CN103521548B - The preparation method of a kind of martensite steel pipe - Google Patents

The preparation method of a kind of martensite steel pipe Download PDF

Info

Publication number
CN103521548B
CN103521548B CN201310508189.0A CN201310508189A CN103521548B CN 103521548 B CN103521548 B CN 103521548B CN 201310508189 A CN201310508189 A CN 201310508189A CN 103521548 B CN103521548 B CN 103521548B
Authority
CN
China
Prior art keywords
steel pipe
martensite steel
temperature
preparation
pipe base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310508189.0A
Other languages
Chinese (zh)
Other versions
CN103521548A (en
Inventor
彭敦林
林虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANJI PENGDA STEEL PIPE Co Ltd
Original Assignee
ANJI PENGDA STEEL PIPE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANJI PENGDA STEEL PIPE Co Ltd filed Critical ANJI PENGDA STEEL PIPE Co Ltd
Priority to CN201310508189.0A priority Critical patent/CN103521548B/en
Publication of CN103521548A publication Critical patent/CN103521548A/en
Application granted granted Critical
Publication of CN103521548B publication Critical patent/CN103521548B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat Treatment Of Articles (AREA)
  • Cleaning And De-Greasing Of Metallic Materials By Chemical Methods (AREA)

Abstract

The present invention discloses the preparation method of a kind of martensite steel pipe, comprises the following steps: 1) martensite steel pipe base hits central hole, then bores a hole; Described piercing temperature is 1000-1200 DEG C; 2) the pipe base after perforation is carried out anneal; 3) the pipe base pickle solution after annealing is carried out pickling, then carry out phosphatization, saponification and swabbing successively; 4) the pipe base after swabbing is carried out cold rolling, obtain martensite steel pipe finished product; Described step 2) annealing process comprise the following steps successively: stove put into by a. steel pipe base, and temperature rises to 750-760 DEG C, insulation 0.5-1.5h; B. in-furnace temperature is risen to 770-820 DEG C, process 3-4h; C. in-furnace temperature is down to 710-730 DEG C, insulation 1.5-2.5h; D. in-furnace temperature is down to 650-700 DEG C, insulation 1.5-2.5h; E. pipe base is come out of the stove, and is cooled to room temperature. This preparation method is reliably simple and easy, and in making, martensite steel pipe does not ftracture, and reduces the learies of pipe base; Obtained martensite tube quality is good, and intensity is low, and toughness is good, is suitable for further processing.

Description

The preparation method of a kind of martensite steel pipe
Technical field
The present invention relates to the preparation field of steel pipe, particularly relate to the preparation method of a kind of martensite steel pipe.
Background technology
Martensite Stainless Steel has good mechanical property and high-temperature oxidation resistance and erosion resistance, so range of application is very wide, but the preparation difficulty of martensite steel pipe is big, the martensite tube quality obtained is poor, not durable, the Chinese patent that the patent No. is CN102699103 discloses the preparation method of a kind of 20CrMo steel pipe on October 3rd, 2012, processing step is brief, it is of value to save energy consumption, but in production process, often there will be steel pipe internal-surface or outside surface longitudinal cracking, once cracking just cannot carry out follow-up processing, cause the waste of steel, and obtained martensite steel pipe, hardness is very big, toughness is little, it is difficult to again process.
Summary of the invention
In order to overcome the deficiencies in the prior art, the present invention provides the preparation method of a kind of martensite steel pipe, and its preparation method can solve the production problem of martensite steel pipe's production, production cost is low, and the martensite tube quality obtained is good, and hardness is low, toughness height, is applicable to it is for further processing.
In order to reach described goal of the invention, the present invention adopts following technical scheme: the preparation method of a kind of martensite steel pipe, it is characterised in that: comprise the following steps: 1) martensite steel pipe base hits central hole, then bores a hole;Described piercing temperature is 1000-1200 DEG C; 2) the pipe base after perforation is carried out anneal; 3) the pipe base pickle solution after annealing is carried out pickling, then carry out phosphatization, saponification and swabbing successively; 4) the pipe base after swabbing is carried out cold rolling, obtain martensite steel pipe finished product; Described step 2) annealing process comprise the following steps successively: stove put into by a. steel pipe base, and temperature rises to 750-760 DEG C, insulation 0.5-1.5h; B. in-furnace temperature is risen to 770-820 DEG C, process 3-4h; C. in-furnace temperature is down to 710-730 DEG C, insulation 1.5-2.5h; D. in-furnace temperature is down to 650-700 DEG C, insulation 1.5-2.5h; E. pipe base is come out of the stove, and is cooled to room temperature.
As preferably, the aperture of described centre hole is more than 15mm, the degree of depth is 10-25mm.
The centre hole of this kind of specification, adaptive with the top of perforation, not easily wear partially, it is to increase piercing efficiency.
As preferably, in annealing process, method of cooling described in step e is Slow cooling in asbestos insulation can.
After coming out of the stove, naturally cooling can cause steel pipe to ftracture, and adopts asbestos insulation can Slow cooling that steel tube surface can be avoided to ftracture.
As preferably, the pickling temperature in described step 3) is 50-60 DEG C, pickling time is 30-50min.
Suitable pickling temperature can improve pickling effect, and pickling time crosses length can cause steel pipe overpickling, the pipe base surface of overpickling slightly hot-tempered, look dark, has circular pin hole time serious, easily glues roller or fragmentation time cold rolling; The insufficient words of pickling can not remove rust, the oxide skin on pipe base surface completely, and the steel pipe finished product resistance to corrosion obtained is poor.
As preferably, the phosphatization temperature in described step 3) is 55-65 DEG C, phosphating time is 15-25min.
Form phosphatize phosphate coat in steel tube surface after bonderizing, play good anticorrosion ability, process 15-25min at 55-65 DEG C and can form 7-10g/m2Phosphatize phosphate coat, existing good preservative effect, can save again high temperature consume energy and phosphatization liquid.
As preferably, described pickle solution is the mixed solution of dilute sulphuric acid and sodium chloride solution.
As preferably, in described pickle solution, the whole volumetric molar concentration of dilute sulphuric acid is 15-20%, described sodium chloride solution final concentration is 4-6%.
The dilute sulphuric acid that the present invention adopts and sodium chloride solution mix as pickle solution, and pickling effect is good, and in conjunction with bonderizing of the present invention, made steel pipe is in cold-rolled process, and cracking rate obviously reduces, and non-corrosibility is better.
As preferably, the pipe base after annealing also being carried out aligning 3-4 time before pickling by described step 3).
The object of aligning is to make the oxide skin of outer surface of tube blank pitch, be convenient to pickling.
As preferably, finished product step 4) obtained carries out ageing treatment in a vacuum furnace.
By implementing above-mentioned technical scheme, it is an advantage of the invention that:
(1) adopting perforation, annealing, pickling, cold rolling flow process to prepare martensite steel pipe, this preparation method is reliably simple and easy, by optimizing annealing process, in making, martensite steel pipe does not ftracture, and obtained martensite tube quality is good, and intensity is low, toughness is good, is suitable for further processing;
(2) piercing temperature is related to the degree of cracking of percentage of perforation and steel pipe, and applicable piercing temperature can ensure piercing efficiency, avoids steel pipe to ftracture, moreover it is possible to avoid the generation of waste product. First by the top preheating of perforation before perforation, perforation effect is better;
(3) annealing process of each processing step parameter of the present invention especially the present invention, steel pipe internal-surface can be overcome or defect that outside surface easily ftractures, this may be owing to steel pipe base first being put into stove 750-760 DEG C of insulation, ensure that steel pipe is consistent with in-furnace temperature, then carry out interim anneal and cooling, make pipe base stable performance.
Embodiment
Below in conjunction with specific embodiment, the present invention is described further.
Embodiment 1:
A preparation method for martensite steel pipe, comprises the following steps: 1) martensite steel pipe base punching footpath is 15mm, and the degree of depth is the centre hole of 10mm, then punching top is preheated to 800 DEG C, bores a hole when temperature is 1000 DEG C; 2) carry out anneal by the pipe base introducing annealing furnace after perforation, comprise the following steps: a. pipe base is introduced in annealing furnace, and temperature rises to 750 DEG C, insulation 1.5h; B. in-furnace temperature is risen to 820 DEG C, process 3h; C. in-furnace temperature is down to naturally 730 DEG C, insulation 2.5h; D. in-furnace temperature is down to naturally 700 DEG C, insulation 1.5h; E. pipe base is come out of the stove, and introduces in asbestos insulation can and slowly cools to room temperature; 3) the pipe base after annealing is carried out aligning 3 times, then with whole volumetric molar concentration be 20% dilute sulphuric acid and final concentration be 5% the pickle solution of sodium chloride solution composition be 60 DEG C of pickling 30min in temperature, afterwards with the steel pipe after high pressure water washing pickling, then bonderizing 25min is carried out, treatment temp is 55 DEG C, process and with water, steel tube surface phosphatization liquid is rinsed well, then carry out saponification process, use glass powder swabbing afterwards; 4) pipe base is carried out cold rolling, obtain martensite steel pipe finished product.
Embodiment 2:
A preparation method for martensite steel pipe, comprises the following steps: 1) martensite steel pipe base punching footpath is 20mm, and the degree of depth is the centre hole of 25mm, then punching top is preheated to 1000 DEG C, bores a hole when temperature is 1200 DEG C; 2) carry out anneal by the pipe base introducing annealing furnace after perforation, comprise the following steps: a. pipe base is introduced in annealing furnace, and temperature rises to 760 DEG C, insulation 0.5h; B. in-furnace temperature is risen to 770 DEG C, process 4h; C. in-furnace temperature is down to naturally 710 DEG C, insulation 2h; D. in-furnace temperature is down to naturally 650 DEG C, insulation 2.5h; E. pipe base is come out of the stove, and introduces in asbestos insulation can and slowly cools to room temperature; 3) the pipe base after annealing is carried out aligning 4 times, then with whole volumetric molar concentration be 15% dilute sulphuric acid and final concentration be 4% the pickle solution of sodium chloride solution composition be 50 DEG C of pickling 50min in temperature, afterwards with the steel pipe after high pressure water washing pickling, then bonderizing 15min is carried out, treatment temp is 65 DEG C, process and with water, steel tube surface phosphatization liquid is rinsed well, then carry out saponification process, use glass powder swabbing afterwards; 4) pipe base is carried out cold rolling, obtain martensite steel pipe finished product.
Embodiment 3:
A preparation method for martensite steel pipe, comprises the following steps: 1) martensite steel pipe base punching footpath is 18mm, and the degree of depth is the centre hole of 20mm, then punching top is preheated to 900 DEG C, bores a hole when temperature is 1100 DEG C; 2) carry out anneal by the pipe base introducing annealing furnace after perforation, comprise the following steps: a. pipe base is introduced in annealing furnace, and temperature rises to 750 DEG C, insulation 1h; B. in-furnace temperature is risen to 800 DEG C, process 3.5h; C. in-furnace temperature is down to naturally 720 DEG C, insulation 1.5h; D. in-furnace temperature is down to naturally 680 DEG C, insulation 2h; E. pipe base is come out of the stove, and introduces in asbestos insulation can and slowly cools to room temperature; 3) the pipe base after annealing is carried out aligning 4 times, then with whole volumetric molar concentration be 18% dilute sulphuric acid and final concentration be 4% the pickle solution of sodium chloride solution composition be 55 DEG C of pickling 40min in temperature, afterwards with the steel pipe after high pressure water washing pickling, then bonderizing 20min is carried out, treatment temp is 60 DEG C, process and with water, steel tube surface phosphatization liquid is rinsed well, then carry out saponification process, use glass powder swabbing afterwards;4) pipe base is carried out cold rolling, obtain martensite steel pipe finished product; 5) carrying out ageing treatment by martensite steel pipe finished product input vacuum oven, vacuum tightness is 10-4Pa��
Embodiment 4:
With the difference of embodiment 1 it is: described pickle solution formula is HF5-8%, HNO310-15%, all the other are water. Described pickling time is 10mim.
Embodiment 5:
With the difference of embodiment 1 being: described bonderizing 10min, treatment temp is 50 DEG C.
Embodiment 6:
With the difference of embodiment 1 it is: described pickle solution formula is HF5-8%, HNO310-15%, all the other are water. Described pickling time is 10mim. Described bonderizing 10min, treatment temp is 50 DEG C.
Comparative example 1:
An existing preparation method for martensite steel pipe, comprises the following steps: 1) martensite steel pipe base hits central hole, bores a hole when temperature is 1000 DEG C; 2) the pipe base after perforation is introduced in annealing furnace, at 800 DEG C of temperature, carry out anneal; 3) to the whole volumetric molar concentration of the pipe base after annealing be 15% dilute sulphuric acid and final concentration be 3% the pickle solution that forms of sodium chloride solution carry out pickling, afterwards with the steel pipe after water flushing pickling, then bonderizing 15min is carried out, treatment temp is 50 DEG C, process and with high pressure water, steel tube surface phosphatization liquid is rinsed well, then carry out saponification process, use glass powder swabbing afterwards; 4) pipe base is carried out cold rolling, obtain martensite steel pipe finished product.
Comparative example 2:
An existing preparation method for martensite steel pipe, comprises the following steps: 1) martensite steel pipe base hits central hole, bores a hole when temperature is 1100 DEG C; 2) the pipe base after perforation is introduced in annealing furnace, at 780 DEG C of temperature, carry out anneal; 3) to the whole volumetric molar concentration of the pipe base after annealing be 13% dilute sulphuric acid and final concentration be 2% the pickle solution that forms of sodium chloride solution carry out pickling, afterwards with the steel pipe after high pressure water washing pickling, then bonderizing 10min is carried out, treatment temp is 50 DEG C, process and with water, steel tube surface phosphatization liquid is rinsed well, then carry out saponification process, use glass powder swabbing afterwards; 4) pipe base is carried out cold rolling, obtain martensite steel pipe finished product.
Hardness (HRC) and the fracture toughness property (K of the martensite steel pipe finished product that embodiment 1-3 and comparative example obtain being of a size of 50*7.5 is sent out by static pressureIC) and 1000 steel pipe finished products in cracking radical detect, detected result is in table 1:
Table 1: the detected result of the martensite steel pipe finished product that different process obtains:
By HRC and KICResult is it will be seen that the martensite steel pipe that martensite steel pipe hardness that the present invention obtains obtains than prior art significantly reduces, and toughness is good, is suitable for further processing; By cracking number: adopting the pickle solution formula in the present invention and pickling temperature and time in conjunction with parkerized time and temperature, the cracking rate obtaining steel pipe significantly reduces.

Claims (7)

1. the preparation method of a martensite steel pipe, it is characterised in that: comprise the following steps: 1) martensite steel pipe base hits central hole, then bores a hole; Described piercing temperature is 1000-1200 DEG C; 2) the martensite steel pipe base after perforation is carried out anneal; 3) the martensite steel pipe base pickle solution after annealing is carried out pickling, then carry out phosphatization, saponification and swabbing successively; 4) the martensite steel pipe base after swabbing is carried out cold rolling, obtain martensite steel pipe finished product;Described step 2) annealing process comprise the following steps: stove put into by a. steel pipe, and temperature rises to 750-760 DEG C, insulation 0.5-1.5h; B. in-furnace temperature is risen to 770-820 DEG C, process 3-4h; C. in-furnace temperature is down to 710-730 DEG C, insulation 1.5-2.5h; D. in-furnace temperature is down to 650-700 DEG C, insulation 1.5-2.5h; E. martensite steel pipe base is come out of the stove, and is cooled to room temperature; Phosphatization temperature in described step 3) is 55-65 DEG C, and phosphating time is 15-25min.
2. the preparation method of a kind of martensite steel pipe according to claim 1, it is characterised in that: the aperture of described centre hole is more than 15mm, and the degree of depth is 10-25mm.
3. the preparation method of a kind of martensite steel pipe according to claim 1, it is characterised in that: in annealing process, described in step e, the method for cooling is Slow cooling in asbestos insulation can.
4. the preparation method of a kind of martensite steel pipe according to claim 1, it is characterised in that: the pickling temperature in described step 3) is 50-60 DEG C, and pickling time is 30-50min.
5. the preparation method of a kind of martensite steel pipe according to claim 1, it is characterised in that: described pickle solution is the mixed solution of dilute sulphuric acid and sodium chloride solution.
6. the preparation method of a kind of martensite steel pipe according to claim 5, it is characterised in that: in described pickle solution, the whole volumetric molar concentration of dilute sulphuric acid is 20-30%, and described sodium chloride solution final concentration is 4-6%.
7. the preparation method of a kind of martensite steel pipe according to claim 1, it is characterised in that: the martensite steel pipe base after annealing also should be carried out aligning 3-4 time before pickling by described step 3).
CN201310508189.0A 2013-10-25 2013-10-25 The preparation method of a kind of martensite steel pipe Active CN103521548B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310508189.0A CN103521548B (en) 2013-10-25 2013-10-25 The preparation method of a kind of martensite steel pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310508189.0A CN103521548B (en) 2013-10-25 2013-10-25 The preparation method of a kind of martensite steel pipe

Publications (2)

Publication Number Publication Date
CN103521548A CN103521548A (en) 2014-01-22
CN103521548B true CN103521548B (en) 2016-06-08

Family

ID=49924105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310508189.0A Active CN103521548B (en) 2013-10-25 2013-10-25 The preparation method of a kind of martensite steel pipe

Country Status (1)

Country Link
CN (1) CN103521548B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103937952B (en) * 2014-03-19 2015-08-19 浙江瑞迈不锈钢管有限公司 A kind of production technique of super-duplex stainless steel steel pipe
CN104525568A (en) * 2014-11-11 2015-04-22 江苏华程工业制管股份有限公司 Machining method of carburized bearing steel seamless steel tube
CN104525569A (en) * 2014-11-11 2015-04-22 江苏华程工业制管股份有限公司 Method for machining spring steel seamless steel tube
CN104451100B (en) * 2014-11-29 2016-08-17 攀钢集团成都钢钒有限公司 A kind of seamless steel pipe heat treatment method
CN106270149A (en) * 2016-08-30 2017-01-04 广西塔锡科技有限公司 A kind of method processing through hole
CN106269980B (en) * 2016-08-30 2018-08-24 安吉县鹏大钢管有限公司 A kind of preparation process of seamless steel pipe
CN106311797B (en) * 2016-08-30 2018-05-22 安吉县鹏大钢管有限公司 A kind of preparation process of pinion steel seamless pipe
CN106282826B (en) * 2016-08-30 2018-04-20 安吉县鹏大钢管有限公司 A kind of preparation method of seamless pipe for high-pressure pipe connector
CN106391715B (en) * 2016-08-30 2018-06-05 安吉县鹏大钢管有限公司 A kind of preparation process of martensitic seamless steel pipe
CN107138533A (en) * 2017-07-13 2017-09-08 射洪县才伦建材有限责任公司 A kind of high steel pipe processing method of lumber recovery
CN109013704A (en) * 2018-08-04 2018-12-18 青岛浩檀汽车配件有限公司 Seamless steel pipe manufacture craft
CN111451313A (en) * 2020-04-13 2020-07-28 四川远方高新装备零部件股份有限公司 Method for processing low-activation martensitic steel C L F-1 steel pipe

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1928128A (en) * 2005-09-08 2007-03-14 内蒙古北方重工业集团有限公司 Ingot slow cool annealing process for low-carbon steel
CN101130830A (en) * 2007-08-15 2008-02-27 唐山建龙实业有限公司 One tenth hardness quenching and tempering and annealing technique for chilled steel strip
CN101372725A (en) * 2007-08-20 2009-02-25 鞍钢股份有限公司 IF steel cage type annealing process
CN102489944A (en) * 2011-11-29 2012-06-13 常熟市无缝钢管有限公司 Processing method of 2Cr13 rectangular pipe

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1928128A (en) * 2005-09-08 2007-03-14 内蒙古北方重工业集团有限公司 Ingot slow cool annealing process for low-carbon steel
CN101130830A (en) * 2007-08-15 2008-02-27 唐山建龙实业有限公司 One tenth hardness quenching and tempering and annealing technique for chilled steel strip
CN101372725A (en) * 2007-08-20 2009-02-25 鞍钢股份有限公司 IF steel cage type annealing process
CN102489944A (en) * 2011-11-29 2012-06-13 常熟市无缝钢管有限公司 Processing method of 2Cr13 rectangular pipe

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
2Cr13不锈钢无缝管生产工艺;赵长华 等;《特钢技术》;19941231;第39-43页 *

Also Published As

Publication number Publication date
CN103521548A (en) 2014-01-22

Similar Documents

Publication Publication Date Title
CN103521548B (en) The preparation method of a kind of martensite steel pipe
CN103710637A (en) Thin-wall super duplex stainless steel seamless tube and production technology thereof
CN101110298B (en) Method for manufacturing positive electrode aluminum foil of electrolytic capacitor
CN103320697B (en) A kind of drill pipe body and manufacture method thereof being applied to ultra deep well operating mode
CN104480409A (en) 06Cr17Ni12Mo2Ti austenitic stainless steel pipe and production process thereof
CN106834913A (en) The corrosion resistance weathering steel and its production method of RE-treated
CN106854733B (en) A kind of manufacturing process of 14Cr17Ni2 stainless steels heavy forging
CN103589837A (en) Stainless steel heat treatment process
CN102851607A (en) 110 ksi-Grade oil sleeve having high resistance to CO2 corrosion and its preparation method
CN104259246B (en) The method producing high strength titanium alloy seamless pipe
CN104862593B (en) The preparation method of ferritic stainless seamless steel tube
CN106378364A (en) Production method for corrugated pipe blank extremely-thin wall stainless steel seamless steel pipe for nuclear power
CN101829703A (en) Martensitic gapless stainless steel tube and manufacturing method thereof
CN105369266A (en) Steel acid washing liquid based on Fenton oxidation reaction and acid washing process
CN106269980B (en) A kind of preparation process of seamless steel pipe
CN104138927B (en) A kind of method of producing titanium alloy tube
CN105586545A (en) Corrosion-resisting alloy material
CN104762455A (en) Special quenching liquid for 50Mn steel and quenching method of 50Mn steel bearing ring
CN103215473A (en) Low-carbon nickel-chromium-molybdenum-niobium alloy stainless-steel seamless pipe
CN105032976A (en) Production method of titanium alloy seamless pipe
CN106311797B (en) A kind of preparation process of pinion steel seamless pipe
CN106282826B (en) A kind of preparation method of seamless pipe for high-pressure pipe connector
CN104625604A (en) Production technology of extremely flat nuts
CN104439963A (en) Nozzle machining technology
CN105063292A (en) Thermal treatment method for 35CrNi3MoV steel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant