet is energized, Attract planetary gear.And this electric magnet is with the second conveyer belt, being gradually distance from outlet, sheet metal leaves clamping cleats of metal, electromagnetism Ferrum power-off, magnetic force disappears.This programme make electric magnet only near outlet time energising attract planetary gear, remaining electric magnet no power, Save electric energy, also avoid the normal operation of unnecessary magnetic interference simultaneously.
Preferred version five: preferably four preferred, described lower grinding face be provided with control the first conveyer belt The first inductive switch, control the second inductive switch of the second conveyer belt, control the control circuit of planet axis and two meters Number device, the first inductive switch is positioned at the position that the first conveyer belt is corresponding, and the second inductive switch is positioned at the position that the second conveyer belt is corresponding Put;Described control circuit connects the first inductive switch and the second inductive switch, and said two enumerator connects the first transmission respectively Band and the second conveyer belt.
The principle of this programme is, the first inductive switch is set to planetary gear herein and connects to during operating position the most completely Logical, the circuit of the first inductive switch and the first conveyer belt connects, it is achieved that the first conveyer belt only grinds under needs planetary gear enters Just running during bevel.Second inductive switch is set to when planetary gear herein does not has fully out connect, the second inductive switch and the The circuit of two conveyer belts connects, it is achieved that the only just running when needs planetary gear removes of the second conveyer belt.When the first inductive switch When all disconnecting with the second inductive switch, control circuit is energized, and makes planet axis slowly turn an angle, it is simple to carry out next row The feeding of star-wheel or removal.The effect of enumerator is that the number of starts to the first conveyer belt and the second conveyer belt counts, After preventing planetary gear from having changed, the first conveyer belt and the second conveyer belt are also in the situation continuing running.The purpose of this programme is to carry The control system of confession achieves the automatic replacing of planetary gear really intelligence, be operation more without any confusion, and avoid Idle work, has saved cost.
Preferred version six: based on the preferred version of scheme, described purge chamber is provided with flusher, purge chamber's first half section Being provided with cleaning liquid chamber, the second half section is provided with clean water chamber.
The principle of this programme is, it is provided that a kind of cleaning way of purge chamber, the when that thermal insulation board being by purge chamber, and punching The cleaning device first half section ejection cleanout fluid in purge chamber, sprays clear water in the second half section of purge chamber, carries out thermal insulation board sufficiently Rinse.
Preferred version seven: based on the preferred version of scheme, described hothouse is provided with temperature control equipment and air blast dress Put.
The principle of this programme is, it is provided that a kind of dry mode, utilizes heating and air blast two ways to thermal insulation board Being dried, rate of drying is fast, effective.
Preferred version eight: preferably six or the preferred version of preferred version seven, described second conveyer belt is net Shape structure.
The principle of this programme is, the second conveyer belt purge chamber to be passed through and hothouse, and network structure is conducive to heat insulation The flushing of plate and air-drying, and the mobile route of current or air-flow will not be blocked, cancellated second conveyer belt can not Hydrops, will not take cleanout fluid to hothouse from purge chamber.
Accompanying drawing explanation
Fig. 1 is the structure diagram of embodiment of the present invention entirety transfer structure.
Fig. 2 is embodiment of the present invention device for deburring and the structural representation of the 3rd conveyer belt.
Fig. 3 is embodiment of the present invention double-ended grinding machine part transfer structure sketch.
Fig. 4 is embodiment of the present invention double-ended grinding machine partial elevational structural representation.
Fig. 5 is embodiment of the present invention electric magnet and clamping cleats of metal structural representation.
Detailed description of the invention
Below by detailed description of the invention, the present invention is further detailed explanation:
Reference in Figure of description includes: plasticator 1, device for deburring 2, roughing device 3, double-ended grinding machine 4, One conveyer belt the 5, second conveyer belt the 6, the 3rd conveyer belt 7, planetary gear 8, purge chamber 9, hothouse 10, product box 11, cut section 12, Guide plate 13, planet axis 14, lower grinding face 15, outlet 16, upper grinding face 17, back-up ring 18, transmit switch 19, transmit wheel 20, from Clutch 21, electric magnet 22, clamping cleats of metal 23, sheet metal 24, skid resistant course 25.
The present embodiment general construction sketch is as it is shown in figure 1, direction of transfer is as shown in the arrow on conveyer belt in figure.
