- CN106270471B CN106270471B CN201610828268.3A CN201610828268A CN106270471B CN 106270471 B CN106270471 B CN 106270471B CN 201610828268 A CN201610828268 A CN 201610828268A CN 106270471 B CN106270471 B CN 106270471B
- Authority
- CN
- China
- Prior art keywords
- steel ladle
- piece
- resistance
- ladle opening
- pouring material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D41/00—Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
- B22D41/02—Linings
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Carbon Steel Or Casting Steel Manufacturing (AREA)
Abstract
The present invention provides to achieve the above object, and the present invention provides a kind of steel ladle opening one-piece casting of resistance to material technique, includes the following steps:Fixing piece is set in the top of the residue pile of steel ladle opening, fixing piece is welded on the flange of steel ladle opening;In the top uniform welding anchoring piece of fixing piece, anchoring piece is made to be arranged in region to be poured;Be placed on residue pile fetal membrane is poured, pouring material poured between loose tool and flange and is poured, at the same shaken using vibrator it is closely knit, until pouring material does not generate bubble;Naturally pouring material is stood, loose tool is removed after its solidification forming;Continue nature and stand pouring material, until the moisture in pouring material fully evaporates.Monolithic castable in the present invention forms an entirety by the anchoring piece of welding, is not easy to peel off, avoids the waste of resistance to material, saves resistance to material cost.
Description
Technical field
The present invention relates to steel ladle opening one-piece casting techniques, more particularly to a kind of steel ladle opening one-piece casting of resistance to material work
Skill.
Background technology
Ladle is called steel ladle, is mainly used for steel mill, Foundry Works, and molten steel is accepted before open hearth, electric furnace or converter, into
Row pours operation, is a kind of container of carrying molten steel and progress external refining, is in connection converter to continuous-casting steel-making production process
Essential transport, external refining and molten steel pour tool.
The resistance to material construction of traditional steel ladle opening, which mostly uses greatly, is laid with one layer of moldable or material for repairing method, inclines in ladle
It is not strong due to being laid with material adhesive force or during overturning, peeling is easy tod produce, steel ladle opening flange is caused to expose.
During refining treatment and the cold steel of ladle are toppled over, steel ladle opening flange is corroded by molten steel, is easy to cause and is worn steel, influences to make steel
Production safety.Domestic major steel mill steel ladle opening all once occurred to wear steel phenomenon caused by flange is corroded by molten steel at present.
Invention content
In view of the foregoing deficiencies of prior art, the technical problem to be solved in the present invention is to provide a kind of steel ladle opening
The one-piece casting of resistance to material technique makes the protective layer of resistance to material being attached on packet mouth flange form an entirety, not easily to fall off.
To achieve the above object, the present invention provides a kind of steel ladle opening one-piece casting of resistance to material technique, includes the following steps:
S1, fixing piece is set above the residue pile of steel ladle opening, the fixing piece is welded on to the flange of steel ladle opening
On;
S2, the top uniform welding anchoring piece in the fixing piece, make the anchoring piece be arranged in region to be poured;
S3, loose tool is installed in the top of the residue pile;
S4, pour into pouring material between the loose tool and the flange and poured, at the same shaken using vibrator it is closely knit,
Until pouring material does not generate bubble;
S5, pouring material is stood naturally, loose tool is removed after its solidification forming;
S6, continue nature standing pouring material, until the moisture in pouring material fully evaporates.
Preferably, in step sl, the fixing piece is the steel plate in circular ring shape, and the fixing piece is welded on the method
On blue inner wall.
Preferably, the fixed plate of vertical display is set on the fixing piece, and the bottom of the fixed plate is welded on described
On fixing piece, the side of the fixed plate is welded on the inner wall of the flange.
Preferably, in step s3, by connecting plate by two semicircle core assemblies connection composition loose tools and by loose tool
It is placed on residue pile.Preferably, in step s 5, pouring material stands 8 hours or more naturally, is torn open after pouring material solidification forming
Except loose tool.
Preferably, in step s 6, wait for that pouring material stands 15 hours or more naturally, until the moisture in pouring material fully steams
Hair.
As described above, the steel ladle opening one-piece casting of resistance to material technique of the present invention, has the advantages that:1, ladle
The method that the resistance to material of packet mouth uses one-piece casting, forms one layer of firm protective layer of resistance to material, it is ensured that steel on steel ladle opening flange
Packet safe handling;2, ladle flange is protected by pouring material, greatly reduces the repair cost of flange;3, one-piece casting material is logical
The anchoring piece for crossing welding forms an entirety, is not easy to peel off, avoids the waste of resistance to material, saves resistance to material cost.
Description of the drawings
Fig. 1 is the partial sectional view of present invention process structure.
Fig. 2 is the vertical view of fixing piece of the present invention and flanged joint.
Fig. 3 is the structural schematic diagram of loose tool.
Fig. 4 is sectional view along A-A in Fig. 3.
Component label instructions
1 residue pile
2 fixing pieces
21 fixed plates
3 flanges
4 loose tools
41 core assemblies
42 connecting plates
43 reinforcing ribs
5 pouring materials
Specific implementation mode
Illustrate that embodiments of the present invention, those skilled in the art can be by this explanations by particular specific embodiment below
Content disclosed by book understands other advantages and effect of the present invention easily.
It should be clear that structure, ratio, size etc. depicted in this specification institute accompanying drawings, only coordinating specification to be taken off
The content shown is not limited to the enforceable qualifications of the present invention so that those skilled in the art understands and reads, therefore
Do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size are not influencing the present invention
Under the effect of can be generated and the purpose that can reach, it should all still fall and obtain the model that can cover in disclosed technology contents
In enclosing.Meanwhile in this specification cited such as "upper", "lower", "left", "right", " centre " term, be merely convenient to chat
That states is illustrated, rather than to limit the scope of the invention, relativeness is altered or modified, and skill is being changed without essence
It is held in art, when being also considered as the enforceable scope of the present invention.
As shown in Figures 1 to 4, the present invention provides a kind of steel ladle opening one-piece casting of resistance to material technique, includes the following steps:
S1, fixing piece 2 is set in the top of the residue pile 1 of steel ladle opening, the fixing piece 2 is welded on steel ladle opening
On flange 3, the fixing piece 2 is generally made of the steel plate of circular ring shape, and the periphery of steel plate is welded on the inner wall of the flange 3
On, it is ensured that the fixing piece 2 will not be fallen from the inner wall of flange 3;
S2, the multiple anchoring pieces of top uniform welding in the fixing piece 2, make multiple anchoring pieces be arranged in and wait pouring
Region, multiple anchoring pieces can form frame structure, can connect into an entirety after so that pouring material 5 is poured by anchoring piece,
Anchoring enhances the connection of pouring material 5 and anchoring piece, and the two can be kept resistance to material whole more secured, be not easy to take off with shared stress
It falls;
S3, loose tool 4 above residue pile 1 is set, makes between the loose tool 4 and the fixing piece 2 that there are spacing, convenient for pouring
Build the filling of material 5;
S4, pouring material 5 is poured between the loose tool 4 and the flange 3 poured, while being shaken using vibrator close
Real, until pouring material 5 does not generate bubble, pouring material 5 need to use high temperature resistant material, prevent during later stage ladle transports molten steel
There is peeling phenomenon;
S5, it waits for that pouring material 5 stands a period of time naturally, until removing loose tool 4 after its solidification forming, prevents damage pouring material
5 shape;
S6, continue naturally to stand pouring material 5, until the moisture in pouring material 5 fully evaporates the baking that can just reach the standard grade.
As shown in Figures 1 to 4, it is preferable that the fixed plate 21 of vertical display, the fixation are set on the fixing piece 2
The bottom of plate 21 is welded on the fixing piece 2, and the side of the fixed plate 21 is welded on the inner wall of the flange 2, described
Fixing piece 2 and the fixed plate 21 are made of steel plate, and fixing piece 2 is fixed on the inner wall of the flange 3, and pouring material 5 is whole
It is connected, the fixing piece 2 is embedded in the inside of pouring material 5, it is ensured that pouring material 5 will not peel off, and the fixed plate 21 is shared
Active force of the pouring material to the fixing piece 2, further ensures that pouring material 5 will not peel off.
As shown in Figures 1 to 4, it is preferable that in step s3, reinforcing rib, reinforcing rib can be vertically arranged on the loose tool 4
43 reinforce the intensity of the loose tool 4, it is ensured that the loose tool 4 will not deform, and the loose tool 4 is circularized by two 41 groups of core assemblies
Structure, loose tool 4 by two connection of core assemblies 41 composition loose tools 4 and is placed on by connecting plate 42 by residue pile when installation
On.
Preferably, in step s 5, pouring material 5 stands 8 hours or more naturally, and tire is removed after 5 solidification forming of pouring material
Pouring material 5 is stood 12 hours by mould 4 naturally in embodiment, and the intensity of forming is preferable, removes loose tool 4, pouring material 5 at this time
Shape will not change.Preferably, in step s 6, wait for that pouring material 5 stands 15 hours or more naturally, until pouring material 5
In moisture fully evaporate, in the present embodiment loose tool 4 remove after, pouring material 5 stands 16 hours naturally, the water in pouring material 5
Divide fully evaporation, at this time can reach the standard grade ladle baking.
