CN106269980B - A kind of preparation process of seamless steel pipe - Google Patents

A kind of preparation process of seamless steel pipe Download PDF

Info

Publication number
CN106269980B
CN106269980B CN201610759511.0A CN201610759511A CN106269980B CN 106269980 B CN106269980 B CN 106269980B CN 201610759511 A CN201610759511 A CN 201610759511A CN 106269980 B CN106269980 B CN 106269980B
Authority
CN
China
Prior art keywords
steel pipe
pipe
temperature
acid
saponification
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610759511.0A
Other languages
Chinese (zh)
Other versions
CN106269980A (en
Inventor
彭敦林
林虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANJI PENGDA STEEL PIPE Co Ltd
Original Assignee
ANJI PENGDA STEEL PIPE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANJI PENGDA STEEL PIPE Co Ltd filed Critical ANJI PENGDA STEEL PIPE Co Ltd
Priority to CN201610759511.0A priority Critical patent/CN106269980B/en
Publication of CN106269980A publication Critical patent/CN106269980A/en
Application granted granted Critical
Publication of CN106269980B publication Critical patent/CN106269980B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B19/00Tube-rolling by rollers arranged outside the work and having their axes not perpendicular to the axis of the work
    • B21B19/02Tube-rolling by rollers arranged outside the work and having their axes not perpendicular to the axis of the work the axes of the rollers being arranged essentially diagonally to the axis of the work, e.g. "cross" tube-rolling ; Diescher mills, Stiefel disc piercers or Stiefel rotary piercers
    • B21B19/04Rolling basic material of solid, i.e. non-hollow, structure; Piercing, e.g. rotary piercing mills
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/10Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of tubular bodies
    • C21D8/105Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of tubular bodies of ferrous alloys
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C22/00Chemical surface treatment of metallic material by reaction of the surface with a reactive liquid, leaving reaction products of surface material in the coating, e.g. conversion coatings, passivation of metals
    • C23C22/78Pretreatment of the material to be coated
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23GCLEANING OR DE-GREASING OF METALLIC MATERIAL BY CHEMICAL METHODS OTHER THAN ELECTROLYSIS
    • C23G1/00Cleaning or pickling metallic material with solutions or molten salts
    • C23G1/02Cleaning or pickling metallic material with solutions or molten salts with acid solutions
    • C23G1/08Iron or steel
    • C23G1/088Iron or steel solutions containing organic acids

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • General Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Manufacturing & Machinery (AREA)
  • Cleaning And De-Greasing Of Metallic Materials By Chemical Methods (AREA)

Abstract

The present invention relates to a kind of preparation processes of seamless steel pipe, include the following steps:1)Steel pipe pipe centering, then into eleven punch 11;2)Pipe after perforation is made annealing treatment;3)Pickling is carried out with pickle to the pipe after annealing, then carries out phosphatization, saponification and lubricated successively;Saponification liquor used in the saponification process includes petroleum sodium sulfonate, triethanolamine, oleic acid, dodecenylsuccinic acid, benzotriazole, machinery oil;4)Pipe after lubricated is subjected to hot rolling, ageing treatment is carried out after cooling, obtains steel pipe finished product, the processing step of the ageing treatment is that a. steel pipe pipes are put into stove, and temperature rises to 45 60 DEG C, keeps the temperature 0.2 0.5h;B. in-furnace temperature is risen to 150 180 DEG C, handles 0.5 1h;C. in-furnace temperature is down to 110 120 DEG C, keeps the temperature 1 1.5h.The present invention controls the parameter in each step, the bright and clean no pit point of steel pipe surface is high-quality, promotes product lumber recovery, reduces production cost by the way that processing step is rationally arranged.

Description

A kind of preparation process of seamless steel pipe
Technical field
The present invention relates to the preparation field of steel pipe more particularly to a kind of preparation processes of seamless steel pipe.
Background technology
With the continuous development of China's economy, the demand of seamless steel pipe is increasing.The processing technology of seamless steel pipe is such as Application publication number be CN102921763A a kind of seamless steel pipe processing technology, including inspection, pickling, phosphatization, saponification, cold-drawn, Reheating, sizing, back-end crop head, inspection, flaw detection processing, packaging and storage.But the tube quality that such processing method obtains is poor, It is not durable.
For another example the Chinese patent of Patent No. CN102699103 disclosed a kind of 20CrMo steel pipes on October 3rd, 2012 Preparation method, processing step is brief, is beneficial to energy saving consumption, but in production process, often will appear steel pipe internal-surface Or outer surface longitudinal cracking leads to the waste of steel, and martensite obtained once cracking just can not carry out subsequent processing Steel pipe, hardness is very big, and toughness is small, it is difficult to process again.
For this purpose, applicant applied for a kind of martensite steel pipe application No. is 2013105081890 on January 25th, 2013 Preparation method the production of martensite steel pipe's production is solved the problems, such as by the improvement to technique, production cost is low, obtained horse Family name's body tube quality is good, and hardness is low, and toughness is high, is suitble to that it is further processed.But the quality of Malpighian tube is still not Ideal, surface point is on the high side, and product fraction defective is higher.
Invention content
For overcome the deficiencies in the prior art, the present invention provides a kind of preparation process of seamless steel pipe, and preparation process obtains The bright and clean no pit point of steel pipe surface arrived, it is high-quality, product lumber recovery is promoted, production cost is reduced.
In order to reach the goal of the invention, the present invention adopts the following technical scheme that:A kind of preparation work of seamless steel pipe Skill includes the following steps:1)Steel pipe pipe centering, then into eleven punch 11;2)Pipe after perforation is made annealing treatment; 3)Pickling is carried out with pickle to the pipe after annealing, then carries out phosphatization, saponification and lubricated successively;The saponification process Saponification liquor used includes petroleum sodium sulfonate, triethanolamine, oleic acid, dodecenylsuccinic acid, benzotriazole, machinery oil;Profit Sliding processing is handled using the mixture of glass powder, graphite, sodium carbonate;4)Pipe after lubricated is subjected to hot rolling, it is cold But ageing treatment is carried out afterwards, obtains steel pipe finished product, the processing step of the ageing treatment is that a. steel pipe pipes are put into stove, temperature 45-60 DEG C is risen to, 0.2-0.5h is kept the temperature;B. in-furnace temperature is risen to 150-180 DEG C, handles 0.5-1h;C. in-furnace temperature is dropped To 110-120 DEG C, 1-1.5h is kept the temperature.
Applicant has found that the outer surface pit point of steel pipe is on the high side, and such case occurs mostly in actual production In step 3)Later, in process below, these pit points can not also be eliminated, in said program, by saponification Liquid is improved, and can be effectively improved point situation, and combine the ageing treatment of segmented, tube quality is stablized.
Preferably, the saponification liquor is by mass percentage, including petroleum sodium sulfonate 42-55%, triethanolamine 3-9%, Oleic acid 15-20%, dodecenylsuccinic acid 1-8%, benzotriazole 15-20%, surplus are machinery oil.
Preferably, in lubricated, glass powder, graphite, sodium carbonate mass parts be 1-3 parts of glass powder, graphite 0.1-1 Part, 0.1-0.3 parts of sodium carbonate are handled using the lubricant of the formula, can improve the point of steel tube surface.
Preferably, the pickle of the pickling is the mixed liquor of phosphoric acid, citric acid solution, Klorvess Liquid, it is described A concentration of 10-15% of phosphoric acid, a concentration of 30-42% of citric acid solution.
The pickle of said program can improve pickling effect, can the rust on fully erased pipe surface, oxide skin, and will not Corrosive is generated, ensures the concentration of the quality of steel pipe, especially phosphoric acid and citric acid, pickling effect is influenced very big.
Preferably, the volumetric mixture ratio of phosphoric acid in the pickle, citric acid, Klorvess Liquid is 3-5:2:1.
Preferably, the step 3)In pickling temperature be 38-45 DEG C, pickling time 20-25min.
In conjunction with the pickle of this programme, suitable pickling temperature can improve pickling effect, and pickling time is long to be caused Steel pipe overpickling, the pipe surface of overpickling it is thick it is hot-tempered, color is dark, there is round pin hole when serious, when cold rolling, is easy roll banding or broken;Acid Wash it is insufficient if cannot the rust on fully erased pipe surface, oxide skin, obtained steel pipe finished product resistance to corrosion is poor.
Preferably, the pipe after the hot rolling carries out at timeliness after thermal conduction plate and hot roll after natural cooling again Reason.
Preferably, before the phosphorating treatment, pipe is surface-treated using surface treatment liquid, the surface treatment Liquid includes oxalic acid, glacial acetic acid, mixed volume ratio 1:1-5.
The defects of corrosion caused by pipe pickling is uneven can be eliminated by carrying out surface treatment, be improved at phosphatization speed shortening The time is managed, pipe is made to generate the uniform phosphate coating of compact crystallization in parkerizing process, while enhancing corrosion resisting property and improving painting Film adhesive force reduces phosphating dregs.
Preferably, the annealing carries out under vacuum, the pit of steel tube surface can be improved to a certain extent Point defect.
Preferably, the vacuum degree of the annealing vacuum condition is at least 2 × 10-2Pa。
Preferably, the material nickel content that the thermal conduction plate uses is 5%-12%, hot roll material uses 2Cr13NiMo.
It has been found that the generation of pit point, in addition to technologic influence, in Steel Tube Rolling, the thermal conduction plate of process Influence is will also result in hot roll, the thermal conduction plate and hot roll used at present can lead to steel bonding, and pit, shadow are generated in steel tube surface Tube quality is rung, the material of thermal conduction plate, hot roll can be solved the problems, such as this according to this programme.
By implementing above-mentioned technical proposal, the present invention has following advantageous effect:The present invention is by being rationally arranged technique Step controls the parameter in each step, and the bright and clean no pit point of steel pipe surface is high-quality, promotes product lumber recovery, reduces production Cost.
Specific implementation mode
Below by specific embodiment, invention is further described in detail.
Embodiment 1:
A kind of preparation process of seamless steel pipe, includes the following steps:1)It is 15mm, depth 10mm that steel pipe pipe, which punches diameter, Centre bore, punching top is then preheated to 800 DEG C, into eleven punch 11 under conditions of temperature is 1000 DEG C;2)After perforating Pipe be introduced into annealing furnace and made annealing treatment;3)Pipe after annealing is aligned, is then in temperature with pickle 38 DEG C of pickling 20min, pickle are the mixed liquor of phosphoric acid, citric acid solution, Klorvess Liquid, volumetric mixture ratio 3:2:1, In, a concentration of the 10% of phosphoric acid, a concentration of the 30% of citric acid;With the steel pipe after high pressure water washing pickling after pickling, then into Row phosphorating treatment 25min, treatment temperature are 55 DEG C, have handled and have been rinsed well steel tube surface phosphating solution with water, have then carried out soap Change is handled, saponification liquor by mass percentage, including petroleum sodium sulfonate 42%, triethanolamine 3%, oleic acid 15%, laurylene base fourth two Acid 1%, benzotriazole 15%, surplus are machinery oil;Be lubricated processing after saponification process, lubricant include 1 part of glass powder, 0.1 part of graphite, 0.1 part of sodium carbonate;4)Pipe is subjected to hot rolling, ageing treatment is carried out after cooling, obtains seamless steel pipe finished product, institute The processing step for stating ageing treatment is that a. steel pipe pipes are put into stove, and temperature rises to 60 DEG C, keeps the temperature 0.5h;B. by in-furnace temperature liter To 180 DEG C, 1h is handled;C. in-furnace temperature is down to 120 DEG C, keeps the temperature 1.5h.
Embodiment 2:
A kind of preparation process of seamless steel pipe, includes the following steps:1)It is 15mm, depth 10mm that steel pipe pipe, which punches diameter, Centre bore, punching top is then preheated to 800 DEG C, into eleven punch 11 under conditions of temperature is 1000 DEG C;2)After perforating Pipe be introduced into annealing furnace and carry out vacuum annealing process, vacuum degree is 2 × 10-2Pa;3)Pipe after annealing is aligned, Then it is 45 DEG C of pickling 25min in temperature with pickle, pickle is the mixed liquor of phosphoric acid, citric acid solution, Klorvess Liquid, Volumetric mixture ratio is 5:2:1, wherein a concentration of the 15% of phosphoric acid, a concentration of the 42% of citric acid;High pressure water washing is used after pickling Steel pipe after pickling, then pipe surface be surface-treated, surface treatment liquid includes oxalic acid, glacial acetic acid, volume ratio 1:3, Then phosphorating treatment 20min is carried out, treatment temperature is 50 DEG C, has handled and has been rinsed well steel tube surface phosphating solution with water, then Carry out saponification process, saponification liquor by mass percentage, including petroleum sodium sulfonate 55%, triethanolamine 9%, oleic acid 20%, laurylene Base succinic acid 8%, benzotriazole 20%, surplus are machinery oil;It is lubricated processing after saponification process, lubricant includes glass 3 parts of powder, 0.3 part of graphite, 0.2 part of sodium carbonate;4)Pipe is subjected to hot rolling, ageing treatment is carried out after cooling, obtains steel pipe finished product, The processing step of the ageing treatment is that a. steel pipe pipes are put into stove, and temperature rises to 45 DEG C, keeps the temperature 0.2h;B. by in-furnace temperature 150 DEG C are risen to, 0.5h is handled;C. in-furnace temperature is down to 110 DEG C, keeps the temperature 1h.
Embodiment 3:
A kind of preparation process of seamless steel pipe, includes the following steps:1)It is 15mm, depth 10mm that steel pipe pipe, which punches diameter, Centre bore, punching top is then preheated to 800 DEG C, into eleven punch 11 under conditions of temperature is 1000 DEG C;2)After perforating Pipe be introduced into annealing furnace and carry out vacuum annealing process, vacuum degree is 3 × 10-2Pa;3)Pipe after annealing is aligned, Then it is 38 DEG C of pickling 25min in temperature with pickle, pickle is the mixed liquor of phosphoric acid, citric acid solution, Klorvess Liquid, Volumetric mixture ratio is 3:2:1, wherein a concentration of the 15% of phosphoric acid, a concentration of the 30% of citric acid;High pressure water washing is used after pickling Steel pipe after pickling, then pipe surface be surface-treated, surface treatment liquid includes oxalic acid, glacial acetic acid, volume ratio 1:1, Then phosphorating treatment 20min is carried out, treatment temperature is 50 DEG C, has handled and has been rinsed well steel tube surface phosphating solution with water, then Carry out saponification process, saponification liquor by mass percentage, including petroleum sodium sulfonate 55%, triethanolamine 3%, oleic acid 20%, laurylene Base succinic acid 1%, benzotriazole 20%, surplus are machinery oil;It is lubricated processing after saponification process, lubricant includes glass 2 parts of powder, 0.6 part of graphite, 0.3 part of sodium carbonate;4)Pipe is subjected to hot rolling, by thermal conduction plate and hot roll, natural cooling is laggard Row ageing treatment obtains steel pipe finished product, and the material nickel content that the thermal conduction plate uses is 5%-12%, and the present embodiment selects 8%, heat Roll material uses 2Cr13NiMo;The processing step of the ageing treatment is that a. steel pipe pipes are put into stove, and temperature rises to 60 DEG C, keep the temperature 0.2h;B. in-furnace temperature is risen to 180 DEG C, handles 0.5h;C. in-furnace temperature is down to 120 DEG C, keeps the temperature 1h.

Claims (5)

1. a kind of preparation process of seamless steel pipe, which is characterized in that include the following steps:1)Steel pipe pipe centering, then Into eleven punch 11;2)Vacuum annealing process is carried out to the pipe after perforation, vacuum degree is to be at least 2 × 10-2Pa;3)After annealing Pipe carries out pickling with pickle, then carries out phosphatization, saponification and lubricated successively;Saponification liquor used in the saponification process Including petroleum sodium sulfonate, triethanolamine, oleic acid, dodecenylsuccinic acid, benzotriazole, machinery oil;Lubricated uses glass Glass powder, graphite, sodium carbonate mixture handled;4)Pipe after lubricated is subjected to hot rolling, timeliness is carried out after cooling Processing obtains steel pipe finished product, and the processing step of the ageing treatment is that a. steel pipe pipes are put into stove, and temperature rises to 45-60 DEG C, Keep the temperature 0.2-0.5h;B. in-furnace temperature is risen to 150-180 DEG C, handles 0.5-1h;C. in-furnace temperature is down to 110-120 DEG C, Keep the temperature 1-1.5h;
The saponification liquor by mass percentage, including petroleum sodium sulfonate 42-55%, triethanolamine 3-9%, oleic acid 15-20%, ten Dialkylene succinic acid 1-8%, benzotriazole 15-20%, surplus are machinery oil;
The pickle of the pickling is the mixed liquor of phosphoric acid, citric acid solution, Klorvess Liquid, the phosphoric acid it is a concentration of 10-15%, a concentration of 30-42% of citric acid solution;
Pipe after the hot rolling carries out ageing treatment again after thermal conduction plate and hot roll after natural cooling;
For the material nickel content that the thermal conduction plate uses for 5%-12%, hot roll material uses 2Cr13NiMo.
2. a kind of preparation process of seamless steel pipe according to claim 1, which is characterized in that phosphoric acid, lemon in the pickle Lemon acid, Klorvess Liquid volumetric mixture ratio be 3-5:2:1.
3. a kind of preparation process of seamless steel pipe according to claim 1, which is characterized in that step 3)In pickling temperature be 38-45 DEG C, pickling time 20-25min.
4. a kind of preparation process of seamless steel pipe according to claim 1, which is characterized in that before the phosphorating treatment, use Surface treatment liquid is surface-treated pipe, and the surface treatment liquid includes oxalic acid, glacial acetic acid.
5. a kind of preparation process of seamless steel pipe according to claim 4, which is characterized in that the oxalic acid and glacial acetic acid it is mixed It is 1 to close volume ratio:1-5.
CN201610759511.0A 2016-08-30 2016-08-30 A kind of preparation process of seamless steel pipe Active CN106269980B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610759511.0A CN106269980B (en) 2016-08-30 2016-08-30 A kind of preparation process of seamless steel pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610759511.0A CN106269980B (en) 2016-08-30 2016-08-30 A kind of preparation process of seamless steel pipe

Publications (2)

Publication Number Publication Date
CN106269980A CN106269980A (en) 2017-01-04
CN106269980B true CN106269980B (en) 2018-08-24

Family

ID=57676023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610759511.0A Active CN106269980B (en) 2016-08-30 2016-08-30 A kind of preparation process of seamless steel pipe

Country Status (1)

Country Link
CN (1) CN106269980B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108823578A (en) * 2018-06-19 2018-11-16 张家港保税区恒隆钢管有限公司 A kind of seamless steel pipe hollow billet acid cleaning process
CN111036882A (en) * 2019-12-17 2020-04-21 江西云泰铜业有限公司 Method for processing special-shaped copper bar
CN112893470B (en) * 2021-01-20 2022-11-08 杭州淳通新材料科技有限公司 Seamless steel tube forming process

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3311629C2 (en) * 1983-03-28 1986-08-14 Mannesmann AG, 4000 Düsseldorf Process for the production of seamless steel tubes
ZA963198B (en) * 1995-05-16 1996-10-25 Timcal Ltd Lubricant composition for use on workpieces in the hot forming of metals
CN1288227C (en) * 2004-12-30 2006-12-06 周永宽 Lubricant for cold drawing steel pipe
CN101811149B (en) * 2010-04-14 2012-05-23 新兴铸管股份有限公司 Manufacturing method of high alloy seamless steel tube
CN102877075B (en) * 2012-09-20 2014-03-26 吴江市天源塑胶有限公司 Metal surface oil and rust removal agent
CN103521548B (en) * 2013-10-25 2016-06-08 安吉县鹏大钢管有限公司 The preparation method of a kind of martensite steel pipe
CN103820795B (en) * 2014-01-22 2016-03-30 西南林业大学 A kind of compound corrosion inhibitor and preparation method thereof and application
CN104087957A (en) * 2014-07-24 2014-10-08 周彩球 High-efficiency derusting solution for steel derusting
CN105419914A (en) * 2015-11-30 2016-03-23 苏州市宝玛数控设备有限公司 Saponification liquid and preparation method thereof

Also Published As

Publication number Publication date
CN106269980A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN103276297B (en) A kind of self-joining type high strength cord is cored the manufacture method of drilling rod weldless steel tube
CN101623719B (en) Method for manufacturing stainless steel heat transfer pipe of nuclear heat exchanger
CN106269980B (en) A kind of preparation process of seamless steel pipe
CN105478525B (en) A kind of manufacture method for the coiled tubing for including logging cable
CN104307876A (en) Production process of precise seamless steel tube for hydraulic cylinder
CN102248372A (en) Method for producing single-sided composite stainless steel cold rolling base stock
CN103521548A (en) Method for manufacturing martensitic steel tube
CN106544494A (en) A kind of online soft annealing method suitable for 1Cr17Ni2 rustless steel cold pull wires
CN108723712A (en) A kind of high anti-corrosion container super austenitic stainless steel composite plate and preparation method
CN101829703A (en) Martensitic gapless stainless steel tube and manufacturing method thereof
CN105834217A (en) Preparation process of large-diameter duplex stainless steel seamless steel tube and application to oceanographic engineering
CN102861784B (en) Mid-carbon, nickel, chromium, molybdenum and vanadium alloy steel seamless tube and production method therefore
CN107096806A (en) A kind of processing method of high-strength accurate steel pipe
CN110899334A (en) Hollow anchor rod processing method
CN104894432B (en) A kind of 110ksi levels titanium alloy oil pipe and preparation method thereof
CN106282826B (en) A kind of preparation method of seamless pipe for high-pressure pipe connector
CN107012363A (en) A kind of manufacturing process of TC4 titanium alloy oil well pipes
CN102465200A (en) Manufacture method for seamless steel tube
CN106216956B (en) The manufacture method of vehicle transmission central siphon
CN106391715B (en) A kind of preparation process of martensitic seamless steel pipe
CN108145386A (en) A kind of optimization preparation method of LF2 aviations conduit
CN107649840A (en) A kind of production technology of jack adjustment threaded rod
CN106311797B (en) A kind of preparation process of pinion steel seamless pipe
CN104551540A (en) Production method of cold-drawn precise cylinder tube
CN108866315A (en) A kind of water-bath quenching heat treatment method of steel wire

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A preparation process of seamless steel pipe

Effective date of registration: 20211018

Granted publication date: 20180824

Pledgee: Anji green sub branch of Hangzhou United Rural Commercial Bank Co.,Ltd.

Pledgor: ANJI PENGDA STEEL PIPE Co.,Ltd.

Registration number: Y2021330001926

PE01 Entry into force of the registration of the contract for pledge of patent right