Plasticator 1 is the automatic compression molding machine 1 of the disposable multiple part of compression moulding of energy, and plasticator 1 includes mechanical hand, and the 3rd transmits Carrying 7 one end to be positioned at below mechanical hand, the other end is positioned at above device for deburring 2.3rd conveyer belt 7 and the company of device for deburring 2 Thermal insulation board, as in figure 2 it is shown, guide plate 13 is positioned at below the 3rd conveyer belt 7, is introduced in device for deburring 2 by access node structure.Set herein Putting two guide plates 13 and device for deburring 2, one adds man-hour, and another mode as shown in Figure 2 is used for holding, two unhairing Limit device 2 alternation.Device for deburring 2 constantly rolls when working, and utilizes to clash into and is removed by the burr being difficult to remove.
3rd conveyer belt 7 is provided with cut section 12, thermal insulation board can be taken out processing herein, uses artificial or special machine Multiple thermal insulation boards are separated by the mode of device, and are removed by tractable burr, finally put back to the 3rd conveyer belt 7, the shifting of thermal insulation board Dynamic direction is as shown in arrow herein.
Device for deburring 2 is positioned at roughing device 3 side;First conveyer belt 5 one end is positioned at roughing device 3 side, separately One end offsets with the outlet 16 of double-ended grinding machine 4.After device for deburring 2 machines, workman uses it for roughing on the spot, than Such as Milling Process.Roughing completes, and thermal insulation board is placed in the planetary gear 8 on the first conveyer belt 5 by workman, and planetary gear 8 sets Having and the hole of thermal insulation board outline, for fixing thermal insulation board man-hour adding, planetary gear 8 is sent to both-end by the first conveyer belt 5 On face grinding machine 4.
After double-ended grinding machine 4 machines, planetary gear 8 enters the second conveyer belt 6, the second conveyer belt 6 together with thermal insulation board For network structure, network structure is conducive to the flushing to thermal insulation board and air-dries, and will not block the shifting of current or air-flow Dynamic route, cancellated second conveyer belt 6 can not hydrops, cleanout fluid will not be taken to hothouse 10 from purge chamber 9.Workman will Planetary gear 8 is taken out, and the most surplus thermal insulation board is on the second conveyer belt 6.
Thermal insulation board first passes through purge chamber 9, and purge chamber 9 is provided with flusher, and purge chamber 9 first half section is provided with cleaning liquid chamber, Second half section is provided with clean water chamber, therefore the first half section that flusher is in purge chamber 9 sprays cleanout fluid, sprays in the second half section of purge chamber 9 Clear water, sufficiently rinses thermal insulation board.
Thermal insulation board passes through hothouse 10 with the second conveyer belt 6 again, and hothouse 10 is provided with temperature control equipment and air-blast device, Utilizing heating and air blast two ways to be dried thermal insulation board, rate of drying is fast, effective.
Finally, thermal insulation board drops into product box 11 under gravity, in order to carries out packing or enter other and is necessary Operation.
The above-mentioned overall process for thermal insulation board processing, elaborates to the structure of double-ended grinding machine 4 below, double-end surface milling The structure of bed 4 is to ensure that the key that the present embodiment operates smoothly, is also difficult point.
The structure of double-ended grinding machine 4 combines Fig. 3 and Fig. 4 explanation, and double-ended grinding machine 4 includes grinding face 17, lower grinding face 15, planet axis 14 and back-up ring 18, upper grinding face 17 is oppositely arranged with lower grinding face 15, and planet axis 14 rotates and is arranged on lower grinding face The center of 15, back-up ring 18 is around lower grinding face 15, and back-up ring 18 is provided with the outlet 16 for loading and unloading, i.e. exports the back-up ring at 16 18 is collapsible, makes planetary gear 8 to skid off from there.Planetary gear 8 is provided with and the hole of thermal insulation board outline, planetary gear 8 On lower grinding face 15, the first conveyer belt 5 and the second conveyer belt 6 all offset with outlet 16, and the first conveyer belt 5 is to exporting 16 directions Transmitting, the second conveyer belt 6 exports 16 directions dorsad and transmits, as shown in 3 arrows in figure.It is designed with below each planetary gear 8 transmitting Wheel 20, transmits wheel 20 and is provided with skid resistant course 25, transmits wheel 20 and is slidably arranged on double-ended grinding machine 4, and and upper grinding face 17 Dynamic.
Double-ended grinding machine 4 is provided with the transmission switch 19 triggered by upper grinding face 17, is additionally additionally added in double-ended grinding machine 4 First inductive switch, the second inductive switch, control circuit sum counter.First inductive switch and the second inductive switch are all disposed within On lower grinding face 15, the first inductive switch is positioned at the position B of the first conveyer belt 5 correspondence, and the second inductive switch is positioned at the second biography Send at the position A of 6 correspondences.First inductive switch and the second inductive switch all use photoinduction to switch.First inductive switch sets Being set to planetary gear 8 at B connect to during operating position the most completely, the circuit of the first inductive switch and the first conveyer belt 5 connects;The Two inductive switches are set to when planetary gear 8 at A does not has fully out connect, the second inductive switch and the circuit of the second conveyer belt 6 Connect.Control circuit is used for controlling planet axis 14 and rotates, and the first inductive switch and the second inductive switch are all accessed by control circuit, Being set to the first inductive switch and time the second inductive switch all disconnects, control circuit connects.Transmit the switch 19 above-mentioned switch of access Main circuit, make the foldings that transmission switch 19 can control whole circuit.Enumerator has two, one with the first conveyer belt 5 Circuit connects, and another is connected with the circuit of the second conveyer belt 6, and energising number of times write down by enumerator.Export and at 16, be provided with clutch 21, make the transmission wheel 20 near the second conveyer belt 6 be operationally connected on clutch 21.Second conveyer belt 6 is provided with some Electric magnet 22, the attachment structure of electric magnet 22 is as it is shown in figure 5, the second conveyer belt 6 arranges two the near one end of outlet 16 Two conveyer belts 6 have the clamping cleats of metal 23 of voltage when moving, the wire two ends of each electric magnet 22 are fixed with sheet metal 24, gold Belong to sheet 24 and can coordinate energising with clamping cleats of metal 23.
The process principle of double-ended grinding machine 4 is, workpiece is placed in the hole of planetary gear 8, upper grinding face 17 and lower grinding face Workpiece is clipped in the middle by 15, and planet axis 14 and planetary gear 8 engage, and planetary gear 8 is rotation and revolution under the drive of planet axis 14, from And drive workpiece to move, make workpiece by upper grinding face 17 and lower grinding face 15 grinding.In the present embodiment, add man-hour every time, transmit Wheel 20, less than lower grinding face 15, does not interferes with processing, transmits switch 19 disconnection, and transmission system will not start, after machining, on Grinding face 17 moves upward, and transmits wheel 20 upward slidings equal as lower grinding face 15, transmits wheel 20 and be connected to clutch 21 at A On, link with the second conveyer belt 6.Go up grinding face 17 simultaneously and trigger transmission switch 19.First inductive switch senses the planet at B The positions that wheel 8 is in setting, the first inductive switch disconnects, the second inductive switch sense at A planetary gear 8 without departing from, second Inductive switch connects, and the second conveyer belt 6 moves, transmission wheel 20 rotation at A, and the planetary gear 8 at A is moved to the second conveyer belt 6.Producing voltage simultaneously between clamping cleats of metal 23, make the electric magnet 22 of correspondence be energized, electric magnet 22 secondary row star-wheel 8 moves to the On two conveyer belts 6.Along with the motion of the second conveyer belt 6, it is always maintained at the electric magnet 22 at outlet 16 and is energized, and remaining is electric The cold state of Magnet 22.
After vacating at A, the second inductive switch disconnects, and now the first inductive switch and the second inductive switch all disconnect, therefore controls Circuit communication, planet axis 14 slowly turns an angle, and makes planetary gear 8 at C move at A, simultaneously the transmission under this planetary gear 8 Wheel 20 is connected on clutch 21.Now vacate at B, therefore the first inductive switch and the connection of the second inductive switch, control circuit is broken Open.First conveyer belt 5 will be equipped with the planetary gear 8 of part to be processed and is sent at B, transmits wheel 20 and the second conveyer belt 6 again by A The planetary gear 8 at place removes.Often being energized once, corresponding enumerator just counts once, and arrives conveyer belt power-off corresponding after six times. After two enumerators all count six times, the replacing of part is fully completed, and processor starts, and upper grinding face 17 moves down out Beginning to process, unison counter resets.After machining, circulate said process.
Having the beneficial effects that of the present embodiment, it is provided that thermal insulation board processing integrated mechanism, the linking between each operation Become tight, drastically increase production efficiency.And consider the feature of each operation, use rational scheme to make whole processing Process is ruly to be carried out, and the design of such as two device for deburring 2 alternately processing, the most such as planetary gear 8 removal is the most double Add planetary gear 8 to double-ended grinding machine 4 while face grinding machine 4, the most farthest saved process time.The present embodiment is also Consider the loss problem of a lot of energy, saved energy cost, and in production process, there is higher automaticity, this A little is the most all huge progress.
Above-described is only embodiments of the invention, and in scheme, the known general knowledge such as concrete structure and/or characteristic is at this Too much describe.It should be pointed out that, for a person skilled in the art, on the premise of without departing from present configuration, also May be made that some deformation and improvement, these also should be considered as protection scope of the present invention, and these are real all without affecting the present invention The effect executed and practical applicability.The protection domain that this application claims should be as the criterion with the content of its claim, description In detailed description of the invention etc. record the content that may be used for explaining claim.

Claims (9)

1. thermal insulation board processing integrated mechanism, it is characterised in that include plasticator, device for deburring, roughing device, double Face grinding machine, the first conveyer belt, the second conveyer belt, the 3rd conveyer belt, planetary gear, purge chamber, hothouse and product box, described pressure Molding machine includes mechanical hand, and described 3rd conveyer belt one end is positioned at below mechanical hand, and the 3rd conveyer belt other end is positioned at burr removing dress Putting top, the 3rd conveyer belt is provided with cut section, and device for deburring is positioned at roughing device side;Described first conveyer belt one end Being positioned at roughing device side, the first conveyer belt other end offsets with the outlet of double-ended grinding machine, described second conveyer belt one end Outlet with double-ended grinding machine offsets, and the second conveyer belt other end is positioned at the top of product box, and the second conveyer belt sequentially passes through clearly Chamber wash and hothouse, described planetary gear is positioned on the first conveyer belt, the second conveyer belt and double-ended grinding machine, planetary gear be provided with The hole of thermal insulation board outline.
Thermal insulation board the most according to claim 1 processing integrated mechanism, it is characterised in that also include can being alternately placed in the 3rd Two guide plates immediately below conveyer belt, two guide plates are connected with two device for deburrings respectively.
Thermal insulation board the most according to claim 1 processing integrated mechanism, it is characterised in that described double-ended grinding machine includes Grinding face, lower grinding face, planet axis and back-up ring, upper grinding face is oppositely arranged with lower grinding face, and planet axis rotates and is arranged on lower mill The center of bevel, back-up ring is around lower grinding face, and back-up ring is provided with the outlet for loading and unloading, and the first conveyer belt passes to Way out Send, the Way out transmission dorsad of the second conveyer belt;Described double-ended grinding machine is provided with some transmission and takes turns, and described transmission wheel is positioned at row The underface of star-wheel.
Thermal insulation board the most according to claim 3 processing integrated mechanism, it is characterised in that described transmission slipping is arranged on On double-ended grinding machine, transmitting wheel and upper grinding face connects, described double-ended grinding machine is provided with the transmission triggered by upper grinding face and opens Closing, described exit is provided with and connects the clutch transmitting wheel with the second conveyer belt.
Thermal insulation board the most according to claim 4 processing integrated mechanism, it is characterised in that described transmission wheel is provided with anti-skidding Layer;Described second conveyer belt is provided with some electric magnet, and input and the outfan of each electric magnet are fixed with sheet metal, Second conveyer belt arranges two groups of clamping cleats of metals having voltage when the second conveyer belt near one end of outlet.
Thermal insulation board the most according to claim 5 processing integrated mechanism, it is characterised in that described lower grinding face is provided with control The first inductive switch of making the first conveyer belt, the second inductive switch controlling the second conveyer belt, control planet axis Control circuit and two enumerators, the first inductive switch is positioned at the position that the first conveyer belt is corresponding, and the second inductive switch is positioned at The position that two conveyer belts are corresponding;Described control circuit connects the first inductive switch and the second inductive switch, said two enumerator Connect the first conveyer belt and the second conveyer belt respectively.
Thermal insulation board the most according to claim 1 processing integrated mechanism, it is characterised in that described purge chamber is provided with flushing dress Putting, purge chamber's first half section is provided with cleaning liquid chamber, and the second half section is provided with clean water chamber.
Thermal insulation board the most according to claim 1 processing integrated mechanism, it is characterised in that described hothouse is provided with temperature control Device processed and air-blast device.
9. process integrated mechanism according to the thermal insulation board described in claim 7 or claim 8, it is characterised in that described second Conveyer belt is network structure.
CN201610760197.8A 2016-08-30 2016-08-30 Thermal insulation board process integration mechanism Expired - Fee Related CN106273155B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610760197.8A CN106273155B (en) 2016-08-30 2016-08-30 Thermal insulation board process integration mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610760197.8A CN106273155B (en) 2016-08-30 2016-08-30 Thermal insulation board process integration mechanism

Publications (2)

Publication Number Publication Date
CN106273155A true CN106273155A (en) 2017-01-04
CN106273155B CN106273155B (en) 2019-02-19

Family

ID=57675300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610760197.8A Expired - Fee Related CN106273155B (en) 2016-08-30 2016-08-30 Thermal insulation board process integration mechanism

Country Status (1)

Country Link
CN (1) CN106273155B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0662365A1 (en) * 1994-01-11 1995-07-12 Michael Voit GmbH Method and apparatus for grinding and/or polishing, in particular the bottom of ceramic ware
CN1234319A (en) * 1998-12-25 1999-11-10 国营建中化工总公司 Grinding automatic production line for uranium dioxide chip
CN101966670A (en) * 2010-09-27 2011-02-09 成都四星液压制造有限公司 Automatic grinding processing production line of magnetic tile
CN203492065U (en) * 2013-08-29 2014-03-19 深圳市普盛旺科技有限公司 Equipment for chamfering and cleaning screen glass of electronic instrument
CN104128853A (en) * 2013-05-02 2014-11-05 东莞精锐电器五金有限公司 Workpiece unloading device and automatic unloading grinding machine
CN204353899U (en) * 2014-12-03 2015-05-27 东莞精明五金科技有限公司 Valve shaft roughly grinds one feeding device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0662365A1 (en) * 1994-01-11 1995-07-12 Michael Voit GmbH Method and apparatus for grinding and/or polishing, in particular the bottom of ceramic ware
CN1234319A (en) * 1998-12-25 1999-11-10 国营建中化工总公司 Grinding automatic production line for uranium dioxide chip
CN101966670A (en) * 2010-09-27 2011-02-09 成都四星液压制造有限公司 Automatic grinding processing production line of magnetic tile
CN104128853A (en) * 2013-05-02 2014-11-05 东莞精锐电器五金有限公司 Workpiece unloading device and automatic unloading grinding machine
CN203492065U (en) * 2013-08-29 2014-03-19 深圳市普盛旺科技有限公司 Equipment for chamfering and cleaning screen glass of electronic instrument
CN204353899U (en) * 2014-12-03 2015-05-27 东莞精明五金科技有限公司 Valve shaft roughly grinds one feeding device

Also Published As

Publication number Publication date
CN106273155B (en) 2019-02-19

Similar Documents

Publication Publication Date Title
CN110026879A (en) A kind of based CMP apparatus and wafer transfer method
CN105690098B (en) A kind of device for the full-automatic bending polishing of shoe rack
CN206201479U (en) Photocuring 3 D-printing production system
CN202367563U (en) Ceramic green brick chamfering machine with silencing and dust absorption functions
CN104551940A (en) Environment-friendly machine for automatically turning, sanding and polishing polyhedrons
CN106216393A (en) A kind of reversible mill with remaining liquid rapid purging device
CN204339512U (en) Environment-friendly type polyhedron automatic turnover sanding polishing machine
CN203509942U (en) Grinding coolant concentrated filtering and chip removal system
CN106273155A (en) Thermal insulation board processing integrated mechanism
CN205110805U (en) Full -automatic bull lathe of forward
CN202725448U (en) Assembly line used in powder spraying process for spin-on filter housing
CN108507331A (en) A kind of high-pressure wash vacuum drying system
CN208312971U (en) A kind of high-pressure wash vacuum drying system
CN202825219U (en) Hot die forging automatic production line
CN205021287U (en) Numerical control lathe's dual sweeps treater
CN207288280U (en) Core box cleaning product line
CN203903326U (en) Processing system applying movable trolley device and movable trolley device for same
CN208680523U (en) Automatic material receiving pendulum material all-in-one machine for powder metallurgy
CN112975427A (en) Electric automation system for chuck production
CN103213427A (en) Full-automatic pen plate gluing machine
CN112605323A (en) Automatic forging production line design integrating forging and heat treatment
CN203371946U (en) Full-automatic pen plate gluing machine
CN209452360U (en) A kind of cleaning, drying equipment of precision bearing
CN208407902U (en) Commutator cleaning equipment
CN108098463B (en) workpiece machining and polishing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200416

Address after: Dingzhou City, Hebei province 073000 Baoding city Dingqu Rd. Tanghe circular economy Industrial Park (North Weiyi Road)

Patentee after: Dingzhou Peng Peng Auto decoration parts manufacturing Co., Ltd.

Address before: 402566 Tongliang City, the streets of the office of the streets of the office of Chongqing Longshan Road, No. 38 (Pu Lu Industrial Park)

Patentee before: CHONGQING KAILONG TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190219

Termination date: 20200830