CN106248911A - A kind of single power source dual pathways country rock mining induced fissure detection system - Google Patents
A kind of single power source dual pathways country rock mining induced fissure detection system Download PDFInfo
- Publication number
- CN106248911A CN106248911A CN201610854547.7A CN201610854547A CN106248911A CN 106248911 A CN106248911 A CN 106248911A CN 201610854547 A CN201610854547 A CN 201610854547A CN 106248911 A CN106248911 A CN 106248911A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- platform
- power source
- interface
- valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N33/00—Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
- G01N33/24—Earth materials
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Health & Medical Sciences (AREA)
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Food Science & Technology (AREA)
- Analytical Chemistry (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Medicinal Chemistry (AREA)
- Physics & Mathematics (AREA)
- Remote Sensing (AREA)
- Biochemistry (AREA)
- General Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Earth Drilling (AREA)
- Examining Or Testing Airtightness (AREA)
Abstract
The invention belongs to drilling technique field, relate to a kind of single power source dual pathways country rock mining induced fissure detection system, agent structure includes that single power source is closed and controls platform, single power source leakage measuring instrumentation platform, platform support, power source dual pathways attachment means, single-power dual pathways country rock mining induced fissure five funtion parts of probe, single power source is closed and is controlled platform, single power source leakage measuring instrumentation platform is arranged on platform support by after flexible pipe parallel connection that caliber is 10mm, then popped one's head in power source dual pathways attachment means and single-power dual pathways country rock mining induced fissure successively by the flexible pipe that caliber is 10mm and connect;Its simple in construction, easy to use, and parts are light, assemble quick, low cost, detection process is stable, accurate, and coal seam country rock mining induced fissure when being particularly suitable for down hole problem grows detection.
Description
Technical field:
The invention belongs to drilling technique field, relate to a kind of single power source dual pathways country rock mining induced fissure detection system, logical
Cross wall-rock crack development characteristics after detection of coal seam exploitation, research production process coal seam, colliery wall-rock crack development characteristics and evolution machine
Reason problem.
Background technology:
At present, although colliery is at China's energy-consuming accounting continuous decrease, but space of top prominence does not shake, coal
The safety problem that resource exploitation relates to remains the Important Problems of China's energy industry safety monitor.Coal seam in recovery process,
Owing to losing the supporting role in coal seam, goaf overlying top board, underlie base plate and coal body around all can be at the works of mine pressure
With lower generation unstability, rupture, mobile, be finally reached weight new steady s tate.And the crack that surrounding rock failure is grown, then it is underground current
There is the artificial passage of migration in body, such as, in South China, roof and floor water flowing fractured zone will result in overlying strata and floor strata
Strong water content is directly entered adopts space;In the Taiyuan Forma-tion coal seam recovery process of North China, base plate water flowing fractured zone is great
Decrease the thickness of effective water barrier, cause Water Inrush to take place frequently;The Northwest progressively becomes the weight of coal resources in China exploitation
Point region, coal production capacity is recent and all to account for the whole nation future the first, owing to Jurassic System Coalfield layer position, northwest is new, it is shallow to bury, coal seam
The water producing fractures that exploitation causes makes Quaternary aquifer water miss, and thus results in the problem such as ecology, groundwater environment.To sum up institute
Stating, adopt wall-rock crack, particularly water producing fractures is grown is to a series of focuses such as Water Inrush, roof water-inrush, water protection minings
The Research foundation of problem, and the detection to water flowing fractured zone, then be the emphasis in engineering practice problem and difficult point.
At present, water flowing fractured zone Detection Techniques mainly include physical prospecting field and drilling field, and drilling method be the most directly perceived,
A kind of the most practical method, double-end sealing leak detection device is also current maximally effective a kind of dress detecting height of water flowing fractured zone
Put, but in long-term engineering practice, himself there is a lot of defects, particularly this device and must use gas and water source
Two kinds of power, (wherein utilizing gas to carry out blocking, utilizing water to carry out cranny development detection), but most underground site condition
It is not provided simultaneously with this condition, particularly stops the detection of mining face crack, first mining face crack detection seasonal epidemic pathogens and waterpipe
All removed, during detection, must again be set up pipeline;Second, the current recording mode of double-end sealing leak detection device is still that
Stop watch figures record watermeter flowing rate, mode is backward and data are inaccurate;3rd, the biography that the water in double-end sealing leak detection device uses
Defeated pipeline is drilling rod, must assure that drilling rod is completely embedded with drilling rod and water-tight in detection process, and this state is impossible
Existing, the existence certainly of some drill pipe section is leaked, owing to the water leakage situation of block section is observed in crack detection exactly, the most greatly
Reduce crack detection accuracy;4th, either plugging operations device or water filling device, its design is complex,
Pipeline connects confusion, and particularly plugging device often results in being split up of air bag, and water filling device often occurs water meter explosion and silt
Block.In the case of coal seam is thicker, peephole arranges the longest, and during the detection of down-hole, drilling rod typically advances by rig, sees
During survey, progress is extremely slow, and the steam hose used due to plugging device is positioned at outside drilling rod, therefore in drilling rod progradation
Often occur flexible pipe damaged, cause air bag to close, finally can only again return, again advance, remeasure, thus wave
Substantial amounts of human and material resources and time are taken.Therefore, in the urgent need to exploitation a kind of novelty, efficient country rock detection system, having
Under the conditions of limit, (single power source) accurately measures country rock mining induced fissure developmental state.
Summary of the invention:
It is an object of the invention to the shortcoming overcoming prior art to exist, seeking design provides a kind of single power source dual pathways
Country rock mining induced fissure detection system, (single power source) accurately measures country rock mining induced fissure developmental state under the limited conditions,
And then study production process coal seam, colliery wall-rock crack development characteristics and evolution mechanism problem.