A kind of embodiment of the present invention is given below:
The width of fixing piece 2 is 200mm, and the length of fixed plate 21 is 200mm, is highly 80mm, two neighboring fixed plate
Spacing between 21 is 450mm, and the height of pouring material 5 is 175mm on residue pile;The ring width of loose tool 4 is 150mm, height
230mm, diameter 4214mm, thickness 20mm, the thickness 20mm of connecting plate 42, length 210mm, width 150mm;The length of reinforcing rib 43
Spend 120mm, height 150mm.
In conclusion the present invention effectively overcomes various shortcoming in the prior art and has high industrial utilization.
The above-described embodiments merely illustrate the principles and effects of the present invention, and is not intended to limit the present invention.It is any ripe
The personage for knowing this technology can all carry out modifications and changes to above-described embodiment without violating the spirit and scope of the present invention.Cause
This, institute is complete without departing from the spirit and technical ideas disclosed in the present invention by those of ordinary skill in the art such as
At all equivalent modifications or change, should by the present invention claim be covered.
Claims (6)
1. a kind of steel ladle opening one-piece casting of resistance to material technique, it is characterised in that:Include the following steps:
S1, the setting fixing piece (2) above the residue pile (1) of steel ladle opening, steel ladle opening is welded on by the fixing piece (2)
On flange (3);
S2, the top uniform welding anchoring piece in the fixing piece (2), make the anchoring piece be arranged in region to be poured;
S3, loose tool (4) is installed in the top of the residue pile (1);
S4, pouring material (5) is poured between the loose tool (4) and the flange (3) poured, while being shaken using vibrator
It is closely knit, until pouring material (5) does not generate bubble;
S5, pouring material (5) is stood naturally, loose tool (4) is removed after its solidification forming;
S6, continue nature standing pouring material (5), until the moisture in pouring material (5) fully evaporates.
2. the steel ladle opening one-piece casting of resistance to material technique according to claim 1, it is characterised in that:In step sl, described
Fixing piece (2) is the steel plate in circular ring shape, and the fixing piece (2) is welded on the inner wall of the flange (3).
3. the steel ladle opening one-piece casting of resistance to material technique according to claim 1, it is characterised in that:In the fixing piece (2)
The fixed plate (21) of upper setting vertical display, the bottom of the fixed plate (21) are welded on the fixing piece (2), the fixation
The side of plate (21) is welded on the inner wall of the flange (2).
4. the steel ladle opening one-piece casting of resistance to material technique according to claim 1, it is characterised in that:In step s3, pass through
Two semicircle core assemblies (41) are connected composition loose tool (4) and loose tool (4) are placed on residue pile (1) by connecting plate (42)
On.
5. the steel ladle opening one-piece casting of resistance to material technique according to claim 1, it is characterised in that:In step s 5, it pours
Expect that (5) stand 8 hours or more naturally, the dismounting loose tool (4) after pouring material (5) solidification forming.
6. the steel ladle opening one-piece casting of resistance to material technique according to claim 1, it is characterised in that:In step s 6, to be poured
It builds material (5) and stands 15 hours or more naturally, until the moisture in pouring material (5) fully evaporates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610828268.3A CN106270471B (en) | 2016-09-18 | 2016-09-18 | The steel ladle opening one-piece casting of resistance to material technique |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610828268.3A CN106270471B (en) | 2016-09-18 | 2016-09-18 | The steel ladle opening one-piece casting of resistance to material technique |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106270471A CN106270471A (en) | 2017-01-04 |
CN106270471B true CN106270471B (en) | 2018-07-13 |
Family
ID=57711742
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610828268.3A Active CN106270471B (en) | 2016-09-18 | 2016-09-18 | The steel ladle opening one-piece casting of resistance to material technique |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106270471B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110385422A (en) * | 2018-04-16 | 2019-10-29 | 广东韶钢松山股份有限公司 | A kind of building method of steel ladle opening |
CN108543940A (en) * | 2018-05-04 | 2018-09-18 | 武汉精鼎科技股份有限公司 | A kind of molten steel pot of non-bonnet (NB) plate is along masonry construction and construction method |
CN110355356A (en) * | 2019-08-02 | 2019-10-22 | 武汉精鼎科技股份有限公司 | A kind of molten steel pot is along integrated cast structure |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5768265A (en) * | 1980-10-14 | 1982-04-26 | Kurosaki Refract Co Ltd | Metallurgical vessel |
JPS6015056A (en) * | 1983-07-08 | 1985-01-25 | Shinagawa Refract Co Ltd | Method for applying refractories to tundish by hot spraying |
JPH05237645A (en) * | 1992-12-14 | 1993-09-17 | Kawasaki Refract Co Ltd | Method for repairing wall of molten steel ladle |
CN2195396Y (en) * | 1994-05-31 | 1995-04-26 | 本溪冶金高等专科学校 | Intergral lining casting ladle |
CN2910424Y (en) * | 2006-04-07 | 2007-06-13 | 唐山钢铁股份有限公司 | Edge wraping structure for preventing brick from falled and enlarging ap of brick |
CN101767197A (en) * | 2010-01-27 | 2010-07-07 | 莱芜钢铁股份有限公司 | Method for pouring steel ladle working lining |
CN202212570U (en) * | 2011-07-22 | 2012-05-09 | 江苏申源特钢有限公司 | Smelting steel ladle |
CN202387953U (en) * | 2011-12-16 | 2012-08-22 | 振石集团东方特钢股份有限公司 | Duckbill steel ladle |
CN103433473A (en) * | 2013-08-30 | 2013-12-11 | 秦皇岛首秦金属材料有限公司 | Steel ladle edge covering structure |
-
2016
- 2016-09-18 CN CN201610828268.3A patent/CN106270471B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5768265A (en) * | 1980-10-14 | 1982-04-26 | Kurosaki Refract Co Ltd | Metallurgical vessel |
JPS6015056A (en) * | 1983-07-08 | 1985-01-25 | Shinagawa Refract Co Ltd | Method for applying refractories to tundish by hot spraying |
JPH05237645A (en) * | 1992-12-14 | 1993-09-17 | Kawasaki Refract Co Ltd | Method for repairing wall of molten steel ladle |
CN2195396Y (en) * | 1994-05-31 | 1995-04-26 | 本溪冶金高等专科学校 | Intergral lining casting ladle |
CN2910424Y (en) * | 2006-04-07 | 2007-06-13 | 唐山钢铁股份有限公司 | Edge wraping structure for preventing brick from falled and enlarging ap of brick |
CN101767197A (en) * | 2010-01-27 | 2010-07-07 | 莱芜钢铁股份有限公司 | Method for pouring steel ladle working lining |
CN202212570U (en) * | 2011-07-22 | 2012-05-09 | 江苏申源特钢有限公司 | Smelting steel ladle |
CN202387953U (en) * | 2011-12-16 | 2012-08-22 | 振石集团东方特钢股份有限公司 | Duckbill steel ladle |
CN103433473A (en) * | 2013-08-30 | 2013-12-11 | 秦皇岛首秦金属材料有限公司 | Steel ladle edge covering structure |
Also Published As
Publication number | Publication date |
---|---|
CN106270471A (en) | 2017-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106270471B (en) | The steel ladle opening one-piece casting of resistance to material technique | |
CN103878314B (en) | Screw pouring technology | |
CN111659870A (en) | Centrifugal roller die casting tool and casting process thereof | |
CN101722303B (en) | Quick-change tool of continuous production of continuous casting bloom | |
CN202779757U (en) | Integrated-casting duck bill on edge of hot metal ladle | |
CN102328092B (en) | Ferroalloy granulating device and granulating method | |
CN106111970A (en) | A kind of device and method being reduced ladle top slag oxidisability by excessive slag method | |
CN205183761U (en) | Ladle package end pouring structure | |
CN201659283U (en) | Quick change tool for continuous production of continuous casting bloom | |
CN108543940A (en) | A kind of molten steel pot of non-bonnet (NB) plate is along masonry construction and construction method | |
CN102896307A (en) | Torpedo ladle opening sprue bushing repair method | |
CN108031829A (en) | Hot ladle pocket block repairing mould and restorative procedure | |
CN205170881U (en) | Nickelbase superalloy slag separates on cooling groove | |
CN205347458U (en) | Production lean slag jar for ferrovanadium | |
CN205020794U (en) | Slag blocking type casting ladle | |
CN204657468U (en) | A kind of iron and steel bag dry slag hooks bag device | |
JP2544720Y2 (en) | Tuyere structure of gas injection nozzle for molten metal container | |
CN212598853U (en) | Pouring gate brick for casting of vacuum induction furnace | |
CN105588445A (en) | Rapid dismantling method for mixed iron car lining | |
CN108913830A (en) | A kind of slag ladle transported for melting casting residue heat insulating ability | |
US1058158A (en) | Treatment of slag. | |
CN217831835U (en) | Pouring ladle brick structure of anode furnace | |
CN201442299U (en) | Hot metal ladle integral pouring tire mold device | |
JP7404770B2 (en) | Refining ladle | |
CN108405837A (en) | Turbine case shell mould ground level stacked box pouring in vertically clamped moulds gap bridge system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |