CN106270471B - The steel ladle opening one-piece casting of resistance to material technique - Google Patents

The steel ladle opening one-piece casting of resistance to material technique Download PDF

Info

Publication number
CN106270471B
CN106270471B CN201610828268.3A CN201610828268A CN106270471B CN 106270471 B CN106270471 B CN 106270471B CN 201610828268 A CN201610828268 A CN 201610828268A CN 106270471 B CN106270471 B CN 106270471B
Authority
CN
China
Prior art keywords
steel ladle
piece
resistance
ladle opening
pouring material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610828268.3A
Other languages
Chinese (zh)
Other versions
CN106270471A (en
Inventor
陈龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Baosteel Technology Services Co Ltd
Original Assignee
MCC Baosteel Technology Services Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Baosteel Technology Services Co Ltd filed Critical MCC Baosteel Technology Services Co Ltd
Priority to CN201610828268.3A priority Critical patent/CN106270471B/en
Publication of CN106270471A publication Critical patent/CN106270471A/en
Application granted granted Critical
Publication of CN106270471B publication Critical patent/CN106270471B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/02Linings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Abstract

The present invention provides to achieve the above object, and the present invention provides a kind of steel ladle opening one-piece casting of resistance to material technique, includes the following steps:Fixing piece is set in the top of the residue pile of steel ladle opening, fixing piece is welded on the flange of steel ladle opening;In the top uniform welding anchoring piece of fixing piece, anchoring piece is made to be arranged in region to be poured;Be placed on residue pile fetal membrane is poured, pouring material poured between loose tool and flange and is poured, at the same shaken using vibrator it is closely knit, until pouring material does not generate bubble;Naturally pouring material is stood, loose tool is removed after its solidification forming;Continue nature and stand pouring material, until the moisture in pouring material fully evaporates.Monolithic castable in the present invention forms an entirety by the anchoring piece of welding, is not easy to peel off, avoids the waste of resistance to material, saves resistance to material cost.

Description

The steel ladle opening one-piece casting of resistance to material technique
Technical field
The present invention relates to steel ladle opening one-piece casting techniques, more particularly to a kind of steel ladle opening one-piece casting of resistance to material work Skill.
Background technology
Ladle is called steel ladle, is mainly used for steel mill, Foundry Works, and molten steel is accepted before open hearth, electric furnace or converter, into Row pours operation, is a kind of container of carrying molten steel and progress external refining, is in connection converter to continuous-casting steel-making production process Essential transport, external refining and molten steel pour tool.
The resistance to material construction of traditional steel ladle opening, which mostly uses greatly, is laid with one layer of moldable or material for repairing method, inclines in ladle It is not strong due to being laid with material adhesive force or during overturning, peeling is easy tod produce, steel ladle opening flange is caused to expose. During refining treatment and the cold steel of ladle are toppled over, steel ladle opening flange is corroded by molten steel, is easy to cause and is worn steel, influences to make steel Production safety.Domestic major steel mill steel ladle opening all once occurred to wear steel phenomenon caused by flange is corroded by molten steel at present.
Invention content
In view of the foregoing deficiencies of prior art, the technical problem to be solved in the present invention is to provide a kind of steel ladle opening The one-piece casting of resistance to material technique makes the protective layer of resistance to material being attached on packet mouth flange form an entirety, not easily to fall off.
To achieve the above object, the present invention provides a kind of steel ladle opening one-piece casting of resistance to material technique, includes the following steps:
S1, fixing piece is set above the residue pile of steel ladle opening, the fixing piece is welded on to the flange of steel ladle opening On;
S2, the top uniform welding anchoring piece in the fixing piece, make the anchoring piece be arranged in region to be poured;
S3, loose tool is installed in the top of the residue pile;
S4, pour into pouring material between the loose tool and the flange and poured, at the same shaken using vibrator it is closely knit, Until pouring material does not generate bubble;
S5, pouring material is stood naturally, loose tool is removed after its solidification forming;
S6, continue nature standing pouring material, until the moisture in pouring material fully evaporates.
Preferably, in step sl, the fixing piece is the steel plate in circular ring shape, and the fixing piece is welded on the method On blue inner wall.
Preferably, the fixed plate of vertical display is set on the fixing piece, and the bottom of the fixed plate is welded on described On fixing piece, the side of the fixed plate is welded on the inner wall of the flange.
Preferably, in step s3, by connecting plate by two semicircle core assemblies connection composition loose tools and by loose tool It is placed on residue pile.Preferably, in step s 5, pouring material stands 8 hours or more naturally, is torn open after pouring material solidification forming Except loose tool.
Preferably, in step s 6, wait for that pouring material stands 15 hours or more naturally, until the moisture in pouring material fully steams Hair.
As described above, the steel ladle opening one-piece casting of resistance to material technique of the present invention, has the advantages that:1, ladle The method that the resistance to material of packet mouth uses one-piece casting, forms one layer of firm protective layer of resistance to material, it is ensured that steel on steel ladle opening flange Packet safe handling;2, ladle flange is protected by pouring material, greatly reduces the repair cost of flange;3, one-piece casting material is logical The anchoring piece for crossing welding forms an entirety, is not easy to peel off, avoids the waste of resistance to material, saves resistance to material cost.
Description of the drawings
Fig. 1 is the partial sectional view of present invention process structure.
Fig. 2 is the vertical view of fixing piece of the present invention and flanged joint.
Fig. 3 is the structural schematic diagram of loose tool.
Fig. 4 is sectional view along A-A in Fig. 3.
Component label instructions
1 residue pile
2 fixing pieces
21 fixed plates
3 flanges
4 loose tools
41 core assemblies
42 connecting plates
43 reinforcing ribs
5 pouring materials
Specific implementation mode
Illustrate that embodiments of the present invention, those skilled in the art can be by this explanations by particular specific embodiment below Content disclosed by book understands other advantages and effect of the present invention easily.
It should be clear that structure, ratio, size etc. depicted in this specification institute accompanying drawings, only coordinating specification to be taken off The content shown is not limited to the enforceable qualifications of the present invention so that those skilled in the art understands and reads, therefore Do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size are not influencing the present invention Under the effect of can be generated and the purpose that can reach, it should all still fall and obtain the model that can cover in disclosed technology contents In enclosing.Meanwhile in this specification cited such as "upper", "lower", "left", "right", " centre " term, be merely convenient to chat That states is illustrated, rather than to limit the scope of the invention, relativeness is altered or modified, and skill is being changed without essence It is held in art, when being also considered as the enforceable scope of the present invention.
As shown in Figures 1 to 4, the present invention provides a kind of steel ladle opening one-piece casting of resistance to material technique, includes the following steps:
S1, fixing piece 2 is set in the top of the residue pile 1 of steel ladle opening, the fixing piece 2 is welded on steel ladle opening On flange 3, the fixing piece 2 is generally made of the steel plate of circular ring shape, and the periphery of steel plate is welded on the inner wall of the flange 3 On, it is ensured that the fixing piece 2 will not be fallen from the inner wall of flange 3;
S2, the multiple anchoring pieces of top uniform welding in the fixing piece 2, make multiple anchoring pieces be arranged in and wait pouring Region, multiple anchoring pieces can form frame structure, can connect into an entirety after so that pouring material 5 is poured by anchoring piece, Anchoring enhances the connection of pouring material 5 and anchoring piece, and the two can be kept resistance to material whole more secured, be not easy to take off with shared stress It falls;
S3, loose tool 4 above residue pile 1 is set, makes between the loose tool 4 and the fixing piece 2 that there are spacing, convenient for pouring Build the filling of material 5;
S4, pouring material 5 is poured between the loose tool 4 and the flange 3 poured, while being shaken using vibrator close Real, until pouring material 5 does not generate bubble, pouring material 5 need to use high temperature resistant material, prevent during later stage ladle transports molten steel There is peeling phenomenon;
S5, it waits for that pouring material 5 stands a period of time naturally, until removing loose tool 4 after its solidification forming, prevents damage pouring material 5 shape;
S6, continue naturally to stand pouring material 5, until the moisture in pouring material 5 fully evaporates the baking that can just reach the standard grade.
As shown in Figures 1 to 4, it is preferable that the fixed plate 21 of vertical display, the fixation are set on the fixing piece 2 The bottom of plate 21 is welded on the fixing piece 2, and the side of the fixed plate 21 is welded on the inner wall of the flange 2, described Fixing piece 2 and the fixed plate 21 are made of steel plate, and fixing piece 2 is fixed on the inner wall of the flange 3, and pouring material 5 is whole It is connected, the fixing piece 2 is embedded in the inside of pouring material 5, it is ensured that pouring material 5 will not peel off, and the fixed plate 21 is shared Active force of the pouring material to the fixing piece 2, further ensures that pouring material 5 will not peel off.
As shown in Figures 1 to 4, it is preferable that in step s3, reinforcing rib, reinforcing rib can be vertically arranged on the loose tool 4 43 reinforce the intensity of the loose tool 4, it is ensured that the loose tool 4 will not deform, and the loose tool 4 is circularized by two 41 groups of core assemblies Structure, loose tool 4 by two connection of core assemblies 41 composition loose tools 4 and is placed on by connecting plate 42 by residue pile when installation On.
Preferably, in step s 5, pouring material 5 stands 8 hours or more naturally, and tire is removed after 5 solidification forming of pouring material Pouring material 5 is stood 12 hours by mould 4 naturally in embodiment, and the intensity of forming is preferable, removes loose tool 4, pouring material 5 at this time Shape will not change.Preferably, in step s 6, wait for that pouring material 5 stands 15 hours or more naturally, until pouring material 5 In moisture fully evaporate, in the present embodiment loose tool 4 remove after, pouring material 5 stands 16 hours naturally, the water in pouring material 5 Divide fully evaporation, at this time can reach the standard grade ladle baking.
A kind of embodiment of the present invention is given below:
The width of fixing piece 2 is 200mm, and the length of fixed plate 21 is 200mm, is highly 80mm, two neighboring fixed plate Spacing between 21 is 450mm, and the height of pouring material 5 is 175mm on residue pile;The ring width of loose tool 4 is 150mm, height 230mm, diameter 4214mm, thickness 20mm, the thickness 20mm of connecting plate 42, length 210mm, width 150mm;The length of reinforcing rib 43 Spend 120mm, height 150mm.
In conclusion the present invention effectively overcomes various shortcoming in the prior art and has high industrial utilization.
The above-described embodiments merely illustrate the principles and effects of the present invention, and is not intended to limit the present invention.It is any ripe The personage for knowing this technology can all carry out modifications and changes to above-described embodiment without violating the spirit and scope of the present invention.Cause This, institute is complete without departing from the spirit and technical ideas disclosed in the present invention by those of ordinary skill in the art such as At all equivalent modifications or change, should by the present invention claim be covered.

Claims (6)

1. a kind of steel ladle opening one-piece casting of resistance to material technique, it is characterised in that:Include the following steps:
S1, the setting fixing piece (2) above the residue pile (1) of steel ladle opening, steel ladle opening is welded on by the fixing piece (2) On flange (3);
S2, the top uniform welding anchoring piece in the fixing piece (2), make the anchoring piece be arranged in region to be poured;
S3, loose tool (4) is installed in the top of the residue pile (1);
S4, pouring material (5) is poured between the loose tool (4) and the flange (3) poured, while being shaken using vibrator It is closely knit, until pouring material (5) does not generate bubble;
S5, pouring material (5) is stood naturally, loose tool (4) is removed after its solidification forming;
S6, continue nature standing pouring material (5), until the moisture in pouring material (5) fully evaporates.
2. the steel ladle opening one-piece casting of resistance to material technique according to claim 1, it is characterised in that:In step sl, described Fixing piece (2) is the steel plate in circular ring shape, and the fixing piece (2) is welded on the inner wall of the flange (3).
3. the steel ladle opening one-piece casting of resistance to material technique according to claim 1, it is characterised in that:In the fixing piece (2) The fixed plate (21) of upper setting vertical display, the bottom of the fixed plate (21) are welded on the fixing piece (2), the fixation The side of plate (21) is welded on the inner wall of the flange (2).
4. the steel ladle opening one-piece casting of resistance to material technique according to claim 1, it is characterised in that:In step s3, pass through Two semicircle core assemblies (41) are connected composition loose tool (4) and loose tool (4) are placed on residue pile (1) by connecting plate (42) On.
5. the steel ladle opening one-piece casting of resistance to material technique according to claim 1, it is characterised in that:In step s 5, it pours Expect that (5) stand 8 hours or more naturally, the dismounting loose tool (4) after pouring material (5) solidification forming.
6. the steel ladle opening one-piece casting of resistance to material technique according to claim 1, it is characterised in that:In step s 6, to be poured It builds material (5) and stands 15 hours or more naturally, until the moisture in pouring material (5) fully evaporates.
CN201610828268.3A 2016-09-18 2016-09-18 The steel ladle opening one-piece casting of resistance to material technique Active CN106270471B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610828268.3A CN106270471B (en) 2016-09-18 2016-09-18 The steel ladle opening one-piece casting of resistance to material technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610828268.3A CN106270471B (en) 2016-09-18 2016-09-18 The steel ladle opening one-piece casting of resistance to material technique

Publications (2)

Publication Number Publication Date
CN106270471A CN106270471A (en) 2017-01-04
CN106270471B true CN106270471B (en) 2018-07-13

Family

ID=57711742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610828268.3A Active CN106270471B (en) 2016-09-18 2016-09-18 The steel ladle opening one-piece casting of resistance to material technique

Country Status (1)