To achieve these goals, the agent structure of the present invention includes that single power source closes control platform, single power source is let out
Leakage measuring table, platform support, power source dual pathways attachment means, single-power dual pathways country rock mining induced fissure five functions of probe
Part, single power source is closed and is controlled platform, single power source leakage measuring instrumentation platform by installation after flexible pipe parallel connection that caliber is 10mm
On platform support, then by flexible pipe that caliber is 10mm successively with power source dual pathways attachment means and the single-power dual pathways
The probe series connection of country rock mining induced fissure, wherein single power source leakage measuring instrumentation platform includes that measuring table inlet union, measuring table go out
Mouth joint, measurement control platform support, flow measurement control main valve, flow velocity table, the first backflow stop valve, Pressure gauge and pressure release
Valve;Platform inlet union, flow measurement control main valve, flow velocity table, the first backflow only valve, Pressure gauge, relief valve are installed
It is placed on measurement with the pipeline of measuring table outlet connection to control on platform support;One end of measuring table inlet union is with outside
Thering is provided underground ventilating pipeline or the supply channel connection measuring medium source, the other end controls main valve with flow measurement and is connected, flow
The two ends of tachograph control main valve respectively with flow measurement and the first backflow only valve is connected, for measure measurement medium flow,
The parameter such as flow velocity and temperature;Pressure gauge is connected with the first backflow only valve and relief valve respectively, and relief valve is arranged on the downside of pipeline also
Being connected with measuring table outlet connection, measuring table outlet connection is connected to the flexible pipe of 10mm caliber, the measurement after pressure regulation, voltage stabilizing
Medium is flowed out by measuring table outlet connection;Single power source is closed control platform and is included closed platform inlet union, closes and put down
Platform outlet connection, closing control platform support, closed system control main valve, the first Pressure gauge, the second backflow only valve, the second pressure
Table and pressure release drain valve;Be provided with closed platform inlet union, closed platform outlet connection, closed system control main valve, first
Pressure gauge, the pipeline of the second backflow only valve, the second Pressure gauge and pressure release drain valve are placed on closing and control, on platform support, to close
One end of platform inlet union is connected with the outside underground ventilating pipeline providing enclosed power source or supply channel, the other end and envelope
Closed system controls main valve and connects, and the first manometric two ends control main valve respectively with closed system and backflow only valve is connected, and are used for
The gross pressure of observation enclosed power source;Second Pressure gauge is connected with the second backflow only valve and pressure release drain valve respectively, and pressure release sluices
Valve is arranged on the downside of pipeline and is connected with closed platform outlet connection, and it is the soft of 10mm that closed platform outlet connection is connected to caliber
Pipe, the enclosed power source after pressure regulation, voltage stabilizing is flowed out by closed platform outlet connection;Platform support include platform frame,
The fixing lower ring of the fixing upper ring of support axis, pipeline, pipeline, hinge fixed by pipeline, film fixed by pipeline, pipeline fixed screw and opening
Hole, platform frame is welded to form triangular structure by the L-type steelframe that three width are 30mm, and the top section of platform frame is not closed
Closing, play stable support function, support axis is the steel pipe of caliber 30mm, and the bottom welding of support axis is at the end of platform frame
In the middle of the L-type steelframe of side, top lower ring fixing with pipeline is connected, solid by pipeline between the fixing upper ring of pipeline and the fixing lower ring of pipeline
Determining gemel connection and be arranged on the top of platform frame, ring fixed by pipeline and pipeline fixes lower ring by a diameter of 40mm's
Iron plate bending forms, it is possible to the most movable, and the fixing lower ring of the fixing upper ring of pipeline, pipeline is fixed with pipeline together with hinge for fixing
Single power source is closed and is controlled platform and the pipe fitting part of single power source leakage measuring instrumentation platform so that it is can be fixedly attached to platform and prop up
In support;Ring fixed by pipeline and pipeline is fixed the inner side of lower ring and is provided with pipeline and fixes film, and pipeline is fixed film and by thickness is
The sheet rubber of 10mm is constituted, and is used for fixing pipe fitting;Pipeline is fixed the end of ring and is provided with two pipeline fixed screws, with pipeline
Having perforate on the L-type steelframe of fixed screw homonymy, pipeline fixed screw is used for fixing pipe fitting together with perforate;Power source bilateral
Road attachment means includes transmission channel male afterbody, transmission channel male screw interface, transmission channel female interface, transmission channel
Female and transmission channel rubber sheet gasket, transmission channel male afterbody and transmission channel male screw interface being combined into one structure
Transmission channel male, transmission channel male screw interface is copper short tube, and one is terminated with the flexible pipe of a diameter of 10mm, the other end
A diameter of 12mm with screw;Transmission channel female is copper short tube, and one is terminated with the flexible pipe of a diameter of 10mm, and the other end is straight
Footpath is 12mm, and transmission channel female interface is enclosed within the afterbody of transmission channel female, and its top diameter is 10mm, afterbody with biography
The defeated passage supporting screw of male screw interface, transmission channel female and transmission channel male are tight by transmission channel female interface
Connect;Transmission channel rubber sheet gasket is arranged at transmission channel male screw interface, makes transmission channel female and transmission channel public
Head secure fit;Single-power dual pathways country rock mining induced fissure probe includes closing pipe line interface, measures pipe interface, closing gas
Capsule, closing chamber, cavity access aperture, total interface of popping one's head in, sealing pipe interface sealing member, closing chamber leak, UNICOM's pipeline, leakage
Interface, UNICOM's interface, measuring section leak and the bar that removably connects, caliber is that the two ends, left and right of the bar that removably connects of 60mm are divided
Not being provided with one and close chamber, close chamber and be made up of the sealed steel pipe that caliber is 75mm, the outside symmetrical expression in each closing chamber is installed
Having four calibers is the closed airbag of 80mm, and closed airbag uses liner soft cloth outsourcing soft-type rubber sleeve to make, each closing phase
Arrange four in capsule and close chamber leak, be used for leaking closed power medium and make closed airbag tympanites;Right-hand member closes the right side in chamber
Have two cavity access aperture, the sealing pipe interface sealing member scribbling fluid sealant, closing pipe line are installed at cavity access aperture
Interface closes intracavity by cavity access aperture injection respectively with measuring pipe interface, and closing pipe line interface is equal with measurement pipe interface
For caliber 10mm steel pipe and be respectively connected to closed hose and measure flexible pipe;Right-hand member close chamber left side be connected to leak interface and
UNICOM's interface, leakage interface is connected with measuring pipe interface by UNICOM's pipeline, and UNICOM's interface closes the right side, chamber with being arranged on left end
UNICOM's interface of side passes through UNICOM's pipeline connection, and it is the 55mm total interface of probe that the right-hand member in right-hand member closing chamber is provided with caliber, probe
Total interface is connected with outside drilling rod;Two groups of measuring section leaks are uniformly had in the two ends circumferential lateral surface of bar that removably connects,
Often group measuring section leak arranges four hole lopping and is uniformly distributed in the bar one week of removably connecting, for uniformly leakage release measurement
Medium.
During on-site construction operations of the present invention, first get out power source and (if down-hole is equipped with pneumatic circuit, then use source of the gas;
If down-hole is equipped with hydraulic circuit, then use water source), each supporting general connecting line (this pipeline be caliber be the resistance to of 10mm
Pressure flexible pipe), rig, drilling rod (rig and drilling rod are as plant equipment and the parts promoting probe to enter boring) and constructed
Peephole (peephole is constructed in advance, its orientation need according to detection target geological conditions design, root is wanted in the aperture of boring
The drilling rod supporting according to rig and boring are constructed), then assemble single power source closing control platform and single power source leakage measuring instrumentation
Platform (is closed control platform and leakage measuring instrumentation platform is carried for convenience, be detachable sectional, when in-situ measurement uses
Assemble on the spot);Then single power source dual pathways attachment means is used at single-power dual pathways country rock mining induced fissure sound end
Connect flexible pipe, and the flexible pipe connected series connection is placed in drilling rod, first drilling rod is connected probe, probe is placed in and constructs
Boring in, and successively advance drilling rod to boring in first measurement position;Then begin to observation and record data.
The concrete detection process of the present invention is: first opens closed system and controls main valve, the second backflow only valve and pressure release sluicing
Valve, the dynamic condition of test enclosed power source;Open flow measurement again and control main valve, the first backflow only valve and relief valve, test
The pressure condition of leakage measuring instrumentation medium;It is then shut off relief valve so that leakage measuring instrumentation medium enters measures pipeline, the most persistently sees
Examining Pressure gauge, the force value of its display reaches to hole the hydrostatic pressing force value shown by interior measuring section (if measuring section distance is holed
The vertical dimension in aperture is H1M, then hydrostatic pressure should be H1/ 100MPa), it is then shut off flow measurement and controls main valve;Continuous observation
First Pressure gauge and the second Pressure gauge, slowly closing pressure release drain valve until the first Pressure gauge and the second Pressure gauge synchronism stability extremely
0.4Mpa;Then continuous observation Pressure gauge, opens slow flow measurement and controls main valve so that the pressure of Pressure gauge instruction slowly increases
Add 0.1MPa and keep pressure stability, then reading the flow speed value a shown by flow tachograph1, observe and recorded data
After, first close flow measurement and control main valve, closed system control main valve, be then shut off the second backflow and stop valve, the first backflow only valve,
Open pressure release drain valve and relief valve, until Pressure gauge, the first Pressure gauge, the second gage pressure are designated as zero, the most perfect
Measure dot number evidence, including measuring sequence number, measuring section distance drilling orifice distance, leakage flow, manometric force value and second
Manometric force value, now first measurement point measurement terminates;Then promote drilling rod and flexible pipe be installed successively to second survey
Amount point, measures and records measurement data, terminates until last measures point;After measurement terminates, dismounting single power source closes control
Platform processed, single power source leakage measuring instrumentation platform and connection flexible pipe, slowly start rig and refund drilling rod, dismantling single power source simultaneously
Dual pathways attachment means and each section of flexible pipe, until probe is withdrawn from boring, then dismantle probe, and detection process terminates.
The flow velocity table that single power source leakage measuring instrumentation platform of the present invention uses is that electronic flow measures meter, improves
The accuracy of DATA REASONING and high efficiency;Backflow only arranging of valve effectively protects flow velocity table;Meanwhile, this platform can make
With water source as the medium of measurement wastage, could be used that the gas medium as measurement wastage, and be provided with in platform end
Pressure gauge and relief valve, both can ensure that pressure is steady during measuring wastage, improves detection accuracy.
Single power source of the present invention is closed control platform and gas both can have been used as enclosed power source, it is possible to use water
As enclosed power source, double Pressure gauges that platform is arranged ensure that the pressure in closed process is steady, protects air bag and is closing
During will not be split up;Platform is provided with backflow only valve and relief valve, both energy quick-speed interruption detection process, protects detection instrument
Without damage.
Platform support of the present invention is by detachable pipeline retainer ring, it is possible to carry out easily platform pipeline reinforcing,
Dismounting, is conducive to adapting to measure the working environment that place is complicated so that platform can be more firm.
Power source dual pathways attachment means of the present invention is mainly the transmission channel of power source, by closed power, measurement
Power pipeline is placed in drilling rod, and pipeline is made up of the flexible pipe that several 1.5m length, caliber are 10mm, logical between flexible pipe and flexible pipe
Cross power source dual pathways attachment means to connect, this device joint can quickly, combining of sealing, be used for transmitting closed power
And measurement dynamic medium.
Single-power dual pathways country rock mining induced fissure of the present invention is popped one's head in as this detection system by arranging double-enclosure gas
Capsule, measure time can be tighter closing measurement space;The structures such as the connection of simple pipeline, detachable member are utilized to set
Meter, greatly improves apparatus convenient in carrying degree;Single-ended double bolloon is provided with unified air cavity space, it is ensured that in closed process
Middle double bolloon can simultaneously tympanites, closing, and the bar that removably connects is provided with two ends leak, it is ensured that measuring medium can
Uniformly leakage, improves the accuracy of detection.
Compared with prior art, during use, closing is controlled platform to the present invention by operator, measuring table is assembled on support
And connect rational single power source, then flexible pipe utilize channel interface connect and prevents and treats one by one in drilling rod, assembling probe, finally
Start detection to measure;Its simple in construction, easy to use, and parts are light, assemble quick, low cost, detection process is stable, accurate
Really, coal seam country rock mining induced fissure when being particularly suitable for down hole problem grows detection.
Accompanying drawing illustrates:
Fig. 1 is single power source leakage measuring instrumentation platform structure principle schematic of the present invention.
Fig. 2 is that single power source of the present invention closes control platform structure principle schematic.
Fig. 3 is platform support side view of the present invention.
Fig. 4 is single power source dual pathways attachment means side view of the present invention.
Fig. 5 is single power source dual pathways wall-rock crack of the present invention probe profile.
Detailed description of the invention:
Below by embodiment and combine accompanying drawing the invention will be further described.
Embodiment:
The agent structure of the present embodiment includes that single power source is closed and controls platform, single power source leakage measuring instrumentation platform, platform
Support, power source dual pathways attachment means, single-power dual pathways country rock mining induced fissure five funtion parts of probe, single power source seals
Close control platform, single power source leakage measuring instrumentation platform is arranged on platform support by after pressure hose parallel connection that caliber is 10mm
On, then adopted with power source dual pathways attachment means and single-power dual pathways country rock successively by the pressure hose that caliber is 10mm
The probe series connection of dynamic crack, wherein single power source leakage measuring instrumentation platform includes that the outlet of measuring table inlet union 101, measuring table connects
102, measure control platform support 103, flow measurement controls main valve 104, flow velocity table 105, first refluxes only valve 106,
Pressure gauge 107 and relief valve 108;Be provided with platform inlet union 101, flow measurement control main valve 104, flow velocity table 105,
The pipeline of the first backflow only valve 106, Pressure gauge 107, relief valve 108 and measuring table outlet connection 102 is placed on measurement control
On platform support 102;One end of measuring table inlet union 101 and the outside underground ventilating pipeline that measurement medium source is provided or confession
Water lines connects, and the other end and flow measurement control main valve 104 is connected, the two ends of flow velocity table 105 respectively with flow measurement
Control main valve 104 and the first backflow only valve 106 connects, for measuring the parameters such as the measurement flow of medium, flow velocity and temperature;Pressure
Table 107 is connected with the first backflow only valve 106 and relief valve 108 respectively, and relief valve 108 is arranged on the downside of pipeline and and measuring table
Outlet connection 102 connects, and measuring table outlet connection 102 is connected to the Durable hose of 10mm caliber, the measurement after pressure regulation, voltage stabilizing
Medium is flowed out by measuring table outlet connection 102;Single power source close control platform include closed platform inlet union 201,
Closed platform outlet connection 202, close control platform support 203, closed system controls main valve the 204, first Pressure gauge 205, the
Two backflows only valve the 206, second Pressure gauge 207 and pressure release drain valve 208;Closed platform inlet union 201, closed platform are installed
Outlet connection 202, closed system control main valve the 204, first Pressure gauge the 205, second backflow only valve the 206, second Pressure gauge 207 and
The pipeline of pressure release drain valve 208 is placed on closing and controls on platform support 203, and one end of closed platform inlet union 201 is with outer
Portion provides the underground ventilating pipeline of enclosed power source or supply channel to connect, and the other end controls main valve 204 with closed system and is connected,
The two ends of the first Pressure gauge 205 control main valve 204 respectively with closed system and backflow only valve 206 is connected, and are used for observing closing dynamic
The gross pressure in power source;Second Pressure gauge 207 is connected with the second backflow only valve 206 and pressure release drain valve 208 respectively, pressure release drain valve
208 are arranged on the downside of pipeline and are connected with closed platform outlet connection 202, and closed platform outlet connection 202 is connected to caliber and is
The Durable hose of 10mm, the enclosed power source after pressure regulation, voltage stabilizing is flowed out by closed platform outlet connection 202;Platform support
Hinge is fixed including platform frame 301, support axis 302, the fixing upper ring 303 of pipeline, the fixing lower ring 304 of pipeline, pipeline
305, pipeline fixes film 306, pipeline fixed screw 307 and perforate 308, and platform frame 301 is the L of 30mm by three width
Shaped steel frame is welded to form triangular structure, and the top section of platform frame 301 does not closes, and plays stable support function, support axis 302
For the steel pipe of caliber 30mm, the bottom welding of support axis 302 in the middle of the bottom side L-type steelframe of platform frame 301, top with
The fixing lower ring 304 of pipeline connects, and fixes hinge 305 even by pipeline between the fixing upper ring 303 of pipeline and the fixing lower ring 304 of pipeline
Connecing and be arranged on the top of platform frame 301, the fixing upper ring 303 of pipeline and the fixing lower ring 304 of pipeline are by a diameter of 40mm
Iron plate bending form, it is possible to freely movable, hinge 305 fixed by the fixing upper ring 303 of pipeline, the fixing lower ring 304 of pipeline and pipeline
Together for fixing single power source closing control platform and the pipe fitting part of single power source leakage measuring instrumentation platform so that it is can be firm
It is arranged in platform frame;Ring 303 fixed by pipeline and pipeline is fixed the inner side of lower ring 304 and is provided with pipeline and fixes film 306,
Pipeline is fixed film 306 and is made up of the sheet rubber that thickness is 10mm, is used for fixing pipe fitting;The end peace of ring 303 fixed by pipeline
Having perforate 308 equipped with on two pipeline fixed screws 307, with the L-type steelframe of pipeline fixed screw 307 homonymy, pipeline is fixed
Screw 307 is used for fixing pipe fitting together with perforate 308;Power source dual pathways attachment means include transmission channel male afterbody 501,
Transmission channel male screw interface 502, transmission channel female interface 503, transmission channel female 504 and transmission channel rubber sheet gasket
505, the transmission channel of transmission channel male afterbody 501 and transmission channel male screw interface 502 being combined into one structure is public
Head, transmission channel male screw interface 502 is copper short tube, and one is terminated with the flexible pipe of a diameter of 10mm, and the other end is a diameter of
12mm with screw;Transmission channel female 504 is copper short tube, and one is terminated with the flexible pipe of a diameter of 10mm, other end diameter
For 12mm, transmission channel female interface 503 is enclosed within the afterbody of transmission channel female 504, and its top diameter is 10mm, afterbody with
Female by transmission channel with the supporting screw of transmission channel male screw interface 502, transmission channel female 504 and transmission channel male
Head interface 503 compact siro spinning technology;Transmission channel rubber sheet gasket 505 is arranged at transmission channel male screw interface 502, makes transmission lead to
Road female 504 and transmission channel male secure fit;Single-power dual pathways country rock mining induced fissure probe includes closing pipe line interface
401, measure pipe interface 402, closed airbag 403, close chamber 404, cavity access aperture 405, total interface 406 of popping one's head in, sealing pipe
Road joint sealing member 407, closing chamber leak 408, UNICOM's pipeline 409, leakage interface 410, UNICOM's interface 411, measuring section are let out
Small opening 412 and the bar 413 that removably connects, caliber is that the left and right of the bar 413 that removably connects of 60mm is respectively arranged at two ends with an envelope
Closing chamber 404, close chamber 404 and be made up of the sealed steel pipe that caliber is 75mm, the outside symmetrical expression in each closing chamber 404 is provided with four
Individual caliber is the closed airbag 403 of 80mm, and closed airbag 403 uses liner soft cloth outsourcing soft-type rubber sleeve to make, each closing
Arrange four in phase capsule 403 and close chamber leak 408, be used for leaking closed power medium and make closed airbag tympanites;Right-hand member is closed
The right side in chamber 404 has two cavity access aperture 405, is provided with and scribbles the sealing pipeline of fluid sealant and connect at cavity access aperture 405
Mouth sealing member 407, closing pipe line interface 401 and measurement pipe interface 402 close chamber by cavity access aperture 405 injection respectively
In 404, closing pipe line interface 401 and measurement pipe interface 402 are the steel pipe of caliber 10mm and are respectively connected to closed hose
With measurement flexible pipe;Right-hand member is closed the left side in chamber 404 and is connected to leak interface 410 and UNICOM's interface 411, and leakage interface 410 is by connection
Siphunculus road 409 connects with measuring pipe interface 402, and UNICOM's interface 411 closes the UNICOM's interface on the right side of chamber 404 with being arranged on left end
411 are connected by UNICOM's pipeline 409, and it is the 55mm total interface 406 of probe that the right-hand member in right-hand member closing chamber 404 is provided with caliber, probe
Total interface 406 is connected with outside drilling rod;Uniformly have two groups of measuring sections in the two ends circumferential lateral surface of bar 413 that removably connects to let out
Small opening 412, often group measuring section leak 412 arranges 4 hole lopping and is uniformly distributed in the bar 413 1 weeks of removably connecting, for equal
Medium is measured in even leakage release.
During the present embodiment on-site construction operations, first get out power source and (if down-hole is equipped with pneumatic circuit, then use gas
Source;If down-hole is equipped with hydraulic circuit, then use water source), each supporting general connecting line (this pipeline be caliber be 10mm's
Pressure hose), rig, drilling rod (rig and drilling rod are as plant equipment and the parts promoting probe to enter boring) and constructed
Good peephole (construct in advance, and its orientation needs the geological conditions according to detection target to design, and the aperture of boring is wanted by peephole
Construct with boring according to the drilling rod that rig is supporting), then assemble single power source closing control platform and single power source leakage survey
(closing control platform and leakage measuring instrumentation platform carries for convenience, be detachable sectional, in-situ measurement uses amount platform
Time assemble on the spot);Then the single power source dual pathways is used to connect dress at single-power dual pathways country rock mining induced fissure sound end
Put connection flexible pipe (i.e. parts shown in accompanying drawing 4, be mainly used in the flexible pipe of connection segment formula), and by a series of flexible pipes connected
Series connection is placed in drilling rod, first drilling rod is connected probe, is placed in the boring constructed by probe, and advances drilling rod extremely successively
First measurement position in boring;Then begin to observation and record data.
The present embodiment using water as single power source medium, concrete detection process is: first opens closed system and controls main valve
204, the second backflow only valve 206 and pressure release drain valve 208, the dynamic condition of test enclosed power source;Open flow measurement control again
Main valve 104, first processed refluxes and stops valve 106 and relief valve 108, the pressure condition of test leakage measuring instrumentation medium;It is then shut off pressure release
Valve 108 so that leakage measuring instrumentation medium enters measures pipeline, now continuous observation Pressure gauge 107, and the force value of its display reaches to bore
In hole, the hydrostatic pressing force value shown by measuring section is (if the vertical dimension of measuring section distance drilling orifice is H1M, then hydrostatic pressure
Should be H1/ 100MPa), it is then shut off flow measurement and controls main valve 104;Continuous observation the first Pressure gauge 205 and the second Pressure gauge
207, slowly closing pressure release drain valve 208 is until the first Pressure gauge 205 and the second Pressure gauge 207 synchronism stability are to 0.4Mpa;So
Rear continuous observation Pressure gauge 107, opens slow flow measurement and controls main valve 104 so that the pressure of Pressure gauge 107 instruction slowly increases
Add 0.1MPa and keep pressure stability, then reading the flow speed value a shown by flow tachograph 1051, observe and recorded number
According to rear, first close that flow measurement controls main valve 104, closed system controls main valve 204, be then shut off the second backflow stop valve 206, the
One backflow only valve 106, opens pressure release drain valve 208 and relief valve 108, until Pressure gauge the 107, first Pressure gauge 205, second is pressed
Power table 207 pressure is designated as zero, finally improves measure dot number evidence, including measuring sequence number, measuring section distance drilling orifice distance, leakage
Defluidization amount, the force value of Pressure gauge 107 and the force value of the second Pressure gauge 207, now first measurement point measurement terminates;Then
Promotion drilling rod successively installation flexible pipe measure point to second, measure and record measurement data, tie until last measures point
Bundle;After measurement terminates, dismounting single power source is closed and is controlled platform, single power source leakage measuring instrumentation platform and connect flexible pipe, slowly opens
Dynamic rig also refunds drilling rod, dismounting single power source dual pathways attachment means and each section of flexible pipe simultaneously, until probe is withdrawn from boring,
Then being dismantled by probe, detection process terminates.
The code that the present embodiment must be correlated with in strict accordance with down-hole drilling machine construction, owing to employing single power source so that its
On-the-spot adaptation ability strengthens;Use the dual pathways so that measure process more efficient;Use modular platform and support, carry
Conveniently, assemble rapidly.
Claims (2)
1. a single power source dual pathways country rock mining induced fissure detection system, it is characterised in that agent structure includes that single power source seals
Close control platform, single power source leakage measuring instrumentation platform, platform support, power source dual pathways attachment means, the single-power dual pathways are enclosed
Rock mining induced fissure five funtion parts of probe, single power source closes control platform, single power source leakage measuring instrumentation platform passes through caliber
For being arranged on platform support after the flexible pipe parallel connection of 10mm, then by flexible pipe that caliber is 10mm successively with the power source dual pathways
Attachment means and the probe series connection of single-power dual pathways country rock mining induced fissure, wherein single power source leakage measuring instrumentation platform includes that measurement is flat
Platform inlet union, measuring table outlet connection, measure control platform support, flow measurement control main valve, flow velocity table, first
Backflow only valve, Pressure gauge and relief valve;Be provided with platform inlet union, flow measurement control main valve, flow velocity table, first time
The pipeline of stream only valve, Pressure gauge, relief valve and measuring table outlet connection is placed on measurement and controls on platform support;Measuring table
One end of inlet union is connected with the outside underground ventilating pipeline providing measurement medium source or supply channel, and the other end is surveyed with flow
Surely controlling main valve to connect, the two ends of flow velocity table control main valve respectively with flow measurement and the first backflow only valve is connected, and are used for
Measure and measure the flow of medium, flow velocity and temperature;Pressure gauge is connected with the first backflow only valve and relief valve respectively, and relief valve is arranged
Being connected on the downside of pipeline and with measuring table outlet connection, measuring table outlet connection is connected to the flexible pipe of 10mm caliber, through pressure regulation,
Measurement medium after voltage stabilizing is flowed out by measuring table outlet connection;Single power source is closed control platform and is included closed platform import
Joint, closed platform outlet connection, closing only control platform support, closed system control main valve, the first Pressure gauge, the second backflow
Valve, the second Pressure gauge and pressure release drain valve;Closed platform inlet union, closed platform outlet connection, closed system control are installed
Main valve processed, the first Pressure gauge, the pipeline of the second backflow only valve, the second Pressure gauge and pressure release drain valve are placed on closing and control platform
On support, one end of closed platform inlet union connects with the outside underground ventilating pipeline providing enclosed power source or supply channel
Connecing, the other end controls main valve with closed system and is connected, and the first manometric two ends control main valve and backflow with closed system respectively
Only valve connects, for observing the gross pressure of enclosed power source;Second Pressure gauge stops valve and pressure release drain valve with the second backflow respectively
Connecting, pressure release drain valve is arranged on the downside of pipeline and is connected with closed platform outlet connection, and closed platform outlet connection is connected to pipe
Footpath is the flexible pipe of 10mm, and the enclosed power source after pressure regulation, voltage stabilizing is flowed out by closed platform outlet connection;Platform support includes
Platform frame, support axis, pipeline fix upper ring, the fixing lower ring of pipeline, hinge fixed by pipeline, film fixed by pipeline, pipeline
Fixed screw and perforate, platform frame is welded to form triangular structure, platform by the L-type steelframe that three width are 30mm
The top section of frame does not closes, and plays stable support function, and support axis is the steel pipe of caliber 30mm, and the bottom welding of support axis is flat
In the middle of the bottom side L-type steelframe of platform bracing frame, top and pipeline fixing lower ring is connected, the fixing upper ring of pipeline and pipeline fixing under ring it
Between fix gemel connection by pipeline and be arranged on the top of platform frame, the fixing upper ring of pipeline and the fixing lower ring of pipeline by
The iron plate bending of a diameter of 40mm forms, it is possible to the most movable, and hinge fixed by the fixing lower ring of the fixing upper ring of pipeline, pipeline and pipeline
Together for fixing single power source closing control platform and the pipe fitting part of single power source leakage measuring instrumentation platform so that it is can be firm
It is arranged in platform frame;Ring fixed by pipeline and pipeline is fixed the inner side of lower ring and is provided with pipeline and fixes film, and pipeline is fixed
Film is made up of the sheet rubber that thickness is 10mm, is used for fixing pipe fitting;Pipeline is fixed the end of ring and is provided with two pipelines admittedly
Determining screw, have perforate on the L-type steelframe of pipeline fixed screw homonymy, pipeline fixed screw is managed for fixing together with perforate
Part;Power source dual pathways attachment means includes transmission channel male afterbody, transmission channel male screw interface, transmission channel female
Interface, transmission channel female and transmission channel rubber sheet gasket, transmission channel male afterbody and transmission channel male screw interface group
The transmission channel male of being integrated structure, transmission channel male screw interface is copper short tube, one be terminated with a diameter of
The flexible pipe of 10mm, a diameter of 12mm of the other end with screw;Transmission channel female is copper short tube, one be terminated with a diameter of
The flexible pipe of 10mm, a diameter of 12mm of the other end, transmission channel female interface is enclosed within the afterbody of transmission channel female, its top diameter
For 10mm, afterbody with the transmission channel supporting screw of male screw interface, transmission channel female and transmission channel male are passed through
Transmission channel female interface compact siro spinning technology;Transmission channel rubber sheet gasket is arranged at transmission channel male screw interface, makes transmission
Passage female and transmission channel male secure fit;The single-power dual pathways country rock mining induced fissure probe include closing pipe line interface,
Measure pipe interface, closed airbag, closing chamber, cavity access aperture, total interface of popping one's head in, sealing pipe interface sealing member, close chamber
Leak, UNICOM's pipeline, leakage interface, UNICOM's interface, measuring section leak and the bar that removably connects, caliber is the removable of 60mm
The left and right unloading connecting rod is respectively arranged at two ends with a closing chamber, closes chamber and is made up of the sealed steel pipe that caliber is 75mm, Mei Gefeng
Closing the outside symmetrical expression in chamber and being provided with four calibers is the closed airbag of 80mm, and closed airbag uses liner soft cloth outsourcing soft-type rubber
Gum cover is made, and arranges four and close chamber leak in each closing phase capsule, is used for leaking closed power medium and makes closed airbag drum
Swollen;Right-hand member is closed the right side in chamber and is had two cavity access aperture, is provided with the sealing pipeline scribbling fluid sealant at cavity access aperture
Joint sealing member, closing pipe line interface and measurement pipe interface close intracavity, closing pipe line by cavity access aperture injection respectively
Interface and measurement pipe interface are the steel pipe of caliber 10mm and are respectively connected to closed hose and measure flexible pipe;Right-hand member closes chamber
Left side be connected to leak interface and UNICOM's interface, leakage interface is connected with measurement pipe interface by UNICOM's pipeline, UNICOM's interface
By UNICOM's pipeline connection, the right-hand member in right-hand member closing chamber with the UNICOM's interface being arranged on the right side of left end closing chamber caliber is installed and is
55mm pops one's head in total interface, and total interface of popping one's head in is connected with outside drilling rod;Uniformly open in the two ends circumferential lateral surface of bar that removably connects
Having two groups of measuring section leaks, often group measuring section leak arranges four hole lopping and is uniformly distributed in the bar one week of removably connecting,
Medium is measured for uniformly leakage release.
Single power source dual pathways country rock mining induced fissure detection system the most according to claim 1, it is characterised in that use this to be
The detailed process that system carries out detecting is: first opens closed system and controls main valve, the second backflow only valve and pressure release drain valve, test envelope
Close the dynamic condition of power source;Opening flow measurement again and control main valve, the first backflow only valve and relief valve, test leakage measuring instrumentation is situated between
The pressure condition of matter;It is then shut off relief valve so that leakage measuring instrumentation medium enters measures pipeline, now continuous observation Pressure gauge,
The force value of its display reaches the hydrostatic pressing force value holed shown by interior measuring section, is then shut off flow measurement and controls main valve;Hold
Continuous observe the first Pressure gauge and the second Pressure gauge, close pressure release drain valve until the first Pressure gauge and the second Pressure gauge synchronism stability
To 0.4Mpa;Then continuous observation Pressure gauge, opens flow measurement and controls main valve so that the pressure of Pressure gauge instruction is slowly increased
0.1MPa also keeps pressure stability, then reads the flow speed value shown by flow tachograph, after observing and having recorded data, first
Close flow measurement and control main valve, closed system control main valve, be then shut off the second backflow and stop valve, the first backflow only valve, open
Pressure release drain valve and relief valve, until Pressure gauge, the first Pressure gauge, the second gage pressure are designated as zero, finally improve and measure
Point data, including measuring sequence number, measuring section distance drilling orifice distance, leakage flow, manometric force value and the second pressure
The force value of table, now first measurement point measurement terminates;Then promote drilling rod and successively install flexible pipe to second measurement point,
Measure and record measurement data, terminating until last measures point;After measurement terminates, dismounting single power source is closed and is controlled to put down
Platform, single power source leakage measuring instrumentation platform and connection flexible pipe, slowly start rig and refund drilling rod, simultaneously dismounting single power source bilateral
Road attachment means and each section of flexible pipe, until probe is withdrawn from boring, then dismantle probe, and detection process terminates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610854547.7A CN106248911B (en) | 2016-09-27 | 2016-09-27 | A kind of single power source binary channels country rock mining induced fissure detection system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610854547.7A CN106248911B (en) | 2016-09-27 | 2016-09-27 | A kind of single power source binary channels country rock mining induced fissure detection system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106248911A true CN106248911A (en) | 2016-12-21 |
CN106248911B CN106248911B (en) | 2018-05-11 |
Family
ID=57610953
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610854547.7A Expired - Fee Related CN106248911B (en) | 2016-09-27 | 2016-09-27 | A kind of single power source binary channels country rock mining induced fissure detection system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106248911B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106814022A (en) * | 2017-03-31 | 2017-06-09 | 西安科技大学 | A kind of shallow overburden Seam Mining unconsolidated formation infiltration rate measure of the change device |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1059145A1 (en) * | 1982-09-07 | 1983-12-07 | Московский геологоразведочный институт им.С.Орджоникидзе | Method of producing counter-filtration curtains when conducting underground leaching of ore beds |
CN101245701A (en) * | 2007-05-28 | 2008-08-20 | 中国矿业大学(北京) | Down-hole guiding height viewer and its observation method |
CN101858209A (en) * | 2010-03-26 | 2010-10-13 | 山东科技大学 | Synchronous detection method of terrane crack distribution of base plate |
RU2441165C1 (en) * | 2010-09-28 | 2012-01-27 | Анатолий Николаевич Осипов | Method for anchorage of mines |
CN104181611A (en) * | 2014-08-28 | 2014-12-03 | 山东科技大学 | Mine working face top board and bottom board mining breaking fracture development dynamic monitoring method |
CN204716153U (en) * | 2015-04-03 | 2015-10-21 | 山东科技大学 | A kind of hydraulic pressure being used for " boring double-end sealing leak detection is measured " send lever apparatus automatically |
CN105003255A (en) * | 2015-06-25 | 2015-10-28 | 山东科技大学 | Floor mining damage zone multi-section blocking synchronous leakage detection method |
CN105134181A (en) * | 2015-06-25 | 2015-12-09 | 山东科技大学 | Method for multi-section blocking of covering rock damage band and synchronous leakage measuring |
CN105372410A (en) * | 2015-12-09 | 2016-03-02 | 山东科技大学 | Double-terminal plugging leak hunting integrated observing system |
CN105547721A (en) * | 2015-12-09 | 2016-05-04 | 山东科技大学 | Double-end blocking and leakage detection integrated observation method |
CN205532590U (en) * | 2016-04-07 | 2016-08-31 | 山东科技大学 | Novel two return circuit bi -polar shutoff systems of leaking hunting |
-
2016
- 2016-09-27 CN CN201610854547.7A patent/CN106248911B/en not_active Expired - Fee Related
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1059145A1 (en) * | 1982-09-07 | 1983-12-07 | Московский геологоразведочный институт им.С.Орджоникидзе | Method of producing counter-filtration curtains when conducting underground leaching of ore beds |
CN101245701A (en) * | 2007-05-28 | 2008-08-20 | 中国矿业大学(北京) | Down-hole guiding height viewer and its observation method |
CN101858209A (en) * | 2010-03-26 | 2010-10-13 | 山东科技大学 | Synchronous detection method of terrane crack distribution of base plate |
RU2441165C1 (en) * | 2010-09-28 | 2012-01-27 | Анатолий Николаевич Осипов | Method for anchorage of mines |
CN104181611A (en) * | 2014-08-28 | 2014-12-03 | 山东科技大学 | Mine working face top board and bottom board mining breaking fracture development dynamic monitoring method |
CN204716153U (en) * | 2015-04-03 | 2015-10-21 | 山东科技大学 | A kind of hydraulic pressure being used for " boring double-end sealing leak detection is measured " send lever apparatus automatically |
CN105003255A (en) * | 2015-06-25 | 2015-10-28 | 山东科技大学 | Floor mining damage zone multi-section blocking synchronous leakage detection method |
CN105134181A (en) * | 2015-06-25 | 2015-12-09 | 山东科技大学 | Method for multi-section blocking of covering rock damage band and synchronous leakage measuring |
CN105372410A (en) * | 2015-12-09 | 2016-03-02 | 山东科技大学 | Double-terminal plugging leak hunting integrated observing system |
CN105547721A (en) * | 2015-12-09 | 2016-05-04 | 山东科技大学 | Double-end blocking and leakage detection integrated observation method |
CN205532590U (en) * | 2016-04-07 | 2016-08-31 | 山东科技大学 | Novel two return circuit bi -polar shutoff systems of leaking hunting |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106814022A (en) * | 2017-03-31 | 2017-06-09 | 西安科技大学 | A kind of shallow overburden Seam Mining unconsolidated formation infiltration rate measure of the change device |
CN106814022B (en) * | 2017-03-31 | 2023-04-14 | 西安科技大学 | Shallow buried depth coal seam mining unconsolidated formation infiltration rate change measuring device |
Also Published As
Publication number | Publication date |
---|---|
CN106248911B (en) | 2018-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110173231A (en) | Long-distance downward drilling segmented compact hole sealing pressure measuring device and method | |
CN109799327A (en) | A kind of visual shield tunnel construction detection of grouting effects experimental rig and method | |
CN104420869B (en) | Horizontal well Analog Experiment for Discharges device | |
CN103644940A (en) | Coal seam gas pressure, gas flow and crustal stress monitoring device and monitoring method | |
CN104374680B (en) | Slip casting diffusion test device and its test method | |
CN104790419B (en) | A kind of dewatering construction method suitable for rich water mobile sand layer tunnel | |
CN206627405U (en) | The double embolism original position injection pressure water penetration detectors of expansion type | |
CN205028579U (en) | Individual well salt cave dissolve chamber physical simulation device | |
CN111456721B (en) | Multistage airbag rapid hole sealing gas pressure measuring device and measuring method | |
CN105888723B (en) | Drainage arrangement from gas pressure measurement to layer-through drilling and method during a kind of lower | |
CN206459937U (en) | A kind of packer permeability test device of engineering geological investigation | |
CN110006760A (en) | A kind of method that Accurate Determining deep hole water pressure blasting fracturing induces rupture reopening pressure | |
CN105096731A (en) | Dissolved cavity physical simulation device and method for single-well salt caverns | |
CN109469474A (en) | Based on the lower device and method for measuring multiple seam gas pressure simultaneously to layer-through drilling | |
CN106837308A (en) | A kind of gas tunnel pressure tester and its method | |
CN109184672A (en) | Coal seam depression angle drilling gas pressure measuring device and pressure measuring method | |
CN107905777A (en) | One kind visualization stagnant sand experimental evaluation device of horizontal well pit shaft | |
CN206038490U (en) | Single power source binary channels country rock mining -induced fissure probe unit | |
CN109973082A (en) | The device and method for measuring multiple seam gas pressure simultaneously to layer-through drilling based on | |
CN110485482A (en) | A kind of miniature steel pipe stake body soil pressure and displacement monitor | |
CN109357794A (en) | A kind of method of hydrofracturing test coal-rock mass ground stress | |
CN106321001A (en) | Drill hole anchoring structure for monitoring floor surrounding rock fractures and construction method thereof | |
CN206144498U (en) | A drilling anchor structure for $monitoring bottom plate country rock crack | |
CN112557279A (en) | Weathered bedrock hole-fracture vertical permeability testing device and method | |
CN110306976B (en) | Inert gas injection control annular pressure experiment device and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180511 Termination date: 20200927 |