CN106253099A - 一种降温电力箱 - Google Patents

一种降温电力箱 Download PDF

Info

Publication number
CN106253099A
CN106253099A CN201610601628.6A CN201610601628A CN106253099A CN 106253099 A CN106253099 A CN 106253099A CN 201610601628 A CN201610601628 A CN 201610601628A CN 106253099 A CN106253099 A CN 106253099A
Authority
CN
China
Prior art keywords
inner shell
casing
electric power
blower fan
power box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610601628.6A
Other languages
English (en)
Inventor
李小福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610601628.6A priority Critical patent/CN106253099A/zh
Publication of CN106253099A publication Critical patent/CN106253099A/zh
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/56Cooling; Ventilation
    • H02B1/565Cooling; Ventilation for cabinets
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/54Anti-seismic devices or installations

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Devices That Are Associated With Refrigeration Equipment (AREA)

Abstract

本发明涉及一种降温电力箱,包括由后板、一对侧板、底板及顶盖构成的箱体及箱门,所述箱体内设置有内壳,所述内壳的体积小于所述的箱体的体积,所述内壳与所述的箱体由绝缘材料一次成型制成;所述箱门上部设置有透明的观察窗;所述箱体的底部设有万向轮;所述箱体的侧板下部设有开口向下的排风口,所述箱体的顶部设有太阳能板,所述内壳的侧板上部设有通风口,所述内壳的通风口处设置有风机;所述内壳的底部还设置有半导体制冷器,所述半导体制冷器和风机均与所述太阳能板通过线路连接。相对现有技术,本发明能有效防雨、防尘、绝缘效果好,散热性能佳,有效缓冲移动过程中产生的震动,提升稳定性。

Description

一种降温电力箱
技术领域
本发明涉及一种电力设备,尤其涉及一种降温电力箱。
背景技术
随着城市建设的发展,城市中架空的电线越来越少,架空电线全部改造成地下电缆使降温电力箱的使用量大大增加,降温电力箱合理的结构设计对城市电力的影响很大,是城市安全供电的重要环节之一。
发明内容
本发明所要解决的技术问题是提供一种降温电力箱,能有效防雨、防尘、绝缘效果好,散热性能佳,有效缓冲移动过程中产生的震动,提升稳定性。
本发明解决上述技术问题的技术方案如下:一种降温电力箱,包括由后板、一对侧板、底板及顶盖构成的箱体及箱门,所述箱体内设置有内壳,所述内壳的体积小于所述的箱体的体积,所述内壳与所述的箱体由绝缘材料一次成型制成;所述箱门上部设置有透明的观察窗;所述箱体的底部设有万向轮;所述箱体的侧板下部设有开口向下的排风口,所述箱体的顶部设有太阳能板,所述内壳的侧板上部设有通风口,所述内壳的内壁顶部设有风机;所述内壳的底部还设置有半导体制冷器,所述半导体制冷器和风机均与所述太阳能板通过线路连接。
本发明的有益效果是:箱体和内壳能实现对电力设备有效防雨、防尘,半导体制冷器和风机形成对角关系,半导体制冷器产生冷气,风机通过通风口排风,能将内壳中的电力设备产生的热气进行高效率排出,能使内壳快速降温,排出热气更加全面和快速,保障内壳中的电力设备高效稳定运行。
在上述技术方案的基础上,本发明还可以做如下改进。
进一步,所述风机为抽风机。
采用上述进一步方案的有益效果是:抽风机运行稳定,使用寿命厂,能对内壳中的热气快速抽出。
进一步,所述太阳能板分别与所述半导体制冷器和风机连接的线路上分别设置有稳压器。
采用上述进一步方案的有益效果是:稳压器能保障半导体制冷器和风机稳定运行,延长半导体制冷器和风机的使用寿命。
进一步,所述的内壳的内壁上设有绝缘层。
采用上述进一步方案的有益效果是:绝缘层能提升本装置的安全性,避免漏电。
进一步,所述箱门外侧的下部设置有多条并列的凸条;且多个所述凸条均呈矩形或半圆形或三角形或梯形。
附图说明
图1为本发明一种降温电力箱的主视图;
图2为本发明一种降温电力箱的内部结构示意图。
附图中,各标号所代表的部件列表如下:
1、箱体,11、排风口,12、太阳能板;
2、箱门,21、观察窗,22、凸条;
3、内壳,31、通风口,32、风机,33、绝缘层,34、半导体制冷器;
4、万向轮。
具体实施方式
以下结合附图对本发明的原理和特征进行描述,所举实例只用于解释本发明,并非用于限定本发明的范围。
如图1和图2所示,一种降温电力箱,包括由后板、一对侧板、底板及顶盖构成的箱体1及箱门2,所述箱体1内设置有内壳3,所述内壳3的体积小于所述的箱体1的体积,所述内壳3与所述的箱体1由绝缘材料一次成型制成;所述箱门2上部设置有透明的观察窗21;所述箱体1的底部设有万向轮4;所述箱体1的侧板下部设有开口向下的排风口11,所述箱体1的顶部设有太阳能板12,所述内壳3的侧板上部设有通风口31,所述内壳3的内壁顶部设有风机32;所述内壳3的底部还设置有半导体制冷器34,所述半导体制冷器34和风机32均与所述太阳能板12通过线路连接;
箱体1和内壳3能实现对电力设备有效防雨和防尘,半导体制冷器34和风机32形成对角关系,半导体制冷器34产生冷气,风机32通过通风口31排风,能将内壳3中的电力设备产生的热气进行高效率排出,能使内壳3快速降温,排出热气更加全面和快速,保障内壳3中的电力设备高效稳定运行。
优选的,所述风机32为抽风机;抽风机运行稳定,使用寿命厂,能对内壳中的热气快速抽出。
优选的,所述太阳能板12分别与所述半导体制冷器34和风机32连接的线路上分别设置有稳压器;稳压器能保障半导体制冷器34和风机32稳定运行,延长半导体制冷器34和风机32的使用寿命。
优选的,所述的内壳3的内壁上设有绝缘层33;绝缘层33能提升本装置的安全性,避免漏电。
优选的,所述箱门2外侧的下部设置有多条并列的凸条22;且多个所述凸条22均呈矩形或半圆形或三角形或梯形。
以上所述仅为本发明的较佳实施例,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (5)

1.一种降温电力箱,其特征在于:包括由后板、一对侧板、底板及顶盖构成的箱体(1)及箱门(2),所述箱体(1)内设置有内壳(3),所述内壳(3)的体积小于所述的箱体(1)的体积,所述内壳(3)与所述的箱体(1)由绝缘材料一次成型制成;所述箱门(2)上部设置有透明的观察窗(21);所述箱体(1)的底部设有万向轮(4);所述箱体(1)的侧板下部设有开口向下的排风口(11),所述箱体(1)的顶部设有太阳能板(12),所述内壳(3)的侧板上部设有通风口(31),所述内壳(3)的通风口(31)处设置有风机(32);所述内壳(3)的底部还设置有半导体制冷器(34),所述半导体制冷器(34)和风机(32)均与所述太阳能板(12)通过线路连接。
2.根据权利要求1所述一种降温电力箱,其特征在于:所述风机(32)为抽风机。
3.根据权利要求1所述一种降温电力箱,其特征在于:所述太阳能板(12)分别与所述半导体制冷器(34)和风机(32)连接的线路上分别设置有稳压器。
4.根据权利要求1所述一种降温电力箱,其特征在于:所述的内壳(3)的内壁上设有绝缘层(33)。
5.根据权利要求1所述一种降温电力箱,其特征在于:所述箱门(2)外侧的下部设置有多条并列的凸条(22);且多个所述凸条(22)均呈矩形或半圆形或三角形或梯形。
CN201610601628.6A 2016-07-27 2016-07-27 一种降温电力箱 Pending CN106253099A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610601628.6A CN106253099A (zh) 2016-07-27 2016-07-27 一种降温电力箱

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610601628.6A CN106253099A (zh) 2016-07-27 2016-07-27 一种降温电力箱

Publications (1)

Publication Number Publication Date
CN106253099A true CN106253099A (zh) 2016-12-21

Family

ID=57604118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610601628.6A Pending CN106253099A (zh) 2016-07-27 2016-07-27 一种降温电力箱

Country Status (1)

Country Link
CN (1) CN106253099A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107359526A (zh) * 2017-08-25 2017-11-17 广西亚泰电力工程有限公司 一种自动降温电力箱
CN107579445A (zh) * 2017-08-25 2018-01-12 广西亚泰电力工程有限公司 一种通电电力箱
CN107591701A (zh) * 2017-08-25 2018-01-16 广西亚泰电力工程有限公司 一种测温电力箱

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030094266A1 (en) * 2001-11-21 2003-05-22 Fritsch Brian D. Cabinet having heat exchanger integrally installed between roof and solar shield
CN203301003U (zh) * 2013-06-29 2013-11-20 胡霞 电力箱
CN204012327U (zh) * 2014-08-01 2014-12-10 宁波市曙光电器设备制造公司 封闭式自冷却配电箱
CN204793701U (zh) * 2015-05-19 2015-11-18 国网河南许昌县供电公司 新型电力配电箱
CN105226538A (zh) * 2015-11-01 2016-01-06 国网河南鄢陵县供电公司 半导体制冷送风散热型高压开关柜

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030094266A1 (en) * 2001-11-21 2003-05-22 Fritsch Brian D. Cabinet having heat exchanger integrally installed between roof and solar shield
CN203301003U (zh) * 2013-06-29 2013-11-20 胡霞 电力箱
CN204012327U (zh) * 2014-08-01 2014-12-10 宁波市曙光电器设备制造公司 封闭式自冷却配电箱
CN204793701U (zh) * 2015-05-19 2015-11-18 国网河南许昌县供电公司 新型电力配电箱
CN105226538A (zh) * 2015-11-01 2016-01-06 国网河南鄢陵县供电公司 半导体制冷送风散热型高压开关柜

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107359526A (zh) * 2017-08-25 2017-11-17 广西亚泰电力工程有限公司 一种自动降温电力箱
CN107579445A (zh) * 2017-08-25 2018-01-12 广西亚泰电力工程有限公司 一种通电电力箱
CN107591701A (zh) * 2017-08-25 2018-01-16 广西亚泰电力工程有限公司 一种测温电力箱

Similar Documents

Publication Publication Date Title
CN106253099A (zh) 一种降温电力箱
CN106099703A (zh) 一种电力箱
CN203574996U (zh) 一种一体化电除尘用高频电源立体风冷散热风道
CN106058658A (zh) 一种散热电力箱
CN106099702A (zh) 一种稳固电力箱
CN207542646U (zh) 一种电力设备箱用散热装置
CN202524318U (zh) 一种逆变器
CN104659690A (zh) 一种高压配电柜的压缩制冷散热系统
CN203537739U (zh) 逆变电路防尘隔离罩
CN202231602U (zh) 一种变频器箱
CN102510226B (zh) 兆瓦级风电变流器的整流逆变单元柜
CN203243232U (zh) 一种逆变器及其功率模块主电路结构
CN214956311U (zh) 一种用于变压器散热的冷却组件
CN203645202U (zh) 一种高压配电柜的压缩制冷散热系统
CN204597285U (zh) 一种带有除湿装置的户内铠装移开式金属封闭开关设备
CN103490598A (zh) 一种变流器柜结构
CN203105031U (zh) 风冷微波激励腔装置
CN203352007U (zh) 一种采用热管自冷散热的箱式光伏逆变站结构
CN106098307A (zh) 一种散热效果好的变压器
CN204315976U (zh) 一种双通道散热的柜体
CN203179659U (zh) 一种用于光伏逆变器其电抗器的冷却风道
CN202856601U (zh) 一种利用整机风道散热的模块电容装置
CN202663278U (zh) 一种变频器
CN219918179U (zh) 一种环保充气柜
CN103612046B (zh) 发电电焊机组

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161221

RJ01 Rejection of invention patent application after publication