Country Link
CN (1) CN106270471B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110385422A (en) * 2018-04-16 2019-10-29 广东韶钢松山股份有限公司 A kind of building method of steel ladle opening
CN108543940A (en) * 2018-05-04 2018-09-18 武汉精鼎科技股份有限公司 A kind of molten steel pot of non-bonnet (NB) plate is along masonry construction and construction method
CN110355356A (en) * 2019-08-02 2019-10-22 武汉精鼎科技股份有限公司 A kind of molten steel pot is along integrated cast structure

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5768265A (en) * 1980-10-14 1982-04-26 Kurosaki Refract Co Ltd Metallurgical vessel
JPS6015056A (en) * 1983-07-08 1985-01-25 Shinagawa Refract Co Ltd Method for applying refractories to tundish by hot spraying
JPH05237645A (en) * 1992-12-14 1993-09-17 Kawasaki Refract Co Ltd Method for repairing wall of molten steel ladle
CN2195396Y (en) * 1994-05-31 1995-04-26 本溪冶金高等专科学校 Intergral lining casting ladle
CN2910424Y (en) * 2006-04-07 2007-06-13 唐山钢铁股份有限公司 Edge wraping structure for preventing brick from falled and enlarging ap of brick
CN101767197A (en) * 2010-01-27 2010-07-07 莱芜钢铁股份有限公司 Method for pouring steel ladle working lining
CN202212570U (en) * 2011-07-22 2012-05-09 江苏申源特钢有限公司 Smelting steel ladle
CN202387953U (en) * 2011-12-16 2012-08-22 振石集团东方特钢股份有限公司 Duckbill steel ladle
CN103433473A (en) * 2013-08-30 2013-12-11 秦皇岛首秦金属材料有限公司 Steel ladle edge covering structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5768265A (en) * 1980-10-14 1982-04-26 Kurosaki Refract Co Ltd Metallurgical vessel
JPS6015056A (en) * 1983-07-08 1985-01-25 Shinagawa Refract Co Ltd Method for applying refractories to tundish by hot spraying
JPH05237645A (en) * 1992-12-14 1993-09-17 Kawasaki Refract Co Ltd Method for repairing wall of molten steel ladle
CN2195396Y (en) * 1994-05-31 1995-04-26 本溪冶金高等专科学校 Intergral lining casting ladle
CN2910424Y (en) * 2006-04-07 2007-06-13 唐山钢铁股份有限公司 Edge wraping structure for preventing brick from falled and enlarging ap of brick
CN101767197A (en) * 2010-01-27 2010-07-07 莱芜钢铁股份有限公司 Method for pouring steel ladle working lining
CN202212570U (en) * 2011-07-22 2012-05-09 江苏申源特钢有限公司 Smelting steel ladle
CN202387953U (en) * 2011-12-16 2012-08-22 振石集团东方特钢股份有限公司 Duckbill steel ladle
CN103433473A (en) * 2013-08-30 2013-12-11 秦皇岛首秦金属材料有限公司 Steel ladle edge covering structure

Also Published As

Publication number Publication date
CN106270471A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN106270471B (en) The steel ladle opening one-piece casting of resistance to material technique
CN103878314B (en) Screw pouring technology
CN111659870A (en) Centrifugal roller die casting tool and casting process thereof
CN101722303B (en) Quick-change tool of continuous production of continuous casting bloom
CN202779757U (en) Integrated-casting duck bill on edge of hot metal ladle
CN102328092B (en) Ferroalloy granulating device and granulating method
CN106111970A (en) A kind of device and method being reduced ladle top slag oxidisability by excessive slag method
CN205183761U (en) Ladle package end pouring structure
CN201659283U (en) Quick change tool for continuous production of continuous casting bloom
CN108543940A (en) A kind of molten steel pot of non-bonnet (NB) plate is along masonry construction and construction method
CN102896307A (en) Torpedo ladle opening sprue bushing repair method
CN108031829A (en) Hot ladle pocket block repairing mould and restorative procedure
CN205170881U (en) Nickelbase superalloy slag separates on cooling groove
CN205347458U (en) Production lean slag jar for ferrovanadium
CN205020794U (en) Slag blocking type casting ladle
CN204657468U (en) A kind of iron and steel bag dry slag hooks bag device
JP2544720Y2 (en) Tuyere structure of gas injection nozzle for molten metal container
CN212598853U (en) Pouring gate brick for casting of vacuum induction furnace
CN105588445A (en) Rapid dismantling method for mixed iron car lining
CN108913830A (en) A kind of slag ladle transported for melting casting residue heat insulating ability
US1058158A (en) Treatment of slag.
CN217831835U (en) Pouring ladle brick structure of anode furnace
CN201442299U (en) Hot metal ladle integral pouring tire mold device
JP7404770B2 (en) Refining ladle
CN108405837A (en) Turbine case shell mould ground level stacked box pouring in vertically clamped moulds gap bridge system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant