CN106249783B CN201610691008.6A CN201610691008A CN106249783B CN 106249783 B CN106249783 B CN 106249783B CN 201610691008 A CN201610691008 A CN 201610691008A CN 106249783 B CN106249783 B CN 106249783B
Authority
CN
China
Prior art keywords
temperature
space
insulation layer
layer
master controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610691008.6A
Other languages
Chinese (zh)
Other versions
CN106249783A (en
Inventor
张长青
崔世茂
刘亚南
高振江
宋阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Zhongtian Technology Co Ltd
Original Assignee
Inner Mongolia Zhongtian Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia Zhongtian Technology Co Ltd filed Critical Inner Mongolia Zhongtian Technology Co Ltd
Priority to CN201610691008.6A priority Critical patent/CN106249783B/en
Publication of CN106249783A publication Critical patent/CN106249783A/en
Application granted granted Critical
Publication of CN106249783B publication Critical patent/CN106249783B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D27/00Simultaneous control of variables covered by two or more of main groups G05D1/00 - G05D25/00
    • G05D27/02Simultaneous control of variables covered by two or more of main groups G05D1/00 - G05D25/00 characterised by the use of electric means
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/14Greenhouses
    • A01G9/1438Covering materials therefor; Materials for protective coverings used for soil and plants, e.g. films, canopies, tunnels or cloches
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/24Devices or systems for heating, ventilating, regulating temperature, illuminating, or watering, in greenhouses, forcing-frames, or the like
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/25Greenhouse technology, e.g. cooling systems therefor

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Soil Sciences (AREA)
  • Greenhouses (AREA)

Abstract

Propose a kind of intelligence of double-membrane greenhouse to leak informaton control system, belong to greenhouse and technical field of automatic control, the system includes:Double-membrane greenhouse, the double-membrane greenhouse isolate the first space of plant growth, second space and exterior space as buffering;The Temperature Humidity Sensor that is distributed in three spaces and for the first tunic and the rolling motor of the second tunic;With sensor and the master controller of motor connection;The master controller is used to be controlled rolling motor according to the volume of the first space and second space, suitable temperature and humidity, the Current Temperatures of the second space obtained and humidity and the current state of the first tunic and the second tunic.The system can be realized unattended and for the more fine control of crop growth environment, lift the quality and yield of crops.

Description

Double-membrane greenhouse is intelligently leaked informaton control system
Technical field
The present invention relates to greenhouse and technical field of automatic control, more particularly to a kind of intelligence of double-membrane greenhouse is leaked informaton control System.
Background technology
At present, greenhouse leaks informaton most or leaked informaton manually, and very small amount is leaked informaton using remote control control motor.Manual people's industry control Greenhouse processed leaks informaton without departing from the behindhand type manually supervised, and also presence reaches certain amount and daily when the greenhouse quantity of management When the time leaked informaton exceedes multiple hours, it is impossible to while the problem of look after, seriously extend the working time of user.In addition, with Family is to time for leaking informaton daily with feeling, by rule of thumb, and when the greenhouse quantity of management is more, also existing on time, accurately to be carried out The problem of leaking informaton, the humiture in greenhouse is caused not reach the optimum humiture of plant growth, accumulating over a long period causes crops Time To Market postpone, had a strong impact on the increasing both production and income of peasant household.
In addition, there is also the solution that some automatic control motors leak informaton.But such solution it is targeted be only In general greenhouse, such greenhouse only include the heat-insulation layer of individual layer, and user by Single-layer Insulation layer open or can be closed by controlled motor Close, to realize purpose that greenhouse leaks informaton.Likewise, for crops, the greenhouse one with Single-layer Insulation layer is insulation effect Fruit is poor, and two be due to only to have one layer of heat preservation layer, then when being automatically controlled, can not highly precisely adjust greenhouse Interior humiture, therefore it is unfavorable for the fine-grained management of crops, it have impact on the yield and quality of crops.
At present, in the prior art and in the absence of the solution for the control that for double-membrane greenhouse leak informaton.
The content of the invention
In order to solve the above-mentioned problems in the prior art, the present invention proposes a kind of intelligence of double-membrane greenhouse and leaked informaton control System processed, to realize intelligent control that whole day is leaked informaton, it is allowed to unmanned, while realize the pipe more to become more meticulous of crops Reason, improve the quality and yield of crops.
The present invention proposes a kind of intelligence of double-membrane greenhouse and leaked informaton control system, and the system includes:Double-membrane greenhouse, it is described Double-membrane greenhouse includes the first layer heat-insulation layer positioned at top, the second layer heat-insulation layer between top and ground, support first The first support of layer heat-insulation layer and the second support of support second layer heat-insulation layer, wherein first layer heat-insulation layer and second layer heat-insulation layer Between there is the first space, there is second space between second layer heat-insulation layer and ground;Three groups of temperature and moisture sensors, its In, first group of Temperature Humidity Sensor is located to sense the temperature and humidity in the first space in first space, and second group is warm and humid Degree sensor is located in the second space to sense the temperature and humidity of second space, and the 3rd group of Temperature Humidity Sensor is positioned at double The outside of film greenhouse is to sense the temperature and humidity of exterior space;First membrane motor and the second membrane motor, described first Membrane motor, which is fixed in first support, is used for the open and close for controlling the first heat-insulation layer, and second membrane motor is fixed on It is used for the open and close for controlling the second heat-insulation layer in second support;Master controller, with three groups of temperature and moisture sensors With first membrane motor and the second wound membrane motor connection, wherein the master controller be used for obtain the first and second supports Height to calculate the volume in the first space and second space, and obtain the suitable temperature of crops at any time in double-membrane greenhouse Degree and humidity, the master controller include storing the volume and the memory of preference temperature and humidity;The master controller is also For the temperature and humidity value for the crops current environment for obtaining second group of Temperature Humidity Sensor sensing, by the temperature and humidity value and suitable temperature Degree is compared with humidity, judges difference whether in allowed band, if it is, not acting, if it is not, then judging that first layer is protected The current state of warm layer and the second layer heat-insulation layer, and be incubated according to the state using different policy control first layers and the second layer Layer is turned on and off.
According to an aspect of the present invention, under temperature control mode, the master controller is used for when first layer heat-insulation layer and the When two layers of heat-insulation layer are all closure state, signal is sent to obtain the current temperature in the first space to first group of temperature sensor Value, according to the current temperature value of the current temperature value in the first space, second space, the first space and second space volume and The difference that temperature invasin is calculated between the temperature value of second space and suitable temperature value reaches in temperature difference allowed band Time needed for first, if the time needed for first is in very first time allowed band, the master controller sends control Signal processed with control the second membrane motor open second layer heat-insulation layer, within the time needed for first master controller do not do into The action of one step, after the time needed for described first, if second group of temperature sensor is sent to the temperature of master controller For difference between value and suitable temperature in temperature difference allowed band, the master controller sends control signal to control volume Two Film motor closes second layer heat-insulation layer;If after the time needed for first, second group of temperature sensor is sent to master controller Temperature value and suitable temperature between difference still without in temperature difference allowed band, then perform when first layer heat-insulation layer closes And the temperature control during unlatching of second layer heat-insulation layer.
According to an aspect of the present invention, the master controller is used to more than the very first time allow when the time needed for first During scope, control signal is sent to control the second membrane motor to open second layer heat-insulation layer.
According to an aspect of the present invention, the master controller is used for when first layer heat-insulation layer is closure state, and second When layer heat-insulation layer is opening, signal is sent to obtain the current temperature value in the first space to first group of temperature sensor, to 3rd group of temperature sensor sends signal to obtain the current temperature value of exterior space, according to the current temperature value of exterior space, Intensity of illumination, first layer heat-insulation layer open after aperture area, the current temperature of the current temperature value in the first space, second space Value, the volume in the first space and second space and temperature invasin calculate the temperature value of second space and suitable temperature Difference between value reaches the time needed for second in temperature difference allowed band, if the time needed for second was in for the second time and permitted Perhaps in the range of, then the master controller sends control signal to control the first membrane motor to open first layer heat-insulation layer.
According to an aspect of the present invention, the system also includes alarm;And the master controller is used for when second When the required time is not in the second time allowed band, alarm is sent a signal to, prompts the user with temperature automatic control Occur abnormal, it is necessary to manual intervention.
According to an aspect of the present invention, the master controller is used for when first layer heat-insulation layer and second layer heat-insulation layer are all During opening, while send control signal and be incubated to the first and second membrane motors with closing first layer heat-insulation layer and the second layer Layer, and after the 3rd time allowed band, master controller obtains the current temperature value of second space and makees ratio with preference temperature value Compared with calculating difference between the two, the difference judged whether in temperature difference allowed band, if in temperature difference allowed band Action is not made then;Otherwise, the control strategy when first layer heat-insulation layer and second layer heat-insulation layer are all closure state is performed.
According to an aspect of the present invention, second group of temperature sensor will no longer within the time needed for described first The temperature sensed is sent to master controller, when after the time needed for described first, second group of temperature sensor further according to The temperature sensed is sent to master controller by the sampling period set before.
According to an aspect of the present invention, the system also includes the limiter supporting with the membrane motor, Yi Jisuo State the longest run time that membrane motor is also stored with the memory of master controller.
As can be seen here, this programme by double insulation and the first space isolated using it, second space with And exterior space realizes the control more to become more meticulous for crop growth environment, can not only realize it is unattended, and And it can also further lift the quality and yield of crops.
Brief description of the drawings
Fig. 1 is the structural representation of double-membrane greenhouse;
Fig. 2 is the schematic block diagram of the automatic control system of double-membrane greenhouse;
Fig. 3 is that the intelligence that the automatic control system is realized is leaked informaton the flow chart of control.
Embodiment
First, as shown in figure 1, the double-membrane greenhouse includes the first layer heat-insulation layer 101 positioned at top, positioned at top and ground The first support 103 of second layer heat-insulation layer 102, support first layer heat-insulation layer between face and the second of support second layer heat-insulation layer Support 104.As shown in figure 1, first support 103 may be supported in second support 104.Between second layer heat-insulation layer and ground Two spaces 106 are the growing space of crops.The first space 105 between first layer heat-insulation layer and second layer heat-insulation layer is buffering Space.As described below, in the present invention, it will using the first space come the tune that is become more meticulous to the humiture of second space Whole, this will be specifically described below.
According to one embodiment, the variable volume of first space and second space.That is, described first support it is vertical Support bar in ground is expansion link, and the support bar perpendicular to ground of second support is equally expansion link.According to a reality Example is applied, the expansion link is automatic telescopic link, can be controlled by extension and contraction control motor.
Include Temperature Humidity Sensor 205,206,207 referring to Fig. 2, the automatic control system of the double-membrane greenhouse in the lump.Institute Stating Temperature Humidity Sensor includes three groups, and first group of Temperature Humidity Sensor 205 is located in first space to sense the first space Temperature and humidity, second group of Temperature Humidity Sensor 206 be located in the second space to sense the temperature of second space and wet Degree, the 3rd group of Temperature Humidity Sensor 207 are located at the outside of double-membrane greenhouse to sense the temperature and humidity of exterior space.Hereinafter, For the facility of statement, this term being combined together of Temperature Humidity Sensor can be used, also can temperature in use sensor and The term of this separation of humidity sensor.
The automatic control system also includes membrane motor 203,204, and the membrane motor includes the first membrane motor 203 And second membrane motor 204.First membrane motor, which is fixed in first support, is used for the unlatching for controlling the first heat-insulation layer Or close, second membrane motor, which is fixed in second support, to be used to control being turned on and off for the second heat-insulation layer.
First and second membrane motor and first to the 3rd group of Temperature Humidity Sensor are connected to master controller 201.According to one embodiment, the extension and contraction control motor (not shown) is also connected to master controller.
The automatic control system also includes distribution box 202, be connected to master controller, the first and second membrane motors and Extension and contraction control motor.In addition, also include the alarm 208 being connected with the distribution box.
The master controller is used for the temperature and humidity signal for receiving Temperature Humidity Sensor transmission, and is stored according in system Multiple parameters send control signal to membrane motor, to realize control of leaking informaton for the double-membrane greenhouse.
The master controller includes memory, the multiple parameter of memory storage.
The volume in the first space and the volume of second space are stored with the memory.In one embodiment, institute The area coverage for stating double-membrane greenhouse is fixed, and it is empty to calculate first and second so as to the height based on the first and second supports Between volume.
In step 301, after the double-membrane greenhouse installs, user can adjust first by extension and contraction control motor The height of frame and second support.First support and the respective telescopic level of second support can be sent to by the extension and contraction control motor The master controller, the master controller is according to the default height of the first and second supports and stretching for the first and second supports Degree calculates the respective height of the first and second supports, so as to obtain the volume in first and second space and be stored in In reservoir.
In operation afterwards, as long as have adjusted the height of the first and second supports by extension and contraction control motor, note that The telescopic level of the support of master controller first and second, master controller will update accordingly the first space for being stored in its memory and The volume of second space.
In step 302, crops preference temperature at any time and wet is also store in the memory of master controller Degree.The preference temperature and humidity be can according to the characteristics of crops itself, it is residing season, current weather, following several What it weather forecast and experience and historical data determined jointly.That is, master controller can be according to these data predictions Go out the optimum temperature and humidity at following one month, one week future or even following one day each moment.Here suitable temperature Degree and humidity generally refer to the humiture of the temperature and humidity in second space, i.e. space where crop growth.Specific meter Calculation method is not the emphasis being discussed herein, therefore, is no longer extended here.
In step 303, second group of temperature sensor can send out the temperature and humidity sensed every a sampling period Give master controller.
Certainly, second group of temperature sensor can be distributed in second space, master controller can calculate sensed it is multiple Temperature and humidity value of the average value of temperature and humidity as crops current environment.
Master controller makes comparisons the temperature and humidity value of current environment with current preference temperature and humidity.As described above, The preference temperature of any time and suitable humidity value are store in the memory.Master controller can obtain from memory should Value.
Under temperature control mode, the temperature value of current environment is the current temperature value of second space and suitable temperature by master controller Angle value is made comparisons, and calculates difference between the two.
In step 304, judge the difference whether in temperature difference allowed band.The temperature difference allowed band refers to agriculture The growth of crop will not bring the temperature gap scope of influence.For example, the temperature difference allowed band is, for example, 0.2 degree Celsius.Institute Temperature difference allowed band is stated also to be stored in the memory.And the temperature difference allowed band is also based on the spy of crops itself Point, residing season, current weather, following several days weather forecast and experience and historical data and determine.
If the difference is in temperature difference allowed band, master controller does not send signal to the first and second wound membranes electricity Machine, that is, maintain current state, and this method terminates.
When the difference is not in temperature difference allowed band, in step 305, master controller judges that first layer is incubated Layer and the current state of second layer heat-insulation layer, and be turned on and off according to the state using different policy control heat-insulation layers, As described below.
If first layer heat-insulation layer and second layer heat-insulation layer are all closure state, master controller is to first group of TEMP Device sends signal to obtain the current temperature value in the first space, current according to the current temperature value in the first space, second space Temperature value, the volume in the first space and second space and temperature invasin calculate the temperature value of second space with it is suitable Difference between temperature value reaches the time needed for first in temperature difference allowed band, if the time needed for first is in first Between in allowed band, then the master controller sends control signal to control the second membrane motor to open second layer heat-insulation layer.Institute Stating the calculation formula of the time needed for first can design according to aerodynamic relative theory, repeat no more here.
The growth that the very first time allowed band refers on crops will not bring the time allowed band of influence.Also It is to say, although the temperature of second space is not suitable for crops in this time allowed band, the growth to crops will not Influence is brought, but influence is likely to result in more than this time, the very first time allowed band can be arranged as required to, hereafter In mention second and the 3rd time allowed band it is identical with the definition of very first time allowed band, only value is probably not With, that is to say, that different values is may be configured as according to different situations.For example, it is assumed that can be by second space in 20 minutes Temperature be adjusted to temperature in temperature difference allowed band, and very first time allowed band is half an hour, then can only be opened Second layer heat-insulation layer, without first layer heat-insulation layer is also opened.So, because first layer heat-insulation layer is in closure state, this Sample not only make use of the relatively stable air of the temperature and humidity in cushion space i.e. the first space, i.e., will not be by extraneous unstable Determine the influence of air, then can more relievedly to think that suitable temperature will necessarily be reached within the time needed for first, And this practice for slowly changing temperature will not bring larger impact to crops, can more be finely controlled crops Environment and crops are looked after more preferably.
As can be seen here, the technical program make use of the sky in the first space between first layer heat-insulation layer and the second heat-insulation layer Gas more subtly adjusts the air in second space.
In order to reduce energy consumption, due to can relievedly think that preference temperature can be reached after the time needed for first, then Within the time needed for described first, the temperature sensed is no longer sent to master controller by second group of temperature sensor. When after the time needed for described first, temperature that second group of temperature sensor will sense further according to the sampling period set before Degree is sent to master controller.
In one embodiment, the master controller is not further within the time needed for first is acted.Described After the time needed for first, if second group of temperature sensor is sent between the temperature value of master controller and suitable temperature Difference in temperature difference allowed band, the master controller sends control signal and protected with controlling the second membrane motor to close the second layer Warm layer.
In another embodiment, if after time needed for first, second group of temperature sensor is sent to master controller Temperature value and suitable temperature between difference still without in temperature difference allowed band, then further controlled, that is, held Trade first layer heat-insulation layer close and second layer heat-insulation layer open when temperature control.
As described above, the time needed for described first is if it exceeds very first time allowed band, and this explanation only opens the Two layers of heat-insulation layer are not sufficient to ensure that crops can obtain required temperature in reasonable time, at this moment, open the second layer and protect It may also need to open first layer heat-insulation layer while warm layer.The master controller can send control signal to control the second wound membrane Motor opens second layer heat-insulation layer.So as to be closed in first layer heat-insulation layer and the state of second layer heat-insulation layer unlatching.
As described above, when the time needed for described first if it exceeds very first time allowed band, or described first Second group of temperature sensor is sent to master control after time of the required time in very first time allowed band but needed for first When difference between the temperature value of device processed and suitable temperature is still without in temperature difference allowed band, first layer heat-insulation layer can be controlled Closure state is made as, and second layer heat-insulation layer can be controlled as opening;Or judge difference not in temperature in step 304 Find that the first heat-insulation layer is in closure state and the second heat-insulation layer is in opening after in poor scope;In general, both In the case of, the first heat-insulation layer is in closure state and the second heat-insulation layer is in opening.At this moment, master controller is warm to first group Spend sensor and send signal to obtain the current temperature value in the first space, to the 3rd group of temperature sensor send signal to obtain outside The current temperature value in portion space, the opening after being opened according to the current temperature value of exterior space, intensity of illumination, first layer heat-insulation layer The volume and temperature of the current temperature value of the current temperature value in area, the first space, second space, the first space and second space The difference that calculates between the temperature value of second space and suitable temperature value of degree invasin reaches in temperature difference allowed band the Time needed for two, if the time needed for second is in the second time allowed band, the master controller sends control Signal with control the first membrane motor open first layer heat-insulation layer.Second time allowed band is determined with very first time allowed band Justice is identical, and only their own value may be different.Further, since second layer heat-insulation layer is opening, then Ke Neng One space at this moment when calculating the time needed for second, can dispense the first space mesh as with the temperature of second space being This parameter of preceding temperature value.
In the time range needed for second operation of second group of temperature sensor can with the time range needed for first Interior operation is identical, also can be different.Since after opening first layer heat-insulation layer, the variable factor of the condition such as extraneous temperature and illumination It is larger.After the time needed for second, master controller can control the first and second membrane motors to close first layer and the second layer Heat-insulation layer.
If the time needed for second is not in the second time allowed band, this explanation is by opening first layer and second Layer heat-insulation layer can not meet the needs of crops, then at this moment master controller can send a signal to alarm, be carried to user It is abnormal, it is necessary to manual intervention that temperature displaying function automatically controls appearance.
If first layer heat-insulation layer and second layer heat-insulation layer are all opening, master controller sends control signal simultaneously To the first and second membrane motors to close first layer heat-insulation layer and second layer heat-insulation layer.It is main after the 3rd time allowed band Controller obtains the current temperature value of second space and made comparisons with preference temperature value, calculates difference between the two, judges The difference does not make action whether in temperature difference allowed band if in temperature difference allowed band;Otherwise, circulation is held again Row step described above.Wherein, as described above, the definition phase of the 3rd time allowed band and very first time allowed band Together, that is to say, that the crops in this time allowed band in second space can bear current temperature, will not be to it Growth impacts.The amount of calculation and the traffic of system can be reduced by adding the 3rd time allowed band, because in this time Each component of interior system can not act.
Explanation has been made to the example implementation of the present invention by taking temperature as an example above.In practice for humid control and such as This.That is, the control above for temperature can directly be replaced with to the control for humidity, i.e., obtain second using humidity sensor The humidity value in space is simultaneously made comparisons to carry out the next control to humidity with Appropriate.Here repeat no more.Further, it is also possible to It is controlled simultaneously according to both temperature and humidities, you can think that both set weight, the value that both are calculated adds respectively The control strategy for two heat-insulation layers is judged after weight.This is a following research direction of this programme, to realize more The crop environment control to become more meticulous, is also no longer repeated here.
In addition to above-mentioned intelligentized control model, the master controller also has other various control patterns, user It can as needed be selected, these control models are introduced below.(upper and lower film here refers to above respectively One layer of heat preservation layer and second layer heat-insulation layer, similarly hereinafter)
" upper film automatic stop ":Film key is pressed out, film action is opened in execution, touches spacing rear wait " touching limit delay " stopping action afterwards; Press and close film key, film action is closed in execution, touches spacing rear wait " touching limit delay " stopping action afterwards;
" lower film automatic stop ":Film key is pressed out, film action is opened in execution, touches spacing rear wait " touching limit delay " stopping action afterwards; Press and close film key, film action is closed in execution, touches spacing rear wait " touching limit delay " stopping action afterwards;
" upper film is warm and humid " control pattern:Set out film threshold moisture, close film lower limit humidity, if reached in this section of section Film temperature is opened and (closed), (opening) is performed and closes film action, wait " collection period " when running the half of " above transporting the time " time, Ran Houzai Judge whether to reach out and (close) film temperature, if reaching out and (closing) film temperature, continue executing with out and (close) film action, encounter upper (lower) " touching limit delay " after spacing, is waited to stop acting again;
" lower film is warm and humid " controls pattern:Set out film threshold moisture, close film lower limit humidity, if reached in this section of section Film temperature is opened and (closes), film action is closed in execution (opening), wait " collection period ", Ran Houzai when running the half of " lower fortune time " time Judge whether to reach out and (close) film temperature, if reaching out and (closing) film temperature, continue executing with out and (close) film action, encounter upper (lower) " touching limit delay " after spacing, is waited to stop acting again;
" double films are warm and humid " controls pattern:Set out film threshold moisture, close film lower limit humidity;
If reaching out film temperature in this section of section, first carry out film and start work.Run the one of " above transporting the time " time " collection period " is waited when half, then judges whether to reach out film temperature, if reaching out film temperature, film is continued executing with and starts Make, after encountering upper limit, wait " touching limit delay " to stop acting again;" collection period " is continued waiting for if remaining to reach out film temperature Degree, then perform lower film and start work, wait " collection period " when running the half of " lower fortune time " time, then judge whether to reach out Film temperature, if reaching out film temperature, continue executing with lower film and start work, encounter lower film it is spacing after, wait " touch limit delay " to stop again Stop is made;
Film temperature is closed if reached in this section of section, lower film is first carried out and closes action.The one of operation " lower fortune time " time " collection period " is waited when half, then judges whether to reach and closes film temperature, film temperature is closed if reached, continues executing with lower film and close Make, after encountering lower film lower limit, wait " touching limit delay " to stop acting again;" acquisition time " is waited to close film temperature if remaining to reach Degree, then perform film and close action, " collection period " is waited when running the half of " above transporting the time " time, then judge whether to reach and close Film temperature, film temperature is closed if reached, continues executing with film and close action, encounter it is spacing after, wait " touch limit delay " to stop moving again Make.
In addition, for alarm described above, in parameter setting, according to actual conditions, the condition of alarm is set, Alarmed when satisfying the condition.
With the membrane motor it is supporting also there is limiter, that is, limit the location of heat-insulation layer.And when limiter loses During effect, the master controller can set the longest run time of membrane motor, to protect the operating of membrane motor.
As described above, this paper technical scheme is described by way of example.Those skilled in the art can To understand, other modifications and adjustment can be made to above-mentioned example in the case where not departing from the initiative spirit of the present invention, these Implementation after modification and adjustment also belongs to scope disclosed in this invention.

Claims (8)

  1. The control system 1. a kind of intelligence of double-membrane greenhouse is leaked informaton, the system include double-membrane greenhouse, and the double-membrane greenhouse includes position First layer heat-insulation layer in top, the second layer heat-insulation layer between top and ground, the first of support first layer heat-insulation layer The second support of support and support second layer heat-insulation layer, there is the first sky wherein between first layer heat-insulation layer and second layer heat-insulation layer Between, there is second space, it is characterised in that the system also includes between second layer heat-insulation layer and ground:
    Three groups of temperature and moisture sensors, wherein, first group of Temperature Humidity Sensor is located in first space to sense first The temperature and humidity in space, second group of Temperature Humidity Sensor are located in the second space to sense the temperature of second space and wet Degree, the 3rd group of Temperature Humidity Sensor are located at the outside of double-membrane greenhouse to sense the temperature and humidity of exterior space;
    First membrane motor and the second membrane motor, first membrane motor, which is fixed in first support, to be used to control first The open and close of heat-insulation layer, second membrane motor be fixed in second support be used for control the second heat-insulation layer unlatching with Close;
    Master controller, connect with three groups of temperature and moisture sensors and first membrane motor and the second membrane motor Connect, wherein the height that the master controller is used to obtain the first and second supports is to calculate the body in the first space and second space Product, and the preference temperature and humidity of crops at any time in double-membrane greenhouse are obtained, the master controller is included described in storage The memory of volume and preference temperature and humidity;
    The master controller is additionally operable to obtain the temperature and humidity value of the crops current environment of second group of Temperature Humidity Sensor sensing, will The temperature and humidity value judges difference whether in allowed band compared with preference temperature and humidity, if it is, not acting, such as Fruit is no, then judges first layer heat-insulation layer and the current state of second layer heat-insulation layer, and controlled using different strategies according to the state First layer and the second layer heat-insulation layer processed is turned on and off.
  2. The control system 2. intelligence according to claim 1 is leaked informaton, it is characterised in that:
    Under temperature control mode, the master controller is used for when first layer heat-insulation layer and second layer heat-insulation layer are all closure state, Signal is sent to obtain the current temperature value in the first space to first group of temperature sensor, according to the current temperature in the first space It is empty that the current temperature value of value, second space, the volume in the first space and second space and temperature invasin calculate second Between temperature value and suitable temperature value between difference reach time needed for first in temperature difference allowed band, if the first institute The time needed is in very first time allowed band, then the master controller sends control signal to control the second membrane motor to beat Second layer heat-insulation layer is opened, the master controller is not further within the time needed for first is acted, needed for described first Time after, if the difference that second group of temperature sensor is sent between the temperature value of master controller and suitable temperature exists In temperature difference allowed band, the master controller sends control signal to control the second membrane motor to close second layer heat-insulation layer, such as After the time needed for fruit first, second group of temperature sensor is sent between the temperature value of master controller and suitable temperature Difference is still without the temperature in temperature difference allowed band, then performed when first layer heat-insulation layer is closed and second layer heat-insulation layer is opened Control.
  3. The control system 3. intelligence according to claim 2 is leaked informaton, it is characterised in that:
    The master controller is used for when the time needed for first exceeding very first time allowed band, sends control signal to control Second membrane motor opens second layer heat-insulation layer.
  4. The control system 4. intelligence according to claim 3 is leaked informaton, it is characterised in that:
    The master controller is used for when first layer heat-insulation layer is closure state, and second layer heat-insulation layer is opening, to the One group of temperature sensor sends signal to obtain the current temperature value in the first space, to the 3rd group of temperature sensor send signal with The current temperature value of exterior space is obtained, after being opened according to the current temperature value of exterior space, intensity of illumination, first layer heat-insulation layer Aperture area, the current temperature value of the current temperature value in the first space, second space, the volume of the first space and second space And the difference that temperature invasin is calculated between the temperature value of second space and suitable temperature value reaches temperature difference permission model Time needed for second in enclosing, if the time needed for second is in the second time allowed band, the master controller is sent out Control signal is sent to control the first membrane motor to open first layer heat-insulation layer.
  5. The control system 5. intelligence according to claim 4 is leaked informaton, it is characterised in that:
    The system also includes alarm;And
    The master controller is used for when being not in the second time allowed band the time needed for second, sends a signal to alarm Device, prompt the user with temperature automatic control and exception occur, it is necessary to manual intervention.
  6. The control system 6. intelligence according to claim 2 is leaked informaton, it is characterised in that:
    The master controller is used for when first layer heat-insulation layer and second layer heat-insulation layer all be opening, while sends control and believe Number to the first and second membrane motors to close first layer heat-insulation layer and second layer heat-insulation layer, and in the 3rd time allowed band Afterwards, master controller obtains the current temperature value of second space and made comparisons with preference temperature value, calculates difference between the two, Judge that the difference whether in temperature difference allowed band, does not make action if in temperature difference allowed band;Otherwise, perform and work as Control strategy when first layer heat-insulation layer and second layer heat-insulation layer are all closure state.
  7. The control system 7. intelligence according to claim 2 is leaked informaton, it is characterised in that:
    The temperature sensed no longer will be sent to master control by second group of temperature sensor within the time needed for described first Device processed, when after the time needed for described first, second group of temperature sensor will sense further according to the sampling period set before To temperature be sent to master controller.
  8. The control system 8. intelligence according to claim 1 is leaked informaton, it is characterised in that:
    The system also includes the limiter supporting with the membrane motor, and
    The longest run time of membrane motor is also stored with the memory of the master controller.
CN201610691008.6A 2016-08-19 2016-08-19 Double-membrane greenhouse is intelligently leaked informaton control system Active CN106249783B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610691008.6A CN106249783B (en) 2016-08-19 2016-08-19 Double-membrane greenhouse is intelligently leaked informaton control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610691008.6A CN106249783B (en) 2016-08-19 2016-08-19 Double-membrane greenhouse is intelligently leaked informaton control system

Publications (2)

Publication Number Publication Date
CN106249783A CN106249783A (en) 2016-12-21
CN106249783B true CN106249783B (en) 2018-04-06

Family

ID=57592986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610691008.6A Active CN106249783B (en) 2016-08-19 2016-08-19 Double-membrane greenhouse is intelligently leaked informaton control system

Country Status (1)

Country Link
CN (1) CN106249783B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101986811A (en) * 2009-07-30 2011-03-23 天津市渔桥蔬菜研究所 High-performance double sunlight greenhouse for four seasons
CN201967424U (en) * 2010-12-16 2011-09-14 嘉兴市海燕农业设施有限公司 Multipurpose greenhouse
CN202059809U (en) * 2011-05-12 2011-12-07 宋进亮 Dual-layer greenhouse

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITRM20050184A1 (en) * 2005-04-14 2006-10-15 L A S P System Italia S R L ROOF STRUCTURE WITH DIFFERENT FUNCTIONS, FOR EXAMPLE THE ANTI-SEISMIC STRUCTURE, OF PROTECTION FROM WIND BURST, AND MORE AGAIN.
FR2912443A1 (en) * 2007-02-13 2008-08-15 Stephan Vogel Movable energy recovery device e.g. solar water heater, support system for e.g. inclined roof of building, has panel supporting device and opened towards bottom in manner to permit operator to access to device through interior of building

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101986811A (en) * 2009-07-30 2011-03-23 天津市渔桥蔬菜研究所 High-performance double sunlight greenhouse for four seasons
CN201967424U (en) * 2010-12-16 2011-09-14 嘉兴市海燕农业设施有限公司 Multipurpose greenhouse
CN202059809U (en) * 2011-05-12 2011-12-07 宋进亮 Dual-layer greenhouse

Also Published As

Publication number Publication date
CN106249783A (en) 2016-12-21

Similar Documents

Publication Publication Date Title
CN102499424B (en) Tobacco leaf baking method
CN101322466B (en) Method for controlling fan system for preventing frost damage of plant and apparatus
CN102937785A (en) Greenhouse multi-model information fusion based methods and system for regulating and controlling greenhouse environment
CN206949094U (en) A kind of planting edible mushroom greenhouse with temerature and humidity alarm
CN115907366B (en) Agricultural product growth environment optimal regulation and control method and equipment based on flamingo algorithm
CN106196784B (en) Active control method and device for variable frequency air conditioner
CN110940030A (en) Operation control method and system of air conditioner and air conditioner
WO2007105168A2 (en) Mist greenhouse
CN107396703A (en) A kind of automatic hygrometric dries mould proof desinsection silo device
WO2012085926A1 (en) System for heated ambient air based drying of tea involving ambient psychrometric conditions
CN111492868B (en) Temperature control system and control method for plant planting box
CN106249783B (en) Double-membrane greenhouse is intelligently leaked informaton control system
CN107347502A (en) The control method and control system of cool-down dehumidification, intelligent greenhouse
CN110006149A (en) A kind of adaptive constant temperature air-conditioning method and system
CN105446190B (en) The roller shutter control method of warmhouse booth
CN106814782A (en) A kind of method and server for adjusting greenhouse
JP2019150015A (en) Crop activity index based protected horticulture combination environmental control system and method
CN106919204A (en) Storage pest habitat regulation system and method
CN205718158U (en) A kind of multi-functional freezer
CN103967294B (en) Calligraphy and painting mildew-resistant solidification temperature controlled atmosphere store mutually
CN104090608B (en) A kind of phytotron control method
CN206665350U (en) A kind of winter stores short-term preservation device with fruits and vegetables
KR20190099810A (en) Control method and apparatus for optimal energy management of smart farm
CN205409191U (en) Anti bean weevil germplasm resources sieving mechanism
Jung et al. Design optimization of proportional plus derivative band parameters used in greenhouse ventilation by response surface methodology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Intelligent Venting Control System for Double Film Greenhouse

Effective date of registration: 20230727

Granted publication date: 20180406

Pledgee: Bank of China Limited by Share Ltd. Hohhot Yuquan branch

Pledgor: INNER MONGOLIA ZHONGTIAN TECHNOLOGY Co.,Ltd.

Registration number: Y2023150000116

PE01 Entry into force of the registration of the contract for pledge of patent right